This is an Amendment to Solicitation (SF 30) issued by the Department of Veterans Affairs, Great Lakes Acquisition Center, modifying solicitation 36C25226Q0330 for Fire System Inspection & Testing services. The amendment, effective April 28, 2026, clarifies requirements within the Statement of Work regarding inspection and testing frequencies for fire protection systems across eight VA buildings (Buildings 14, 22/69, 49, 60, 128, 129, 130, and 131).
The amendment addresses two primary clarifications: (1) Dry pipe valve trip testing and air leakage testing requirements are to be performed on a three-year cycle per NFPA 25 standards, with testing scheduled for Base Year FY26 and Option Year 3 FY29, rather than annually; and (2) Inspection frequency intervals (quarterly, semi-annual, and annual) are clarified as inclusive rather than cumulative per NFPA guidelines, meaning higher-frequency inspections (quarterly at four occurrences annually for fire sprinkler systems) satisfy lower-frequency interval requirements, not in addition to them. This prevents redundant overlapping inspections and aligns the contract requirements with industry-standard NFPA practices. Contractors must acknowledge receipt of this amendment prior to the bid submission deadline, either by completing and returning the specified copies, acknowledging receipt on each offer submitted, or via separate written communication referencing both the solicitation and amendment numbers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25226Q0330 0002.docx | DOCX document | |
| WD 2015-5021 RV27 dtd 12-3-25.pdf | ||
| 36C25226Q0330.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None 04-28-2026 Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25226Q0330
X X X See CONTINUATION Page X one The purpose of this amendment is to clarify information within the Statement of Work (see attached).
Lori Eastmead Contracting Officer
CONTINUATION PAGE
RESPONSE:
Per NFPA 25 13.4.5.2.2.2 a full trip test of dry systems is required every three years, and an air leakage test of dry systems every three years per NFPA 13.4.5.2.9. for the following buildings. Years for testing shall be Base Year FY26, and Option Year 3 FY29.
1. Building 14
1. Building 22/69
1. Building 49
1. Building 60
1. Building 128
1. Building 129
1. Building 130
1. Building 131 (This is in SOW, written this way, for the full dry trip test).
(This is not in the SOW but NFPA 25 states)- 13.4.3.2.3- During the years when full flow testing in accordance with 13,4,4,2,2 is not required, the Preaction valve shall be trip tested with the control valve partially open.
As far as the quarterly, semi-annual, annual testing it would make no sense to do a quarterly test, then right after doing a semi-annual test, then right after doing an annual test performing the same test on the same visit. Unless mistaken, there are no tests that would be a quarterly test, and a semi-annual test, and/or an annual test.
REQUEST FOR CLARIFICATION:
1. Inspection Frequency Overlap (Quarterly, Semi-Annual, Annual) The CLIN structure appears to define inspection frequencies as separate and cumulative as follows:
· Annual = 1 occurrence
· Semi-Annual = 2 occurrences
· Quarterly = 4 occurrences However, per NFPA, these inspection intervals are not additive, but rather inclusive, where higher frequency inspections (quarterly) inherently satisfy the requirements of lower frequency intervals (semi-annual and annual).
Concern:
The current structure appears to require performance and pricing of:
· 4 quarterly inspections
· PLUS 2 semi-annual inspections
· PLUS 1 annual inspection This results in 7 total inspection events annually, which exceeds NFPA requirements and standard industry practice.
Per NFPA guidelines exclusively the following is the standard:
Fire Alarm Systems: 2 Inspections per year
· Annual
· Semi-Annual Fire Sprinkler Systems: 4 Inspections per year
· Annual
· Quarterly 1
· Semi-Annual
· Quarterly 2 Kitchen Hoods: 2 Inspections per yer
· Annual
· Semi-Annual
2. Dry Pipe Trip Testing (3-Year Frequency) The CLIN structure includes dry pipe valve trip testing in:
· Base Year
· All Option Years Per NFPA 25, dry pipe valve trip testing is required once every 3 years, not annually.
Concern:
Including this requirement in every contract year appears to conflict with NFPA 25 and may result in:
· Unnecessary system disruption
· Increased wear on equipment
· Inflated pricing Request for Clarification:
· Should dry pipe trip testing be performed strictly on a 3-year cycle (e.g., Base Year and Option Year 3)?
· Or is the Government requiring annual trip testing regardless of NFPA guidance?