36C25519R0075-001.docx
DOCX document Posted
- Attached to
- Poplar Bluff JOC Federal contract opportunity
- Solicitation number
- 36C25519R0075
About this file
36C25519R0075 36C25519R0075.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25519R0075-007.docx | DOCX document | |
| 36C25519R0075-008.pdf | ||
| 36C25519R0075-008.pdf | ||
| 36C25519R0075-007.docx | DOCX document | |
| 36C25519R0075-006.docx | DOCX document | |
| 36C25519R0075-006.docx | DOCX document | |
| 36C25519R0075-003.docx | DOCX document | |
| 36C25519R0075-004.docx | DOCX document | |
| 36C25519R0075-002.docx | DOCX document | |
| 36C25519R0075-005.pdf | ||
| 36C25519R0075-001.docx | DOCX document | |
| 36C25519R0075-004.docx | DOCX document | |
| 36C25519R0075-002.docx | DOCX document | |
| 36C25519R0075-003.docx | DOCX document | |
| 36C25519R0075-005.pdf | ||
| 36C25519R0075-000.docx | DOCX document | |
| 36C25519R0075-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6.
PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV.
8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that t ime. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.
36C25519R0075 X 05-20-2019 36C25519R0051 None 36C255 Department of Veterans Affairs Network Contracting Office
(NCO) 15
3450 S 4th Street Trafficway Leavenworth KS 66048 Y Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 Mike Bottary 913-946-1142 THIS SOLICITATION IS A 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE.
NCO 15 anticipates the award of one (1) Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contract (JOC), for the John J. Pershing VA Medical Center (Poplar Bluff VAMC),1500 N. Westwood Blvd. Poplar Bluff, MO 63901.
Poplar Bluff VAMC is in need of expedited procurement capabilities through the JOC to provide simp lified non-complex, general construction services for lower dollar construction projects, maintenance, alterations, and repair of buildings, structures, or other real property projects.
The North American Industry Classification System (NAICS) for this acquisition is 236220, General Contractors.
The small business size standard is $36.5 million.
This acquisition is a 100% Set-Aside for Service Disabled Veteran Owned Small Business (SDVOSB).
All Contractors and Joint Ventures must be verified in VetBiz and registered in SAMS at the time of proposal due date to be eligible for award. Notice: Clause 52.222-37 Employment Reports on Disabled Veterans and Veterans is incorporated by reference in this solicitation. Public Law (P.L. 105-339), Section 1354 provides that no agency may enter into a contract with a contractor who has not filed a VETS-4212 report for the proceeding fiscal year under Title 38 Section 4212(d).
P roposals submitted by Teaming Arrangements other than VA Joint Ventures will not be considered.
Contract will be for a one-year (1) base period with up tofour (4) one-year option periods.
The total contract will not exceed five (5) years. Minimum task order amount: $2,000.00 and Maximum Task Order amount: $500,000. The maximum contract value for each contract shall not exceed $20,000,000.00 over the life of award and will be made ba sed on the best value to the Government. Base Contract Year is anticipatedto be for a 365 calendar day period.
There will be only one site visit / pre-solicitation meeting on July 09, 2019 at 10:00 AM CST. Attendance is highly recommended.
ALL QUESTIONS ARE DUE BY
EMAIL TO michael.bottary@va.gov on JULY 16, 2019 BY 1:00 P.M. CST
TBD
TBD
52.211-10 X
2:00 PM CDT
07-25-2019 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMEN
DMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR
OR PERSON AUTHORIZED
31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to i ssuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 36C255 Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp Austin TX 877-353-9791 512-460-5429 X
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 CONTRACT COEFFICIENTS | 5 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 9 |
| 1.1 52.228-1 BID GUARANTEE (SEP 1996) | 9 |
| 1.2 PROPOSAL SUBMITTAL INSTRUCTIONS | 10 |
| PROPOSAL SUBMITTAL INSTRUCTIONS | 10 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 29 |
| 2.1 APPENDIX 1- Contractor Safety Reqarding Safety and Environmental | 29 |
| 2.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 52 |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 52 |
| 2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 52 |
| 2.5 52.233-2 SERVICE OF PROTEST (SEP 2006) | 53 |
| 2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 54 |
| 2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 54 |
| 2.8 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 55 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 55 |
| 2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 55 |
| 2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 56 |
| REPRESENTATIONS AND CERTIFICATIONS | 57 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018) | 57 |
| 3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 60 |
| 3.3 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018) | 61 |
| GENERAL CONDITIONS | 64 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 64 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 64 |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 65 |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 66 |
| 4.5 52.216-18 ORDERING (OCT 1995) | 66 |
| 4.6 52.216-19 ORDER LIMITATIONS (OCT 1995) | 67 |
| 4.7 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 67 |
| 4.8 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 68 |
| 4.9 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 68 |
| 4.10 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) | 69 |
| 4.11 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 70 |
| 4.12 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014) | 71 |
| 4.13 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 72 |
| 4.14 52.223-20 AEROSOLS (JUN 2016) | 75 |
| 4.15 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) | 75 |
| 4.16 SUPPLEMENTAL INSURANCE REQUIREMENTS | 76 |
| 4.17 52.236-4 PHYSICAL DATA (APR 1984) | 76 |
| 4.18 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 77 |
| 4.19 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 80 |
| 4.20 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 81 |
| 4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 82 |
| 4.22 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 82 |
| 4.23 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 83 |
| 4.24 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 84 |
| 4.25 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 84 |
| 4.26 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002) | 85 |
| 4.27 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019) | 87 |
| 4.28 MANDATORY WRITTEN DISCLOSURES | 88 |
| 4.29 DAVIS BACON WAGE RATES | 88 |
| 4.30 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 94 |
| 4.31 List of Attachments | 94 |
A.3 CONTRACT COEFFICIENTS
SCHEDULE A -- CONTRACT COEFFICIENTS
1. LOCATON
All work outlined in each task order solicitation shall be performed at:
John J. Pershing VAMC (Poplar Bluff, MO)
2. COEFFICIENTS:
0001 - BASIC CONTRACT YEAR - ONE CALENDAR YEAR FROM AWARD
The price set forth in the RS Means software on the date the proposal is due shall be multiplied against the coefficient proposed below to determine line item unit cost.
Fill-in the blanks using the format = X.XX (no more than two decimal places).
0001A
______ -- NORMAL WORK HOURS --
In effect from contract award date of “TBD” to end of ordering period of “TBD” (see notes).
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday excluding Saturday, Sunday, and Federal Holidays.
0001B
______ -- OTHER THAN NORMAL WORK HOURS --
In effect from contract award date of “TBD” to end of ordering period of “TBD” (see notes).
Other than normal working hours are any hours not stated above.
0002 - OPTION PERIOD I
0002A
______ -- NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday excluding Saturday, Sunday, and Federal Holidays.
0002B
______ -- OTHER THAN NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
0003 - OPTION PERIOD II
0003A
______ -- NORMAL WORK HOURS --
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday excluding Saturday, Sunday, and Federal Holidays.
0003B
______ -- OTHER THAN NORMAL WORK HOURS --
0004 - OPTION PERIOD III
0004A
______ -- NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday excluding Saturday, Sunday, and Federal Holidays.
0004B
______ -- OTHER THAN NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
Other than normal working hours are any hours not stated above.
0005 - OPTION PERIOD IV
0005A
______ -- NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday excluding Saturday, Sunday, and Federal Holidays.
0005B
______ -- OTHER THAN NORMAL WORK HOURS --
In effect from option period award date of “TBD” to end of ordering period of “TBD” (see notes).
Other than normal working hours are any hours not stated above.
3. NOTES:
a. In addition to the insurance requirements required by FAR 28.307-2 and FAR 52.228-5, there shall be no exclusionary clauses added to this contract for any asbestos related work that would void the general liability insurance.
b. The effective dates will be filled in at the time of the contract award. The base ordering period shall be from the date of the contract award for one year (365 calendar days). This contract will provide up to four one-year option periods, to extend the ordering periods. The contract coefficients shall be established for the base contract year and for each of the possible four one-year option periods. The contract(s) resulting from this solicitation will not provide for periodic economic price adjustments with the exception of utilizing the latest yearly-published version of R.S. Means Cost Data.
c. Contractor shall use the RS Means Facilities Repair Cost Data Software located at www.rsmeans.com. This Software contains pricing information for the work to be accomplished and for the units of measure specified. The contractor must furnish pricing (proposals) for each individual Task Order on a LINE ITEM BASIS per RS Means Cost Works (www.rsmeans.com).
d. The most recent versions of RS Means cost estimating data will serve as the Unit Price Book (UPB) for this contract. The UPB is updated annually after 1 January and no later than 15 January. The contractor’s proposals for the work described in each task order will be based on the pricing information and the units of measure specified in the UPB. The following RS Means data shall be used:
Facilities Construction Cost Data Facilities Maintenance and Repair Cost Data Mechanical Cost Data Plumbing Cost Data Electrical Cost Data Assemblies Cost Data
e. HARD COPY OF MEANS: The contractor shall provide two (2) electronic (CD) copies and two (2) hard copies of unit price data to consist of the R.S. MEANS® cost data books listed below. Contractor shall annually provide the latest edition of these books to the hospital Chief of Engineering and Contracting Officer (CO) after 1 January and no later than 15 January, for the life of the contract to include each option year. The contractor shall consider the item non-priced ONLY if it cannot be located in the computer database or any of these guides.
Facilities Construction Cost Data Facilities Maintenance and Repair Cost Data
f. LINE ITEM UNIT PRICES AND QUANTITIES: The price set forth in the RS Means software on the date proposal is due shall be multiplied against the coefficient to determine line item unit cost. Use John J. Pershing VA Medical Center (Poplar Bluff VAMC),1500 N. Westwood Blvd. Poplar Bluff, MO 63901. For the location of the facility where work is to be completed for all RS Means pricing.
(END OF SCHEDULE)
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
1.2 PROPOSAL SUBMITTAL INSTRUCTIONS
PROPOSAL SUBMITTAL INSTRUCTIONS
1. PREPARATION AND SUBMITTAL OF PROPOSALS
a. GENERAL INFORMATION
The Government plans to award one Indefinite Delivery Indefinite Quantity (IDIQ) Job Order (JOC) Task Order contract for the John J. Pershing VA Medical Center (Poplar Bluff VAMC),1500 N. Westwood Blvd. Poplar Bluff, MO 63901. Award will be made to the Offeror who is deemed responsible in accordance with the Federal Acquisition Regulations (FAR), whose proposal conforms to the solicitation requirements, and whose proposal is judged by an overall assessment of the evaluation factors to be most advantageous to the Government.
The five (5) evaluation factors consist of:
| 1. Contractor Organization & Technical Approach; |
| 2. Relevant Experience |
| 3. Past Performance |
| 4. Contractor Safety Plan, and |
5. Price
RELATIVE IMPORTANCE OF EVALUATION FACTORS - All non-price factors, when combined, are significantly more important than price. The non-price factors are listed in descending order of importance Offerors should address, in detail, their capabilities by describing their proposed approach to each factor. All factors will be considered based solely on the proposal provided, to the extent in which the proposal demonstrates a clear understanding of the requirements, and the contractor’s ability to meet those requirements.
Noncompliance with the RFP requirements will raise serious questions regarding an Offeror’s technical ability to perform the services and may be grounds to eliminate the proposal from further consideration for contract award.
b. THE OFFER
The submission of the documentation specified below will constitute the Offeror’s acceptance of the terms and conditions of the RFP, concurrence with the Requirement Description & Statement of Work and the proposed contract type.
These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
c. AWARD BASED ON INITIAL OFFERS
Pursuant to clause 52.215-1, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
d. NUMBER OF VOLUMES & COPIES TO SUBMIT
PROPOSAL CONTENT: Prospective offerors shall submit the proposal in two separate binders along with a CD of the proposal contents. Mailed or Hand carried proposals WILL BE ACCEPTED by the due date – at the NCO 15 Contracting Office 3450 S 4th Street Leavenworth KS 66048. Offerors shall label the original copies of volumes one (1) and two (2) as “ORIGINAL” and each of the Two (2) copies shall be labeled “COPY.” The binders shall be packaged and shipped in appropriate shipping carton. If more than one package is required, identify each shipping carton as “PKG __ OF __” with the blanks filled in to indicate the package number and total number of packages. Proposals shall be submitted prior to the closing date and time to the address listed below.
e. PROPOSAL SHIPPING LABELS
Each shipping package shall be labeled as follows.
| - Upper left corner of shipping label - enter your firm’s name and return address. |
| - Center of shipping label - enter the following mailing address: |
| DEPARTMENT OF VETERANS AFFAIRS |
| NCO 15 – CONTRACTING OFFICE |
| 3450 SOUTH 4TH STREET TRAFFICWAY |
| LEAVENWORTH, KS 66048 |
- Lower left corner of shipping label - enter: SOLICITATION 36C25519R0075
2. FORMAT OF PROPOSALS
All Offeror s shall be required to submit a proposal with the minimum content as specified herein. Proposals that do not provide the minimum content may be rejected.
a. PAGE FORMAT
Printed text shall be easily readable (12-pitch type or 10 point proportional spacing) and all text shall be single spaced and printed black on white paper. Cross-references should be utilized to preclude unnecessary duplication of data between sections. All pages shall be standard letter size (8-½” by 11”) sheets of paper with a minimum of ½” margins. Text size and spacing requirements for illustrations and tables can be at the discretion of the Offeror but must be easily readable.
b. PAGE LIMITATIONS
Page limitations are as follows: Fold-outs will be counted as the appropriate number of pages based on an 8-1/2” x 11” sheet of paper. The Contractor shall number each page to eliminate any confusion.
| VOLUME |
| TITLE |
| PAGE LIMIT |
| I |
| TECHNICAL PROPOSAL |
| 100 Pages |
| II |
| CONTRACT DOCUMENTS & PRICE PROPOSAL |
| 50 Pages |
c. PROPOSAL LIMITATIONS
The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages more than the limit shall be removed and returned, unread, to the Offeror. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals).
Page limits include: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
Page limits do not include: Covers for volumes, tables of contents, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. They will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
In the event an Offeror creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
3. CONTENT OF PROPOSALS
Offeror’s proposals shall consist of two (2) separate volumes, each in a separate three-ring binder along with a CD of the proposal contents. Volume I (1) will consist of TECHNICAL PROPOSAL (NON-PRICE FACTORS) and Volume II (2) will consist of CONTRACT DOCUMENTS & PRICE PROPOSAL, in addition, offerors are to provide proof of bonding capacity in the form of a letter from their surety indicating bonding capacity per contract and aggregate (in addition complete attachment 3 Surety Form).
Each Volume shall be a separate three-ring loose-leaf binder. Offeror’s proposal shall contain a “Table of Contents” of the total proposal as a master index of the entire proposal. The table of contents shall identify major areas by Title, as well as Volume, Section, Tab, and Page Numbers. A copy of this master “Table of Contents” shall be placed in front of each Volume. Tabs and indexing shall be used to identify all areas, annexes, sections, and topics.
a. VOLUME I - TECHNICAL PROPOSAL (NON-PRICE FACTORS)
The Technical Proposal will be submitted as a separately bound volume and will be evaluated separately from the Price Proposal. The technical (non-priced) evaluation factors, listed below in descending order of importance, will be used to determine the acceptability standards for non-price factors. The sub-factors within each evaluation factor are equal in importance.
The Government will rate an offeror's Technical proposal, at the factor level, by use of descriptive adjectives that combines technical merit and proposal risk that most accurately defines the offeror's performance risk considering all sub-factors identified in this section.
NOTE: THE TECHNICAL PROPOSAL SHALL NOT CONTAIN ANY PRICING INFORMATION RELATING TO THE OFFEROR’S PROPOSED COEFFICIENTS.
FACTOR 1. CONTRACTOR ORGANIZATION & TECHNICAL APPROACH
SUB-FACTOR 1.a. CONTRACTOR ORGANIZATION
Within the Contractor Organization sub-factor, three (3) elements will be evaluated. All three elements are of equal importance.
ELEMENT 1.a. (1) QUALIFICATIONS OF KEY PERSONNEL
Offerors shall provide a detailed description of the proposed critical personnel that will be involved in managing and executing projects (task orders) under the resulting contract. Offerors are provided considerable flexibility in how they structure their proposed staffing, but the functional positions (regardless of job title) must, at least, address the following functions:
| - OSHA-Qualified On-Site Construction Superintendent; | |
| - Project Manager; | |
| - Quality Control Manager | |
| - OSHA-Qualified Site Safety and Health Officer (SSHO) and a Competent Person (CP), | and |
| - Any Other Key Personnel Identified by the Offeror. |
For each Key Personnel position proposed, provide the following narrative description:
| - Position Title; |
| - Functional Responsibilities; |
| - Contractual/Administrative Authorities; |
| - Name of Proposed Individual; |
| - Individual Qualifications, to include (at a minimum): |
| a) -Background & Experience (to include all significant projects within the last three (3) | years; |
| b) - Education & Training; and | |
| c) - Any Applicable Technical Certifications (e. g., OSHA Certification) |
NOTE: Offerors may include significant experience of Key Personnel even if performed for another organization. Offerors may not replace or substitute Key Personnel without the written authorization and concurrence from the Contracting Officer (CO) and Contracting Officer’s Representative (COR). At a minimum, any proposed individuals must meet or exceed the experience level of the Key Personnel being replaced. No more than two positions may be held by the same person.
ELEMENT 1.a. (2) PROXIMITY OF CONTRACTOR’S OFFICE
Offerors shall provide a detailed description of how the Offeror’s proposed office location will support the requirement to respond to emergencies 24/7 and provide effective on-site management and timely responses to requests for on-site meetings within the two and one-half (2.5) hour maximum response time referenced in the Statement of Work. This requirement can be met by operating out of the contractor’s home office, if it is located close enough to the given VA Medical Facility.
As an alternative, the contractor may choose to operate out of an established subordinate office, provided it is close enough to meet the response time, and is staffed by the contractor’s principal representative authorized to engage in binding negotiations. Because failure to meet this requirement on an on-going basis shall be just cause for a Termination for Default of the resulting contract, Offerors must demonstrate the ability to meet the maximum 2.5-hour response time performance standard referenced above. If verification of this requirement cannot be made by time of award, offeror will be deemed unacceptable and will be ineligible for award.
ELEMENT 1.a. (3) _KEY SUBCONTRACTORS
Offerors shall provide a detailed list of the Key Subcontractors they intend to utilize in executing projects (task orders) issued under the resulting contract. Offerors shall list a minimum of one (1) and a maximum of three (3) proposed subcontractors for the following specialty trades:
| - MECHANICAL; |
| - ELECTRICAL; |
| - PLUMBING; and |
| - SITEWORK. |
For each of the proposed subcontractors, Offerors shall provide a brief narrative description of the subcontractor’s:
| - Qualifications & Experience in the Specialty Trade Work; |
| - Capability, Availability, and Willingness to Perform Subcontract Work for the Offeror. |
NOTE: If offerors plan to self-perform some of this specialty trade work, using their own resources, they must list themselves for the applicable trade work. When doing so, offerors must provide the same information regarding qualifications, capability, and availability to self-perform that they would provide for a separate subcontractor.
SUB-FACTOR 1.b. TECHNICAL APPROACH
Within the Technical Approach sub-factor, three (3) elements will be evaluated. All three elements are of equal importance.
ELEMENT 1.b. (1) QUALITY CONTROL
Offerors shall provide a detailed description of specific techniques and processes used to manage Quality Control for construction projects.
| - Describe the minimum qualifications for personnel identified to perform Quality Control and Construction Management functions, to include experience, education, and proven capabilities. |
| - Describe what measures and controls will be taken to ensure that quality control inspections are conducted in a timely and effective manner. Include a description of the inspection criteria and standards used to control performance by identifying, preventing, and correcting deficiencies. |
| - Describe how the Offeror’s Construction Management function will ensure that record keeping requirements are adhered to (i.e., submission of construction schedules, certified payrolls, daily logs, specification submittals, insurance certificates, proper progress payment requests, change order/modification documentation, etc.). |
ELEMENT 1.b. (2) COMPLIANCE WITH CONSTRUCTION STANDARDS
Offerors shall provide a detailed explanation of how well the offeror and proposed subcontractors have the technical knowledge and capability to insure strict compliance with applicable construction industry standards. The applicable standards may vary by the scope of individual task orders, and typically may include, but are not limited to:
| - BOCA Code; |
| - International Building Code; |
| - National Electric Code; |
| - National Fire Protection Code; |
| - National Safety Code; |
| - OSHA Regulations; |
| - ASHRA-E Codes & Standards; |
| - International Plumbing Code; |
| - Joint Commission on Accreditation of Hospitals Organization (JCAHO); and |
| - Dept. of Veterans Affairs Standards/Specifications for Construction. |
The narrative description shall be specific, detailed, and complete to clearly and fully demonstrate that the Offeror, and proposed subcontractors, collectively have a thorough understanding of the requirements for compliance with established construction industry standards.
The narrative should identify specific project experience and/or key personnel training/qualifications rather than merely stating that the offeror “intends to conform to all standards.” The point of the factor is not to indicate good intentions, it is to demonstrate qualifications.
ELEMENT 1.b. (3) TIMELINESS
Offerors shall provide a detailed description of procedures and techniques for maintaining on-time schedule performance. The narrative shall address the offeror’s plan to execute projects (task orders) from the initial development through project completion and a manner that will best meet the Government’s completion requirements.
The narrative shall address the planned timeframes for responding to:
| - Site Visit Requests; |
| - Response to RFP’s for New Task Orders; and |
| - Response to RFP’s to Task Order Modifications. |
The narrative should also address the Offeror’s management tools and practices to for:
| - Estimating System/Software Employed; |
| - Construction Scheduling System Used; |
| - Procedures for Providing Shop Drawing and Technical Submittals; |
| - Management Control Over Subcontractor Performance; and |
| - Measures taken to ensure that the Commencement, Prosecution, and Completion terms for all task orders are adhered to and completion dates are met. |
FACTOR 2. RELEVANT EXPERIENCE
To demonstrate their relevant experience, Offerors shall provide a minimum of three (3) and a maximum of five (5) construction projects started within the last three (3) years that most closely match the nature of work described in the Statement of Work, (in addition the contractor shall submit a Performance Relevance Survey “Attachment 2” for each project). Relevant Experience is interpreted to mean contracts for hospital or medical facility repair or renovation construction projects where the Offeror served as the Prime (General) Contractor and the work involved multiple Subcontractors with multiple projects running concurrently. If Offerors wish to submit experience that was not conducted at hospital or medical facilities, they should explain how the nature and complexity of the work involved was equivalent to that described in the Statement of Work.
For each construction project submitted for Relevant Experience evaluation, provide the following information:
| - Project Title & Location; |
| - Project Award Date, Amount (in dollars); |
| - Original (initial) Contract Performance Period (duration); |
| - Status of project (still active or complete). |
| - Address and Telephone Number of the Contracting Activity (government or commercial); |
| - Address and Telephone Number of the Contract Administrative Activity (if applicable); and |
| - A narrative explanation of the submitted project’s scope of work, including any special aspects of the work that meet the complexity and schedule maintenance requirements as described in the solicitation Statement of Work. |
NOTES:
- If the work submitted is not for hospital or medical facility repair or renovation construction projects, provide additional information to explain how the nature and complexity of the work involved was equivalent to that described in the Statement of Work.
- Offerors may submit for Relevant Experience evaluation projects involving its officers and/or individuals submitted for the Key Personnel sub-factor. However, if the Offeror’s firm did not perform as the Prime (General) Contractor, discuss in detail the role performed by the individuals involved.
FACTOR 3. PAST PERFORMANCE
a. Offerors shall provide a minimum of three (3) and a maximum of five (5) of the most recently completed construction contracts accomplished within the last five (5) years. Projects submitted for Past Performance considerations shall be completed construction contracts that were:
| - Executed as a contract with a Federal, State, or Local Government organization (NOTE: | |
| non-government contracts may be used if Government contracts are not available); | |
| - Completed within the last five years (projects not yet completed will not be considered); | |
| - Equal to, or greater than, ONE HUNDRED THOUSAND DOLLARS ($100,000.00) | |
| (Note: For contract total price, include all post-award actions in the total); | |
| - Awarded to the Offeror as the Prime (General) Contractor | |
| (Note: work performed by the Offeror as a Subcontractor will not be considered); and | |
| - Involved construction work involving multiple subcontractors working at occupied facilities. |
- * See note for past performance questionnaires
b. For each construction contract submitted (which are to be submitted via a past performance questionnaire) for Past Performance evaluation, provide the following information:
| - Project Title & Location; |
| - Contract Number, Award Date, and Contract Type; |
| - Original (initial) Contract Award Amount and Final Contract Amount (both in dollars); |
| - Original (initial) Contract Performance Period (duration), and Actual (final) Completion Date; |
| - Address and Telephone Number of the Contracting Activity (government or commercial); |
| - Address and Telephone Number of the Contract Administrative Activity (if applicable); and |
| - Name, Telephone & Fax Numbers, and E-Mail for the Following Points-of-Contact: |
| - Procuring Contracting Officer (PCO) |
| - Administrative Contracting Officer (ACO) |
| - Engineering/Technical Representative |
| (With 1st-hand knowledge and involvement in the submitted contract.) |
c. In assessing relevancy, the Government will evaluate an offeror's references for similarity of the construction methods to the scope of this solicitation, (multi-discipline or specialized area), scope/type of contracts/projects, cost magnitude of projects as it relates to price, area of consideration requested, client type and location of work performed as it relates to the location(s) of work to be performed under this contract. Performance on managing multiple projects at one time may also be considered.
The past performance evaluation will be conducted using information obtained from your proposal, as well as other sources available to the Government, such as information obtained from the Past Performance Information Retrieval System (PPIRS), and /or any other sources deemed appropriate. The Government also reserves the right to contact any owner of a prior construction project performed by the Offeror to obtain additional information.
* Completed Past Performance Questionnaire shall be mailed to: NCO 15 Contracting, 3450 S. 4th Street Trafficway, Leavenworth, Kansas 66048. Past Performance Questionnaires shall be postmarked NLT the closing date for receipt of proposals (7-25-2019) in order to be considered. NOTE: Offeror or subcontractor must not review the Past Performance Questionnaire prior to submission. They must be submitted by the client/evaluator directly to the Contracting Officer.
Offerors should follow-up and encourage references to get the past performance questionnaires to the Contracting Officer in a timely manner. Do not include copies of the letters or questionnaires in the proposal.
Special Note: Offerors that May Lack Past Performance Information: In accordance with FAR Part 15.305(a)(2), An offeror with no Past Performance may receive a rating based on the evaluation of its predecessor companies, key personnel, and/or subcontractors. If such information is not applicable (i.e., the offeror does not have a predecessor company, key personnel or subcontractors with relevant experience), the offeror shall be evaluated as "Neutral”. However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.
Currency, Relevancy, Trends: The Government will consider the currency, relevancy and trends of the performance information while conducting its performance evaluation.
For this solicitation, currency is performance occurring within the last five years through the solicitation release date. Within this period, performance occurring more recently will have greater significance than work occurring earlier in the period. For example, performance information for work occurring during 2018-2019 may have greater importance than performance information for work occurring during 2016.
The Government may consider an offeror’s previous contracts in the aggregate in determining relevancy, should the offeror’s present and past performance lend itself to this approach. For example, an offeror’s work experience on three contracts may, by definition, represent only a semi-relevant effort when each contract is considered as a stand-alone effort. However, when these contracts are performed concurrently (in part or in whole) and are assessed in the aggregate, the work may more accurately reflect a relevant effort.
In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, offerors may be given the opportunity to clarify certain aspects of their proposals, e.g., the relevance of an offeror's Past Performance information and adverse Past Performance information to which the offeror has not previously had an opportunity to respond, or to resolve minor clerical errors.
FACTOR 4. CONTRACTOR SAFETY PLAN
Offerors must provide a construction safety plan according to TIL Spec Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements, available at https://www.cfm.va.gov/til/spec.asp A. Compliance & Plan Content: The contractor's Safety Plan shall be evaluated for their compliance with local/State/Federal rules and regulations and the company's consideration of safety of its employees and the public. The contractor's Safety Plan, at the minimum, shall address their safety policy, detailed disciplinary action to be taken with respect to employees violating safety requirements, personnel safety responsibilities, personnel safety training, personal protective equipment, accident / incident reporting procedure and investigations, emergency procedures guidelines, and their safety incentive plan.
B. Hospital Working Environment Considerations: The contractor’s Safety Plan shall address their plan for completing all contract work on and around an active hospital without impacting patient care. Plan will be evaluated on how it demonstrates contractor’s intended efforts for maintaining infection control around the hospital work site. Contractor must also detail its plan for accomplishing all necessary tuberculosis screenings for its workforce.
b. VOLUME II - CONTRACT DOCUMENTS & PRICE PROPOSAL
The Contract Documents & Price Proposal will be submitted as a separately bound volume and will be evaluated separately from the Technical Proposal. Volume II shall be organized into two major sections: the CONTRACT DOCUMENTS and the PRICE PROPOSAL as described below.
(1) SECTION 1 - CONTRACT DOCUMENTS
Section 1 shall consist of the following tabbed subsections:
| TAB “A” - Cover Letter |
| TAB “B” - Standard Form 1442 (completed) |
| TAB “C” - Schedule A |
| TAB “D” – Payment and Performance Bonds – Capability Statement |
| TAB “E” - Representations & Certifications |
TAB “A” - COVER LETTER
A Cover Letter and Introduction (maximum of two pages in length) shall include the following information.
- The name and address of the organization submitting the proposal.
- The name, address, and telephone number of the designated individual who has the authority to make representations relative to the proposal, participate in discussions or negotiations (if necessary), and sign any legally binding documents for the organization (including proposals and resulting contract documents).
TAB “B” STANDARD FORM (SF) 1442
Submit the Completed Standard Form 1442 (Solicitation, Offer, and Award) issued with the solicitation. Be sure to fill out blocks 14, 15, 16, 17, 20A, 20B and 20C, and Acknowledge any solicitation amendments in block 19 of the Standard Form 1442.
TAB “C” SCHEDULE A
Fill in the blanks in Schedule A for the VAMC schedule.
TAB “D” - LETTER FOR BONDING CAPABILITY
Offerors shall submit a letter from their surety, providing the payment and performance bonds limitation. Offerors must have the capability to bond task orders from $500,000.00 each, up to FOUR MILLION DOLLARS (4,000,000.00) for the base year and each option year ordering period (although there is no order limitation in each period for that amount). The maximum order amount under the entire contract is 20,000,000.00.
TAB “E” REPRESENTATIONS & CERTIFICATIONS
Complete all REPRESENTATIONS AND CERTIFICATIONS included in the solicitation unless the Offeror submits Representations and Certifications electronically in accordance with FAR Clause 52.204-8 - ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018).
(2) SECTION 2 – PRICE PROPOSAL
FACTOR 5. PRICE
The price coefficients for work during normal work hours and work during other than normal work hours will be evaluated using price analysis techniques to determine if they are fair and reasonable.
Section 2 shall contain the supporting documentation for coefficient factors submitted in Schedule A (Tab “C” of Section 1). The schedule consists of two Coefficients for: (1) Normal Working Hours; (2) Other Than Normal Working Hours.
NON-PREPRICED ITEMS:
Items of work not covered by RS Means Software, but within its scope, may be negotiated by the Contracting Officer for the respective task orders. Added items of work shall be incorporated into and made a part of the task order in accordance with VAAR 852.236-88 Changes, and shall be performed at the negotiated unit price. Non-prepriced work shall be so noted on each task order. Non-prepriced proposals shall be supported with verifiable documentation showing a minimum of two competitive quotes. Non-prepriced items shall be proposed in bare costs only (material, equipment and labor) multiplied by the quantity and the coefficient. If the dollar value of the non-prepriced items exceeds 10 percent of the dollar value of the task order proposals, the non prepriced items must be supported with verifiable documentation and quotes from at least three sources.
NOTE: Repetitive non-prepriced items may be negotiated and incorporated to the R. S. Means by modification to the basic contract, thereby making a pre-priced item for the remainder of the contract period. The contractor shall not use more than 10% by cost non- priced line items. The determination to add or not to add, a non-priced item, shall be made by the Government’s contracting Officer.
DEFINITION OF COEFFICENTS
NORMAL WORK HOURS COEFFICIENT:
Normal work hours are from 7:30 A.M. to 4:30 P.M., Monday through Friday. Contractors will not be permitted to work on Saturday, Sunday, or federal holidays unless otherwise authorized in writing by the Contracting Officer. The exclusion of work on Saturday, Sunday and federal holidays will be considered in computing the performance time of each task order.
OTHER THAN NORMAL WORK HOURS COEFFICIENT:
Other than normal working hours are any hours not stated as normal work hours above.
FORMAT FOR COEFFICIENTS:
The base ordering period shall be from the date of the contract award for one year (365 calendar days). This contract will provide up to four one-year option periods, to extend the ordering periods. The contract coefficients shall be established for the base contract year and for each of the four one-year option periods. The contract resulting from this solicitation will not provide for periodic economic price adjustments with the exception of utilizing the latest yearly-published version of R.S. Means Cost Data.
The contract coefficient is used as a factor to adjust the Unit Price Book “Bare Costs” to arrive at the final Firm Fixed Price for the given task order. The coefficient will result in either a "net" (e.g., 1.0) amount, or a percentage "increase" (e.g., 1.25), or a percentage "decrease” (e.g., 0.95) from the unit prices listed in the Unit Price Book (UPB). As a percentage factor for multiplication, the coefficient shall be limited to two decimal places or less. The government expects reasonable coefficients to accomplish the resulting task orders. Submitted coefficient(s) less than one (1.00) requires an acknowledgement from the bonding company that work will be bid and may potentially be accomplished at less than cost.
The Offeror 's contract coefficients shall address all costs except: (1) Unit Prices in the Unit Price Book (these prices include direct costs for labor, material and equipment); and (2) the City Cost Index (which will be included prior to adding the coefficient). For each Coefficient, provide a detailed breakdown explaining the conversion of the typical cost components (as listed above) to the given coefficients. The proposed profit rate should be supported with a quantitative evaluation of market conditions, anticipated order volume and risk assessment, in addition to being justified with narrative rationale. The coefficients are meant to cover all overheads, contingencies, general conditions, miscellaneous costs, and contractor’s profit. Examples of coefficient cost components include, but are not limited to:
| - Overhead, Profit, Labor Burden, Contingencies; |
| - Payment and Performance Bonds; |
| - Estimating Software (Cost-Works) |
| - Proposal Preparation; |
| - Subcontractor Profit and Overhead; |
| - Mobilization and Close Out for Total Contract and Each Task Order; |
| - Projected Increases (Cost Risk) In Construction Costs over the 1-Year Ordering Period; |
| - All Wastes and Excess Material; |
| - Final Clean Up (Day-To-Day Clean Up Included in Material Costs); |
| - Project Management and Supervision; |
| - Office Management and Equipment; |
| - Quality Control; |
| - Submittals (Including As-Built Drawings), Permits, Licenses; |
| - Protection of Government Property; |
| - Compliance with Safety Laws (I.E., Safety Rails, Face and Clothing Protection, Etc.); |
| - Compliance with Environmental Laws (Including Permits & Reporting Requirements, Etc.); |
| - Compliance with Tax Laws; |
| - Traffic and Work Site Signs and Barriers; |
| - Depreciation of Equipment and Assets (Including On-Site Mobile Offices); |
| - Insurance; and |
| - Any Other Risks of Doing Business. |
NOTES:
The price set forth in the RS Means software on the date proposal is due shall be multiplied against the coefficient to determine line item unit cost. Use John J. Pershing VA Medical Center (Poplar Bluff VAMC),1500 N. Westwood Blvd. Poplar Bluff, MO 63901.