36C25518Q0199-012.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C25518Q0199
About this file
36C25518Q0199 ATTACHMENT QUALITY ASSURANCE SURVEILLANCE PLAN - QASP.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25518Q0199-A0002000.docx | DOCX document | |
| 36C25518Q0199-009.docx | DOCX document | |
| 36C25518Q0199-010.pdf | ||
| 36C25518Q0199-011.pdf | ||
| 36C25518Q0199-A00001000.docx | DOCX document | |
| 36C25518Q0199-008.docx | DOCX document | |
| 36C25518Q0199-005.docx | DOCX document | |
| 36C25518Q0199-007.pdf | ||
| 36C25518Q0199-006.pdf | ||
| 36C25518Q0199-004.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
| Performance Objective |
| Acceptable Quality Level (AQL) |
| Method of Performance Assessment |
| Incentive / Disincentive |
| 1 - Meet scheduled response times |
| Performance criteria equals 99% or better |
| Random, observations, customer feedback |
| When AQL is not met: 1st offense is written notice to the contractor to correct the deficiency. 2nd offense will result in another than positive CPARS evaluation |
| 2 - Meet non-scheduled response times |
| Performance criteria equals 98% or better |
| Random, observations, customer feedback |
| When AQL is not met: 1st offense is written notice to the contractor to correct the deficiency. 2nd offense will result in an other than positive CPARS evaluation |
| 3. Response to call-backs per |
| Performance criteria equals 99% or better |
| Observations, customer feedback |
| When AQL is not met: 1st offense is written notice to the contractor to correct the deficiency. 2nd offense will result in an other than positive CPARS evaluation. |
| 4. Contractor personnel performance |
| Performance criteria equals 95% or better |
| Random, observations, customer feedback |
| When AQL is not met: 1st offense is written notice to the contractor to correct the deficiency. 2nd offense will result in an other than positive CPARS evaluation |
| 5. - Inspection of contractor’s facilities/equipment |
| No more than three discrepancies noted |
| On-site inspection |
| When AQL is not met: 1st offense is written notice to the contractor to correct the deficiency. 2nd offense will result in an other than positive CPARS evaluation |
Quality Assurance Surveillance Plan (QASP)
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
Contract #: ____________________________________ Contractor: ____________________________________
SERVICE or STANDARD: _______________________________________________________________
SURVEY PERIOD: _____________________________________________________________________
SURVEILLANCE METHOD (Check):
[__] Periodic Inspection [__] Customer Complaint [__] Review of documents
LEVEL OF SURVEILLANCE (Check):
[__] Monthly [__] Quarterly [__] As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | [__] Meets Standards | ||
| [__] Does Not Meet Standards | |||
| Narrative of Performance During Survey Period: | ___________________________________________ |
PREPARED BY: ___________________________________ DATE: _________________