36C25518R0522-028.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25518R0522
About this file
36C25518R0522 04 Fire Protection Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518R0522-023.pdf | ||
| 36C25518R0522-031.pdf | ||
| 36C25518R0522-032.pdf | ||
| 36C25518R0522-029.pdf | ||
| 36C25518R0522-027.pdf | ||
| 36C25518R0522-030.pdf | ||
| 36C25518R0522-024.pdf | ||
| 36C25518R0522-025.pdf | ||
| 36C25518R0522-026.pdf | ||
| 36C25518R0522-022.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-E
1-51-31-21-1
1-H
1-J1A-A
1-M
1-N
1-Q1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
AREA NOT IN SCOPE
REMOVE AND RELOCATE FIRE
SPRINKLER HEADS TO PROVIDE
PROPER COVERAGE WITHIN THE
OUTLINED AREA.
PATIENT ROOM
221-1
TOILET
220-1
SOILED UTILITY
218-1
TOILET
217-1
PATIENT ROOM
216-1
AIRBORNE INFECTION ISO.
PATIENT ROOM
214-1
TOILET
213-1
PATIENT ROOM
211-1
TOILET
209-1
PATIENT ROOM
208-1
PATIENT ROOM
204-1
BARIATRIC PATIENT ROOM
202-1
MEDICATION
230-1
EQUIP. STOR.
229-1
PATIENT ROOM
233-1
PATIENT ROOM
234-1 PATIENT ROOM
236-1
TOILET
232-1
ANTE RM
215-1
CHARTING
206-1
CLEAN UTILITY
231-1
TOILET
238-1
RECEPTION
241-1
NURSE STATION
224-1
EXIST. STAIRS
2-STAIR-W
TOILET
210-1
TOILET
203-1
TOILET
205-1
CORR
200-1
CORR
201-1
CORR
225-1
CORR
212-1
CORR
219-1
CORR
207-1
STAFF TOILET
222-1
HSKPG
240-1
CHASE
ELECT.
228-1
NOURISH.
227-1
ALCOVE
201A-1
CLEAN LINEN
201B-1
TOILET
235-1
TOILET
237-1
CLOSET
207A-1
1. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE
FOR THE SPRINKLER HEAD LAYOUTS, CALCULATIONS,
AND ENGINEERING DRAWINGS AS LISTED IN GENERAL
NOTES ON F-001.
2. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING
FULL COORDINATION AND LAYOUT DRAWINGS PER FIRE
PROTECTION SPEC SECTION. COORDINATION SHOULD BE
COMPLETED WITH ALL TRADES INCLUDED.
CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION
DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER
AND COR.
GENERAL NOTES
LIGHT HAZARD
PLAN NOTES
ORDINARY HAZARD I
ORDINARY HAZARD II
NO
HATCH
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
F-121
FIRE PROTECTION - SECOND FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
FIRE PROTECTION PLAN - SECOND FLOOR
2' 4' 8'0'
1/4" = 1'-0"
N
No. Description Date
1-E
1-51-31-21-1
1-H
1-J1A-A
1-M
1-N
1-Q1A-D
1A-C
1A-B
1-T
1-V
1-W
1-U
1-3A
1-6
1-9
1-11
1-13
1-X
1-R
1-I
1-D
1-20 1-211-16
1-121-101-7
1-G
AREA NOT IN SCOPE
REMOVE AND RELOCATE FIRE
SPRINKLER HEADS TO PROVIDE
PROPER COVERAGE WITHIN THE
OUTLINED AREA.
PATIENT ROOM
336-1
EQUIP. STOR.
338-1
EQUIP. ALCOVE
300-1
HALL
301-1
HALL
326-1
HALL
339-1
EXIST. STAIRS
3-STAIR-W
ELECT.
328-1
CLEAN UTILITY
330-1
TOILET
337-1
PATIENT ROOM
334-1
TOILET
335-1
SOILED UTILITY
319-1
PATIENT RM
316-1
TOILET
317-1
STORAGE
320-1 TOILET
321-1
ANTE RM
318-1
PATIENT RM
322-1
PATIENT RM
314-1
HSKPG
324-1
NURSE STATION
325-1
STAFF TOILET
323-1
TOILET
313-1CHASE
NOURISH.
327-1
PATIENT RM
311-1
TOILET
310-1
TOILET
309-1
PATIENT RM
308-1
BARIATRIC PATIENT ROOM
302-1
PATIENT RM
304-1
TOILET
305-1
HALL
307-1
HALL
312-1
CHARTING
306-1
ALCOVE
301-1A
CLOSET
307A-1
MEDICATION
331-1
EQUIP. STOR.
329-1
1. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE
FOR THE SPRINKLER HEAD LAYOUTS, CALCULATIONS,
AND ENGINEERING DRAWINGS AS LISTED IN GENERAL
NOTES ON F-001.
2. THIS CONTRACTOR IS RESPONSIBLE FOR SUBMITTING
FULL COORDINATION AND LAYOUT DRAWINGS PER FIRE
PROTECTION SPEC SECTION. COORDINATION SHOULD BE
COMPLETED WITH ALL TRADES INCLUDED.
CONSTRUCTION SHALL NOT BEGIN UNTIL COORDINATION
DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER
AND COR.
GENERAL NOTES
LIGHT HAZARD
PLAN NOTES
ORDINARY HAZARD I
ORDINARY HAZARD II
NO
HATCH
PHASE 1
Drawing Title Project Title
Date
Location
Checked
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
589A7-17-203
Robert J. Dole VA Medical Center
RENOVATE WARDS FOR PATIENT
PRIVACY PHASE 1, B1
117 PIERCE ST, SUITE 110
SIOUX CITY, IOWA
142 N. MOSELY ST
WICHITA, KANSAS
F-131
FIRE PROTECTION - THIRD FLOOR
BOH AR04/26/2018
1/4" = 1'-0"
FIRE PROTECTION PLAN - THIRD FLOOR
2' 4' 8'0'
1/4" = 1'-0"
N
No. Description Date
File details come from the government source that posted it.