36C25518R0214-029.pdf
PDF 40 KB Posted
- Solicitation number
- 36C25518R0214
About this file
36C25518R0214 D4 ON Call General Surgery QASP 02.26.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518R0214-026.pdf | ||
| 36C25518R0214-027.pdf | ||
| 36C25518R0214-025.docx | DOCX document | |
| 36C25518R0214-028.pdf | ||
| 36C25518R0214-030.pdf | ||
| 36C25518R0214-024.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
36C25518R0214 On-Site General Surgery Services
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How monitoring will take place.
Who will conduct the monitoring?
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Colleen Donahue-MacDonald
Organization or Agency: NCO 15
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Charles Anderson
Organization or Agency: Kansas City
3. CONTRACTOR REPRESENTATIVES
The employee(s) of the contractor serve as the contractor’s program manager(s) for this contract. Program Managers will be station specific and will be identified at the time of award.
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract
a. Primary Program Manager:
b. Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined.
Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this
QASP.
a. DIRECT OBSERVATION. 100% surveillance: Surveillance will be accomplished through site visits; interviews with the veterans, the veteran families, and staff; record review and will be done by COR and assigned VA staff, to evaluate all reports provided.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed basis; COR will evaluate outcomes through documentation and/or contractor’s physicians’ notes; randomly selected files will be reviewed per the required inspection period.
c. RANDOM SAMPLING. Periodic Sampling will be taken when a problem and/or deficiency is suspected. Sample results are applicable only for the specific work being inspected. This will occur either on a monthly and/or quarterly basis.
d. VALIDATED USER/CUSTOMER COMPLAINTS. The Patient Safety Report will be utilized to maintain and track patient complaints; Information from the patient advocacy office will assist in validating the complaints.
e. PROGRESS OR STATUS MEETINGS. Verification and/or documentation provided by Contractor. Documentation shall be submitted to the COR and/or CO as verification of compliance. Review of TMS will ensure whether or not contractor’s physicians are adhering to the mandatory training requirements set forth in the PWS.
PERFORMANCE MEASURES
Measures PWS Reference
Performance Requirement
Standard Acceptable Quality Level
Surveillance Method
1 – Provider Quality Performance
4.6.4.1 All contract physician (s)
shall perform in accordance with clinical standards
Ongoing Provider Performance Evaluation (OPPE) documentation for all (100%) staff providing services under the contract
100% OPPE
a. Patient Care Performance
b. Medical/Clinical knowledge
c. Practiced Based Learning & Improvement
d. Interpersonal & Communication Skills
e. Professionalism
f. System Based Practice
2 – Qualifications of Key Personnel
4.6.4.2 All contract physician(s)
shall have current certification in accordance with The American Board of Surgery and maintain license, registration and/or certification
All Surgeons shall be certified and compliant with all certifications.
100% Random Inspection of records.
3 – Patient Access 4.6.4.4 Patient must receive treatment in a timely manner.
Surgeons shall be onsite and available during all scheduled OR hours and within 30 minutes of the facility
All (97%) of identified documentation required is in the veteran’s medical record and record is current and up to date. No acceptable deviation.
Direct Observation and random Inspection
6. Patient Safety 4.6.4.5. Patient safety incidents shall be reported using Patient Safety Report All incidents shall be reported immediately (within 24 hours)
All of patient safety incidents are reported using Patient Safety Report within 24 hours of incident
100% Direct observation and periodic inspection
7 – Maintains licensing, registration, and certification.
4.6.4.6. Updated Licensing, registration and certification shall be provided as they are renewed.
Licensing and registration information shall be kept current.
All licensing, registration(s) and certification(s) for contract personnel
(s) shall be provided as they are renewed Licensing and registration information shall be kept current
100% Periodic Sampling and Random Sampling
8 – Mandatory Training, Privacy, Confidentiality and
HIPAA
4.6.4.7. Contractor physician (s)
shall complete all required training on time per VAMC policy.
Contractor personnel (s) is aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality, and HIPAA and complies with all standards Zero breaches of privacy or confidentiality.
All contractor personnel (s) shall comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality, and
HIPPA.
97% Periodic sampling Contractor personnel (s) shall provide evidence of annual training required by VAMC, reports violations per VA Directive 6500.6
6. RATINGS
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY
: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT.
However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
7. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR
PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See Sample CDR below.
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
File details come from the government source that posted it.