This is a Pre-Bid Request for Information (RFI) response document for VA Danville's roof repair project (Solicitation 36C25226B0038, Project 550-27-111 B58). The document addresses thirteen questions submitted by Gold Wave Inc. and VA Danville Maintenance between August 12 and September 1, 2026, regarding project specifications, personnel requirements, materials, and site conditions.
Key clarifications from the RFI responses include: (1) Quality Control and Compliance (QCC) qualifications will be determined by previous project experience rather than requiring a college degree; (2) the Superintendent may serve dual or triple roles as QCC Systems Manager and Site Safety and Health Officer (SSHO) if adequate qualifications are provided; (3) six-foot chain link temporary construction fencing is acceptable instead of the specified seven-foot minimum; (4) fencing must be positioned 20 feet from the building to account for falling objects/debris, with all egress points and stairwell exits remaining accessible and covered by platforms; (5) replacement wood materials must match existing materials to maintain historical preservation standards; (6) infection control measures are not required; (7) the VA will provide water, electricity, and sanitary facilities; (8) synthetic felt is acceptable for roofing; (9) dormer siding must be removed to the sheating layer, then replaced with new moisture/thermal barriers and siding; (10) existing lower anchor points must be removed; and (11) abandoned ventilation ducts and stacks must be removed to below the roof line. The bid submission deadline is September 23, 2026, at 1:00 PM CST, with in-person hard copy or mailed submissions required at the Great Lakes Acquisition Center (GLAC) in Milwaukee, Wisconsin.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226B0038 0002.docx | DOCX document | |
| Attachment 2 - B58 Egress Locations.pdf | ||
| S06 36C25226B0038 Amend 0001.pdf | ||
| Attachment 4 SAM Wage Determination 550-27-111.pdf | ||
| Attachment 1 - 550-27-111 SOW Final.pdf | ||
| 36C25226B0038_1.docx | DOCX document | |
| S02 Attachment 3 - 550-27-111 Specs.pdf | ||
| Attachment 2 - 550-27-111 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid RFIs
| 550-27-111 B58 Roof Repair | |||||
| Pre-Bid RFIs - 36C25226B0038 | |||||
| No. | Date Submitted | Requested By: (Name of Firm) | SUBJECT/COMMENT | Amendment # | |
| 1 | 8/12/26 | Gold Wave Inc | Please confirm the correct Quality Control Specification (014500) has been included in the solicitation. Paragraph 1.1 of Specification 014500 states the specification is for “Design-Bid-Build (DBB) or Design-Build (DB) construction projects” whereas there is no design associated with the scope of work. This version of Specification 014500 also requires the CQC Systems Manager to be a “graduate engineer, graduate architect, or a graduate of construction management” (see paragraph 3.4.B of Specification 014500), but this seems overkill for a roof replacement project. | 1 | The qualification of CQC is to be determined by previous project experience |
| 2 | 8/12/26 | Gold Wave Inc | If the version of Specification 014500 that has been provided as part of the solicitation is used in light of the above question, is there an equivalent number of years of experience supervising construction projects for the CQC Systems Manager to not have to be a college graduate (e.g., 5 or 10 years of experience)? | 2 | The qualification of CQC is to be determined by previous project experience |
| 3 | 8/12/26 | Gold Wave Inc | Can the Superintendent serve as the CQC Systems Manager and/or SSHO (e.g., dual- or triple-hat)? Please note having the Superintendent be the CQC Systems Manager conflicts paragraph 3.2.B.1 of Specification 014500, which states “…CQC System Manager that reports to the project superintendent.” Having the CQC Systems Manager be the SSHO conflicts with paragraph 3.4.A of Specification 014500, which states “The Safety and Health Manager shall satisfy the requirements of Specification 01 35 26 Safety Requirements and reports directly to a senior project (or corporate) official independent from the CQC System Manager.” Please advise on whether we need three separate persons to serve as the Superintendent, CQC Systems Manager, and SSHO or what combination(s) would be acceptable as we would like to keep costs down by limiting the oversight staff. | 2 | The VA will accept the superintendent as QCc and SSHO provided that adequate qualifications are provided. |
| 4 | 8/12/26 | Gold Wave Inc | Can 6-foot chain link temporary construction fence be used or do we need to comply with Specification 010000, paragraph 1.7.H, which states “…Contractor shall provide a chain link construction fence, 2.1m (seven-foot) minimum height…” | 2 | 6 foot fence is acceptable. |
| 5 | 8/12/26 | Gold Wave Inc | The drawings provided do not show “each construction area indicated on the drawings” referenced in Specification 010000, paragraph 1.7.H for construction fence. Please provide a drawing or diagram (e.g., aerial photo markup) showing where temporary chain link construction fence is supposed to be located and where the contractor needs to maintain building access points. | 2 | B58 Egress Locations: The fencing should be 20 ft from the building to account for falling objects/debris All exits from stair wells and main entrance must be usable at all time. Areas should be covered by platforms to allow safe traversal from egress. See attachements for areas that will need to kept open |
| 6 | 8/12/26 | Gold Wave Inc | Please confirm that the wood used for replacement of damaged trim, fascia, dormer framing, gutter, vents, or soffit needs to be identical to the existing materials to maintain the historical preservation objectives of the VA’s Historic Preservation Office. | 2 | That is correct. |
| 7 | 8/12/26 | Gold Wave Inc | Please confirm that Infectious Controls are not required for this project, or, if they are required, what the PCRA/ICRA requirements are for the project. | 2 | there should not be the need for Infection controls. |
| 8 | 8/12/26 | Gold Wave Inc | Will the VA provide water, electricity, and sanitary facilities for contractor use? | 2 | yes |
| 9 | 9/1/26 | VA Danville Maintenance | Can synthetic felt be used? | 2 | Yes |
| 10 | 9/1/26 | VA Danville Maintenance | Is there any additional work needed to be done to the dormers? | 2 | Yes, take off the siding of dormer down to the sheeting then place a new moister/thermal barrier and sidding. |
| 11 | 9/1/26 | VA Danville Maintenance | Is there any work related to anchor points? | 2 | Remove lower anchor points that exists. |
| 12 | 9/1/26 | VA Danville Maintenance | Will there be any work needed for abandoned ventilation. | 2 | Any abandoned ventilation duct/stacks shall be removed to below the roof line. |
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 | |||||
| 31 | |||||
| 32 | |||||
| 33 | |||||
| 34 | |||||
| 35 | |||||
| 36 | |||||
| 37 | |||||
| 38 | |||||
| 39 | |||||
| 40 | |||||
| 41 | |||||
| 42 | |||||
| 43 | |||||
| 44 | |||||
| 45 | |||||
| 46 | |||||
| 47 | |||||
| 48 | |||||
| 49 | |||||
| 50 | |||||
| 51 | |||||
| 52 | |||||
| 53 | |||||
| 54 | |||||
| 55 | |||||
| 56 | |||||
| 57 | |||||
| 58 | |||||
| 59 | |||||
| 60 | |||||
| 61 | |||||
| 62 | |||||
| 63 | |||||
| 64 | |||||
| 65 | |||||
| 66 | |||||
| 66 |
&F &P of &N
File details come from the government source that posted it. Updated .