36C25519Q0061-002.pdf

PDF 180 KB Posted

Attached to
EATON UPS BATTERY REPLACEMENT Federal contract opportunity
Solicitation number
36C25519Q0061
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

36C25519Q0061 J_A-Redacted.pdf

View the file

Other files for this federal contract opportunity

Other files attached to EATON UPS BATTERY REPLACEMENT, newest first.
File Type Posted
36C25519Q0061-0002000.docx DOCX document
36C25519Q0061-0001000.docx DOCX document
36C25519Q0061-001.docx DOCX document
36C25519Q0061-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPM Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

VHAPM Part 813.106 Page 1 of 1 Original Date: 08/30/17 Revision 01 Eff Date: 04/23/2018

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID: 36C255-19-AP-0036

1. Contracting Activity:

- Department of Veterans Affairs, Marion VAMC 2401 West Main St. Marion, IL. 62959-1188

- Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway, Leavenworth KS. 66048

Center

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:

- The Marion VA Medical Center is requesting replacement for Eaton UPS Battery replacement and Installation. This is a new requirement with an estimated amount of

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

- This is Brand Specific requirement; the facility has two Eaton UPS systems that require battery replacement/installation. Acquiring other brands could void the warranties.

4. Description of market research conducted and results or statement why it was not conducted:

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Note: COs are required to make a determination of price reasonableness IAW FAR 13.106-3. See the S19 Open Market (FAR13) Award Documentation Form with Abstract to document price reasonableness.

Contract Specialist

11/5/2018

X Emilio Ballentos

Emilio Ballentos Signed by: Emilio Ballentos 632259 https://www.acquisition.gov/?q=/browse/far/13 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466 https://vaww.pclo.infoshare.va.gov/PMWeb/S19%20Open%20Market-FAR13%20Award%20Documentation%20Form.pdf

File details come from the government source that posted it.