Amendment 36C25226B0025 0002 550-25-108 CON.docx
DOCX document 161 KB Posted
- Solicitation number
- 36C25226B0025
About this file
This is Amendment 0002 to solicitation 36C25226B0025 for bathroom renovation services at VA Illiana Health Care System (VAIHCS) in Danville, Illinois. The amendment extends the bid due date to Wednesday, June 24, 2026, at 1:00 PM CDT, with bid opening to occur at the same time in-person at the Great Lakes Acquisition Center in Milwaukee, Wisconsin. Only hard copy bids submitted in person or by mail will be accepted; email submissions are not permitted. The amendment increases the government's acceptance period to 120 calendar days after the bid due date, and any offers providing less than 120 calendar days for government acceptance will not be considered.
The amendment includes responses to 10 Request for Information (RFI) questions received after April 29, 2026, clarifying technical specifications and project requirements. Key clarifications address: existing restroom walls do not require extension to the deck; ceramic tile specifications should be disregarded if not applicable to the project; shower trim TS-3 should be replaced with TS-2 (Schluter Dilex-AHK in Brushed Chrome); waterproofing moisture barrier must extend at least 12 inches past shower walls; existing shower floors have flush transitions and do not require mud beds; restroom floors do not need to slope toward drains and tile should not be cut for sloping; crack isolation and expansion joints are not required; project working hours are 7:30 AM to 4:00 PM CST; and the period of performance is 365 calendar days after Notice to Proceed. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226B0025.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
06-05-2026
550-26-3-6991-0006
550-25-108
Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101
Milwaukee WI 53214-1476
Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25226B0025 04-16-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-24-2026 1:00 PM CDT
Solicitation: 36C25226B0025 Project 550-25-108 Renovate Bathrooms B103 PRRTP & B 64/72 (CON) at VA Illiana Health Care System (VAIHCS).
The purpose of amendment 0002 is to incorporate the following:
1. Extend bid due date and time to Wednesday, June 24, 2026, 1:00 pm, local time (CST).
2. Increase Government acceptance after the date offers are due to 120 days.
3. Provide responses to RFI questions.
See Continuation page for details.
June C. Gaytan Contracting Officer
CONTINUATION PAGE
1. Extend bid due date and time to Wednesday, June 24, 2026, 1:00 pm, local time (CST).
Bid opening will be on Wednesday, June 24, 2026, at 1:00 PM local time (CST).
No email bid submissions will be considered, only in person hard copy and mailed bid submissions will be accepted.
Bid opening is still held in-person at the Great Lakes Acquisition Center (GLAC), Milwaukee, WI. Contactors will check-in at the front desk and escorted to a designed area. It is the responsibility of all contactors to arrive prior to the Bid Opening time, as the Bid Opening will start promptly at the time listed above. GLAC address is as follows:
Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee, WI 53214-1476
2. Increase Government acceptance after the date offers are due to 120 days.
Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be requested.
3. Responses to RFI Questions RFI Questions and Answers (Received after 4/29/2026)
1. Is it the intent that existing walls don’t currently extend above the existing finished ceilings up to the deck? Therefore, we are to include cost for 2’ of additional metal framing and drywall to extend all restroom walls up to deck above?
Yes, it is the intent that the existing wall do not currently extend to deck. They can remain as is. A cost for 2’ of additional metal framing and drywall to extend all restroom walls up to deck above is not needed.
2. What exactly is required in the ceramic specifications? The specifications are not project specific and seem to encompass a lot of situations which are not applicable to this project.
The original design included both ceramic and porcelain tile which is why the specification has both. If a specification requirement does not pertain to the project or ceramic finish, please disregard.
3. Shower trim is called out as TS-3, this is the transition between the floor and walls in the shower and is shown in Detail 2/AI500. It is called out as Schluter – Shower profile – S on AI001. This profile is to be used to accommodate drainage to the Schluter Kerdi-LINE drain per Schluter. The drain in the showers appears to be FD-B (P001) which is not a Schluter Kerdi-Line. Kerdi-Line is a linear drain, FD-B appears to be a circular drain (9” diameter).
Please replace TS-3 (shower profile -S) in all the restrooms with TS-2 (Schluter Dilex-AHK).
a. How is this trim to intersect Schluter Dilex- AHK at the corners of the showers?
This trim will not need to intersect the dilex anymore as Schluter Dilex-AHK (TS-2) will be the transition throughout the restroom floor to wall.
b. Note Schluter Dilex-AHK and Schluter Shower profile-S are called out as different finishes.
Use only the finish called out for TS-2 Schluter Dilex-AHK in Brushed Chrome.
4. Please verify waterproofing (moisture barrier) is only in the showers and extends only 6” past the shower wall per 3/AI500.
Waterproofing moisture barrier to be extended at least 12 inches past the shower wall.
5. Will a mud bed be required at showers? Demo plans – Note 10 does not specify if there is a current recess in the slab or if a new one will be cut.
A mud bed may be required. Existing shower floors have a flush transition from the bathroom floor to the sloped tile shower floor.
6. Will the floors in restrooms need to be sloped to the existing drains? Specification 093013-3.6-D-8-c requires it, but no mention of slope requirements. Also please note sloping 12x24 tile will require cutting of tile which may not result in the most appealing look.
The VA TIL / code does not require restroom area floors to slope towards the floor drain. DO NOT cut the tile for sloping towards the floor drain.
7. Is crack isolation required?
No.
8. Will any expansion joints be required in the tile? None shown on plans and EJ171 requires the architect to provide locations.
There are no expansion joints in the restroom area for tile.
9. What are the working hours for this project?
Working hours are 7:30am – 4:00pm CST.
10. What is the schedule for this project?
Period of Performance is 365 calendar days after NTP. Contractor to develop and submit detailed project schedule.