This is Addendum 01 to the VA Lovell Surgical HVAC Systems Replacement Project (Project #23022.008), dated April 14, 2026, issued by Specialized Engineering Solutions.
The addendum reissues architectural and electrical drawing sheets to reflect design modifications identified during the 100% construction document phase. Architectural changes include modifications to ceiling types in five second-floor rooms (Corridor C2220, Sub Sterile 2C109A, 2C108A, 2C105B, and Work Room 2C111) to reflect existing field conditions on sheets AE111 and AE112, along with updates to reflected ceiling plan notes and ceiling type legends. Electrical drawing revisions on sheets E000, E400-B133, and E700 add symbol references for exit signs and public address speakers, incorporate new luminaires and demolition items in the sterile corridor (specifically new light fixture G1, a 2x4 flat panel fixture), document the relocation of existing public address speakers and wireless access points, update the luminaire schedule and lighting control schedule, and revise energy code compliance calculations (ComCheck) to account for the new lighting configuration. The lighting control schedule establishes corridor lighting operation with occupancy sensors, daylight harvesting capability, and automated on/off sequencing. All sheets are reissued in their entirety and submitted by Tyler Sanders, Connor Mensch, and Ryan Hempel of Specialized Engineering Solutions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25226B0013 0002.docx | DOCX document | |
| S06 - RFI Response 20260406.pdf | ||
| 36C25226B0013 0001.docx | DOCX document | |
| S06 - Site Visit Sign-in 17MAR26.pdf | ||
| S02 - 556-23-127 Drawing Combined 100CD 27MAY25.pdf | ||
| S02 - Wage Determination IL 20260008 Mod 1 20260108.pdf | ||
| 36C25226B0013_1.docx | DOCX document | |
| S02 - 556-23-127 Specifications 100CD 27MAY25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 01
Date: 04/14/2026
Project Name: VA Lovell Surgical HVAC Systems Replacement Project #: 23022.008
Architectural Drawing Items:
1. The following sheets are reissued in their entirety:
A. AE111 – Second Floor Architectural RCP & ICRA Plan
1. Modified ceiling types for Corridor C2220, Sub Sterile 2C109A, Sub Sterile 2C108A, sub Sterile 2C105B, and Work Room 2C111 to reflect existing conditions.
2. Added Reflected Ceiling Plan Note #9 to legend.
3. Modified ceiling type description in reflected Ceiling Type Legend.
B. AE112 – Second Floor Architectural RCP & ICRA Plan
1. Modified ceiling type description in reflected Ceiling Type Legend.
Electrical Drawing Items:
2. The following sheets are reissued in their entirety:
A. E000 – Electrical Symbols and Abbreviations
1. Added symbol reference for exit signs and public address speaker.
B. E400 – B133 – Second Level Floor Plans – Enlarged – Lighting and Lighting Control
1. Added luminaires to be demolished in sterile corridor on demolition plan, as well as existing public address speakers and wireless access point to be relocated.
2. Added new luminaires in sterile corridor on new work.
C. E700 – Electrical Schedules
1. Added new light fixture G1 to Luminaire Schedule.
2. Added Lighting Control Schedule.
3. Revised ComCheck calculations with new lighting.
Submitted By: Tyler Sanders, Connor Mensch, and Ryan Hempel www.specializedeng.com
A 9' - 5 1/2"
A 8' - 2 1/2"
A 7' - 6 1/2"
A 7' - 10 1/2"
A 9' - 5 1/2"
A 8' - 2 1/2"
A 7' - 10 1/2"
A 7' - 10 1/2"
A 7' - 6 1/2"
A 9' - 5 1/2"
A 8' - 2 1/2"
A 8' - 5 1/2"
A 9' - 5 1/2"
A 7' - 2 1/2"
3 3
8 8
5 6
5 6
5 6
OR 2
2C106
OR 1
2C105
OR 4
2C108
OR 3
2C109
CLEAN SUPPLY
2C110
SUB STERILE
2C109A
CORRIDOR
C2220
WORK ROOM
2C111
CORRIDOR
2C105A
SUB STERILE
2C105B
SUB STERILE
2C108A
MED ROOM
2C107
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE
ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
DEMOLITION GENERAL NOTES
A.
B.
REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION
AND ELECTRICAL FOR COORDINATION ITEMS. COORDINATE AS REQUIRED
INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
REMOVE ALL EQUIPMENT WITHIN OR TO PROTECT DURING CONSTRUCTION.
THIS INCLUDES WALL AND CEILING MOUNTED EQUIPMENT, SUCH AS
TV/MONITOR MOUNTS. SPECIALTY MEDICAL EQUIPMENT SUCH AS
EQUIPMENT BOOMS OR LIGHT AND MONITOR BOOMS, COORDINATE WITH VA
AND EQUIPMENT VENDOR FOR REMOVAL AND STORAGE. CONTRACTOR
SHALL NOT DISTURB WITHOUT PERMISSION. DO NOT REMOVE STRUCTURE
FOR CEILING MOUNTED SPECIALTY MEDICAL EQUIPMENT. FOR ALL OTHER
ITEMS, THESE SHALL BE STORED IN A SAFE, DRY, AND PROTECTED
LOCATION UNTIL THEY CAN BE REPLACED IN THE ORS.
UPON CONSTRUCTION COMPLETION, REPLACE ALL ITEMS FROM WHERE
THEY WERE REMOVED. COORDINATE WITH EQUIPMENT VENDOR FOR
REINSTALLATION OF SPECIALTY MEDICAL EQUIPMENT.
CAREFULLY DISCONNECT AND REMOVE ALL LIGHT FIXTURES, AND STORE IN
A SAFE, DRY, AND PROTECTED LOCATION UNTIL THEY CAN BE REPLACED IN
THE ORS.
UPON CONSTRUCTION COMPLETION, REPLACE ALL LIGHT FIXTURES FROM
WHERE THEY WERE REMOVED.
BULKHEAD CONSTRUCTION TO REMAIN. MEP ELEMENTS, COORDINATE WITH
ENGINEERING DRAWINGS.
REMOVE EXISTING CEILING TILES AND GRID AS REQUIRED TO ACCOMODATE
ABOVE CEILING MECHANICAL WORK. REPLACE BROKEN OR DAMAGED
CEILING TILES AS REQUIRED. ASSUME 25% OF TILES FOR REPLACEMENT.
REMOVE GYPSUM BOARD CEILINGS COMPETELY WITHIN THE OR TO
ACCOMMODATE DUCTWORK REPLACEMENT. LEAVE CEILING SUPPORTS AND
STRUCTURE AS POSSIBLE AS THESE WILL NEED TO BE REPLACED FOR NEW
DRYWALL INSTALLATION.
UPON COMPLETION OF ABOVE CEILING WORK, REPLACE ANY STRUCTURE
THAT WAS REMOVED AND INSTALL NEW DRYWALL CEILINGS MATCHING
EXISTING EXACTLY. FINISH WITH SPECIALTY PAINT COATING.
UPON REMOVAL OF EQUIPMENT WITHIN ORS, COVER FLOOR AND WALLS
WITH PLYWOOD, PLASTIC, OR OTHER MATERIALS TO PROTECT DURING
CONSTRUCTION. ANY DAMAGE TO FLOOR OR WALL FINISHES DURING
CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE VA.
ALL WORK IN THIS CORRIDOR SHALL BE DONE DURING NIGHTS AND SHALL
BE COORDINATED WITH THE VA TO MINIMIZE DISRUPTION TO HOSPITAL
OPERATIONS. CEILING TILES SHALL BE REPLACE AT THE END OF EACH
WORK SHIFT AND THE CORRIDOR SHALL BE CLEANED TO THE
SATISFACTION OF THE VA FOR THE START OF EACH DAY. PROVIDE PLASTIC
BARRIERS AS REQUIRED FOR PORTIONS OF WORK WHICH CAN BE
COMPLETED IN A SINGLE SHIFT.
CLOSE OFF DURING CONSTRUCTION AND SEAL. DOOR SHALL NOT TO BE
USED DURING CONSTRUCTION.
REMOVE EXISTING GYP CEILING AND ASSOCIATED GRID AS REQUIRED TO
ACCOMMODATE ABOVE CEILING MECHANICAL WORK. PATCH AND PAINT TO
MATCH EXISTING AS NEEDED.
#REFLECTED CEILING PLAN NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A EXISTING GYPSUM BOARD CEILING. TO
BE REMOVED AS NOTED
EXISTING TO REMAIN - 2x2 ACOUSTIC
CEILING TILE
B
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
BEYOND PROJECT BOUNDARY
IC / PHASING LEGEND
A.
B.
C.
D.
CLASS IV:
(NOTE: CLASS IV MUST INCLUDE ALL CLASS I, II & III LEVEL OF PRECAUTIONS
REQUIREMENTS LISTED ON SHEET AE112 AS WELL AS ALL IV REQUIREMENTS
LISTED BELOW)
BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL
BARRIER.
CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE
CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS’ PPE AND CLEANING.
WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE
OF VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA
VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN
SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING
THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED
SHOE COVERS MUST BE CHANGED IMMEDIATELY.
LEVEL OF PRECAUTIONS
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER OR
CONTRACTOR CORE PER OWNER'S
PREFERENCE, HARDWARE AND CLOSER
AIR PRESSURE MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
NOTE: THIS PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) WAS
COMPLETED DURING DESIGN IN ANTICIPATION OF WORK REQUIRED TO BE
COMPLETED BY THE CONTRACTOR DURING CONSTRUCTION. ACTUAL ICRA SHALL BE
COMPLETED BY THE VA ONCE CONSTRUCTION CONTRACT IS AWARDED. CONTRACTOR
SHALL COMPLY WITH ALL REQUIREMENTS AS DIRECTED BY THE VA INFECTION
CONTROL REPRESENTATIVE.
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE A (ROOF & OFFICE), TYPE B
(MECHANICAL ROOM) AND D (OPERATING ROOMS)
PATIENT RISK GROUP: LOW (ROOF, OFFICES & MECHANICAL ROOM) AND HIGHEST
(OPERATING ROOMS)
CLASS OF PRECAUTION MATRIX: I (ROOF & OFFICES), III (MECHANICAL ROOM) AND IV
(OPERATING ROOMS)
1.
2.
3.
4.
5.
6.
7.
8.
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/AE111.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 4/AE111.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC COVER IN ROOM.
COVER EVERY EACH ON WALLS AND FLOOR. REFER TO SPECIFICATION FOR
ADDITIONAL INFORMATION.
USE EXISTING OPENING AS CONSTRUCTION BARRIER. PROTECT DURING
CONSTRUCTION, SEAL AS REQUIRED, AND PROVIDE ALL ACCESSORIES. USE
AS ANTI ROOM.
EXTEND DRYWALL UP TO DECK, SEAL ALL PENETRATIONS AND CONVERT
EXISTING WALL AS REQUIRED TO CREATE 1 HR BARRIER.
EXISTING SMOKE BARRIER WALL. EXTEND DRYWALL UP TO DECK, SEAL ALL
PENETRATIONS AND CONVERT EXISTING SMOKE BARRIER WALL AS
REQUIRED TO CREATE 1 HR BARRIER.
EXISTING 2 HOUR FIRE BARRIER.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
REFER TO MEP DRAWING FOR PHASING.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE
FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK OUTSIDE OF THE TEMPORARY CONSTRUCTION
BARRIER SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM.
IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO
REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE
MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
DOOR EXISTING FROM CONSTRUCTION AREA. MAT SHALL BE REPLACED OR
CLEANED AS NECESSARY.
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
DOOR EXISTING FROM CONSTRUCTION AREA.
CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 6 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
CLEAN SUPPLY
2C110
SUB STERILE
2C109A
CORRIDOR
C2220
WORK ROOM
2C111
B
A
4 4
6 5
2 4
A 8' - 2 1/2"
MED ROOM
2C107
A.
B.
BID ITEM #1: BASE BID
BID ITEM #2: WORK DESCRIBED IN PORTION OF AREA SHOWN AS
ALTERNATE A, INCLUDING WORK WITHIN ALTERNATE B.
BID ITEM #3: WORK DESCRIBED IN PORTION OF WORK SHOWN AS
ALTERNATE B.
ALTERNATE A - ELIMINATE WORK IN OPERATING ROOMS
Omit all work within operating rooms. Refer to MEP for above ceiling work in corridors and clean supply room. Work in this area will require Class IV level of precaution.
ALTERNATE B - ELIMINATE WORK IN CLEAN CORRIDORS AND ANCILLARY
SPACES EXCEPT WHERE OUTLINED ON PLAN
Omit replacement of all ductwork on the second floor from the scope. Refer to MEP for above ceiling work for third floor drain replacement. Work in this area will require Class IV level of precaution.
STATEMENT OF BID ITEMS
EXISTING SMOKE BARRIER
EXISTING 2 HR FIRE RATED
CONVERTED 1 HR FIRE RATED
WALL RATING LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 23022.008
Au to de sk D oc s:
//2 .0
VA
L ov el l S ur gi ca l H
VA
C S ys te m s R ep la ce m en t/2 3.
.1 2_ A_ v2 2.
rv t
4/ /2 4:
:2
PM
AE111
SECOND FLOOR ARCHITECTURAL
RCP & ICRA PLAN
SURGICAL HVAC SYSTEMS
REPLACEMENT
3001 GREEN BAY ROAD, NORTH CHICAGO, IL 60061
556-23-127
133 & 133CA
05/27/2025 TS TD
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE111
1 SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA A)
N
0' 10' 20' 40'
SCALE: 1 1/2" = 1'-0"AE111
3 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"AE111
4 TEMPORARY WALL CONSTRUCTION ELEVATION
N
0' 10' 20' 40'
SCALE: 1/8" = 1'-0"AE111
2 BID DEDUCT PLAN - SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA A)
Revisions: Date:
ADD-01 2026/04/14
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE
ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR
ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
DEMOLITION GENERAL NOTES
A.
B.
REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION
AND ELECTRICAL FOR COORDINATION ITEMS. COORDINATE AS REQUIRED
INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
GENERAL NOTES
NOTE: THIS PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) WAS
COMPLETED DURING DESIGN IN ANTICIPATION OF WORK REQUIRED TO BE
COMPLETED BY THE CONTRACTOR DURING CONSTRUCTION. ACTUAL ICRA SHALL BE
COMPLETED BY THE VA ONCE CONSTRUCTION CONTRACT IS AWARDED. CONTRACTOR
SHALL COMPLY WITH ALL REQUIREMENTS AS DIRECTED BY THE VA INFECTION
CONTROL REPRESENTATIVE.
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE A (ROOF & OFFICE), TYPE B
(MECHANICAL ROOM) AND D (OPERATION ROOMS)
PATIENT RISK GROUP: LOW (ROOF, OFFICES & MECHANICAL ROOM) AND HIGHEST
(OPERATION ROOMS)
CLASS OF PRECAUTION MATRIX: I (ROOF & OFFICES), III (MECHANICAL ROOM) AND IV
(OPERATION ROOMS)
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
REFER TO MEP DRAWING FOR PHASING.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE
FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK OUTSIDE OF THE TEMPORARY CONSTRUCTION
BARRIER SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM.
IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO
REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE
MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
DOOR EXISTING FROM CONSTRUCTION AREA. MAT SHALL BE REPLACED OR
CLEANED AS NECESSARY.
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
DOOR EXISTING FROM CONSTRUCTION AREA.
CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 6 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
OFFICE
2D240
OFFICE
2D239
OFFICE
2D238
OFFICE
2D243
OFFICE
2D246A
OFFICE
2D246C
OFFICE
2D246
EXAM
2D115SS
ICU ATTEND
2D245
MAT MGNT
2D247
OFF ICE
2D242
OFFICE
2D241
KITCHENETTE
2D277
OFFICE
2D235
OFFICE
2D236
OFFICE
2D237
LOBBY
C2190
CORRIDOR
C2176
CONFERENCE
2D249
FEMALE LOCKER
2D253
CONFERENCE ROOM
PROCEDURE
2D260
CORRIDOR
C2176
CORRIDOR
C2176
PHYSIC. OFFICE
2D218
COMMUN. CENTER
C2171
TRAINIG
2D231
SUPPLY
2D231A
COMMUN. CENTER
C2171
NOURISMENT
2D213CLEAN
2D214
JAN
2D215
OFFICE
2D216
OFFICE
2D258
COMMUN. CENTER
C2171
SOILED
2D212
PATIENT ROOM
2D221
PATIENT ROOM
2D220
PATIENT ROOM
2D222
1. REMOVE CEILING TILES AS NEEDED FOR MEP SCOPE. REMOVE BROKEN OR
COMPROMISED CEILING TILES AND REPLACE TO MATCH EXISTING.
#REFLECTED CEILING PLAN NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
EXISTING TO REMAIN 2x2 ACOUSTIC
CEILING TILE
B
A.
B.
C.
CLASS I:
PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC.,
UPON COMPLETION OF WORK.
ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST
BE FREE OF CONTAMINANTS AND LOOSE MATERIAL.
LEVEL OF PRECAUTIONS
BEYOND PROJECT BOUNDARY
ICRA LEGEND
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
1. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION WITH ZIP UP DOOR. REFER TO SPECIFICATION FOR
ADDITIONAL INFORMATION.
INFECTION CONTROL PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 23022.008
Au to de sk D oc s:
//2 .0
VA
L ov el l S ur gi ca l H
VA
C S ys te m s R ep la ce m en t/2 3.
.1 2_ A_ v2 2.
rv t
4/ /2 4:
:1
PM
AE112
SECOND FLOOR ARCHITECTURAL
RCP & ICRA PLANS
SURGICAL HVAC SYSTEMS
REPLACEMENT
3001 GREEN BAY ROAD, NORTH CHICAGO, IL 60061
556-23-127
133 & 133CA
05/27/2025 TS TD
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE112
1 SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA B)
N
0' 10' 20' 40'
Revisions: Date:
ADD-01 2026/04/14
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CEILING
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM IF ONE EXISTS. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM INSPECTION AS REQUIRED TO OBTAIN UL MASTER LABEL RECERTIFICATION, UL MASTER LABEL AND/OR LPI SYSTEM
CERTIFICATE.
D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
G. PROVIDE AN INSULATED CONTINUOUS COPPER CONDUCTOR, NOT SMALLER THAN #10, TO BOND ALL
NORMAL AND ESSENTIAL ELECTRICAL SYSTEM PANELBOARDS TOGETHER THAT SERVE THE SAME
INDIVIDUAL PATIENT VICINITY AS DEFINED IN NEC 517.14.
H. ALL CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, INCLUDING LIGHTING AND WALL RECEPTACLES, SHALL BE MECHANICALLY PROTECTED PER NEC 517.31(C)(3). NON-FLEXIBLE RACEWAY SHALL BE USED FOR CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, EXCEPT THAT THE FINAL CONNECTION TO VIBRATING EQUIPMENT OR LIGHT FIXTURES IF THE TOTAL LENGTH OF FLEXIBLE RACEWAY IS 6' OR LESS ACROSS THE
ENTIRE CIRCUIT LENGTH.
I. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
LEGEND: (LOW VOLTAGE COORDINATION LEGEND)
CF: CONTRACTOR FURNISHED
CI: CONTRACTOR INSTALLED
OF: OWNER FURNISHED
OI: OWNER INSTALLED
REMARKS: (LOW VOLTAGE COORDINATION LEGEND)
1. FIRE ALARM IS AN EXTENSION OF AN EXISTING SYSTEM. NEW DEVICES SHALL FUNCTION AS AN EXTENSION OF THE
EXISTING SYSTEM.
GENERAL NOTES: (LOW VOLTAGE COORDINATION LEGEND)
A. REFER TO SYMBOL LEGENDS AND SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.
B. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL EQUIPMENT SELECTION FOR ALL SYSTEMS.
C. COORDINATE ROUGH-IN REQUIREMENTS WITH OWNER FOR OWNER FURNISHED SYSTEMS.
D. CONDUITS SHALL ROUTE CONCEALED INSIDE WALL TO ABOVE NEAREST ACCESSIBLE CEILING SPACE, UNLESS
OTHERWISE INDICATED.
E. WHERE CABLING IS CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED, TERMINATE AND TEST ALL CABLING PER
SPECIFICATION.
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10
100% CONSTRUCTION DOCUMENTS
321 4 5 6
05/27/2025 www.specializedeng.com
SES Project : 23022.008
05/27/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll
S u rg ic a l H
V A
C S y s te m s R e p la c e m e n t/
.B
.M E
P T
R
.r v t
/1
/2
:4
:0
P
M
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
SURGICAL HVAC SYSTEMS
REPLACEMENT
3001 Green Bay Rd, North Chicago, IL 60064
556-23-127
133 & 133CA
05/27/2025 KSB BLS
ELECTRICAL FIXTURE
SYMBOLS
PLAN SYMBOL NAME
RECEPTACLE - DUPLEX -
CEILING MOUNTED
RECEPTACLE - DUPLEX - CONV
RECEPTACLE - DUPLEX - CONV -
GFCI
FIRE ALARM SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
DETECTOR - SYSTEM DUCT
SMOKE DETECTOR
PROVIDE SYSTEM DUCT SMOKE DETECTOR IN ACCESSIBLE LOCATION. PROVIDE REMOTE STATUS INDICATOR AND
TEST STATION AND COORDINATE ASSOCIATED MOUNTING LOCATION WITH OWNER.
SMOKE DAMPER OR FIRE/SMOKE
DAMPER
CIRCUIT FIRE AND FIRE/SMOKE DAMPERS PROVIDED BY MECHANICAL CONTRACTOR TO 20A 120V BRANCH CIRCUITS IN ASSOCIATED EMERGENCY BRANCH PANEL (INSTALL CIRCUIT BREAKER LOCK ON BRANCH BREAKERS).
EACH BRANCH CIRCUIT SHALL SERVE A MAXIMUM OF 20 DAMPERS. PROVIDE INDIVIDUAL CIRCUITS FOR EACH AIR HANDLING UNIT ZONE. REFER TO MECHANICAL PLANS FOR ASSOCIATED ZONES. CONTROL EACH DAMPER INDIVIDUALLY WITH ADDRESSABLE CONTROL MODULES FROM FIRE ALARM SYSTEM. LABEL EACH RELAY WITH THE NAME OF THE AIR HANDLING UNIT SERVING THE SMOKE ZONE AND WITH THE WORDS "SMOKE DAMPER CONTROL".
PROVIDE SYSTEM DUCT SMOKE DETECTOR IN ACCESSIBLE LOCATION WITHIN 5 FEET OF THE DAMPER TO CONTROL DAMPER. PROVIDE REMOTE STATUS INDICATOR AND TEST STATION FOR DETECTOR AND COORDINATE ASSOCIATED MOUNTING LOCATION WITH OWNER. REFER TO ENLARGED ELECTRICAL PLANS FOR DAMPER
LOCATIONS.
LIGHTING DEVICE SYMBOLS
PLAN SYMBOL NAME
LIGHT SWITCH
LIGHTING DEVICE SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
PUSH BUTTON DEVICE SHALL PROVIDE ON/OFF CONTROL OF ZONES INDICATED. SUBSCRIPT LETTER(S) CORRESPOND TO LIGHTING ZONE(S) IN AREA. PROVIDE DEVICE CAPABLE OF SWITCHING QUANTITY OF ZONES INDICATED. WHERE NO ZONES ARE INDICATED, PROVIDE CONTROL OF SINGLE ZONE. MUST BE CAPABLE OF 3 AND 4 WAY SWITCHING FROM
ADDITIONAL DEVICES.
TYPE ‘D’ – DEVICE SHALL PROVIDE ON/OFF AND MIN/MAX DIMMING CONTROL OF ZONES INDICATED. SUBSCRIPT LETTER(S) CORRESPOND TO LIGHTING ZONE(S) IN AREA, PROVIDE DEVICE CAPABLE OF SWITCHING QUANTITY OF ZONES INDICATED. MUST BE CAPABLE OF 3 AND 4 WAY SWITCHING FROM ADDITIONAL DEVICES.
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CABLE TRAY
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
SWITCHED RECEPTACLE
ELECTRICAL MISC SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
LIGHTING CONTROL TAG REFER TO LIGHTING CONTROL SCHEDULE FOR ADDITIONAL INFORMATION.
LIGHTING FIXTURE
SYMBOLS
PLAN SYMBOL NAME
DOWNLIGHT FIXTURE
EMERGENCY HATCH
EXIT SIGN - CEILING
CHEVRONS AS SHOWN
TROFFER - RECESSED
LOW VOLTAGE COORDINATION LEGEND
SYSTEMS
ROUGH-INS &
PATHWAYS
CABLING &
TERMINATIONS
DEVICES &
EQUIPMENT REMARKS
FIRE ALARM CF / CI CF / CI CF / CI -
ONE LINE SYMBOL
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
CONTINUATION
DISCONNECT SWITCH
DUCT TEMPERATURE SENSOR -
SHORT
GENERATOR
GROUND BAR
GROUNDING ELECTRODE
MOTOR STARTER
PANEL BOARD
SWITCHBOARD/SWITCHGEAR
SWITCHBOARD/SWITCHGEAR -
DOUBLE TUB
TRANSFORMER
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
COMBINATION MAGNETIC
STARTER/DISCONNECT
(ENCLOSED MOTOR
CONTROLLER)
DISTRIBUTION PANEL
ENCLOSED DISCONNECT
SWITCH - NON-FUSED
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
VARIABLE FREQUENCY DRIVE
DATA SYMBOLS
PLAN SYMBOL NAME
WIRELESS ACCESS POINT -
CEILING
COMMUNICATION SYMBOLS
PLAN SYMBOL NAME
PUBLIC ADDRESS SPEAKER -
CEILING
FHCC CONDUIT COLOR SCHEME
Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call
Revisions: Date:
ADD-01 04/14/2026
S
S
S
S
L
M
N
P
Q
R
S
12131416171819
T
E'
F'
D'
C'
B'
9'
DD
DD
DD
LIMITS OF SELECTIVE DEMOLITION
LIMITS OF
SELECTIVE
DEMOLITION
DD
D
D
D
D D
D
D
D
D
DD
D D
D D
D
D
D D D
D
D
D
D
DD
D D
D
D
D
D
D
D D
D
D
DDD
D
D
D
D
D D D
D
D
DD
D D D
D
D DDD
D
D
D
D D
D
D
D
DD
D D
DD
R
WAP
R
R
WAP
R
R
R
WAP
R
R
R
D D
DD D D D
D D
D DDDDD
D
D
D
R
R
R
R
LIMITS OF SELECTIVE DEMOLITION 31
L
M
N
P
Q
R
S
12131416171819
T
E'
F'
D'
C'
B'
9'
H24 H24
H24H24
H24 H24
H24H24
H24 H24
H24H24
H24 H24
H24 H24
D1 D1
D1
D1 D1
D1
D1
D1
D1
D1
D1D1D1
D1
D1
D1
D1 D1 D1
D1 D1
D1D1
D1 D1
D1D1
D1
D1
D1
D1 D1
D1 D1 D1 D1 D1
D1
D1
D1
D1D1D1D1 D1
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1D1D1
Db
Da
Da Db
Da Db
Db Da b b b b b b b b b b b b b b b aa aa aa a a b b b b b bbbbb b b b b b b aa a ab b b b b b b b b b b bbbbb aa a ab b b b b b b b b b b b b b
G1
G1
G1
G1 G1 G1 G1
G1
G1
G1
G1G1G1 G1 G1
G1 G1
G1 R
R
R
R
WAP
R
R
R
2 6
6 6
LS LS
LS
LS LS
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10
100% CONSTRUCTION DOCUMENTS
321 4 5 6
05/27/2025 www.specializedeng.com
SES Project : 23022.008
05/27/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll
S u rg ic a l H
V A
C S y s te m s R e p la c e m e n t/
.B
.M E
P T
R
.r v t
/1
/2
:4
:0
P
M
E400
B133 - SECOND LEVEL FLOOR PLANS
- ENLARGED - LIGHTING AND
LIGHTING CONTROL
SURGICAL HVAC SYSTEMS
REPLACEMENT
3001 Green Bay Rd, North Chicago, IL 60064
556-23-127
133 & 133CA
05/27/2025 KSB NTH
1/8" = 1'-0"
B133 - SECOND LEVEL OR - POWER, LIGHTING, AND LIGHTING CONTROL - DEMOLITION
1/8" = 1'-0"
B133 - SECOND LEVEL OR - POWER, LIGHTING, AND LIGHTING CONTROL
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
N
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. ALL SCOPE REGARDING LIGHTING AND LIGHTING CONTROL ARE BASE BID. DEDUCT ALTERNATES ARE AS FOLLOWS:
A. DEDUCT ALTERNATE 1: NO LIGHTING AND LIGHTING CONTROL SCOPE.
B. DEDUCT ALTERNATE 2: NO LIGHTING AND LIGHTING CONTROL SCOPE.
2. EXTEND EXISTING BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES IN AREA TO NEW LUMINAIRES SHOWN. ALL LUMINAIRES TO BE SERVED BY
EXISTING TO REMAIN BRANCH CIRCUITS.
3. DEMOLISH ALL EXISTING LUMINAIRES AND LIGHTING CONTROLS. MAINTAIN BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES FOR REUSE IN NEW
LIGHTING PLAN. ALL OTHER ELECTRICAL SYSTEMS ARE EXISTING TO REMAIN.
4. DISCONNECT EXISTING BOOMS FROM BRANCH CIRCUITS. MAINTAIN BRANCH CIRCUITS AND BOOMS FOR REINSTALLATION DURING CONSTRUCTION
PHASE. STORE EQUIPMENT IN SAFE ENVIRONMENT TO PREVENT DAMAGE BETWEEN PHASES.
5. EXTEND BRANCH CIRCUITS PREVIOUSLY SERVING BOOMS TO NEW BOOM LOCATIONS. COORDINATE WITH ARCH AND OWNER FOR FINAL BOOM
LOCATIONS.
6. EXTEND EXISTING LIFE SAFETY BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES IN AREA TO NEW LUMINAIRES SHOWN. ALL LUMINAIRES TO BE
SERVED BY EXISTING TO REMAIN BRANCH CIRCUITS.
Revisions: Date:
ADD-01 04/14/2026
COR
REMARKS: (EQUIPMENT CONNECTION SCHEDULE)
1. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL.
2. PROVIDE NEW CIRCUIT BREAKER IN NEW PANEL.
3. VFDs SHOWN ON PLAN. ROUTE BRANCH FEEDER FROM SOURCE TO VFD TO MECHANICAL EQUIPMENT.
GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)
A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS
BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.
B. ITEMS NOTED AS "NA" ARE NOT APPLICABLE TO THE CONNECTION.
C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:
• "INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).
• "CONT" = EQUIPMENT OPERATES CONTINUOUSLY (NO CONTROLS). FOR MOTORS WITHOUT INTERNAL OVERLOAD PROTECTION, PROVIDE SEPARATE OVERLOAD PROTECTION. OVERLOAD PROTECTION MAY BE
PROVIDED AS PART OF A MANUAL MOTOR STARTER.
• "DDC" = CONTROL SIGNAL FROM TEMPERATURE CONTROL SYSTEM PROVIDED BY MECHANICAL CONTRACTOR OR TEMPERATURE CONTROLS CONTRACTOR.
• "TIME SW" = CONTROL SIGNAL FROM TIME SWITCH PROVIDED BY ELECTRICAL CONTRACTOR.
• TIME SWITCH SHALL BE 7-DAY DIGITAL TYPE WITH AUTOMATIC DAYLIGHT SAVINGS ADJUSTMENTS AND BATTERY BACKUP. LOCATE TIMESWITCH IN NEAREST MECHANICAL OR ELECTRICAL UTILITY ROOM.
LABEL TIME SWITCH. COORDINATE TIME SCHEDULE WITH OWNER AND MECHANICAL ENGINEER.
• "WALL SW" = CONTROL SIGNAL FROM WALL SWITCH PROVIDED BY ELECTRICAL CONTRACTOR.
• COORDINATE LOCATION OF WALL SWITCH WITH OWNER. LABEL WALL SWITCH.
• "FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS.
• PROVIDE FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AT RETURN-SIDE AND SUPPLY-SIDE OF FAN/UNIT. PROVIDE MULTIPLE DETECTORS IF REQUIRED TO ACCOMMODATE MAIN DUCT TAKE-OFFS WHERE A
SINGLE DETECTOR CANNOT BE INSTALLED TO CAPTURE ALL AIRFLOW. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT.
PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN.
• "WF STOP" = HIGH VOLUME LOW SPEED (HVLS) FANS SHUT DOWN HVLS FAN UPON WATERFLOW ALARM. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR AND
CONNECT TO SHUT DOWN FAN.
• "FA START" = FANS USED FOR SMOKE EVACUATION OR PRESSURIZATION.
• FIRE ALARM SYSTEM SHALL START FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE
AT MOTOR CONTROLLER/STARTER AND CONNECT TO START FAN.
• "DATA" = PROVIDE WITH DATA CONNECTION FROM NEAREST DATA NETWORK COMMUNICATIONS ROOM.
• "CONDUIT" = PROVIDE EMPTY 3/4" CONTROLS CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT TO ACCOMMODATE CONTROL CABLING BY MECHANICAL OR TEMPERATURE CONTROLS CONTRACTOR.
D. "DISCONNECT BY" :
• "MECHANICAL" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT.
• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.
• "ELECTRICAL" = DISCONNECT IS FURNISHED BY ELECTRICAL CONTRACTOR. COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT FURNISHED BY MECHANICAL CONTRACTOR.
• "MANUFACTURER" = DISCONNECT IS FURNISHED BY EQUIPMENT MANUFACTURER. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS
FURNISHED BY EQUIPMENT MANUFACTURER.
E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:
• "NEMA-___" = DUPLEX (TYP) RECEPTACLE TO ACCOMMODATE CORD AND PLUG CONNECTION (CORD AND PLUG FURNISHED WITH EQUIPMENT UNLESS NOTED OTHERWISE)
• "REC/SW" = PROVIDE 20A 120V RECEPTACLE OR 20A TOGGLE SWITCH DISCONNECT.
• COORDINATE REQUIRED SELECTION WITH EQUIPMENT.
• "NF" = NON-FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. 20/1 AND SMALLER SHALL BE TOGGLE SWITCH DISCONNECT.
• "F" = FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED.
• FUSE PER MANUFACTURER'S RECOMMENDATIONS.
• "FUSTAT" = SWITCH AND FUSTAT. FUSE SIZE PER EQUIPMENT MANUFACTURER.
• LOCATE SWITCH IN CONCEALED ACCESSIBLE LOCATION.
• "ENCL CB" = ENCLOSED CIRCUIT BREAKER DISCONNECT.
• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED.
• "ENCL MCSW" = ENCLOSED MOLDED CASE SWITCH DISCONNECT.
• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED.
• "SHUNT ENCL CB" = SHUNT TRIP ENCLOSED CIRCUIT BREAKER DISCONNECT.
• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED. PROVIDE WITH INTEGRAL 120V CONTROL TRANSFORMER SERVED FROM LINE SOURCE WITH PRIMARY AND SECONDARY FUSING.
COORDINATE ENCLOSURE AND COVER SIZE TO ACCOMMODATE TRANSFORMER. PROVIDE WITH EQUIPMENT GROUND BAR AND SEPARATE INSULATED ISOLATED GROUND BAR. WHERE NEUTRAL CONDUCTOR IS UTILIZED. PROVIDE SOLID NEUTRAL BAR. CONNECT SHUNT TRIP VOLTAGE SOURCE AND ACTUATOR TO ASSOCIATED EMERGENCY POWER (EPO) SWITCHES. PROVIDE EPO AND COORDINATE
LOCATION.
• "LOCK CB" = CIRCUIT BREAKER CAPABLE OF BEING LOCKED IN THE OPEN POSITION, LOCATED IN THE SOURCE ELECTRICAL PANEL. THE PROVISIONS FOR LOCKING MUST REMAIN IN PLACE WITH OR WITHOUT THE
LOCK INSTALLED.
• "MAG" = COMBINATION MAGNETIC MOTOR STARTER WITH DISCONNECT (COORDINATE COIL VOLTAGE WITH CONTROL SOURCE). LOCATE COMBINATION MAGNETIC MOTOR STARTER TO SERVE AS THE MOTOR DISCONNECT. WHERE STARTER SERVES OUTDOOR EQUIPMENT, LOCATE STARTER IN THE SOURCE ELECTRICAL ROOM.
• "MAN" = COMBINATION MANUAL MOTOR STARTER WITH DISCONNECT. LOCATE COMBINATION MANUAL MOTOR STARTER TO SERVE AS THE MOTOR DISCONNECT. WHERE STARTER SERVES OUTDOOR
EQUIPMENT, LOCATE STARTER IN THE SOURCE ELECTRICAL ROOM.
• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.
• "INT" = DISCONNECT IS MANUFACTURED INTEGRAL TO THE EQUIPMENT.
• "HW" = HARDWIRE. DISCONNECT NOT REQUIRED.
• LOCATE DISCONNECT ADJACENT TO EQUIPMENT PER NEC - PROVIDE WITH STRUT MOUNTING AS REQUIRED.
• LOCATE RECEPTACLE OR JUNCTION BOX TO DIRECTLY SERVE EQUIPMENT.
• COORDINATE EXACT LOCATION WITH ARCHITECT, ARCHITECTURAL DETAILS, AND EQUIPMENT MANUFACTURER'S REQUIREMENTS.
• WHERE DISCONNECT SERVES OUTDOOR EQUIPMENT, PROVIDE AS NEMA-3R.
• PROVIDE DISCONNECT WITH EQUIPMENT GROUND KIT.
• WHERE FEEDER INDICATED UTILIZES A NEUTRAL, PROVIDE DISCONNECT WITH SOLID NEUTRAL KIT.
• WHERE FEEDER INDICATED UTILIZES AN ISOLATED GROUND, PROVIDE DISCONNECT WITH ADDITIONAL INSULATED GROUND KIT.
• DISCONNECTS NOT SHOWN AS "F" OR "NF" SHALL BE NON-FUSED.
• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.
• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.
F. "GEN" - EQUIPMENT IS SERVED FROM A SOURCE PANEL PROVIDED WITH GENERATOR BACK-UP.
G. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF
THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR.
REMARKS: (LIGHTING FIXTURE SCHEDULE)
1. GYP CEILING MOUNTING - PROVIDE WITH MANUFACTURER'S FLANGE MOUNTING KIT/ACCESSORY(S) TO ALLOW FOR
RECESSED MOUNTING OF LUMINAIRE WITHIN GYP CEILING.
GENERAL NOTES: (LIGHTING FIXTURE SCHEDULE)
A. CATALOG NUMBER VERIFICATION - CONTRACTOR SHALL VERIFY LIGHTING FIXTURE INSTALLATION REQUIREMENTS
AND CATALOG NUMBER PRIOR TO ORDERING.
B. SUBSTITUTIONS - WHERE INDICATED WITH 'N' (NO), NO SUBSTITUTIONS WILL BE ACCEPTED. WHERE INDICATED WITH
'P' (PRIOR APPROVAL), SUBSTITUTIONS MUST BE APPROVED PRIOR TO BID WITH ACCEPTANCE ISSUED BY ADDENDUM.
WHERE INDICATED WITH 'Y' (YES), THE FOLLOWING MANUFACTURER'S ARE CONSIDERED ACCEPTABLE EQUIVALENT MANUFACTURER'S, PROVIDED THE EQUIVALENT FIXTURE IS OF THE SAME QUALITY, EFFICIENCY, PERFORMANCE AND
CHARACTERISTICS AS THAT SCHEDULED:
1. ACUITY BRANDS
2. EATON/COOPER BRANDS
3. HUBBELL
4. WILLIAMS
5. PHILLIPS/SIGNIFY BRANDS
C. DOWNLIGHT - PROVIDE DOWNLIGHT REFLECTOR FINISH/COLOR AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE.
SELECT CEILING TRIM FINISH/COLOR TO COORDINATE WITH CEILING TYPE. "WHITE" TRIM FOR DOWNLIGHTS MOUNTED IN WHITE ACOUSTICAL TILE CEILINGS. "CLEAR" (TO MATCH REFLECTOR FINISH/COLOR) FOR DOWNLIGHTS MOUNTED
IN PAINTED GYPSUM BOARD CEILINGS.
D. COVE – DRAWINGS PROVIDE GENERAL ILLUSTRATION OF COVE LAYOUT. COORDINATE EXACT UNIT LENGTHS AND QUANTITIES WITH ARCHITECTURAL DETAILS TO PROVIDE CONTINUOUS ILLUMINATION FOR ENTIRE LENGTH OF COVE.
LED COVE LIGHTING FIXTURES SHALL BE INSTALLED END-TO-END (NO GAP BETWEEN FIXTURES) WITH A MAXIMUM 6” GAP AT COVE ENDS AND CORNERS. SELECT UNIT LENGTHS AND QUANTITIES TO ACHIEVE THE ABOVE REQUIRED
PERFORMANCE (SHORTER UNIT LENGTHS IN GREATER QUANTITIES MAY BE REQUIRED).
E. TRACK – PROVIDE SINGLE-CIRCUIT TRACK SYSTEM WITH ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION, INCLUDING, BUT NOT LIMITED TO: POWER FEEDS, STAND OFFS, CONNECTORS, END CAPS, AND TRANSFORMERS. TRACK AND ACCESSORY FINISH SHALL MATCH FINISH OF SPECIFIED TRACK HEAD. PROVIDE TRACK LENGTHS AND TRACK HEAD QUANTITIES PER PLANS. COORDINATE TRACK TYPE FOR COMPATIBILITY WITH SPECIFIED TRACK HEAD FIXTURE. PROVIDE REMOTE TRANSFORMER QUANTITIES AND SIZES TO ACCOMMODATE LOAD OF TRACK HEADS INDICATED. PROVIDE POWER FEEDS AND TRACK CONNECTORS AS NEEDED TO PROVIDE TRACK LENGTH INDICATED. MOUNT REMOTE TRANSFORMER ABOVE NEAREST ACCESSIBLE CEILING. COORDINATE LENGTH OF
STANDOFFS AND POWER FEEDS AND EXACT SHAPE OF CURVED TRACKS WITH ARCHITECT.
F. UNDERCABINET- PROVIDE ALL NECESSARY MANUFACTURER'S INSTALLATION ACCESSORIES TO ACCOMMODATE INSTALLATION, INCLUDING, BUT NOT LIMITED TO: SPLICE BOXES, END CONNECTORS, AND JUMPER/DAISY CHAIN
CONNECTORS.
G. FIXTURE FINISH - WHERE CATALOG NUMBER LISTED INDICATES '**' IN LIEU OF MANUFACTURER'S FINISH OPTION, COORDINATE WITH ARCHITECT FOR EXACT FINISH PRIOR TO ORDERING.
H. WALL-TO-WALL MOUNTING - PROVIDE FIXTURE WITH CONTINUOUS ILLUMINATION FROM WALL TO WALL. COORDINATE EXACT WALL DIMENSIONS WITH GENERAL CONTRACTOR AND ARCHITECTURAL DETAILS. PROVIDE MANUFACTURER'S
WALL-TO-WALL MOUNTING ACCESSORY(S) AS REQUIRED FOR A COMPLETE INSTALLATION.
GENERAL NOTES: (LIGHTING CONTROL SCHEDULE)
A. SUBMIT MANUFACTURER INTERCONNECTION DIAGRAMS INDICATING DEVICE QUANTITIES, LOCATIONS, AND ASSOCIATED CONTROLS CABLING FOR APPROVAL.
B. REFER TO LIGHTING PLAN FOR WALL DEVICE TYPES, QUANTITIES, AND LOCATIONS. REFER TO SYMBOL LEGEND FOR LIGHTING PUSH BUTTON TYPE DESCRIPTIONS.
C. DEVICE QUANTITIES NOT INDICATED. PROVIDE TYPE AND QUANTITY OF DEVICES AS REQUIRED TO PROVIDE COMPLETE COVERAGE OF SPACE AND INTENDED SYSTEM
OPERATION.
D. WHERE BI-LEVEL SWITCHING AND AUTO ON TO 50% ARE USED IN THE SAME SPACE, THE ZONE THAT IS AUTOMATICALLY TURNED ON SHALL BE CONTROLLED BY THE BOTTOM
BUTTON OF WALL DEVICES.
E. WHERE PHOTOCELLS ARE BEING UTILIZED FOR DAYLIGHT HARVESTING, PROVIDE ADDITIONAL COMPONENTS AS NEEDED TO CONTROL LIGHTING WITHIN DAYLIGHT ZONES
INDEPENDENT OF GENERAL AREA LIGHTING WITHIN SPACE. PROVIDE MINIMUM OF (1) PHOTOCELL DEVICE PER DAYLIGHT ZONE.
F. UNLESS NOTED OTHERWISE, LIGHTING SHALL UTILIZE CONTINUOUS DIMMING AND EXTERIOR LIGHTING SHALL UTILIZE MULTI-LEVEL STEP DIMMING.
G. UNDERCABINET LIGHTING SHALL BE SWITCHED SEPARATELY FROM MAIN ROOM LIGHTING. UNDERCABINET LIGHTING SHALL BE CONTROLLED BY THE AUTO OFF FUNCTION OF
OCCUPANCY SENSORS.
H. WHERE PHOTOCELLS ARE UTILIZED FOR DAYLIGHT HARVESTING, TARGET ILLUMINANCE LEVELS SHALL BE MEASURED AT WORK PLANE OF PRIMARY TASK IN SPACE.
I. COORDINATE PROGRAMMING OF BUSINESS HOURS WITH OWNER PRIOR TO OCCUPANCY.
J. "DEVICES":
• "OCC" - OCCUPANCY SENSOR. PROVIDE TYPE INDICATED BELOW. CEILING MOUNT UNLESS NOTED OTHERWISE.
• "IR" = PASSIVE INFRARED
• "US" = ULTRASONIC/MICROPHONIC
• "DT" = DUAL TECHNOLOGY
• "N" = NO OCCUPANCY SENSOR
• "DAYLIGHT" - DAYLIGHT CONTROLS. CEILING MOUNT UNLESS NOTED OTHERWISE.
• "Y" = PROVIDE DAYLIGHT PHOTOCELL. PHOTOCELLS MAY NOT BE COMBINED WITH OCCUPANCY SENSORS UNLESS NOTED OTHERWISE.
• "N" = NO DAYLIGHT PHOTOCELL.
• "AUX" - AUXILIARY CONTACT.
• "Y" = PROVIDE AUXILIARY CONTACT/RELAY TO INDICATE OCCUPANCY FOR USE BY OTHER SYSTEMS. AUXILIARY CONTACT/RELAY MAY BE INTEGRATED WITH OCCUPANCY
SENSOR. AUXILIARY CONTACTS MAY BE OMITTED IF SYSTEM IS FULLY NETWORKED AND ROOM STATUS IS COMMUNICATED TO OTHER SYSTEMS THROUGH SOFTWARE INTEGRATION. COORDINATE WITH OTHER SYSTEMS AND CONFIRM THIS DESIGN IS ACCEPTABLE WITH OWNER AND ENGINEER PRIOR TO ORDERING PARTS.
• "N" = NO AUXILIARY CONTACT.
• "NETWK" - NETWORKED LIGHTING CONTROL COMMUNICATIONS.
• "Y" = NETWORK ROOM DEVICES TO BUILDING-WIDE LIGHTING CONTROLS NETWORK COMMUNICATIONS.
• "N" = BUILDING-WIDE LIGHTING CONTROLS NETWORK COMMUNICATIONS NOT REQUIRED TO THIS ROOM.
• "REC" - CONTROLLED RECEPTACLES
• "Y" = PROVIDE AUTOMATIC CONTROL OF SELECTED RECEPTACLES WITHIN SPACE. REFER TO POWER PLAN FOR RECEPTACLES TO BE CONTROLLED.
• "N" = NO CONTROLLED RECEPTACLES.
10360 Ellison Circle Omaha, NE 68134 Phone:
402.991.5520
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10
100% CONSTRUCTION DOCUMENTS
321 4 5 6
05/27/2025 www.specializedeng.com
SES Project : 23022.008
05/27/2025
A u to d e s k D o c s /2
.0
V A
L o v e ll
S u rg ic a l H
V A
C S y s te m s R e p la c e m e n t/
.B
.M E
P T
R
.r v t
/1
/2
:4
:0
P
M
E700
ELECTRICAL SCHEDULES SURGICAL HVAC SYSTEMS
REPLACEMENT
3001 Green Bay Rd, North Chicago, IL 60064
556-23-127
133 & 133CA
05/27/2025 KSB MEA
EQUIPMENT CONNECTION SCHEDULE
MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES
LOAD
[VA]
CONTROL
TYPE
DISCONNECT
BY
DISCONNEC
T TYPE FEEDER PANEL
CIRCUIT
NUMBER SCCR GEN REMARKS
VOLTAGE DROP
AHU-1 AIR HANDLER CONTROLS COOLING TOWER 3C102 0 0 1 1.3 15 120 1 1 120 INT MECHANICAL SW (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 1 5 Yes 1 0.2
AHU-12 AIR HANDLER CONTROLS MECHANICAL 3D134 0 0 1 1.3 15 120 1 1 120 INT MECHANICAL SW (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 3 5 Yes 1 0.35
CWP-3A CONDENSOR WATER PUMPS MECHANICAL EQUIPMENT-1 3C100A-1 7.5 0 11 13.8 30 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-DP-001-3C100 1 5 No 1,3 0.24
CWP-3B CONDENSOR WATER PUMPS MECHANICAL EQUIPMENT-1 3C100A-1 7.5 0 11 13.8 30 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-DP-001-3C100 2 5 No 1,3 0.25
EF-41 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 1,3,5 5 Yes 1,3 0.06
EF-42 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 7,9,11 5 Yes 1,3 0.23
EF-43 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 13,15,17 5 Yes 1,3 0.1
EF-44 EXHAUST FAN 0.33 0 1.1 1.4 15 120 1 1 914 DDC MANUFACTURER INT (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 5 5 Yes 1 2.41
EF-45 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 31,33,35 5 Yes 1,3 0.05
EF-46 EXHAUST FAN 0.5 0 1.1 1.4 15 480 3 3 914 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 19,21,23 5 Yes 1,3 0.04
EF-47 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 25,27,29 5 Yes 1,3 0.08
RF-12 RETURN FAN 7.5 0 11 13.8 15 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C.