36C25519Q0010-004.pdf

PDF 765 KB Posted

Attached to
Furniture QM & HR (VA-18-00144128) - CO 589A93012 CI Select
Solicitation number
36C25519Q0010
Issued by

About this file

36C25519Q0010 Qm_HR Floor Plan.pdf

View the file

Other files

File Type Posted
-15857.docx DOCX document
36C25519Q0010-0002000.docx DOCX document
36C25519Q0010-0001001.docx DOCX document
36C25519Q0010-0001000.docx DOCX document
36C25519Q0010-003.docx DOCX document
36C25519Q0010-001.docx DOCX document
36C25519Q0010-000.docx DOCX document
36C25519Q0010-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF.

R

EF

2 HOUR

RATED

2 HOUR

RATED

2 HOUR

RATED

2 HR.

RATED

2 HOUR

RATED

2 HOUR

RATED

2 HOUR

RATED

2 HOUR

RATED

2 HOUR

RATED

Path 2

Path 2

Path 1

Path 1

Path 1

1-A3.0

Office

Office

Office 662 Open Office

Team Room

File Room

Copy/Storage

Office

Office

PIV

Waiting 660A

Existing IT

Stairs

Office

Office

Office

Office

Office

Shared Office

Shared Office

Office

Office

Office

Office

Office

Ga lle y

Corridor C004

Co rri do r

C0

Corridor C001

Elevator Lobby

Open Office

Team Rm

Office 607Corridor

C63

Corridor C62

Copy/ Storage

Galley 602A

Office

Office

Office

Office

Renovate Vacated ICU Project #: 589A4-16-101

Project Area

1-A3.0 9

1-A3.0 10

CODE ANALYSIS

FULLY SPRINKLERED

Building Code: 2015 International Building Code

Building Information / Classification Section 304 B-Business Group

Squarefootage of Renovation: 6,342 Squarefootage of Overall Floor: 23,490

Building Type: 11B Fully Sprinkled

Fire Seperation:

2 Hour FLoor 2 Hour Egress Stairwell 2 Hour Vertical Shafts

Occupant Loads

Table 1004.1.2 Classification B - 100 Gross SF Floor Area Per Occupant

Overall: 23,490 / 100 = 234 Occupants Renovation: 6,342 / 100 = 63 Occupants

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans A sffair Depa frtment o

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

7/13/2017 9:52:39 AM

800 Hospital Drive Columbia, MO 65201

6th Floor Life Safety Plan Renovate Vacated ICU, 6th Floor

1-G1.0 07/12/2017

BID DOCUMENTS

JCB ZF

589A4-16-101

N

1/8" = 1'-0"1 6th Floor Life Safety Plan

Travel Path Travel Distance Path 1 120'-2" Path 2 139'-7"

07/12/2017

Existing Wall to be Demolished

Existing Wall to Remain

Existing Door to be Demolished

Existing Door to Remain

Demolition Plan Legend

Temporary 1-HR Fire Rated Construction Partition exended to deck above

Break Room 656IHallway

656J

ICU Bay 5 656K

ICU Bay 3 656M

ICU Bay 4 656L

Ante 656G

Toilet 656H

ICU Bay 6 656F

ICU Bay 7 656E

ICU Bay 8 656D

ICU Bay 9 656C

ICU Bay 10 656B

656T

ICU ISO

656P

ICU ISO

656R

Ante Rm 656Q

Ante Rm 656S

Soil Dispatch

656O

Equip.

Storage

656N

Janitor

Soiled Dispatch

Consult Rm

Mgr. Office 656 U

Equipment Storage

Waiting Area

Room

Toilet 610A

Stairs

IT

613C

IT

613B

612 612G

612F

612E612D

625E 612A 612B 612C

625D

Toilet 645A

Office

IT Rm

Resp. Care Office

Vending

Toilet

Clean Dispatch

Cardiology Providers Spec. Care

Physician Spec. Care

Physician Surg. Svc.

Physician Spec. Care

W/C Stg.

601C

Central Jan.

Stg.

601B

Service Lobby

Soiled Dispatch

601A

Corridor C63

Corridor C62

Elev. Lobby

Stairs

Corridor C65

6 66

5 5 5

3 3

4 4

4.1 4.1

5 5

5.4 5.4

6 6

6.2 6.2

6.7 6.7

7 7

8 8

10 10

F

F

G

G

Ga

Ga

H

H

Hb

Hb

J

J

Jb

Jb

K

K

N.I.C.

N.I.C.

N.I.C.

N.I.C.

Pr oj ec t L in e

Project Line

Ja

Ja

20 20 20

HOLD

6'-0"

MAINTAIN ACCESS TO

STAIRWELL DURING

HOSPITAL HOURS

MAINTAIN ACCESS TO

STAIRWELL DURING

HOSPITAL HOURS

Area of WorkNot in Contract

Demo Existing Acoustical Ceiling Tile System, Light Fixtures, Sprinkler Heads, HVAC Diffusers and And Ceiling Mounted Devices Completely. Refer to MEP Drawings For Additional Information.

Demo Existing Vinyl Composition Tile and Vinyl Base Completely. Prepare Area to Receive New Flooring Finish.2

Remove Existing Medical Gas and Associated Hardware.

Cap Services in Wall or Below Floor. (RE: Plumbing)3

Demo Existing Carpet Flooring and Base Completely.

Prepare Area to Receive New Flooring Finish.4

Dashed Lines Indicate Approximate layout Existing Patient Lift Rails. Contractor To Carefully Remove Existing Equipment Rails and Supports and Return to the Owner For Future Use.

Remove Existing Plumbing Fixture(s) and Associated Hardware Completely. Cap All Services Below Floor. Re:

Plumbing Drawings for Additional Information.

Remove Existing Casework (Upper and Lower), Countertop, Plumbing Fixture and Services Completely.

Cap All Services Below Floor or Within Wall if Wall Remains.

Remove Existing Medical Gas Alarm and Control Panel.

RE: Plumbing8

Keynote Legend - 6th Floor Demolition Plan

Demo Existing Ceramic Tile Flooring and Ceramic Base Completely. Prepare Area to Receive New Flooring Finish.9

Demo Existing Sheet Vinyl Flooring and Vinyl Base Completely. Prepare Area to Receive New Flooring Finish.10

Demo Existing Gypsum Board Ceiling System, Light Fixtures, Sprinkler Heads, HVAC Diffusers and Any Ceiling Mounted Devices Completely.

Remove Casework12

Remove Telephone13

Remove all stainless steel corner guards14

Remove Wood Chair Rail @ Walls to Remain15

Remove Sliding Glass Door16

Remove Ceramic Tile from walls to remain17

Existing Drinking Fountain to remain18

Existing handrails to remain, unless otherwise noted19

Remove window sill & window blinds20

Remove Mopsink; RE: Plumbing21

Remove handrail22

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans A sffair Depa frtment o

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

7/13/2017 9:52:10 AM

800 Hospital Drive Columbia, MO 65201

6th Floor Demolition Plan Renovate Vacated ICU, 6th Floor

1-A1.0 07/12/2017

BID DOCUMENTS

JCB ZF

589A4-16-101

General Notes - Demolition Plans

A Demolition and construction must be sequenced and coordinated to ensure that the building owner's operations are continuously mantained.

B This demolition plan reflects information gathered from existing conditions drawings and architects feild observations. Contractor to verify accuracy of information and include all required demolition in their bid & report any discrepancies to the architect.

C Items to be demolished, removed, or relocated are shown dashed. Existing items to remain shall be protected during construction by contractor. Patch and repair any surfaces disturbed by demolition that are to remain.

D Remove all flooring finishes and base unless otherwise noted. Prepare slab and existing walls that are to remain for new finishes.

E Remove ceiling tile, grids, lights, associated hardward and panels. Refer to RCP Drawings for existing ceiling to remain.

F Remove all all mounted wire mould and recepticles. Pull wire back to electrical panel.

RE: Electrical drawings for additional information.

G Remove all existing phone/data lines back to nearest patch panel. RE: Electrical drawings for additional information.

H Protect all medical equipment and associated medical items during construction.

I All demolition and construction areas must have ante rooms as required and described in the specifications. Verify exact locations of ante rooms with COR.

J Remove all ceiling mounted curtain tracks.

K All work in corridors and elevator lobby (other than containment walls) is to be done on either weekends or after hours.

L Access to the passenger and frieght elevators must be maintained at all times.

M Other than building of containment walls, contractors are not allowed in corriodor C65 (while Surg. 6 is occupied)

N

1/8" = 1'-0"1 6th Floor Demolition Plan

1" = 40'-0"

Key Plan Overall

1-A1.2

1-A1.3

3 3

4 4

4.1 4.1

5 5

5.4 5.4

6 6

6.2 6.2

6.7 6.7

7 7

8 8

9 9

10 10

N

N

M

M

F

F

G

G

Ga

Ga

H

H

Hb

Hb

J

J

Jb

Jb

K

K

L

L

La

La

Office

Office

Office

Office

Office

Office

Office

Open Office

Team Room

File Room

Copy/Storage

Office

PIV

Waiting 660A

Office

Office

Office

Office

Office

Shared Office

Shared Office

Open Office

Corridor C63

Team Rm

Office

Copy/ Storage

Corridor C62

Elevator Lobby

Galley

Office

Office

Office

Office

Office

Office

Co rri do r

C0

Corridor C002

Corridor C002

MATCHLINE

Open Office

Corridor C003

Corridor C004

Ja

Ja

Q ua lit y

M an ag em en t

Closet

Clos.

H um an R es ou rc es

2, SF

T ot al 3, SF

T ot al

Galley 602A

Corridor C65

Area of WorkNot in Contract

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans A sffair Depa frtment o

One Memorial Drive Suite 1800 Saint Louis, MO 63102

Tel Fax

314.621.4343 314.621.0261

7/13/2017 9:52:12 AM

800 Hospital Drive Columbia, MO 65201

6th Floor Renovation Plan Renovate Vacated ICU, 6th Floor

1-A1.1 07/12/2017

BID DOCUMENTS

JCB ZF

589A4-16-101

N

1/8" = 1'-0"1 Overall Existing 6th Floor Plan

N

1" = 40'-0"