36C25519R0050-004.pdf
PDF 20 MB Posted
- Solicitation number
- 36C25519R0050
About this file
36C25519R0050 P09 - FINAL DRAWINGS - 657-18-301JC (55 PAGES).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25519C0064-000.docx | DOCX document | |
| 36C25519R0050-A0003001.pdf | ||
| 36C25519R0050-A0003000.docx | DOCX document | |
| 36C25519R0050-A0002002.pdf | ||
| 36C25519R0050-A0002000.docx | DOCX document | |
| 36C25519R0050-A0002001.pdf | ||
| 36C25519R0050-A0001001.pdf | ||
| 36C25519R0050-A0001000.docx | DOCX document | |
| 36C25519R0050-002.pdf | ||
| 36C25519R0050-001.docx | DOCX document | |
| 36C25519R0050-003.pdf | ||
| 36C25519R0050-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ITEMS
REFERENCE SECTION 01 00 00 GENERAL REQUIREMENTS ITEM 1.3 STATEMENT OF BID ITEMS:
Alternate #1: OMIT RENOVATION OF A402. EXISTING ROOM TO BE USED AS A CONSULTATION ROOM.
Alternate #2: OMIT PHASE 4 RENOVATION WORK. STAFF LOUNGE TO BE LOCATED IN OTHER AREA AND THE
EXISTING COMPOUNDING ROOM TO BE USED AS ICE MAKER ROOM.
VICINITY MAP LOCATION MAP
VERIFY STAGING LOCATION
WITH PROJECT ENGINEER.
VA ST LOUIS HEALTH CARE SYSTEM
JOHN COCHRAN FACILITY - 4TH
FLOOR
ST LOUIS, MO 63106
1A
6A
7A
8A
8B
MAIN HOSPITAL & CLINICAL ADDITION EMERGENCY
GENERATOR VAULT
EDUCATION, MEDICAL MEDIA, CHAPEL, RESEARCH
D.H.C.P. HYPERTENSION
ENGINEERING, A.F.G.E., H.B.H.C.
DRUG DEPENDENCE TREATMENT UNIT
RESEARCH
RESEARCH
RESEARCH
RESEARCH
BOILER PLANT
CHILLER PLANT
GENERATOR
FLAG POLE
GAD METER HOUSE
GARAGE
YEATMAN WAREHOUSE
PROJECT
NORTH
TRUE
NORTH
PROJECT
LOCATION
S
AR
AH
W A
R N
E
V A
N D
E V
EN
TE
R
O N
E S
K R
U M
R E
D D
F O
XX
P
R A
IR
IE
S
PR
IN
G
A
LP
H O
N S
U S
C O
M P
T O
N
C H
A N
N
IN
G
BA
C
O N
C O
LE
M
AN
LA
FL
IN
FR
AN
C
IS
TH
E
R E
S A
G R
A N
D B
LV
D
P R
O S
P E
C T
G R
A N
D
F O
R E
S T
C H
A N
N
IN
G
W A
T E
R C
O U
R S
E
W A
Y
C O
M P
T O
N
LA
C
LE
C T
C A
R D
IN
A
L P
LC
G A
R R
IS
O
N
W A
R
IN
G
E W
IN
G
R E
P O
S T
O R
Y
W
LK
JE
FF
E R
S O
N
U N
IV
E
R S
IT
Y
R
V
T
D H
U N
T
LE
Y
LE
F
F
IN
G W
E
LL
B E
A U
M O
N T
E
LL
IO
T
C A
R D
IN
A
L
G A
R R
IS
O
N
LE
O
N A
R D
G L
A S
G O
W
LE
F
F
IN
G W
E L
L
J E
F F
E R
S O
N
E
LL
IO
T
LE
F
F
IN
G W
E
LL
G
LA
S G
O W
S
LA
T T
E R
Y
G A
R R
IS
O
N
COZENS
EVANS
GARFIELDCOTE BRILLANTEALTOINECASS
COZENS
PAGE
EVANS
COOK
FINNEYBELL
WEST BELLE PLC
CD BANKS
BELL
ENRIGHTDELMARGRANDEL SQWASHINGTON
FRANKLIN
LUCASWESTMINSTER
OLIVE
LINDELL
WEST PINE
LACLEDE
FOREST PARKCLARK
LOCUST
OLIVE
COLLEGE LA
RED MAPLE
LAWTON PLLACLEDE SUGAR
MAPLE
KNOLLS
CHESTNUT
PINE
OLIVE
ST CHARLES
LOCUST
WASHINGTON
LUCAS
DELMAR
CARR
CASS
MULLAN
HOWARD
MADISON
MAIDEN
NORTH
MONTGOMMERY
MONTGOMMERY
BELL
BELL
DR SAMUAL T SHEPPARD
ST. LOUIS
HARRIS
STOWE
STATE
COLLEGE
MARKET
COLE
DAYTON
GAMBLE
STODDARD
MILLS
JAMES COOL PAPA BELL
THOMAS
SHERIDAN
HOWARD
BRANTNER
EVANS
MADISON
MAGAZINE
YEATMAN
NORTH MARKET
BENTON
M
ARTIN LUTHER KING
SCHOOL
SCHOOL
UNIVERSITY
S P
R
IN
G S
T R
E E
T
G R
A N
D B
LV
D
DELMAR AVE.
ENRIGHT AVE.
11 8B
8A
7A
6A
1A
VACANT
BLDG.
TAXI
CO. UNION
LOCAL
PRINTING
CO.
D.A.V. STORE
6378 SF
EXAM / ON-CALL SMOKE
COMPARTMENT
7436 SF
AETC / ONCOLOGY
SMOKE COMPARTMENT
(7168 SF EXISTING)
PRE-OP / POST-OP /
OUTPATIENT (4B)
SMOKE COMPARTMENT
13,003 SF
(13,289 SF EXISTING)
ELEVATOR NO.6
E6
ELEVATOR NO.5
E5
ELEVATOR LOBBY
H406
STAIRWELL NO.1
S401
CONSULT
A402
CONSULT
A401
SURGERY WAITING
A400
CORRIDOR
H403
SERVICE ELEVATOR LOBBY
H407
MED GAS STORAGE
A445
TOILET PUBLIC
A444
23 HOUR OBSERVATION
A476
CORRIDOR
H402
STAIRWELL NO.2
S402
ELEVATOR NO.4
E4
ELEVATOR NO.3
E3
ELEVATOR NO.1
E1
HD STORAGE (-)
A456A
HD BUFFER (-)
A457A
PHARMACY
A456
ANTE (+)
A457 NON-HD BUFFER (+)
A457B
TOILET, MALE
A454 ELEC. CLOSET
A454A
STAIRWELL NO.5
S405
STAFF LOUNGE
A452
CHEMO TREATMENT ROOM
A455
CORRIDOR
H405
CHASE
CH-A-6
F.E. CLOSET
A436E
ELEC. CLOSET
A436D
ELEC. CLOSET
A436F
F.E. CLOSET
H405A
ELEC. CLOSET
A458A
STORAGE
A436C
ELEC. CLOSET
A436A
F E
EX
FE
EXEX
FE
RELOCATE 1HR SMOKE BARRIER
2FB
2FB 2FB 2FB
2FB
2FB
2FB 2FB
1SB
1SB
1SB
1SB
1SB
1FB
1FB
2FB
2FB
2FB
2FB
1SB
1FB
ST. LOUIS VA MEDICAL CENTER - JOHN COCHRAN
CORRECT PHARMACY DEFICIENCIES ON 4TH LEVEL FOR USP 800 COMPLIANCE
ST. LOUIS, MISSOURI
APPLICABLE CODES:
INTERNATIONAL BUILDING CODE - 2018 IBC
LIFE SAFETY CODE - NFPA 101, 2018 EDITION
INTERNATIONAL MECHANICAL CODE - 2015 IMC
INTERNATIONAL PLUMBING CODE - 2018 IPC
INTERNATIONAL FIRE CODE - 2018 IFC
NATIONAL ELECTRIC CODE - 2017 NEC
INTERNATIONAL ENERGY CONSERVATION CODE - 2018 IECC
BUILDING CODE ANALYSIS:
AUTOMATIC FIRE SUPPRESSION SYSTEM:
FULLY SPRINKLED THROUGHOUT (407.5)
USE GROUPS:
NON-SEPARATED MIXED USE OCCUPANCY
PRIMARY USE GROUP: I-2, INSTITUTIONAL (308.3)
INCIDENTAL USE AREAS: (TABLE 508.2)
• MECHANICAL ROOMS: 1-HOUR OR SPRINKLER SYSTEM
• STORAGE ROOMS: 1-HOUR OR SPRINKLER SYSTEM
• GROUP I-2 WASTE AND LINEN COLLECTION ROOMS: 1-HOUR
• “WHERE TABLE 508.2 PERMITS AN AUTOMATIC FIRE-EXTINGUISHING SYSTEM WITHOUT A FIRE BARRIER, THE
INCIDENTAL USE AREA SHALL BE SEPARATED FROM THE REMAINDER OF THE BUILDING BY CONSTRUCTION CAPABLE OF RESISTING THE PASSAGE OF SMOKE.” THIS REQUIRES A SMOKE PARTITION WITH NO RATING
REQUIREMENT.
SPECIAL DETAILED REQUIREMENTS FOR USE GROUP I-2: (SECTION 407)
CORRIDOR WALLS: (407.3) SMOKE PARTITIONS REQUIRED (NO RATING)
SMOKE BARRIER AREAS: (1-HOUR RATED)
MAXIMUM AREA = 22,500 S.F.
MAXIMUM TRAVEL DISTANCE = 200 FEET
CONSTRUCTION TYPE: 1A (REQUIRED SINCE BUILDING IS OVER 4 STORIES)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS: (TABLE 601)
• STRUCTURAL FRAME: 3-HOUR
• BEARING WALLS:
EXTERIOR: 3-HOUR
INTERIOR: 3-HOUR
• EXTERIOR NONBEARING WALLS AND PARTITIONS: (TABLE 602)
FIRE SEPARATION DISTANCE > 30 FEET: 0-HOUR REQUIRED
• SHAFT ENCLOSURE: 2-HOUR
• FLOOR CONSTRUCTION: 2-HOUR
• ROOF CONSTRUCTION: 1 ½ HOUR
COMBUSTIBLE MATERIAL IN TYPE 1 CONSTRUCTION:
FIRE-RETARDANT TREATED WOOD ALLOWED IN:
NONBEARING PARTITIONS IF FIRE RATING < 2-HOURS
NONBEARING EXTERIOR WALLS IF NO FIRE RATING REQUIRED
FIRE-RETARDANT TREATED WOOD NOT ALLOWED IN ROOF CONSTRUCTION
THERMAL AND ACOUSTICAL INSULATION: MAXIMUM FLAME SPREAD INDEX = 25
ALLOWABLE / ACTUAL FLOOR AREA AND BUILDING HEIGHT: (TABLE 503)
ALLOWABLE AREA: UNLIMITED
ALLOWABLE HEIGHT: UNLIMITED
ACTUAL HEIGHT: 9 STORIES, 130 FEET
FIRE DOOR RATINGS: TABLE 715.4)
2-HOUR FIRE BARRIER AT STAIRS: 1 1/2 HOUR RATED DOOR. CLOSER, LATCH, AND SMOKE SEAL REQUIRED.
1-HOUR FIRE BARRIER: 3/4 HOUR RATED DOOR (45 MIN.) CLOSER, LATCH & SMOKE SEAL REQUIRED.
1-HOUR SMOKE BARRIER: 1/3 HOUR RATED DOOR (20 MIN.) CLOSER, LATCH & SMOKE SEAL REQUIRED.
1-HOUR FIRE PARTITION: 1/3 HOUR RATED DOOR (20 MIN.) NO SMOKE SEAL REQUIRED. CLOSER, & LATCH REQUIRED.
SMOKE PARTITIONS: NO DOOR RATING REQUIRED. NO CLOSER REQUIRED. LATCH & SMOKE SEAL REQUIRED.
BUILDING CODE SUMMARY
OCCUPANT LOAD: (TABLE 1004.1.1)
ACCESSORY STORAGE AND MECHANICAL ROOMS: 300 SF/PERSON (GROSS)
INSTITUTIONAL INPATIENT TREATMENT AREAS: 240 SF/PERSON (GROSS)
OFFICE AREAS: 100 S.F./PERSON (GROSS)
ROOF FIRE CLASSIFICATION: CLASS B ROOF ASSEMBLY (TABLE 1505.1)
MEANS OF EGRESS:
“MULTIPLE MEANS OF EGRESS SHALL BE SIZED SUCH THAT THE LOSS OF ANY ONE MEANS OF EGRESS SHALL NOT REDUCE THE AVAILABLE CAPACITY TO LESS THAN 50% OF THE REQUIRED CAPACITY.” (1005.1)
MINIMUM REQUIRED EGRESS WIDTH: (TABLE 1005.1)
STAIRWAYS: 0.3 INCHES PER OCCUPANT
OTHER EGRESS COMPONENTS: 0.2 INCHES PER OCCUPANT
DOOR ENCROACHMENT: SHALL NOT REDUCE REQUIRED EGRESS WIDTH TO LESS THAN 50%. DOORS SHALL NOT
ENCROACH MORE THAN 7” INTO EGRESS WIDTH WHEN FULLY OPEN. (1005.2)
AREA OF REFUGE: (1007.6)
30” X 48” SPACE REQUIRED FOR EVERY 200 OCCUPANTS AT EACH EXIT STAIRWAY.
SMOKE BARRIER SEPARATION REQUIRED.
TWO-WAY COMMUNICATION SYSTEM REQUIRED.
DOOR WIDTH: (1008.1.1)
MINIMUM CLEAR WIDTH = 41.5 INCHES AT USE GROUP I-2 WHEN USED FOR MOVEMENT OF BEDS.
MINIMUM CLEAR WIDTH = 32 INCHES (AT OTHER LOCATIONS)
DOOR SWING: “DOORS SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL WHERE SERVING AN OCCUPANT LOAD OF 50
OR MORE PERSONS.” (1008.1.2)
PANIC HARDWARE REQUIREMENTS AT ELECTRICAL ROOMS: (1008.1.9)
“ELECTRIC ROOMS WITH EQUIPMENT RATED 1,200 AMPS OR MORE AND OVER 6 FEET WIDE… REQUIRE PANIC HARDWARE
AND DOORS SWINGING IN DIRECTION OF EGRESS.”
STAIRWAYS: (1009.1)
MINIMUM WIDTH = 44 INCHES
MAXIMUM RISER = 7 INCHES
MINIMUM RISER = 4 INCHES
MINIMUM TREAD = 11 INCHES
EXIT ACCESS:
GROUP I-2: (1014.2.2)
HABITABLE ROOMS OR SUITES IN GROUP I-2 OCCUPANCIES SHALL HAVE AN EXIT ACCESS DOOR LEADING DIRECTLY TO A
CORRIDOR. (SEE EXCEPTIONS)
COMMON PATH OF EGRESS TRAVEL: (1014.3) MAXIMUM 75 FEET
EXIT ACCESS TRAVEL DISTANCE: MAXIMUM 200 FEET (TABLE 1016.1)
CORRIDOR FIRE RESISTANCE RATING: 0-HOUR REQUIRED (TABLE 1017.1)
MINIMUM CORRIDOR WIDTH: (1017.2)
96 INCHES WHERE BED MOVEMENT REQUIRED
44 INCHES AT OTHER LOCATIONS
72 INCHES FOR SURGICAL AREAS WITH NO BED MOVEMENT
MAXIMUM DEAD END CORRIDOR: 20 FEET (1017.3)
VERTICAL EXIT ENCLOSURES: 2-HOUR RATING REQUIRED WHEN CONNECTING 4 OR MORE STORIES (1020.1)
EXIT PASSAGEWAYS: (SECTION 1021)
2-HOUR FIRE RATING
DOORS FROM NORMALLY UNOCCUPIED SPACES PROHIBITED IN EXIT PASSAGEWAYS
LIFE SAFETY LEGEND
1HR SMOKE BARRIER1SB
2HR FIRE BARRIER
1HR FIRE BARRIER
2FB
1FB
FIRE EXTINGUISHER LOCATION
FE
EX
MEANS OF EGRESS TO EXITS /
EXTERIOR OF BUILDING
EXIT
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
HAZ./INCIDENTAL USE
FIRE BARRIER
STRUCTURAL ENGINEER
PLUMBING ENGINEER
SUSAN SANDERS 316.262.2500 susans@hfgarchitecture.comINTERIOR DESIGNER
JOY MARTIN-CARMICHAEL 316.262.2691 joy.martincarmichael@pec1.com
MECHANICAL ENGINEER BRIAN HENRY 316.262.2691 brian.henry@pec1.com
ELECTRICAL ENGINEER JOSH WILCOX 316.262.2691 josh.wilcox@pec1.com
DALE MCKINNEY 712.252.4014 dalem@stonegrouparchitects.comARCHITECT OF RECORD
CONTACT PHONE EMAILPOSITION
JAMES HOLT 316.262.2691 james.holt@pec1.com
INDUSTRIAL HYGIENIST GREG CHAMBLISS 314.432.8073 greg.chambliss@psiusa.com
DESIGN TEAM CONTACTS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:3
:1
A
M
GI001
COVER SHEET CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
1 55
GENERAL
GI001 COVER SHEET
GI002 GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
GI101 PHASING PLAN
ARCHITECTURAL
AD101 4TH LEVEL DEMOLITION FLOOR PLAN AND CEILING PLAN
AE101 4TH LEVEL FLOOR PLAN, PARTITION TYPES AND ALTERNATE PLANS
AE102 4TH & 3RD LEVEL REFLECTED CEILING PLANS
AE103 4TH LEVEL FINISH, WALL PROTECTION, SIGNAGE PLAN, AND SCHEDULE
AE104 4TH LEVEL EQUIPMENT PLAN AND SCHEDULE
AE201 EXTERIOR ELEVATION AND PARTIAL PLANS
AE401 ENLARGED PLANS AND INTERIOR ELEVATIONS
AE501 DETAILS
AE601 DOOR SCHEDULE & DETAILS
PLUMBING
PP001 PLUMBING COVER SHEET
PD101 3RD LEVEL PLUMBING DEMOLITION PLAN
PD102 4TH LEVEL PLUMBING DEMOLITION PLAN
PD111 3RD LEVEL MEDICAL GAS DEMOLITION PLAN
PD112 4TH LEVEL MEDICAL GAS DEMOLITION PLAN
PL101 3RD LEVEL PLUMBING FLOOR PLAN
PL102 4TH LEVEL PLUMBING FLOOR PLAN
PL111 4TH LEVEL MEDICAL GAS FLOOR PLAN
PL501 PLUMBING SCHEDULES
MECHANICAL
MM001 MECHANICAL COVER SHEET
MM002 MECHANICAL SYMBOLS
MD101 MECHANICAL DEMOLITION PLANS
MD102 HYDRONIC DEMOLITION PLANS
MH101 MECHANICAL FLOOR PLANS
MP101 HYDRONICS FLOOR PLANS
MP102 HYDRONICS FLOOR PLANS
M-301 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS
M-801 MECHANICAL DIAGRAMS
ELECTRICAL
E-001 ELECTRICAL LEAD SHEET
ED100 ELECTRICAL BASEMENT OVERALL EXISTING PLAN
ED140 ELECTRICAL 4TH LEVEL OVERALL EXISTING PLAN
ED141 ELECTRICAL 4TH LEVEL DEMOLITION PLANS
EL141 ELECTRICAL 4TH LEVEL LIGHTING PLAN
EL501 ELECTRICAL LIGHTING DETAILS AND SCHEDULES
EP141 ELECTRICAL 4TH LEVEL POWER PLAN
EP501 ELECTRICAL POWER DETAILS
EP601 ELECTRICAL POWER SCHEDULES
EY141 ELECTRICAL 4TH LEVEL SYSTEMS PLAN
EY501 ELECTRICAL SYSTEMS DETAILS AND SCHEDULES
FIRE PROTECTION
FP101 FIRE PROTECTION PLAN
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
JOHN COCHRAN DIVISION
100% BIDDING DOCUMENTS
10/9/2018
VA #657-18-301JC
CORRECT PHARMACY DEFICIENCIES ON
4TH LEVEL FOR USP 800 COMPLIANCE
SHEET INDEX
HAZARDOUS
HA101 HAZARDOUS MATERIALS PLANS
STRUCTURAL
SF101 GENERAL NOTES, INSPECTION TABLES AND PLAN
SF201 ELEVATION AND DETAILS
SX101 4TH LEVEL EXISTING FLOOR FRAMING PLAN (INFO ONLY)
SX102 5TH LEVEL EXISTING FLOOR FRAMING PLAN (INFO ONLY)
SX601 EXISTING COLUMN SCHEDULE (INFO ONLY)
SX602 EXISTING COLUMN SCHEDULE (INFO ONLY)
1" = 20'-0" F1
4TH LEVEL LIFE SAFETY PLAN
Revision# Description Date:
COMMON ABBREVIATIONS
SYMBOLS USED AS ABBREVIATIONS:
& AND
L ANGLE
LL DOUBLE ANGLE
@ AT
d PENNEY
# POUND OR NUMBER
Ø ROUND OR DIAMETER
ABBREVIATIONS:
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT/ROD
ABV ABOVE
AC ASPHALTIC CONCRETE/AIR
CONDITIONER
ACC ACCESSIBLE
ACM ALUMINUM COMPOSITE MATERIAL
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT,
ADJOINING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASI ARCHITECTURAL SUPPLEMENTAL
INFORMATION
BD BOARD
BEV BEVELED
BFF BELOW FINISH FLOOR
BL BRICK LEDGE
BLDG BUILDING
BLKG BLOCK (ING)
BM BEAM
BOT BOTTOM
BO BOTTOM OF
BOC BOTTOM OF CONCRETE
BOF BOTTOM OF FOOTING
BRG BEARING
BRK BRICK
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CHANNEL/CELSIUS
CAB CABINET
CB CERAMIC BASE
CC CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CD CONSTRUCTION DOCUMENTS
CEM CEMENT
CF CUBIC FEET OR FOOT
CG CORNER GUARD
CIPC CAST-IN-PLACE CONCRETE
CJ CONTROL/CONSTRUCTION JOINT
CL CENTER LINE
CLG CEILING
CLKG CAULKING
CLR CLEAR, CLEARANCE
CMU CONCRETE MASONRY UNIT
CO CHANGE ORDER/CLEAN OUT
COL COLUMN
COMB COMBINATION
COMP COMPOSITE/COMPOSITION
CONC CONCRETE
CONN CONNECT (ION)
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACT (OR)
COORD COORDINATE
CORR CORRUGATED/CORRIDOR
CPT CARPET
CPPT CARPET TILE
CSMT CASEMENT
CT CERAMIC TILE
CTB CARPET TILE BASE
CTR CENTER
D DEPTH
DBL DOUBLE
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVIDE, DIVISION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING (S)
DWR DRAWER
DWTR DUMBWAITER
(E) EXISTING
E EAST
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENL ENLARGED
EMER EMERGENCY
ENGR ENGINEER
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPS EXPANDED POLYSTYRENE BOARD
EPT EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
ETC ETCETERA
ETR EXISTING TO REMAIN
EW EACH WAY
EXIST EXISTING
EXC EXCAVATE/EXCAVATION
EXH EXHAUST
EXP EXPANSION/EXPOSED
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FA FIRE ALARM
FAB FABRICATE/FABRICATION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FFE FINISH FLOOR ELEVATION
FIN FINISH (ED)
FLOUR FLUORESCENT
FLR FLOOR (ING)
FO FACE OF
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FOF FACE OF FINISH
FR FIRE RESISTANT/FRAME
FRP FIBERGLASS REINFORCED PANEL
FS FLOOR SINK
FT FOOT, FEET/FIRE TREATED
FTG FOOTING
FURG FURRING
FUT FUTURE
GA GAGE, GAUGE
GB GRAB BAR
GC GENERAL CONTRACTOR
GALV GALVANIZED
GC GENERAL CONTRACTOR
GI GALVANIZED IRON
GL GLASS
GLU LAMGLUE LAMINATED (BEAM)
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HC HANDICAP / HOLLOW CORE
HD HEAVY DUTY
HDBD HARDBOARD
HDR HEADER
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION, AIR-
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER/DIMENSION
IFC INTERNATIONAL FIRE CODE
IN INCH(ES)
INCL INCLUDE (D), INCLUDING
INFO INFORMATION
INSP INSPECTION
INSTR INSTRUCTION(S)
INSUL INSULATE (D), INSULATION
INT INTERIOR
JAN JANITOR
JST JOIST
JT JOINT
KCJ KEYED CONSTRUCTION JOINT
KO KNOCK OUT
L LENGTH / ANGLE
LAB LABORATORY
LAM LAMINATE (ED)
LAV LAVATORY
LB POUND
LF LINEAR FEET
LH LEFT HAND
LKR LOCKER
LOC LOCATION
LONG LONGITUDINAL
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURE (R)
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MIRROR
MTL METAL
(N) NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPP OPPOSITE
OPG OPENING
ORIG ORIGINAL
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
PAR PARALLEL
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR/PROPOSAL REQUEST
PRCST PRECAST CONCRETE
PREFAB PREFABRICATE
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT PAINT / PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS/RISER
RB RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
REC RECESSED
REF REFERENCE/REFRIGERATOR
REINF REINFORCE (D), (ING), (MENT)
REQ REQUIRE
REQD REQUIRED
RES RESILIENT FLOORING
RET RETURN
REV REVISION (S), REVISED
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RL RIDGE LINE
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RVS REVERSE (SIDE)
RWL RAIN WATER LEADER
S SOUTH
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCR SHOWER CURTAIN ROD
SCT SECTION
SD SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLDG SLIDING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNX SANITARY NAPKIN DISPOSAL
SOG SLAB ON GRADE
SPEC SPECIFICATION (S)
SQ SQUARE
SSM SOLID SURFACE MATERIAL
SST STAINLESS STEEL
ST STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SW SHEARWALL
SYM SYMMETRICAL
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TBD TO BE DETERMINED
TEMP TEMPORARY/TEMPERED
TER TERRAZZO
TFE TOP FOOTING ELEVATION
THD THREAD (ED) (S)
THK THICKNESS
THRU THROUGH
TKBD TACKBOARD
TL TILE
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE/CURB
TOD TOP OF DECK
TOF TOP OF FOOTING (FOUNDATION)
TOM TOP OF MASONRY
TOP TOP OF PIER
TOJ TOP OF JOIST
TOS TOP OF SLAB/STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPO THERMOPLASTIC POLYOLEFIN
TPTN TOILET PARTITION
TRANS TRANSVERSE
TS TUBE STEEL
TYP TYPICAL
UG UNDERGROUND
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
V SHEAR
VAR VARIES
VB VAPOR BARRIER
VC VA FURNISHED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VR VAPOR RETARDER
VV VA FURNISHED / VA INSTALLED
VWC VINYL WALL COVERING
W WEST/WIDTH
W/ WITH
W/O WITHOUT
WA WEDGE ANCHOR
WB WOOD BASE
WC WATER CLOSET
WD WOOD/WOODWORK
WDW WINDOW
WF (W) WIDE FLANGE
WG WALL GUARD
WH WATER HEATER
WI WROUGHT IRON
WL WIND LOAD
WP WATERPROOF (ING)
WR WATER RESISTANT
WSCT WAINSCOT
WT WEIGHT/WINDOW TREATMENT
WWF WELDED WIRE FABRIC
MEDICAL ABBREVIATIONS
ACPH AIR CHANGES PER HOUR
BSC BIOLOGICAL SAFETY CABINET
CACI COMPUNDING ASEPTIC CONTAINER
ISOLATOR
C-PEC CONTAINMENT PRIMARY
ENGINEERING CONTROL
C-SEC CONTAINMENT SECONDARY
ENGINEERING CONTROL
EPA ENVIRONMENTAL PROTECTION
AGENCY
HD HAZARDOUS DRUG
HEPA HIGH-EFFICIENCY PARTICULATE AIR
IV INTRAVENEOUS
LAFW LAMINAR AIRFLOW WORKBENCH
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINSTRATION
PPE PERSONAL PROTECTIVE EQUIPMENT
SOP STANDARD OPERATING PROCEDURE
UPS UNINTERUPTED POWER SOURCE
SYMBOLS LEGEND
RIGID INSULATION
WOOD ROUGH (CONTINUOUS)
WOOD ROUGH (SPACED)
EARTH
CONCRETE
BLOCK WALL/VENEER
GYPSUM BOARD
PLYWOOD
BATT INSULATION
NEW CONSTRUCTION
EXISTING
CONSTRUCTION TO BE
REMOVED
DIMENSION LINE
BREAK LINE
DETAIL INDICATOR
X
X-XX
X
X-XX
BUILDING SECTION
INDICATOR
X
X-XX
X
X-XX
ELEVATION
INDICATOR, EXTERIOR
ELEVATION INDICATOR
CENTER LINE
ELEVATION INDICATOR,
INTERIOR,
X-XX
X
X-XX
X
X
X
X
NORTH ARROWXX DRAWING BLOCK TITLE
DRAWING TITLE
XX=XX
NORTH
EXISTING WALL
CG
CORNER GUARD
FEC
FIRE EXTINGUISHER
CABINET
XXX
ROOM
DOOR TAG
ROOM TAG
REVISION TAG
KEYNOTE TAG
INTERIOR PARTITION TYPES
WINDOW TAG
FURNITURE, FIXTURE, &
EQUIPMENT INDICATOR
W#
A10
CARD READERCR
CJ
CONTROL JOINT
FIRE EXTINGUISHERFE
PP
1. ALL EXISTING DUCTWORK, ELECTRICAL OR PIPING IS NOT NECESSARILY SHOWN ON
THE DRAWINGS.
2. BEFORE CONTRACTOR(S) BID THE JOB, IT IS IMPERATIVE THEY VISIT THE JOBSITE
AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT,
DUCTWORK, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND
COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL
INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR RELOCATED
WORK ON HIS CONTRACT.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY PROJECT
ENGINEER OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF ANY
COMPONENTS
4. THE CONTRACTOR WILL TAKE ALL NECESSARY PRECAUTIONS INCLUDING THE
BUILDING AND MAINTENANCE OF DUST TIGHT PARTITIONS, DAILY VACUUMING,
SWEEPING, AND PROVISION OF CLEAN FLOOR MATS AT THE PROJECT ENTRANCES,
TO PREVENT THE INFILTRATION OF DIRT AND DUST FROM THE CONSTRUCTION
AREAS INTO THE OWNER OCCUPIED AREAS.
5. PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED
SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH
ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE
PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)
REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.
6. UNLESS OTHERWISE INDICATED FINISH ALL NEW FRAMES AND PARTITIONS TO
MATCH SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME
COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT
HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC COMPLETELY REMOVED
AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR
7. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD,
ELECTRICAL PANELS, ACCESS PANELS, ETC.,TO MATCH WALL FINISH UNLESS
OTHERWISE NOTED.
8. CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR
FIRE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED
ACCORDINGLY WITH APPROVED FIRESTOPPING MATERIAL THE SAME DAY THE
PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS
AND STAIRWELLS SHALL BE CONSIDERED 2 HOUR RATED PARTITIONS AND BE
SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN. PENETRATIONS THROUGH
THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
9. ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC.,IN FINISHED
ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR
CONCRETE CONSTRUCTION, SHALL BE FURRED IN, THE FURRING FINISHED TO
MATCH THE ROOM FINISH.
10. WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE
REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,
FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE. AFTER REMOVAL; FLOORS,
WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.
11. UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE(S) WILL BE
DONE AFTER NORMAL WORKING HOURS (NIGHTS, WEEKENDS, HOLIDAYS, ETC.) AT
NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH
THE V.A. PROJECT ENGINEER.
12. WORK THAT MUST OCCUR IN OCCUPIED AREAS, SUCH AS PUBLIC CORRIDORS, OF
THE MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION WILL BE DONE
AT TIMES OTHER THAN NORMAL WORKING HOURS (NIGHTS, WEEKENDS, HOLIDAYS,
ETC.) AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED
WITH THE V.A. PROJECT ENGINEER.
13. ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE SPECIFIED.
CIRCUITING FOR ELECTRIC DOOR HOLD OPENS IN MASONRY WALLS SHALL BE
SURFACE RACEWAY.
14. COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO
ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL
PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR
A COMPLETE AND FUNCTIONAL SYSTEM.
15. DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF
EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO
SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND
ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY
INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK,
FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY
BE REQUIRED.
16. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE
DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT
LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING
WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR
A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL
COST.
17. ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS,
ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. BEFORE CONTRACTOR
PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE
EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL
BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL
BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH
WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR
RELOCATED WORK IN THIS PROJECT.
18. CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER
OBSTRUCTIONS UNDER OR ADJACENT TO HVAC EQUIPMENT THAT WILL ELIMINATE
OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
19. BEFORE THE CONTRACTOR BEGINS WORK HE SHALL RECORD ANY EXISTING
SYSTEM INFORMATION SUCH AS TEMPERATURE, FLOW RATE, PRESSURE,
CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY FOR HIM TO
RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING CONDITION. UNLESS
NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS ( HVAC, ELECTRICAL,
PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY MANNER AT THE BEGINNING
OF THE PROJECT. THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE
SUBMITTED TO THE PROJECT ENGINEER FOR REVIEW AND ACCEPTANCE BEFORE
ANY DEMOLITION OR OTHER RELATED WORK CAN PROCEED.
20. FOR DOORS BEING REPLACED: IF THE EXISTING DOOR HAS SIGNAGE APPLIED TO
IT, THIS SIGNAGE SHOULD BE CAREFULLY REMOVED AND REAPPLIED TO THE NEW
DOOR. IF THE SIGNAGE IS DAMAGED DURING REMOVAL OR CANNOT OTHERWISE
BE REAPPLIED IT SHOULD BE REPLACED WITH NEW SIGNAGE OF IDENTICAL TYPE.
21. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS
DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL
AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS
MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF
PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT,
HARDWARE REPAIR, DOOR REPAIR, ETC.
22. IT IS IMPORTANT THAT ALL REPLACEMENT DOORS HAVE A GAP OF LESS THAN 3/4"
BETWEEN THE BOTTOM OF THE DOOR AND THE FLOOR AT ALL POINTS.
CONTRACTOR MUST COORDINATE INSTALLED DOOR FRAME HEIGHT OR MAKE
OTHER NECESSARY MODIFICATIONS0 TO MEET THIS REQUIREMENT AND KEEP FIRE
RATING OF DOOR AND FRAME. BOTTOM SWEEPS ARE NOT ACCEPTABLE UNLESS
SPECIFICALLY STATED ON DRAWING.
23. THERE IS NO CONTRACTOR PARKING ON HOSPITAL PROPERTY AT THE JOHN
COCHRAN (JC) DIVISION. CONTRACTOR MAY LOAD AND UNLOAD MATERIALS IN
UNRESTRICTED AREAS ONLY.
24. IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF
PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE
ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING
MEMBRANE MANUFACTURER. HE MUST BE APPROVED BY THE MEMBRANE
MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING SINGLE PLY
MEMBRANE ROOF WARRANTIES.
25. EXISTING CIRCUITRY (CONDUIT, BOXES, WIRE, ETC.) MAY BE REUSED AT THE
CONTRACTOR'S OPTION AS LONG AS IT MEETS THE SAME SPECIFICATIONS
REQUIRED FOR NEW CIRCUITRY. ALL WORK, NEW AND EXISTING, SHALL COMPLY
WITH THE LATEST NEC CODE.
26. WHERE DOOR AND HARDWARE ARE SHOWN TO BE REMOVED, THE DOOR STOPS
ARE TO REMAIN AND BE REUSED UNLESS NOTED OTHERWISE.
CONTRACTOR NOTES
1. CONTRACTOR IS NOT AUTHORIZED TO SCALE CONSTRUCTION DOCUMENTS.
ARCHITECT IS TO BE NOTIFIED IN THE EVENT A DISCREPANCY IS FOUND IN EITHER
SPECIFICATIONS OR CONTRACT DOCUMENTS AT THE EARLIEST PRACTICAL
OPPORTUNITY.
2. GENERAL CONTRACTOR SHALL OBSERVE ALL REGULATIONS IMPOSED BY
GOVERNING BODIES.
3. CONSTRUCTION SHALL PROCEED IN AN ORDERLY AND CONTINUOUS FASHION IN
ACCORDANCE WITH THE INTERNATIONAL BUILDING CODES AND ALL OTHER
APPLICABLE CODES.
4. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY, INCLUDING
STORAGE OF MATERIAL AND EQUIPMENT, WITHIN THE CONSTRUCTION LIMITS, AT ALL
TIMES BEING RESPONSIBLE FOR AND ABIDING BY RULES AND REGULATIONS OF THE
OWNER.
5. GENERAL CONTRACTOR TO BE RESPONSIBLE FOR REPAIRING ANY AND ALL
SURFACES DAMAGED BY HIMSELF OR SUBCONTRACTORS UNDER HIS CONTROL.
REPAIRS ARE TO MATCH EXISTING MATERIALS AND MUST BE ACCEPTABLE TO
OWNER.
6. ADEQUATELY PATCH/REPAIR TO MATCH ADJACENT CONSTRUCTION, ALL BUILDING
STRUCTURES, COMPONENTS, AND UTILITIES WHICH ARE DISTURBED AND REQUIRE
REPAIR AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT.
7. ALL FLOOR TRANSITIONS BETWEEN DIFFERENT MATERIALS SHALL BE SMOOTH AND
FLUSH (MAXIMUM SLOPE = 1/8" PER FOOT).
8. GENERAL CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS FROM JOBSITE.
ALL CONSTRUCTION DEBRIS SHALL BE CONTAINED INSIDE CONSTRUCTION LIMITS.
9. ALL WALLS WITH ITEMS SUCH AS GRAB BARS, TOILET ACCESSORIES, WOOD TRIM,
SHELVING, CASEWORK, ETC. SHALL BE REINFORCED WITH CONCEALED, FIRE
TREATED WOOD BLOCKING OR METAL STUD BLOCKING. (GENERAL CONTRACTOR TO
INSTALL BLOCKING TYP.)
10. BUILDING 1 WILL REMAIN IN PARTIAL OCCUPANCY THROUGHOUT THE CONSTRUCTION
PERIOD. THE CONTRACTOR SHALL TAKE EVERY NECESSARY PRECAUTION TO
ENSURE THE UNINTERRUPTED OPERATION OF THE FACILITY, STAFF, PATIENTS AND
VISITORS. DISRUPTION TO ADJACENT DEPARTMENTS AS WELL AS DEPARTMENTS ON
FLOORS ABOVE OR BELOW SHALL BE COORDINATED WITH THE FACILITY CONTRACT
OFFICER. THE CONTRACTOR SHALL COORDINATE ALL WORK, CONSTRUCTION,
PATHWAYS, ELEVATOR USAGE, AND UTILITY INTERRUPTION WITH THE OWNER.
11. CONTRACTOR TO EXERCISE ALL PRECAUTIONS TO PROVIDE FOR STAFF, PATIENTS,
VISITORS, AND WORKMEN'S SAFETY DURING THE PERFORMANCE OF THIS CONTRACT
PER EPA, OSHA, AND OTHER APPLICABLE CODES, STANDARDS, AND REGULATIONS.
12. THE CONTRACTOR SHALL MAINTAIN & KEEP BARRIER FREE THE EXISTING MEANS OF
EGRESS.
13. ALL GYPSUM BOARD TO BE MOISTURE/MOLD RESISTANT TYPE X.
14. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF TEMPORARY
PARTITIONS AND TEMPORARY VENTILATION SYSTEMS AS REQUIRED TO PREVENT THE
SPREAD OF DUST FROM THE CONSTRUCTION AREA TO OCCUPIED AREAS OF THE
BUILDING. OCCUPIED AREAS SHALL REMAIN DUST FREE THROUGHOUT THE
CONSTRUCTION. THE CONTRACTOR SHALL MAINTAIN THE AFFECTED AREAS OF THE
BUILDING (INCLUDING MATERIAL TRANSPORT ROUTES) CLEAN AND DUST FREE.
15. ALL WOOD USED IN WALL CONSTRUCTION SHALL BE FIRE-RETARDANT-TREATED
LUMBER.
16. ALL WRITTEN CORRESPONDENCE WILL BE TRANSMITTED FROM SUBCONTRACTOR
THROUGH GENERAL CONTRACTOR THROUGH ARCHITECT TO OWNER. ALL PARTIES
CORRESPONDENCE ARE TO RECEIVE WRITTEN AND SIGNED COPIES OF SUCH. NO
VERBAL AGREEMENTS AFFECTING COST OR ALTERNATIVE CONSTRUCTION METHODS
AND ARRANGEMENTS WILL BE CONSIDERED VALID OR BINDING, AND ARE
THEREFORE, DISALLOWED.
17. GENERAL CONTRACTOR SHALL COMPLY WITH ALL DIRECTIVES OF THE OWNER. IF
CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS AND REQUIREMENTS OF BUILDING
OWNER AND/OR OPERATORS ARISE, THEY SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT IMMEDIATELY.
18. THE HVAC, PLUMBING AND ELECTRICAL CONTRACTORS SHALL COORDINATE THEIR
WORK WITH THE WORK OF OTHER TRADES TO ASSURE THAT THE WORK CAN BE
INSTALLED IN A WORKMAN-LIKE MANNER. EACH CONTRACTOR SHALL BE EXPECTED
TO COOPERATE WITH OTHER CONTRACTORS IN THE PLACEMENT OF WORK TO AVOID
CONFLICTS AND MAINTAIN JOB PROGRESS.
19. IT IS THE INTENT OF THESE DRAWINGS THAT A COMPLETE JOB IS TO BE
ACCOMPLISHED IN PREPARING THE BID. THE BIDDER SHALL MAKE ALLOWANCES FOR
DETAILS WHICH MIGHT HAVE BEEN INADVERTENTLY OMITTED FROM THE DRAWINGS.
20. ALL EXISTING DUCTWORK, ELECTRICAL OR PIPING IS NOT NECESSARILY SHOWN ON
THE DRAWINGS.
21. BEFORE CONTRACTOR(S) BID THE JOB, IT IS IMPERATIVE THEY VISIT THE JOBSITE
AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK,
ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY TO DESIGN AND
RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE
CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR RELOCATED WORK ON HIS
CONTRACT.
PROJECT GENERAL NOTES
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE INFORMATION ON THE
TECHNICAL INFORMATION LIBRARY (TIL)
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED
IN VA DESIGN DOCUMENTS)
• NFPA 101 LIFE SAFETY CODE
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING
VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENT, ENERGY,
AND TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE
GENERAL REQUIREMENTS SECTION 01010 IF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR THE ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD
62.1 – 2004.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 –
2007.
NOTE: ALL WORK IS TO BE PERFORMED TO THE LATEST EDITION OF THE FOLLOWING
CODES, ORDINANCES, AND LAWS WHICH INCLUDE, BUT ARE NOT LIMITED TO:
BUILDING CODES, GUIDES, MANUALS
PHARMACY DESIGN GUIDES
• USP 800
• USP 797 - PROPOSED
• USP 795
• VA PHARMACY SERVICE DESIGN GUIDE (PG-18-12) DATED: APRIL 1, 2018
3'-0" 4'-0" 3'-0"
3'-6" 3'-6"
6"
M
IN
HANDRAILS
WHEELCHAIR MANEUVERING
MANEUVERING CLEARANCES AT DOORS
LATCH SIDE APPROACH LATCH SIDE APPROACH
HINGE SIDE APPROACHHINGE SIDE APPROACH
FRONT APPROACHFRONT APPROACH
GENERAL REACH DIMENSIONS
LAVATORY DIMENSIONS
MOUNTING HEIGHT DIMENSIONS
90 TURNS 180 TURN
1 1/2 " CLEAR1.25"-2" DIA.
IF CIRCULAR
Pull Side
Push Side
Push Side
Push Side Pull Side m in
24"min.
X
Y
X m in
Y m in
Y
54" min.
m in
X
24" min.
X
Y m in
NOTE: y=48" minimum if door has both a latch and closer.
NOTE: y = 54" minimum if door has closer
NOTE: y=48" min if door has closer
NOTE: x = 36" min if y = 60", x = 42" min if y = 54"
18" minimum 24" preferred
NOTE: x = 12" if door has both a closer and latch.
SOAP DISPENSER
MIRROR
TELEPHONE
CLOCK
LIGHT SWITCH
M
A X
M
A X
M
A X
(TO HIGHEST
OPERABLE PART)
17" MIN
M
IN
M
IN
M
A X
M
A X
M
IN
6" MAX
17" MIN
M
IN
M
A X
M
A X
M
IN
6" MAX
8" MIN
PAPER TOWEL
DISPENSER
OCCUPANCY SIGN
LATCH SIDE PERFERED
THERMOSTAT
OR OTHER
CONTROL
48"
M
IN
Z
48"
Y
X 30" 24"
M
A X
30"
10" MAX
21" MAX
M
IN
M
A X
36" MIN
M
IN
M
A X
NOTE: X SHALL BE < 25";
Z SHALL BE > X, WHEN X < 20",
THEN Y SHALL BE 48" MAX
WHEN X IS 20"-25",
THEN Y SHALL BE 44" MAX.
INSULATE
EXPOSED PIPES
NO SCALE
NO SCALE
NO SCALE
M A
X
COUNTER
OR
LAVATOR
Y
GRAB BARS
1 1/2 " CLEAR1.25"-2" DIA.
IF CIRCULAR
IF NON-CIRCULAR
PERIMETER MUST
BE 4"-6.25" AND
DIAMETER MUST
NOT EXCEED 2.25"
IF NON-CIRCULAR
PERIMETER MUST
BE 4"-6.25" AND
DIAMETER MUST
NOT EXCEED 2.25"
.5 m in m in
/4
/2
BEVELED FLOORING TRANSITIONS
/4 m a x
/2 m a x
CARPET ON FLOOR SURFACES
/4 m a x
BEVELED FLOORING TRANSITIONS
TURNING CLEAR
5'-0" 2'-6"
TOP AND SIDES
MUST BE
UNOBSTRUCTED. UP
TO 20% OF BOTTOM
MAY BE
OBSTRUCTED FOR
SUPPORTS.
ROBE HOOK
NEED TO VERIFY ALL
FIXTURE TYPE & SIZES
WITH MANUFACTURER
HAND
SANITIZER
24x 36
MARKER
BOARD
TRIPLE
GLOVE
BOX
SHARPS
CONTAINE
R
T
O T
H E
R
IM
WAITING
TV
PROVIDE APPROPRIATE IN-WALL BLOCKING FOR SUPPORT OF FURNITURE AND ACCESSORIES.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:3
:0
A
M
GI002
GENERAL NOTES, LEGENDS, AND
ABBREVIATIONS
CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
2 55Revision# Description Date:
23 HOUR
OBSERVATION
A476
23 HOUR
OBSERVATION
A476
23 HOUR
OBSERVATION
A476
CORRIDOR
H405
S405
SERVICE
ELEVATOR
LOBBY
H407
ELEVATOR
NO.5
E5
E6
23 HOUR
OBSERVATION
A456
CLEAN ROOM
A453
TOILET, MALE
A454
CHEMO
TREATMENT
ROOM
A455
PHARMACY
A452
STAFF LOUNGE
A476
S401
ELEVATOR
NO.6
STAIR
NO.1
STAIR
NO.5
A402
A401
SURGERY
WAITING
A400
CONSULT
CONSULT
CORRIDOR
H403
CORRIDOR
H405
S405
SERVICE
ELEVATOR
LOBBY
H407
ELEVATOR
NO.5
E5
E6 CLEAN ROOM
A453
TOILET, MALE
A454
CHEMO
TREATMENT
ROOM
A455
PHARMACY
A452
S401
ELEVATOR
NO.6
STAIR
NO.1
STAIR
NO.5
CONSULT
A402
CONSULT
A401
SURGERY
WAITING
A400
HD STORAGE (-)
A456A
HD BUFFER
(-)A457A
ANTE (+)
A457
PHARMACY
A456
NON-HD
BUFFER (+)
A457B
STAFF LOUNGE
A452
CORRIDOR
H403
CORRIDOR
H405
S405
SERVICE
ELEVATOR
LOBBY
H407
ELEVATOR
NO.5
E5
E6
TOILET, MALE
A454
CHEMO
TREATMENT
ROOM
A455
S401
ELEVATOR
NO.6
STAIR
NO.1
STAIR
NO.5
CORRIDOR
H403
CORRIDOR
H405
S405
SERVICE
ELEVATOR
LOBBY
H407
ELEVATOR
NO.5
E5
E6
23 HOUR
OBSERVATION
A456
CLEAN ROOM
A453
TOILET, MALE
A454
CHEMO
TREATMENT
ROOM
A455
PHARMACY
A452
S401
ELEVATOR
NO.6
STAIR
NO.1
STAIR
NO.5
CONSULT
A402
CONSULT
A401
SURGERY
WAITING
A400
CORRIDOR
H403
CONSULT
A402
CONSULT
A401
ICE MAKER
A476A
SURGERY
WAITING
A400
SURGERY
WAITING
A400
HD STORAGE (-)
A456A
HD BUFFER
(-)A457A
ANTE (+)
A457
PHARMACY
A456
NON-HD
BUFFER (+)
A457B
ICE MAKER
A452A
PHASE 1 - 4TH LEVEL
1" = 20'-0"
1. REMOVE EXIST FURNITURE/EQUIPMENT TO BE SALVAGED.
SEE DEMOLITION PLAN FOR SPECIFIC NOTES.
2. ADJUST SIZE OF EXISTING RECEPTION DESK AND MOVE
KIOSK CHECK-IN.
3. BUILD TEMPORARY CONSTRUCTION PARTITIONS TO
CONTAIN CONSTRUCTION WORK AS PER DRAWINGS.
3.1 TEMPORARY DOOR LOCATION.
4. CARRY OUT DEMOLITION AND NEW CONSTRUCTION AS
PER DRAWINGS.
5. UPDATE FLOORING AND FINISHES IN THIS AREA ON
WEEKEND BETWEEN PHASE 1 AND 2.
6. REMOVE TEMPORARY CONSTRUCTION PARTITIONS.
PHASE 1 - 4TH LEVEL NOTES: #
PHASE 3 - 4TH LEVEL NOTES: # PHASE 4 - 4TH LEVEL NOTES: #
1 4 1 5
1 3
1 3
1. REMOVE EXIST FURNITURE/EQUIPMENT TO BE SALVAGED.
SEE DEMOLITION PLAN FOR SPECIFIC NOTES.
2. BUILD TEMPORARY CONSTRUCTION PARTITIONS TO CONTAIN
CONSTRUCTION WORK AS PER DRAWINGS.
2.1 TEMPORARY DOOR LOCATION.
3. CARRY OUT DEMOLITION AND NEW CONSTRUCTION AS PER
DRAWINGS.
4. BUILD NEW EQUIPMENT ON ROOF AND EXTERIOR DUCT
CHASE.
5. DUCTWORK IN CEILING OVER LOCKER ROOM TO NEW
PHARMACY.
6. REMOVE TEMPORARY CONSTRUCTION PARTITIONS.
1. REMOVE EXIST FURNITURE/EQUIPMENT TO BE SALVAGED.
SEE DEMOLITION PLAN FOR SPECIFIC NOTES.
2. BUILD TEMPORARY CONSTRUCTION PARTITIONS TO
CONTAIN CONSTRUCTION WORK AS PER DRAWINGS.
2.1 TEMPORARY DOOR LOCATION.
3. CARRY OUT DEMOLITION AND NEW CONSTRUCTION AS PER
DRAWINGS.
4. REMOVE TEMPORARY CONSTRUCTION PARTITIONS.
P L A
N N
O R
T H
PHASE 2 - 4TH LEVEL
1" = 20'-0"
P L A
N N
O R
T H
PHASE 3 - 4TH LEVEL
1" = 20'-0"
P L A
N N
O R
T H
PHASE 4 - 4TH LEVEL
1" = 20'-0"
P L A
N N
O R
T H
1. REMOVE EXIST FURNITURE/EQUIPMENT TO BE SALVAGED.
SEE DEMOLITION PLAN FOR SPECIFIC NOTES.
2. ADJUST SIZE OF EXISTING RECEPTION DESK LOCATION
AND KIOSK CHECK-IN.
3. BUILD TEMPORARY CONSTRUCTION PARTITIONS TO
CONTAIN CONSTRUCTION WORK AS PER DRAWINGS.
3.1 TEMPORARY DOOR LOCATION.
3.2 BUILD TEMPORARY CONSTRUCTION PARTITIONS TO
CONTAIN CONSTRUCTION WORK AS PER DRAWINGS. THIS
TEMPORARY PARTITION NEEDS TO BE 1-HR SMOKE
BARRIER.
4. FINALIZE FINISHES AND MOVE RECEPTION DESK AND
KIOSK TO FINAL LOCATION WHEN THIS TEMP PARTITION
CAN BE REMOVED.
5. CARRY OUT DEMOLITION AND NEW CONSTRUCTION AS
PER DRAWINGS.
6. REMOVE TEMPORARY CONSTRUCTION PARTITIONS.
PHASE 2 - 4TH LEVEL NOTES: #
(NEW 23-HOUR ROOM)(EXPAND WAITING)
(NEW PHARMACY) (STAFF LOUNGE)
3.2
3.2
PHASE 3
3.1
3.1 3.13.1
3.1
2.1
2.1
PHASE 1
PHASE 4
PHASE 2
PHASING PLAN LEGEND
TEMPORARY CONSTRUCTION PARTITION AND DOORS
KEYNOTE#
LOCATION OF 1-HR TEMP CONSTRUCTION LIMITS
A. TEMPORARY CONSTRUCTION PARTITION BARRIERS FOR INFECTION
CONTROL AND TO MAINTAIN FIRE BARRIER ASSEMBLIES AS
REQUIRED.
B. CONTRACTOR TO COORDINATE WITH OWNER FOR STAGING AREA
ON SITE AND MOBILIZATION ACCESS POINTS FOR EACH PHASE.
C. REFERENCE SPECIFICATION FOR INFORMATION REGARDING
ASBESTOS IN THE EVENT THAT ASBESTOS IS PRESENT,
CONTRACTOR IS RESPONSIBLE FOR ASBESTOS REMOVAL.
D. COORDINATE THE TRANSITIONS BETWEEN PHASES WITH THE
OWNER TO ALLOW FOR ADEQUATE TIME TO RELOCATE EXISTING
EQUIPMENT / FURNITURE.
E. COORDINATE TEMPORARY INTERIOR FINISHES, POWER, HVAC, AND
PLUMBING WITH OWNER IN TEMPORARY (INTERIM) SPACES.
D. COORDINATE WITH OWNER WHEN A SHUT DOWN OF ANY SYSTEMS
WILL OCCUR TO MINIMIZE DISRUPTION OF EXISTING SERVICES.
E. OWNER COORDINATED RISK ASSESSMENT TO OCCUR PRIOR TO
CONSTRUCTION COMMENCEMENT AND DURING PHASING
TRANSITIONS.
PHASING GENERAL NOTES
EXIST. DECK ABOVE
FIRE CAULK EACH SIDE
FIRESAFE PENETRATIONS @ EXIST. UTIL.
WITH 1HR RATED SYSTEM
CONT. 1HR RATED PTN. TO UNDERSIDE OF
DECK ABOVE
CONTRACTOR OPTION, PROVIDE 1HR HORIZ.
ASSEMBLY TO NEAREST RATED CONST. IN LIEU
OF PTN. TO DECK
NOTE: AS A CONTRACTOR OPTION, RECONFIGURE EXISTING SPRINKLER SYSTEMS TO
PROVIDE UPRIGHT HEADS FOR FULL SPRINKLER COVERAGE OF THE CONSTRUCTION AREA IN
LIEU OF RATED TEMPORARY SEPARATIONS UNTIL NEW CEILING FINISHES ARE INSTALLED.
5/8" TYPE "X" GYP. BD. BOTH SIDES ON 3-5/8"
METAL STUDS. LEVEL 2 FINISHES AND
PAINT ON CORRIDOR / ROOM SIDE.
CORRIDOR / ROOM
SIDE
WORK SIDE
METAL SLIP TRACK; ALLOW FOR MIN.
1" DEFLECTION - UNO. SEE SPEC
METAL STUD RUNNER
GYPSUM BD CLADDING
UL #U419
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:3
:0
A
M
GI101
PHASING PLAN CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
3 55
1 1/2" = 1'-0" F4
TEMPORARY PARTITION - FIRE RATED
UP
UTSR
QPONH-AG-AMLKJIHGFE
ROOF BELOW
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
LIMITS
PHASE #1
LIMITS
PHASE #1
LIMITS
PHASE #2
LIMITS
PHASE #2
LIMITS
PHASE #3
LIMITS
PHASE #3
LIMITS
PHASE #3
LIMITS
PHASE #3
LIMITS
PHASE #4
LIMITS
PHASE #4 ALT #2
ALT #1
ACM ON PIPING
AND PIPE FITTINGS
ACM FLOORING
LBP ON DOOR
FRAMES
ACM ON PIPING
AND PIPE FITTINGS
ACM ON PIPING
AND PIPE FITTINGS
ACM ON PIPING
AND PIPE FITTINGS
LBP WINDOW SILLS
AND FRAMES
LBP WINDOW SILLS
AND FRAMES
ACM FLOORING
ACM FLOORING
ACM FLOORING
GENERAL NOTES - ASBESTOS ABATEMENT:
A. REMOVE ALL ASBESTOS PIPE FITTING INSULATION WITHIN THE ASBESTOS
ABATEMENT WORK SPACE, ABOVE CEILINGS, (INCLUDING THERMAL
INSULATION ON PIPING SERVING 9TH FLOOR CONVECTORS), AND IN THOSE
CHASES SCHEDULED FOR DEMOLITION, REMOVE ALL DEBRIS FOUND IN THE
WORK AREA. USE TRADITIONAL ASBESTOS ABATEMENT METHODS IN THOSE
AREAS WHERE INSULATION MAY BE DAMAGED AND SIGNIFICANT PORTIONS
OF DEBRIS MAY EXIST SUCH AS IN CHASES THAT CANNOT BE ACCESSED
WITHOUT DEMOLITION. CHASES SHOWN TO BE REMOVED SHALL BE INITIALLY
OPENED UP ONLY AS NECESSARY TO ALLOW VISUAL INSPECTION OF THE
TO TAKE PLACE TO DETERMINE THE CONDITION OF THE MATERIAL INSIDE. IF
SIGNIFICANT DAMAGE IS BELIEVED TO EXIST, THAN THE REMAINING CHASE
WALLS SHALL BE REMOVED USING TRADITIONAL ASBESTOS ABATEMENT TO
PRECLUDE ANY POSSIBLE RELEASE OF MATERIAL INTO THE AREA DUE TO
DEMOLITION ACTIVITIES.
B. REMOVE ALL FLOOR TILE AND FLOOR TILE MASTIC WITHIN THE ASBESTOS
ABATEMENT WORK AREA.
C. REINSULATE ANY PLUMBING/MECHANICAL SYSTEM THAT IS TO REMAIN IN USE.
REFER TO MECHANICAL DRAWINGS AND SPECIFICATIONS.
PLUMBING/MECHANICAL SYSTEMS TO BE PERMANENTLY REMOVED , MAY BE
CUT AND WRAPPED AND REMOVED IN SECTIONS WITH THE INSULATION STILL
ATTACHED.
D. ENCAPSULATE THE EXPOSED ENDS OF ANY PIPE INSULATION THAT IS NOT
REMOVED AT ADJOINING FLOOR LEVELS.
ACM - FLOOR TILE AND/OR MASTIC
ACM - THERMAL PIPE INSULATION/FITTINGS
ABOVE CEILING AND WITHIN PIPE CHASES
SYMBOLS - HAZARDOUS
LBP - LEAD BASED PAINT AS NOTED
REFER TO ASBESTOS AND LBP SURVEY REPORT IN
SPECIFICATIONS FOR ADDITIONAL DETAILS AND
QUANTITIES.
STAIRWELL NO.
S401 SERVICE
ELEVATOR
LOBBY
H407
STAIRWELL NO.
S405
PHARMACY
A452
CLEAN ROOM
A453
TOILET, MALE
A454
23 HOUR
OBSERVATION
A456
ICE MAKER
A476A
STAFF LOUNGE
A476
SURGERY
WAITING
A400
EXAM
A401
EXAM
A402
CHASE
CH-A-3
ELEC. CLOSET
A454AF.E. CLOSET
H405A
CHASE
CH-A-6
ELEVATOR
NO.5
E5
ELEVATOR NO.
E6
CORRIDOR
H403
CHEMO
TREATMENT
ROOM
A455
CORRIDOR
H405
ELEC. CLOSET
A436A
HAC
A403
TOILET
A406A
CORRIDOR
H402
LAB
A435
WAITING
CONSULT
A436
CONSULT
A436A
STORAGE
A436C
HAC
A475
TOILET
A472A
CLEAN UTILITY
A458
ELEC. CLOSET
A458A
TOILET
A461A
PUBLIC TOILET
A444
ELEVATOR NO.
E4
ELEVATOR NO.
E3
ELEVATOR
LOBBY
H406
F.E. CLOSET
A436E
ELEC. CLOSET
A436D
ELEC. CLOSET
A436F
STORAGE
A404
UTSRQPONH-AG-AMLKJIHGFE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
REMOVED WASTE ASSUMED
ACM ON PIPING AND FITTINGS
REMOVED WASTE ASSUMED
ACM ON PIPING AND FITTINGS
ALT #2
ALT #1
REMOVED WASTE ASSUMED
ACM ON PIPING AND FITTINGS
REMOVED WASTE ASSUMED
ACM ON PIPING AND FITTINGS
VACANT
A302B
VACANT
A302A
TOILET
A375A
OFFICE
A375
CLINICAL
NUTRITION
A374
OFFICE
A374A
CORRIDOR
H304
LAUNDRY
A350
PT WORK
A345 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:3
:1
A
M
HA101
HAZARDOUS MATERIALS PLANS CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
4 55
1/8" = 1'-0" F1
4TH LEVEL HAZARDOUS PLAN P
L A
N N
O R
T H
1/8" = 1'-0" C1
3RD LEVEL HAZARDOUS CEILING PLAN P
L A
N N
O R
T H
NOTE:
UNKNOWN CONDITIONS OF PIPING BEING
REMOVED ON 3RD LEVEL. ASSUMED ASBESTOS
CONTAINING MATERIALS IN THESE LOCATIONS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
SHEET FOR
REFERENCE ONLY
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:2
:4
A
M
SX101
4TH LEVEL EXISTING FLOOR FRAMING
PLAN (INFO ONLY)
CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
7 55
1/8" = 1'-0"
EXISTING 4TH LEVEL FRAMING PLAN
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
SHEET FOR
REFERENCE ONLY
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:2
:4
A
M
SX102
5TH LEVEL EXISTING FLOOR FRAMING
PLAN (INFO ONLY)
CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
657-18-301JC
8 55
1/8" = 1'-0"
EXISTING 5TH LEVEL FRAMING PLAN
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
SEE COVER SHEET FOR IPT MEMBERS
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA 51101
712.252.4014
142 N. MOSLEY ST.
WICHITA, KANSAS 67202
316.262.2500
303 S. TOPEKA
WICHITA, KANSAS 63202
316.262.2691
8669 OLIVE BOULEVARD
ST LOUIS, MISSOURI 63132
314.432.8073
SHEET FOR
REFERENCE ONLY
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
ASSOCIATE DIRECTOR
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
PLAN
NORTH
Building Key Plan: 4th LevelSeal:
TRUE
NORTH
/9
/2
:2
:4
A
M
SX601
EXISTING COLUMN SCHEDULE (INFO
ONLY)
CORRECT PHARMACY DEFICIENCIES ON 4TH
LEVEL FOR USP 800 COMPLIANCE
10/9/2018 DM JN/JB
100% BIDDING DOCUMENTS
9 55Revision# Description Date: