36C25518Q0427
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
TBD
36C25518Q0427 06-05-2018 Zaritz, Larry larry.zaritz@va.gov 913-946-1977 06-12-2018 10:00 am 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 X 325413 1250 Employees N/A X Department of Veteran Affairs VISN 15 Facilities See Section B for addresses
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048
36C255 Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp Austin TX 877-353-9791 512-460-5429 See CONTINUATION Page The purpose of this requirement is to obtain a Cost Per Test(CPT)for Liquid Based PAP testing using both GYN/Non-GYN See Section B.4 Statement of Requirements(SOR) for Details This requirement is being solicited IAW FAR Part 13 See CONTINUATION Page
TBD
X X Zaritz, Larry Contracting Officer
36C25518Q0427
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 4 |
| B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011) | 5 |
| B.4 STATEMENT OF REQUIREMENTS | 5 |
| B.5 PRICE/COST SCHEDULE | 13 |
| ITEM INFORMATION | 13 |
| DELIVERY SCHEDULE | 14 |
| SECTION C - CONTRACT CLAUSES | 15 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 15 |
| C.2 52.216-18 ORDERING (OCT 1995) | 15 |
| C.3 52.216-19 ORDER LIMITATIONS (OCT 1995) | 15 |
| C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 16 |
| C.5 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) | 16 |
| C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 17 |
| C.7 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 17 |
| C.8 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992) | 17 |
| C.9 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009) | 17 |
| C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 18 |
| C11. VAAR 852.246-71 INSPECTION (JAN 2008) | 19 |
| C.12 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018) | 19 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 27 |
| SECTION E - SOLICITATION PROVISIONS | 28 |
| E.1 GREY MARKET GOODS; | 28 |
| E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 28 |
| E.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 29 |
| E.3 52.233-2 SERVICE OF PROTEST (SEP 2006) | 30 |
| E.4 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION) | 30 |
| E.5 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 31 |
| E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 31 |
| E.7 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 32 |
| E.8 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017) | 32 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
(continuation from Standard Form 1449, block 18A.)
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C255
| Department of Veterans Affairs |
| Network Contracting Office (NCO) 15 |
| 3450 S 4th Street Trafficway |
| Leavenworth KS 66048 |
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] In Arears, Monthly |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
| Department of Veterans Affairs |
| Financial Services Center |
| http://www.fsc.va.gov/einvoice.asp |
| Austin TX |
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes FAR 52.219-4 Notice of Price Evaluation Preference for HubZone Small Business Concerns. Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
B.3 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes VAAR 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, and VAAR 852.215-71, Evaluation Factor Commitments. Accordingly, any contract resulting from this solicitation will include these clauses. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) to assist in assessing contractor compliance with the subcontracting commitments incorporated into the contract. To that end, the support contractor(s) may require access to the contractor's business records or other proprietary data to review such business records regarding contract compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor compliance with the subcontracting commitments.
B.4 STATEMENT OF REQUIREMENTS
SCOPE OF PROCUREMENT:
The desired instrumentation and associated reagent shall be acquired for each of the clinical laboratories located at the VISN facilities listed in Attachment A.
1. The Contractor is required to provide a continuously stocked inventory of reagents, controls, and supplies required to ensure that patient care operations are not interrupted. These items shall be of the highest quality, sensitivity, specificity and tested to assure precision and accuracy. Expiration date must be clearly marked on reagent, standards and control containers. Alert/Notification of any delays in shipment as well as any or all technical advisory/recalls/alerts, prior to or simultaneously with field alerts should be forwarded to the designated individuals determined at contract award.
1. Special handling for emergency orders of supplies: In the event that the supplies are found to be defective and unsuitable for use with the Contractor’s equipment, or the Contractor has failed to comply with the requirements for routine supply delivery, the Contractor is required to deliver the supplies within 24 hours of receipt of a verbal order for emergency delivery. If either circumstance has occurred, the Contractor shall deliver to the Government site in the most expeditious manner possible without additional cost to the Government, the necessary consumables in sufficient quantity as required to allow operation of the Contractor’s equipment for one week (under normal Government test load volume). If additional requests for emergency supply delivery are required by the Government, they shall be honored by the Contractor until the arrival at the laboratory of the monthly standing order/routine supplies delivery.
DEFINITIONS:
Cost per Test (CPT)- as defined in the Federal Supply Schedule FSC Group 66, Part III, Cost-Per-Test Clinical Laboratory Analyzers – Contractors are required to provide a price for each test that can be performed on its equipment. The per test price shall include costs covering (1) 5 year equipment use; (2) all reagents, standards, quality controls, supplies, consumable/disposable items, parts, accessories and any other item required for the proper operation of the Contractor’s equipment and necessary for the generation and reporting of a test result; (3) all necessary maintenance to keep the equipment in good operating condition (This element includes both preventive maintenance and emergency repairs); and (4) training for Government personnel. Contractors are required to provide delivery, installation and removal of equipment at no additional charge.
REAGENT MENU: Refer to Attachment B for desired reagent menu and estimated annual volumes. This solicitation uses a Brand Name or Equal Description of the product required. This permits prospective contractors to offer products other than those specifically referenced by brand name.
GENERAL REQUIREMENTS:
1. Operational Features: The instrumentation offered shall have the following:
0. The capability to automate preparation of liquid based PAP testing for both GYN and non GYN samples
0. The capability to automate preparation of cell blocks from Non GYN samples
1. Technical Features: The instruments offered shall have the following:
1. Liquid Based PAP Testing for GYN and non-GYN samples shall:
0. Utilize thin layer technology
0. Utilize one slide per case
0. Provide for standardization of processing, allowing for less variation from slide to slide and less potential for error.
0. Utilize PAP collection device that is used in conjunction with the instrumentation, but be approved for adjunctive HPV testing.
1. Automated Cell Block System shall:
1. Produce tissues blocks by use of vacuum assisted filtration.
1. Capture available cells and produce a high quality slide from small sample.
1. Reduce cross contamination of samples
1. Process a block in less than 45 minutes.
1. Hardware Features – The instrumentation shall have the following:
2. All monitors/screens will clearly display information in all light conditions.
2. An uninterruptible power supply (UPS) for each instrument provided. Each UPS must provide electrical power for a minimum of 15 minutes after electrical power fails and the system must allow for an automatic controlled shutdown to prevent damage to the instrument and data records.
2. Analyzers must be bench top in design.
2. Method Performance/Validation Requirements
3. Method Optimization shall be at the expense of the Contractor, shall include reagents, and be consistent with current College of American Pathologists (CAP) standards and Federal regulations.
3. Validation for each analyte. A minimum of 5 samples, shall be run by the present and the proposed method. Studies shall be at the expense of the vendor.
1. Reports- The Contractor shall provide to the Contracting Officer and other individuals (designated post-award) a copy of a quarterly report of sales, by ordering facility, within 30 calendar days after the close of each quarter’s business. Reports are to reflect, at a minimum, total net sales amounts before discount, and discount amounts by ordering facility as well as the raw data used to develop these reports. These reports shall be used to monitor the commitment of each facility, reporting the savings realized and shall be shared with each participating facility, personnel associated with acquiring the products, and respective laboratory personnel. Additional invoice charges associated with reagent and/or supply wastage or repair parts included at no charge (per FSS awarded contract) shall not be accepted. There will be no additional charges for any reports required as part of the BPA. Attachment C may be used as a template to provide these quarterly reports.
1. Support Features-
4. Commercial marketing. The equipment models being offered shall be in current production as of the date this offer is submitted. For purposes of this solicitation, “current production” shall mean that the clinical laboratory analyzer model is being offered as new equipment. Discontinued models that are only being made available as remanufactured equipment are not acceptable.
4. Start-Up Reagents. The Contractor shall provide all reagents, calibrators, controls, consumable/disposable items, parts, and accessories required to establish instruments for operation for performance of acceptance testing. The Contractor shall perform, to the satisfaction of the Government, all validation studies including: method comparison with current analyzer.
4. Training. The Contractor shall provide an instrument training program that is coordinated with and timely to the equipment installation, sufficient to the size and scope of the facility’s. This shall include training on the operation of the system, data manipulation, and basic trouble shooting and repair. Utilization of the training slots shall be mutually agreed upon between the VA and the Contractor. A training program that involves off-site travel shall include the cost of airfare, room and board for each participant.
4. Equipment Preventative Maintenance/Repair Service. The Contractor shall be able to provide emergency equipment repair and preventative maintenance on all primary instrumentation and any incremental support equipment, e.g. water system, offered according to the following terms:
Service Requirements A technical assistance center shall be available by telephone 24 hours per day, 7 days per week with a maximum call back response time of hour.
Equipment repair service shall be provided during core business hours. See Attachment A defining core business hours of each facility included in this solicitation. Certain circumstances may dictate the need for repair service to be conducted outside routine business hours. All such arrangements shall be coordinated between the Contractor and VA laboratory personnel.
Equipment repair response time shall be no more than hours.
Preventative maintenance will be performed as frequently as published in manufacturer’s operator’s manual and within 2 weeks of the scheduled due date.
A malfunction incident report shall be furnished to the Laboratory upon completion of each repair call. The report shall include, as a minimum, the following:
Date and time notified Date and time of arrival Serial number, type and model number of equipment Time spent for repair, and proof of repair that includes documentation of a sample run of quality control verifying acceptable performance.
Each notification for an emergency repair service call shall be treated as a separate and new service call.
Equipment repair service shall include one (1) relocation of equipment, for each participating facility, during the life of the agreement. This shall include labor, travel and validation support.
4. Upgrades - The Contractor shall provide upgrades to both the equipment hardware and software in order to maintain the integrity of the system and the state-of –the art technology, at no additional charge to the Government. These shall be provided as they become commercially available and at the same time as they are being provided to commercial customers. This requirement only applies to “system upgrades” that enhance the model of equipment being offered, i.e. new version of software, correction of hardware defect, upgrade offered to commercial customers at no additional charge, upgrade to replace model of equipment no longer Contractor supported, etc. This does not refer to replacing the original piece of equipment provided under the BPA; however, it does refer to significant changes in the hardware operational capability.
4. Ancillary support equipment - The Contractor shall provide, install and maintain through the life of the BPA, as indicated, any and all ancillary support equipment to fully operate or place the analyzer within a laboratory as defined in these specifications, e.g. cabinetry or stands to support/house the analyzer, etc.), etc. In addition, the Contractor shall include all ancillary components that are customarily sold or provided with the model of equipment proposed, e.g. starter kits, tables/stands, line conditioners, UPS and UPS Batteries etc.
4. Commercial offerings - The Contractor shall provide any additional support material that is routinely provided to equivalent commercial customers and assists in regulatory compliance, e.g. Computer disc containing their procedure manual in CLSI format or an on-line procedure manual in the instrument software.
4. Characterization of waste – The Contractor shall provide documentation that it has characterized the hazardous nature of all wastes produced by all equipment, devices, reagents, and discharges in accordance with the requirements of the Code of Federal Regulations Title 40 “Protection of the Environment” Part 261 et seq. and applicable state and local requirements. Documentation shall include a description of the characteristics of the hazardous waste produced as a byproduct of the instrument operations, Safety Data Sheets (SDS) meeting the requirements of the Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA), the analytical process used to determine the hazardous nature and characteristics of the waste, and the analytical test results. Testing of hazardous waste is to be done in accordance with testing protocol specified for each individual waste as described in the Code of Federal Regulations Title 40 to make a determination if the waste is a hazardous waste or otherwise regulated.
7. The determination and description shall address the following:
0. Waste toxicity (Reference 40 CFR §261.11 and 40 CFR §261.24)
0. Waste ignitability (Reference 40 CFR §261.21)
0. Waste corrosivity (Reference 40 CFR §261.22)
0. Waste reactivity (Reference 40 CFR §261.23)
0. Hazardous waste from non-specific sources (F-listed) (Reference 40 CFR §261.31)
0. Discarded commercial products (acutely toxic or P-listed and toxic or U-listed) (Reference 40 CFR §261.33)
0. Solid Waste (Reference 40 CFR §261.2)
0. Exclusions (Reference 40 CFR §261.4)
7. The contractor will provide written instructions and training material to ensure VHA laboratory staff are trained as needed to properly operate devices with special emphasis to managing and disposing of hazardous waste in accordance with EPA and state requirements. Additionally, the training provided by the contractor must fulfill Resource Conservation and Recovery Act (RCRA) requirements for training as applicable to devices.
7. Contractor shall provide a description of all wastes the process or equipment may discharge so that the facility can determine whether the discharge meets Local Publicly Owned Treatment Works (POTW), State and Federal discharge requirements. At a minimum, the characteristics of ignitability, corrosivity, reactivity and toxicity as defined in 40 CFR §261 must be determined and documented. Any mercury containing reagents must be identified in any concentrations. All test results shall be provided. All listed chemicals (F, U, K and P) found in 40 CFR §261 shall be provided in product information and their concentrations documented. For those materials with a positive hazardous waste determination, a mechanism for the laboratory to meet local discharge requirements (i.e. mercury, thimerosol and formaldehyde) must be developed and SDS sheets must be provided in advance for review. At a minimum, documentation shall include, but not be limited to the concentration/measures of the elements and parameters listed below and must be included with vendor response:
| 2. Barium | (Total) | |
| 2. Cadmium | (Total) | |
| 2. Chromium | (Total) | |
| 2. Copper | (Total) | |
| 2. Cyanide | (Total) | |
| 2. Lead | (Total) | |
| 2. Mercury | (Total) | |
| 2. Nickel | (Total) | |
| 2. Silver | (Total) | |
| 2. Zinc | (Total) | |
| 2. Arsenic | (Total) | |
| 2. Selenium | (Total) | |
| 2. Tin | (Total) |
2. pH
2. Flash point (to higher than 200F)
2. BOD; biochemical oxygen demand
7. The documentation the contractor provides will be used to work with the VAMC and the public and/or private organization (e.g., POTW) to determine whether or not the waste from each device can legally be disposed of via the sewerage system
7. Implementation/transition timeframe - The implementation of the services/requirements described in this solicitation shall be completed no later than 90 days after the award of the BPA. This timeline is based on a reasonable attempt of the Contractor to complete all of the necessary implementation requirements within the stated timeframe. Contractor shall not be penalized for implementation timelines that extend beyond the 90 day timeframe, if the extension is through no fault of the Contractor and is a result of delays due to the Government.
4. Upon award of a BPA, the transition period for the awarded BPA to have all equipment and peripherals installed and operational by Aug 31, 2018. During this same period, all initial training of VA personnel in the operation and maintenance of said award shall also be completed.
4. Contractor shall provide with its quotation an implementation plan for installation of new equipment. Contractor’s submitted plan shall project for the transition of all services under the awarded BPA including installation and training of personnel, transition of all testing materials, reagents and supplies, etc., performance of all correlations and validations with a start date of September 1, 2018. Failure of the Contractor to conform to the transition period shall be considered as sufficient cause to terminate BPA for cause under the Termination for Cause clause of the BPA.
4. On September 1, 2018 the awarded Contractor shall have full and sole responsibility for services under the awarded BPA.
1. Standard and Quality of Performance- This paragraph establishes a standard of quality performance that shall be met before any equipment listed on the delivery order [or BPA] is accepted by the Government. This also includes replacement, substitute machines and machines that are added or field modified after a system has demonstrated successful performance. The acceptance period shall begin on the installation date. It shall end when the equipment has met the standard of performance for a period of 30 consecutive calendar days by operating in conformance with the Contractor’s technical specification or as quoted in any BPA at an effectiveness level of 90% or more.
5. In the event that equipment does not meet the standard of performance during the initial 30 consecutive calendar days, the standard of performance tests shall continue on a day-by-day basis until the standard of performance is met for a total of 30 consecutive days.
5. If the equipment fails to meet the standard of performance after 90 calendar days from the installation date, the user may, at his/her option, request a replacement or terminate the order in its entirety.
5. Operational use time for performance testing for a system is defined as the accumulated time during which the machine is in actual use. System failure downtime is that period of time when any machine in the system is inoperable due to equipment failure. Downtime for each incident shall start from the time the Government makes a bona fide attempt to contact the Contractor’s designated representative at the prearranged contact point until the system or machine(s) is returned to the Government in proper operating condition.
5. During the performance period for a system, a minimum of 100 hours of operational use time with productive or simulated work shall be required as a basis for computation of the effectiveness level. However, in computing the effectiveness level, the actual number of operational use hours shall be used when in excess of the minimum of 100 hours
5. The Government will maintain daily records to satisfy the requirements of the Standard and Quality of Performance section and shall notify the Contractor in writing of the date of the first day of the successful period of operation. Operations use time and downtime shall be measured in hours and whole minutes.
5. During the term of the BPA, should the repair record of any individual piece of laboratory equipment reflect a downtime of 10% or greater of the normal working days in one calendar month, a determination shall be made by the COR to replace the malfunctioning equipment with new equipment. The responsibility for maintaining the equipment furnished in good condition in accordance with manufacturer’s instructions, shall be solely that of the Contractor. Each instrument provided by the Contractor shall maintain an uptime of 90% in each month of the term of the agreement for equipment.
1. Government’s Responsibility- The user will perform routine maintenance and cleaning as required in the manufacturer’s operation and maintenance instructions. The user shall maintain appropriate records to satisfy the requirements of this paragraph.
1. Ownership of Equipment- Title to the equipment shall remain with the Contractor. All accessories (unused consumables, etc.) furnished by the Contractor shall accompany the equipment when returned to the Contractor. The Contractor, upon expiration of order(s), at termination and/or replacement of equipment, shall remove the equipment. The Contractor shall disconnect the analyzer (gas, water, air, etc.) and shall be responsible for all packing and shipping required to remove the analyzer and appropriate decontamination prior to removal.
7. The Contractor will identify if removable media is required to perform their duties. The Clinical Engineering Department will ensure the removable media is scanned with anti-virus software running current virus definitions prior to connection to any medical device/system. Any Contractor with patient sensitive information that is imported into the removable media device for any reason must purge all patient sensitive information prior to departure from the facility.
7. Prior to termination or completion of this BPA, Contractor/subcontractor must not destroy information received from VA, or gathered/created by the Contractor in the course of performing this BPA without prior written approval by the VA. Any data destruction done on behalf of VA by a Contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the Contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination or completion of the BPA.
7. All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information must be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the BPA or (ii) disposal or return of the IT equipment by the Contractor/subcontractor or any person acting on behalf of the Contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the Contractors/subcontractors that contain VA information must be returned to the VA for sanitization or destruction or the Contractor/subcontractor must self-certify that the media has been disposed of per 6500.1 requirements. This must be completed within 30 days of termination or completion of the BPA or disposal or return of the IT equipment, whichever is earlier
7. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the Contractor at the end of lease, for trade-in, or other purposes. The options are:
3. Contractor must accept the system without the drive;
3. VA’s initial medical device procurement includes a spare drive which must be installed in place of the original drive at time of turn-in; or
3. VA must reimburse the company for media at a reasonable open market replacement cost at time of purchase.
7. Due to the highly specialized and sometimes proprietary hardware and software associated with medical equipment/systems, if it is not possible for the VA to retain the hard drive, then;
4. The equipment Contractor must have an existing BAA if the device being traded in has protected health information stored on it and hard drive(s) from the system are being returned physically intact; and
4. Any fixed hard drive on the device must be non-destructively sanitized to the greatest extent possible without negatively impacting system operation. Selective clearing down to patient data folder level is recommended using VA approved and validated overwriting technologies/methods/tools. Applicable media sanitization specifications need to be pre-approved and described in the purchase order or BPA.
7. A statement needs to be signed by the Director (System Owner) that states that the drive could not be removed and that (a) and (b) controls above are in place and completed. The Information Security Officer (ISO) needs to maintain the documentation.
9. TRAINING
7. All contractor employees and subcontractor employees requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and its systems:
6. Sign and acknowledge (either manually or electronically) understanding of and responsibilities for compliance with the Contractor Rules of Behavior, Appendix E relating to access to VA information and information systems;
6. Successfully complete the VA Cyber Security Awareness and Rules of Behavior training and annually complete required security training
6. Successfully complete the appropriate VA privacy training and annually complete required privacy training; and
6. Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system access [to be defined by the VA program official and provided to the contracting officer for inclusion in the solicitation document – e.g., any role-based information security training required in accordance with NIST Special Publication 800-16, Information Technology Security Training Requirements.
7. The contractor shall provide to the contracting officer and/or the COR a copy of the training certificates and certification of signing the Contractor Rules of Behavior for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required Failure to complete the mandatory annual training and sign the Rules of Behavior annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete
PARTICIPATING MEDICAL CENTERS
Participating Medical Centers:
1. Kansas City
1. Topeka
1. St Louis
B.5 PRICE/COST SCHEDULE
ITEM INFORMATION
| CLIN# |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Kansas City CPT Annual Estimated Cost |
Contract Period: Base
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 0002 |
| Topeka CPT Annual Estimated Costs |
Contract Period: Base
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 0003 |
| St Louis CPT Annual Estimated Cost |
Contract Period: Base
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 1001 |
| Kansas City CPT Annual Estimated Cost |
Contract Period: Option 1
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 1002 |
| Topeka CPT Annual Estimated Costs |
Contract Period: Option 1
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 1003 |
| St Louis CPT Annual Estimated Cost |
Contract Period: Option 1
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 2001 |
| Kansas City CPT Annual Estimated Cost |
Contract Period: Option 2
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 2002 |
| Topeka CPT Annual Estimated Costs |
Contract Period: Option 2
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 2003 |
| St Louis CPT Annual Estimated Cost |
Contract Period: Option 2
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 3001 |
| Kansas City CPT Annual Estimated Cost |
Contract Period: Option 3
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 3002 |
| Topeka CPT Annual Estimated Costs |
Contract Period: Option 3
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 3003 |
| St Louis CPT Annual Estimated Cost |
Contract Period: Option 3
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 4001 |
| Kansas City CPT Annual Estimated Cost |
Contract Period: Option 4
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 4002 |
| Topeka CPT Annual Estimated Costs |
Contract Period: Option 4
| 1.00 |
| YR |
| ___________ |
| ____________ |
| 4003 |
| St Louis CPT Annual Estimated Cost |
Contract Period: Option 4
| 1.00 |
| YR |
| ___________ |
| ____________ |
| GRAND TOTAL |
| ______________ |
DELIVERY SCHEDULE
| FACILITY ADDRESS: |
| Period of Performance |
Department of Veteran Affairs Kansas City VA Medical Center Kansas City, MO 64128 2226 IAW Section B.5 Price/Cost Schedule
Department of Veterans Affairs Topeka VAMC 2200 Gage Blvd, Warehouse Bldg 20 Topeka, KS 66622 0001 IAW Section B.5 Price/Cost Schedule
Department of Veterans Affairs St Louis VAMC 935 N. Grand Blvd St Louis, MO. 63106-1621 IAW Section B.5 Price/Cost Schedule
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER |
| MAY 2011 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| DEC 2013 |
(End of Clause)
C.2 52.216-18 ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from Effective Date of Contract through Expiration of the Contract.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
(End of Clause)
C.3 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than Minmum Units Estimated per CLIN per Facility, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of Maximum Units Estimated per CLIN per Facility;
(2) Any order for a combination of items in excess of Maximum # of Units per CLIN per Facility; or
(3) A series of orders from the same ordering office within 7 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
C.4 52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after Expiration Date of the Contract.
(End of Clause) C.5 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule (See Attachment A in Section D). The Contracting Officer may exercise the option by written notice to the Contractor within the Duration of the contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of Clause)
C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 Days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 90 Days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.
(End of Clause)
C.7 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)
The bidder or offeror agrees that if a contract is awarded to him/her, as a result of this solicitation, he/she will not advertise the award of the contract in his/her commercial advertising in such a manner as to state or imply that the Department of Veterans Affairs endorses a product, project or commercial line of endeavor.
(End of Clause) C.8 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)
(a) Except as provided in paragraph (c) below, the Contractor shall display prominently, in common work areas within business segments performing work under VA contracts, Department of Veterans Affairs Hotline posters prepared by the VA Office of Inspector General.
(b) Department of Veterans Affairs Hotline posters may be obtained from the VA Office of Inspector General (53E), P.O. Box 34647, Washington, DC 20043-4647.
(c) The Contractor need not comply with paragraph (a) above if the Contractor has established a mechanism, such as a hotline, by which employees may report suspected instances of improper conduct, and instructions that encourage employees to make such reports.
(End of Clause)
C.9 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)
The offeror agrees, if awarded a contract, to use the service-disabled veteran-owned small businesses or veteran-owned small businesses proposed as subcontractors in accordance with 852.215-70, Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors, or to substitute one or more service-disabled veteran-owned small businesses or veteran-owned small businesses for subcontract work of the same or similar value.
(End of Clause)
C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001.
(2) Designated agency office has the meaning given in 5 CFR 1315.2(m).
(3) Electronic form means an automated system transmitting information electronically according to the Accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.
(4) Invoice payment has the meaning given in FAR 32.001.
(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:
(1) VA’s Electronic Invoice Presentment and Payment System. (See Web site at http://www.fsc.va.gov/einvoice.asp.)
(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI). The X12 EDI Web site (http://www.x12.org) includes additional information on EDI 810 and 811 formats.
(d) Invoice requirements. Invoices shall comply with FAR 32.905.
(e) Exceptions. If, based on one of the circumstances below, the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for:
(1) Awards made to foreign vendors for work performed outside the United States;
(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;
(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;
(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or
(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.
(End of Clause)
C11. VAAR 852.246-71 INSPECTION (JAN 2008)
Rejected goods will be held subject to contractor’s order for not more than 15 days, after which the rejected merchandise will be returned to the contractor's address at his/her risk and expense. Expenses incident to the examination and testing of materials or supplies that have been rejected will be charged to the contractor's account.
(END-OF-CLAUSE)
(End of Addendum to 52.212-4)
C.12 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(3) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).
[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[] (5) [Reserved] [] (6) 52.204–14, Service Contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.