About this file

This is Addendum 01 to the VA Lovell Surgical HVAC Systems Replacement Project (Project #23022.008), dated April 14, 2026, issued by Specialized Engineering Solutions.

The addendum reissues architectural and electrical drawing sheets to reflect design modifications identified during the 100% construction document phase. Architectural changes include modifications to ceiling types in five second-floor rooms (Corridor C2220, Sub Sterile 2C109A, 2C108A, 2C105B, and Work Room 2C111) to reflect existing field conditions on sheets AE111 and AE112, along with updates to reflected ceiling plan notes and ceiling type legends. Electrical drawing revisions on sheets E000, E400-B133, and E700 add symbol references for exit signs and public address speakers, incorporate new luminaires and demolition items in the sterile corridor (specifically new light fixture G1, a 2x4 flat panel fixture), document the relocation of existing public address speakers and wireless access points, update the luminaire schedule and lighting control schedule, and revise energy code compliance calculations (ComCheck) to account for the new lighting configuration. The lighting control schedule establishes corridor lighting operation with occupancy sensors, daylight harvesting capability, and automated on/off sequencing. All sheets are reissued in their entirety and submitted by Tyler Sanders, Connor Mensch, and Ryan Hempel of Specialized Engineering Solutions.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Surgical HVAC Systems Replacement 556-23-127, newest first.
File Type Posted
36C25226B0013 0002.docx DOCX document
S06 - RFI Response 20260406.pdf PDF
36C25226B0013 0001.docx DOCX document
S06 - Site Visit Sign-in 17MAR26.pdf PDF
S02 - 556-23-127 Drawing Combined 100CD 27MAY25.pdf PDF
S02 - Wage Determination IL 20260008 Mod 1 20260108.pdf PDF
36C25226B0013_1.docx DOCX document
S02 - 556-23-127 Specifications 100CD 27MAY25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 01

Date: 04/14/2026

Project Name: VA Lovell Surgical HVAC Systems Replacement Project #: 23022.008

Architectural Drawing Items:

1. The following sheets are reissued in their entirety:

A. AE111 – Second Floor Architectural RCP & ICRA Plan

1. Modified ceiling types for Corridor C2220, Sub Sterile 2C109A, Sub Sterile 2C108A, sub Sterile 2C105B, and Work Room 2C111 to reflect existing conditions.

2. Added Reflected Ceiling Plan Note #9 to legend.

3. Modified ceiling type description in reflected Ceiling Type Legend.

B. AE112 – Second Floor Architectural RCP & ICRA Plan

1. Modified ceiling type description in reflected Ceiling Type Legend.

Electrical Drawing Items:

2. The following sheets are reissued in their entirety:

A. E000 – Electrical Symbols and Abbreviations

1. Added symbol reference for exit signs and public address speaker.

B. E400 – B133 – Second Level Floor Plans – Enlarged – Lighting and Lighting Control

1. Added luminaires to be demolished in sterile corridor on demolition plan, as well as existing public address speakers and wireless access point to be relocated.

2. Added new luminaires in sterile corridor on new work.

C. E700 – Electrical Schedules

1. Added new light fixture G1 to Luminaire Schedule.

2. Added Lighting Control Schedule.

3. Revised ComCheck calculations with new lighting.

Submitted By: Tyler Sanders, Connor Mensch, and Ryan Hempel www.specializedeng.com

A 9' - 5 1/2"

A 8' - 2 1/2"

A 7' - 6 1/2"

A 7' - 10 1/2"

A 9' - 5 1/2"

A 8' - 2 1/2"

A 7' - 10 1/2"

A 7' - 10 1/2"

A 7' - 6 1/2"

A 9' - 5 1/2"

A 8' - 2 1/2"

A 8' - 5 1/2"

A 9' - 5 1/2"

A 7' - 2 1/2"

3 3

8 8

5 6

5 6

5 6

OR 2

2C106

OR 1

2C105

OR 4

2C108

OR 3

2C109

CLEAN SUPPLY

2C110

SUB STERILE

2C109A

CORRIDOR

C2220

WORK ROOM

2C111

CORRIDOR

2C105A

SUB STERILE

2C105B

SUB STERILE

2C108A

MED ROOM

2C107

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

DEMOLITION GENERAL NOTES

A.

B.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION

AND ELECTRICAL FOR COORDINATION ITEMS. COORDINATE AS REQUIRED

INCLUDING NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.

GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

REMOVE ALL EQUIPMENT WITHIN OR TO PROTECT DURING CONSTRUCTION.

THIS INCLUDES WALL AND CEILING MOUNTED EQUIPMENT, SUCH AS

TV/MONITOR MOUNTS. SPECIALTY MEDICAL EQUIPMENT SUCH AS

EQUIPMENT BOOMS OR LIGHT AND MONITOR BOOMS, COORDINATE WITH VA

AND EQUIPMENT VENDOR FOR REMOVAL AND STORAGE. CONTRACTOR

SHALL NOT DISTURB WITHOUT PERMISSION. DO NOT REMOVE STRUCTURE

FOR CEILING MOUNTED SPECIALTY MEDICAL EQUIPMENT. FOR ALL OTHER

ITEMS, THESE SHALL BE STORED IN A SAFE, DRY, AND PROTECTED

LOCATION UNTIL THEY CAN BE REPLACED IN THE ORS.

UPON CONSTRUCTION COMPLETION, REPLACE ALL ITEMS FROM WHERE

THEY WERE REMOVED. COORDINATE WITH EQUIPMENT VENDOR FOR

REINSTALLATION OF SPECIALTY MEDICAL EQUIPMENT.

CAREFULLY DISCONNECT AND REMOVE ALL LIGHT FIXTURES, AND STORE IN

A SAFE, DRY, AND PROTECTED LOCATION UNTIL THEY CAN BE REPLACED IN

THE ORS.

UPON CONSTRUCTION COMPLETION, REPLACE ALL LIGHT FIXTURES FROM

WHERE THEY WERE REMOVED.

BULKHEAD CONSTRUCTION TO REMAIN. MEP ELEMENTS, COORDINATE WITH

ENGINEERING DRAWINGS.

REMOVE EXISTING CEILING TILES AND GRID AS REQUIRED TO ACCOMODATE

ABOVE CEILING MECHANICAL WORK. REPLACE BROKEN OR DAMAGED

CEILING TILES AS REQUIRED. ASSUME 25% OF TILES FOR REPLACEMENT.

REMOVE GYPSUM BOARD CEILINGS COMPETELY WITHIN THE OR TO

ACCOMMODATE DUCTWORK REPLACEMENT. LEAVE CEILING SUPPORTS AND

STRUCTURE AS POSSIBLE AS THESE WILL NEED TO BE REPLACED FOR NEW

DRYWALL INSTALLATION.

UPON COMPLETION OF ABOVE CEILING WORK, REPLACE ANY STRUCTURE

THAT WAS REMOVED AND INSTALL NEW DRYWALL CEILINGS MATCHING

EXISTING EXACTLY. FINISH WITH SPECIALTY PAINT COATING.

UPON REMOVAL OF EQUIPMENT WITHIN ORS, COVER FLOOR AND WALLS

WITH PLYWOOD, PLASTIC, OR OTHER MATERIALS TO PROTECT DURING

CONSTRUCTION. ANY DAMAGE TO FLOOR OR WALL FINISHES DURING

CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE VA.

ALL WORK IN THIS CORRIDOR SHALL BE DONE DURING NIGHTS AND SHALL

BE COORDINATED WITH THE VA TO MINIMIZE DISRUPTION TO HOSPITAL

OPERATIONS. CEILING TILES SHALL BE REPLACE AT THE END OF EACH

WORK SHIFT AND THE CORRIDOR SHALL BE CLEANED TO THE

SATISFACTION OF THE VA FOR THE START OF EACH DAY. PROVIDE PLASTIC

BARRIERS AS REQUIRED FOR PORTIONS OF WORK WHICH CAN BE

COMPLETED IN A SINGLE SHIFT.

CLOSE OFF DURING CONSTRUCTION AND SEAL. DOOR SHALL NOT TO BE

USED DURING CONSTRUCTION.

REMOVE EXISTING GYP CEILING AND ASSOCIATED GRID AS REQUIRED TO

ACCOMMODATE ABOVE CEILING MECHANICAL WORK. PATCH AND PAINT TO

MATCH EXISTING AS NEEDED.

#REFLECTED CEILING PLAN NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

A EXISTING GYPSUM BOARD CEILING. TO

BE REMOVED AS NOTED

EXISTING TO REMAIN - 2x2 ACOUSTIC

CEILING TILE

B

TEMPORARY WALLS. SEE PLAN AND PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS DOORS

BEYOND PROJECT BOUNDARY

IC / PHASING LEGEND

A.

B.

C.

D.

CLASS IV:

(NOTE: CLASS IV MUST INCLUDE ALL CLASS I, II & III LEVEL OF PRECAUTIONS

REQUIREMENTS LISTED ON SHEET AE112 AS WELL AS ALL IV REQUIREMENTS

LISTED BELOW)

BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL

BARRIER.

CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE

CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS’ PPE AND CLEANING.

WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE

OF VISIBLE DUST BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA

VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN

SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING

THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED

SHOE COVERS MUST BE CHANGED IMMEDIATELY.

LEVEL OF PRECAUTIONS

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER OR

CONTRACTOR CORE PER OWNER'S

PREFERENCE, HARDWARE AND CLOSER

AIR PRESSURE MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

NOTE: THIS PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) WAS

COMPLETED DURING DESIGN IN ANTICIPATION OF WORK REQUIRED TO BE

COMPLETED BY THE CONTRACTOR DURING CONSTRUCTION. ACTUAL ICRA SHALL BE

COMPLETED BY THE VA ONCE CONSTRUCTION CONTRACT IS AWARDED. CONTRACTOR

SHALL COMPLY WITH ALL REQUIREMENTS AS DIRECTED BY THE VA INFECTION

CONTROL REPRESENTATIVE.

CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE A (ROOF & OFFICE), TYPE B

(MECHANICAL ROOM) AND D (OPERATING ROOMS)

PATIENT RISK GROUP: LOW (ROOF, OFFICES & MECHANICAL ROOM) AND HIGHEST

(OPERATING ROOMS)

CLASS OF PRECAUTION MATRIX: I (ROOF & OFFICES), III (MECHANICAL ROOM) AND IV

(OPERATING ROOMS)

1.

2.

3.

4.

5.

6.

7.

8.

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/AE111.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 4/AE111.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC COVER IN ROOM.

COVER EVERY EACH ON WALLS AND FLOOR. REFER TO SPECIFICATION FOR

ADDITIONAL INFORMATION.

USE EXISTING OPENING AS CONSTRUCTION BARRIER. PROTECT DURING

CONSTRUCTION, SEAL AS REQUIRED, AND PROVIDE ALL ACCESSORIES. USE

AS ANTI ROOM.

EXTEND DRYWALL UP TO DECK, SEAL ALL PENETRATIONS AND CONVERT

EXISTING WALL AS REQUIRED TO CREATE 1 HR BARRIER.

EXISTING SMOKE BARRIER WALL. EXTEND DRYWALL UP TO DECK, SEAL ALL

PENETRATIONS AND CONVERT EXISTING SMOKE BARRIER WALL AS

REQUIRED TO CREATE 1 HR BARRIER.

EXISTING 2 HOUR FIRE BARRIER.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

REFER TO MEP DRAWING FOR PHASING.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE

FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK OUTSIDE OF THE TEMPORARY CONSTRUCTION

BARRIER SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM.

IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO

REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE

MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

DOOR EXISTING FROM CONSTRUCTION AREA. MAT SHALL BE REPLACED OR

CLEANED AS NECESSARY.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

DOOR EXISTING FROM CONSTRUCTION AREA.

CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 6 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL PLAN NOTES

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

CLEAN SUPPLY

2C110

SUB STERILE

2C109A

CORRIDOR

C2220

WORK ROOM

2C111

B

A

4 4

6 5

2 4

A 8' - 2 1/2"

MED ROOM

2C107

A.

B.

BID ITEM #1: BASE BID

BID ITEM #2: WORK DESCRIBED IN PORTION OF AREA SHOWN AS

ALTERNATE A, INCLUDING WORK WITHIN ALTERNATE B.

BID ITEM #3: WORK DESCRIBED IN PORTION OF WORK SHOWN AS

ALTERNATE B.

ALTERNATE A - ELIMINATE WORK IN OPERATING ROOMS

Omit all work within operating rooms. Refer to MEP for above ceiling work in corridors and clean supply room. Work in this area will require Class IV level of precaution.

ALTERNATE B - ELIMINATE WORK IN CLEAN CORRIDORS AND ANCILLARY

SPACES EXCEPT WHERE OUTLINED ON PLAN

Omit replacement of all ductwork on the second floor from the scope. Refer to MEP for above ceiling work for third floor drain replacement. Work in this area will require Class IV level of precaution.

STATEMENT OF BID ITEMS

EXISTING SMOKE BARRIER

EXISTING 2 HR FIRE RATED

CONVERTED 1 HR FIRE RATED

WALL RATING LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 23022.008

Au to de sk D oc s:

//2 .0

VA

L ov el l S ur gi ca l H

VA

C S ys te m s R ep la ce m en t/2 3.

.1 2_ A_ v2 2.

rv t

4/ /2 4:

:2

PM

AE111

SECOND FLOOR ARCHITECTURAL

RCP & ICRA PLAN

SURGICAL HVAC SYSTEMS

REPLACEMENT

3001 GREEN BAY ROAD, NORTH CHICAGO, IL 60061

556-23-127

133 & 133CA

05/27/2025 TS TD

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AE111

1 SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA A)

N

0' 10' 20' 40'

SCALE: 1 1/2" = 1'-0"AE111

3 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1/4" = 1'-0"AE111

4 TEMPORARY WALL CONSTRUCTION ELEVATION

N

0' 10' 20' 40'

SCALE: 1/8" = 1'-0"AE111

2 BID DEDUCT PLAN - SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA A)

Revisions: Date:

ADD-01 2026/04/14

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE

ARCHITECTURAL FLOOR PLANS AND ENGINEERING DRAWINGS FOR

ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

DEMOLITION GENERAL NOTES

A.

B.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION

AND ELECTRICAL FOR COORDINATION ITEMS. COORDINATE AS REQUIRED

INCLUDING NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.

GENERAL NOTES

NOTE: THIS PRELIMINARY INFECTION CONTROL RISK ASSESSMENT (ICRA) WAS

COMPLETED DURING DESIGN IN ANTICIPATION OF WORK REQUIRED TO BE

COMPLETED BY THE CONTRACTOR DURING CONSTRUCTION. ACTUAL ICRA SHALL BE

COMPLETED BY THE VA ONCE CONSTRUCTION CONTRACT IS AWARDED. CONTRACTOR

SHALL COMPLY WITH ALL REQUIREMENTS AS DIRECTED BY THE VA INFECTION

CONTROL REPRESENTATIVE.

CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE A (ROOF & OFFICE), TYPE B

(MECHANICAL ROOM) AND D (OPERATION ROOMS)

PATIENT RISK GROUP: LOW (ROOF, OFFICES & MECHANICAL ROOM) AND HIGHEST

(OPERATION ROOMS)

CLASS OF PRECAUTION MATRIX: I (ROOF & OFFICES), III (MECHANICAL ROOM) AND IV

(OPERATION ROOMS)

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

REFER TO MEP DRAWING FOR PHASING.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE

FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK OUTSIDE OF THE TEMPORARY CONSTRUCTION

BARRIER SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM.

IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO

REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE

MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

DOOR EXISTING FROM CONSTRUCTION AREA. MAT SHALL BE REPLACED OR

CLEANED AS NECESSARY.

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

DOOR EXISTING FROM CONSTRUCTION AREA.

CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 6 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

OFFICE

2D240

OFFICE

2D239

OFFICE

2D238

OFFICE

2D243

OFFICE

2D246A

OFFICE

2D246C

OFFICE

2D246

EXAM

2D115SS

ICU ATTEND

2D245

MAT MGNT

2D247

OFF ICE

2D242

OFFICE

2D241

KITCHENETTE

2D277

OFFICE

2D235

OFFICE

2D236

OFFICE

2D237

LOBBY

C2190

CORRIDOR

C2176

CONFERENCE

2D249

FEMALE LOCKER

2D253

CONFERENCE ROOM

PROCEDURE

2D260

CORRIDOR

C2176

CORRIDOR

C2176

PHYSIC. OFFICE

2D218

COMMUN. CENTER

C2171

TRAINIG

2D231

SUPPLY

2D231A

COMMUN. CENTER

C2171

NOURISMENT

2D213CLEAN

2D214

JAN

2D215

OFFICE

2D216

OFFICE

2D258

COMMUN. CENTER

C2171

SOILED

2D212

PATIENT ROOM

2D221

PATIENT ROOM

2D220

PATIENT ROOM

2D222

1. REMOVE CEILING TILES AS NEEDED FOR MEP SCOPE. REMOVE BROKEN OR

COMPROMISED CEILING TILES AND REPLACE TO MATCH EXISTING.

#REFLECTED CEILING PLAN NOTES

REFLECTED CEILING TYPE LEGEND

TYPE GRAPHIC DESCRIPTION

EXISTING TO REMAIN 2x2 ACOUSTIC

CEILING TILE

B

A.

B.

C.

CLASS I:

PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC.,

UPON COMPLETION OF WORK.

ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST

BE FREE OF CONTAMINANTS AND LOOSE MATERIAL.

LEVEL OF PRECAUTIONS

BEYOND PROJECT BOUNDARY

ICRA LEGEND

TEMPORARY WALLS. SEE PLAN AND PLAN NOTES

1. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION WITH ZIP UP DOOR. REFER TO SPECIFICATION FOR

ADDITIONAL INFORMATION.

INFECTION CONTROL PLAN NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 23022.008

Au to de sk D oc s:

//2 .0

VA

L ov el l S ur gi ca l H

VA

C S ys te m s R ep la ce m en t/2 3.

.1 2_ A_ v2 2.

rv t

4/ /2 4:

:1

PM

AE112

SECOND FLOOR ARCHITECTURAL

RCP & ICRA PLANS

SURGICAL HVAC SYSTEMS

REPLACEMENT

3001 GREEN BAY ROAD, NORTH CHICAGO, IL 60061

556-23-127

133 & 133CA

05/27/2025 TS TD

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AE112

1 SECOND FLOOR ARCHITECTURAL REFLECTED CEILING PLAN (AREA B)

N

0' 10' 20' 40'

Revisions: Date:

ADD-01 2026/04/14

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CEILING

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. NEW ROOF MOUNTED EQUIPMENT SHALL BE BONDED TO EXISTING BUILDING LIGHTNING PROTECTION SYSTEM IF ONE EXISTS. PROVIDE AIR TERMINALS ON TOP OF EQUIPMENT AND BOND TO EXISTING SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM INSPECTION AS REQUIRED TO OBTAIN UL MASTER LABEL RECERTIFICATION, UL MASTER LABEL AND/OR LPI SYSTEM

CERTIFICATE.

D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

G. PROVIDE AN INSULATED CONTINUOUS COPPER CONDUCTOR, NOT SMALLER THAN #10, TO BOND ALL

NORMAL AND ESSENTIAL ELECTRICAL SYSTEM PANELBOARDS TOGETHER THAT SERVE THE SAME

INDIVIDUAL PATIENT VICINITY AS DEFINED IN NEC 517.14.

H. ALL CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, INCLUDING LIGHTING AND WALL RECEPTACLES, SHALL BE MECHANICALLY PROTECTED PER NEC 517.31(C)(3). NON-FLEXIBLE RACEWAY SHALL BE USED FOR CRITICAL AND LIFE SAFETY BRANCH CIRCUITS, EXCEPT THAT THE FINAL CONNECTION TO VIBRATING EQUIPMENT OR LIGHT FIXTURES IF THE TOTAL LENGTH OF FLEXIBLE RACEWAY IS 6' OR LESS ACROSS THE

ENTIRE CIRCUIT LENGTH.

I. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

LEGEND: (LOW VOLTAGE COORDINATION LEGEND)

CF: CONTRACTOR FURNISHED

CI: CONTRACTOR INSTALLED

OF: OWNER FURNISHED

OI: OWNER INSTALLED

REMARKS: (LOW VOLTAGE COORDINATION LEGEND)

1. FIRE ALARM IS AN EXTENSION OF AN EXISTING SYSTEM. NEW DEVICES SHALL FUNCTION AS AN EXTENSION OF THE

EXISTING SYSTEM.

GENERAL NOTES: (LOW VOLTAGE COORDINATION LEGEND)

A. REFER TO SYMBOL LEGENDS AND SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.

B. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL EQUIPMENT SELECTION FOR ALL SYSTEMS.

C. COORDINATE ROUGH-IN REQUIREMENTS WITH OWNER FOR OWNER FURNISHED SYSTEMS.

D. CONDUITS SHALL ROUTE CONCEALED INSIDE WALL TO ABOVE NEAREST ACCESSIBLE CEILING SPACE, UNLESS

OTHERWISE INDICATED.

E. WHERE CABLING IS CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED, TERMINATE AND TEST ALL CABLING PER

SPECIFICATION.

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10

100% CONSTRUCTION DOCUMENTS

321 4 5 6

05/27/2025 www.specializedeng.com

SES Project : 23022.008

05/27/2025

A u to d e s k D o c s /2

.0

V A

L o v e ll

S u rg ic a l H

V A

C S y s te m s R e p la c e m e n t/

.B

.M E

P T

R

.r v t

/1

/2

:4

:0

P

M

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

SURGICAL HVAC SYSTEMS

REPLACEMENT

3001 Green Bay Rd, North Chicago, IL 60064

556-23-127

133 & 133CA

05/27/2025 KSB BLS

ELECTRICAL FIXTURE

SYMBOLS

PLAN SYMBOL NAME

RECEPTACLE - DUPLEX -

CEILING MOUNTED

RECEPTACLE - DUPLEX - CONV

RECEPTACLE - DUPLEX - CONV -

GFCI

FIRE ALARM SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

DETECTOR - SYSTEM DUCT

SMOKE DETECTOR

PROVIDE SYSTEM DUCT SMOKE DETECTOR IN ACCESSIBLE LOCATION. PROVIDE REMOTE STATUS INDICATOR AND

TEST STATION AND COORDINATE ASSOCIATED MOUNTING LOCATION WITH OWNER.

SMOKE DAMPER OR FIRE/SMOKE

DAMPER

CIRCUIT FIRE AND FIRE/SMOKE DAMPERS PROVIDED BY MECHANICAL CONTRACTOR TO 20A 120V BRANCH CIRCUITS IN ASSOCIATED EMERGENCY BRANCH PANEL (INSTALL CIRCUIT BREAKER LOCK ON BRANCH BREAKERS).

EACH BRANCH CIRCUIT SHALL SERVE A MAXIMUM OF 20 DAMPERS. PROVIDE INDIVIDUAL CIRCUITS FOR EACH AIR HANDLING UNIT ZONE. REFER TO MECHANICAL PLANS FOR ASSOCIATED ZONES. CONTROL EACH DAMPER INDIVIDUALLY WITH ADDRESSABLE CONTROL MODULES FROM FIRE ALARM SYSTEM. LABEL EACH RELAY WITH THE NAME OF THE AIR HANDLING UNIT SERVING THE SMOKE ZONE AND WITH THE WORDS "SMOKE DAMPER CONTROL".

PROVIDE SYSTEM DUCT SMOKE DETECTOR IN ACCESSIBLE LOCATION WITHIN 5 FEET OF THE DAMPER TO CONTROL DAMPER. PROVIDE REMOTE STATUS INDICATOR AND TEST STATION FOR DETECTOR AND COORDINATE ASSOCIATED MOUNTING LOCATION WITH OWNER. REFER TO ENLARGED ELECTRICAL PLANS FOR DAMPER

LOCATIONS.

LIGHTING DEVICE SYMBOLS

PLAN SYMBOL NAME

LIGHT SWITCH

LIGHTING DEVICE SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

PUSH BUTTON DEVICE SHALL PROVIDE ON/OFF CONTROL OF ZONES INDICATED. SUBSCRIPT LETTER(S) CORRESPOND TO LIGHTING ZONE(S) IN AREA. PROVIDE DEVICE CAPABLE OF SWITCHING QUANTITY OF ZONES INDICATED. WHERE NO ZONES ARE INDICATED, PROVIDE CONTROL OF SINGLE ZONE. MUST BE CAPABLE OF 3 AND 4 WAY SWITCHING FROM

ADDITIONAL DEVICES.

TYPE ‘D’ – DEVICE SHALL PROVIDE ON/OFF AND MIN/MAX DIMMING CONTROL OF ZONES INDICATED. SUBSCRIPT LETTER(S) CORRESPOND TO LIGHTING ZONE(S) IN AREA, PROVIDE DEVICE CAPABLE OF SWITCHING QUANTITY OF ZONES INDICATED. MUST BE CAPABLE OF 3 AND 4 WAY SWITCHING FROM ADDITIONAL DEVICES.

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CABLE TRAY

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

SWITCHED RECEPTACLE

ELECTRICAL MISC SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

LIGHTING CONTROL TAG REFER TO LIGHTING CONTROL SCHEDULE FOR ADDITIONAL INFORMATION.

LIGHTING FIXTURE

SYMBOLS

PLAN SYMBOL NAME

DOWNLIGHT FIXTURE

EMERGENCY HATCH

EXIT SIGN - CEILING

CHEVRONS AS SHOWN

TROFFER - RECESSED

LOW VOLTAGE COORDINATION LEGEND

SYSTEMS

ROUGH-INS &

PATHWAYS

CABLING &

TERMINATIONS

DEVICES &

EQUIPMENT REMARKS

FIRE ALARM CF / CI CF / CI CF / CI -

ONE LINE SYMBOL

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

CONTINUATION

DISCONNECT SWITCH

DUCT TEMPERATURE SENSOR -

SHORT

GENERATOR

GROUND BAR

GROUNDING ELECTRODE

MOTOR STARTER

PANEL BOARD

SWITCHBOARD/SWITCHGEAR

SWITCHBOARD/SWITCHGEAR -

DOUBLE TUB

TRANSFORMER

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

COMBINATION MAGNETIC

STARTER/DISCONNECT

(ENCLOSED MOTOR

CONTROLLER)

DISTRIBUTION PANEL

ENCLOSED DISCONNECT

SWITCH - NON-FUSED

PANELBOARD - SURFACE

SWITCHBOARD

TRANSFORMER - DRY TYPE

VARIABLE FREQUENCY DRIVE

DATA SYMBOLS

PLAN SYMBOL NAME

WIRELESS ACCESS POINT -

CEILING

COMMUNICATION SYMBOLS

PLAN SYMBOL NAME

PUBLIC ADDRESS SPEAKER -

CEILING

FHCC CONDUIT COLOR SCHEME

Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call

Revisions: Date:

ADD-01 04/14/2026

S

S

S

S

L

M

N

P

Q

R

S

12131416171819

T

E'

F'

D'

C'

B'

9'

DD

DD

DD

LIMITS OF SELECTIVE DEMOLITION

LIMITS OF

SELECTIVE

DEMOLITION

DD

D

D

D

D D

D

D

D

D

DD

D D

D D

D

D

D D D

D

D

D

D

DD

D D

D

D

D

D

D

D D

D

D

DDD

D

D

D

D

D D D

D

D

DD

D D D

D

D DDD

D

D

D

D D

D

D

D

DD

D D

DD

R

WAP

R

R

WAP

R

R

R

WAP

R

R

R

D D

DD D D D

D D

D DDDDD

D

D

D

R

R

R

R

LIMITS OF SELECTIVE DEMOLITION 31

L

M

N

P

Q

R

S

12131416171819

T

E'

F'

D'

C'

B'

9'

H24 H24

H24H24

H24 H24

H24H24

H24 H24

H24H24

H24 H24

H24 H24

D1 D1

D1

D1 D1

D1

D1

D1

D1

D1

D1D1D1

D1

D1

D1

D1 D1 D1

D1 D1

D1D1

D1 D1

D1D1

D1

D1

D1

D1 D1

D1 D1 D1 D1 D1

D1

D1

D1

D1D1D1D1 D1

D1

D1

D1

D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1D1D1

Db

Da

Da Db

Da Db

Db Da b b b b b b b b b b b b b b b aa aa aa a a b b b b b bbbbb b b b b b b aa a ab b b b b b b b b b b bbbbb aa a ab b b b b b b b b b b b b b

G1

G1

G1

G1 G1 G1 G1

G1

G1

G1

G1G1G1 G1 G1

G1 G1

G1 R

R

R

R

WAP

R

R

R

2 6

6 6

LS LS

LS

LS LS

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10

100% CONSTRUCTION DOCUMENTS

321 4 5 6

05/27/2025 www.specializedeng.com

SES Project : 23022.008

05/27/2025

A u to d e s k D o c s /2

.0

V A

L o v e ll

S u rg ic a l H

V A

C S y s te m s R e p la c e m e n t/

.B

.M E

P T

R

.r v t

/1

/2

:4

:0

P

M

E400

B133 - SECOND LEVEL FLOOR PLANS

- ENLARGED - LIGHTING AND

LIGHTING CONTROL

SURGICAL HVAC SYSTEMS

REPLACEMENT

3001 Green Bay Rd, North Chicago, IL 60064

556-23-127

133 & 133CA

05/27/2025 KSB NTH

1/8" = 1'-0"

B133 - SECOND LEVEL OR - POWER, LIGHTING, AND LIGHTING CONTROL - DEMOLITION

1/8" = 1'-0"

B133 - SECOND LEVEL OR - POWER, LIGHTING, AND LIGHTING CONTROL

5 5 10 15 20

1/8" = 1'-0"

FEETSCALE

N

5 5 10 15 20

1/8" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. ALL SCOPE REGARDING LIGHTING AND LIGHTING CONTROL ARE BASE BID. DEDUCT ALTERNATES ARE AS FOLLOWS:

A. DEDUCT ALTERNATE 1: NO LIGHTING AND LIGHTING CONTROL SCOPE.

B. DEDUCT ALTERNATE 2: NO LIGHTING AND LIGHTING CONTROL SCOPE.

2. EXTEND EXISTING BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES IN AREA TO NEW LUMINAIRES SHOWN. ALL LUMINAIRES TO BE SERVED BY

EXISTING TO REMAIN BRANCH CIRCUITS.

3. DEMOLISH ALL EXISTING LUMINAIRES AND LIGHTING CONTROLS. MAINTAIN BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES FOR REUSE IN NEW

LIGHTING PLAN. ALL OTHER ELECTRICAL SYSTEMS ARE EXISTING TO REMAIN.

4. DISCONNECT EXISTING BOOMS FROM BRANCH CIRCUITS. MAINTAIN BRANCH CIRCUITS AND BOOMS FOR REINSTALLATION DURING CONSTRUCTION

PHASE. STORE EQUIPMENT IN SAFE ENVIRONMENT TO PREVENT DAMAGE BETWEEN PHASES.

5. EXTEND BRANCH CIRCUITS PREVIOUSLY SERVING BOOMS TO NEW BOOM LOCATIONS. COORDINATE WITH ARCH AND OWNER FOR FINAL BOOM

LOCATIONS.

6. EXTEND EXISTING LIFE SAFETY BRANCH CIRCUITS PREVIOUSLY SERVING LUMINAIRES IN AREA TO NEW LUMINAIRES SHOWN. ALL LUMINAIRES TO BE

SERVED BY EXISTING TO REMAIN BRANCH CIRCUITS.

Revisions: Date:

ADD-01 04/14/2026

COR

REMARKS: (EQUIPMENT CONNECTION SCHEDULE)

1. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL.

2. PROVIDE NEW CIRCUIT BREAKER IN NEW PANEL.

3. VFDs SHOWN ON PLAN. ROUTE BRANCH FEEDER FROM SOURCE TO VFD TO MECHANICAL EQUIPMENT.

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY QUANTITY WITH FLOOR PLANS. WHERE LOCATIONS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS, REFER TO MECHANICAL SHEETS. REFER TO DEFINITIONS

BELOW FOR CLARIFICATIONS OF CONNECTION REQUIREMENTS.

B. ITEMS NOTED AS "NA" ARE NOT APPLICABLE TO THE CONNECTION.

C. "CONTROL TYPE" - PROVIDE CONTROL AND CONNECTIONS:

• "INT" = CONTROLS ARE MANUFACTURED INTEGRAL TO THE EQUIPMENT (SELF-CONTAINED).

• "CONT" = EQUIPMENT OPERATES CONTINUOUSLY (NO CONTROLS). FOR MOTORS WITHOUT INTERNAL OVERLOAD PROTECTION, PROVIDE SEPARATE OVERLOAD PROTECTION. OVERLOAD PROTECTION MAY BE

PROVIDED AS PART OF A MANUAL MOTOR STARTER.

• "DDC" = CONTROL SIGNAL FROM TEMPERATURE CONTROL SYSTEM PROVIDED BY MECHANICAL CONTRACTOR OR TEMPERATURE CONTROLS CONTRACTOR.

• "TIME SW" = CONTROL SIGNAL FROM TIME SWITCH PROVIDED BY ELECTRICAL CONTRACTOR.

• TIME SWITCH SHALL BE 7-DAY DIGITAL TYPE WITH AUTOMATIC DAYLIGHT SAVINGS ADJUSTMENTS AND BATTERY BACKUP. LOCATE TIMESWITCH IN NEAREST MECHANICAL OR ELECTRICAL UTILITY ROOM.

LABEL TIME SWITCH. COORDINATE TIME SCHEDULE WITH OWNER AND MECHANICAL ENGINEER.

• "WALL SW" = CONTROL SIGNAL FROM WALL SWITCH PROVIDED BY ELECTRICAL CONTRACTOR.

• COORDINATE LOCATION OF WALL SWITCH WITH OWNER. LABEL WALL SWITCH.

• "FA STOP" = FANS WITH CFM OF 2000 OR GREATER AND FANS SERVING DUCTS CONTAINING SMOKE DAMPERS.

• PROVIDE FIRE ALARM SYSTEM DUCT SMOKE DETECTORS AT RETURN-SIDE AND SUPPLY-SIDE OF FAN/UNIT. PROVIDE MULTIPLE DETECTORS IF REQUIRED TO ACCOMMODATE MAIN DUCT TAKE-OFFS WHERE A

SINGLE DETECTOR CANNOT BE INSTALLED TO CAPTURE ALL AIRFLOW. FIRE ALARM SYSTEM SHALL SHUTDOWN FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT.

PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR CONTROLLER/STARTER AND CONNECT TO SHUTDOWN FAN.

• "WF STOP" = HIGH VOLUME LOW SPEED (HVLS) FANS SHUT DOWN HVLS FAN UPON WATERFLOW ALARM. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE AT MOTOR AND

CONNECT TO SHUT DOWN FAN.

• "FA START" = FANS USED FOR SMOKE EVACUATION OR PRESSURIZATION.

• FIRE ALARM SYSTEM SHALL START FAN UPON DETECTION OF SMOKE IN DUCT OR ROOMS SERVED FROM THIS EQUIPMENT. PROVIDE WITH INDIVIDUAL FIRE ALARM SYSTEM ADDRESSABLE CONTROL MODULE

AT MOTOR CONTROLLER/STARTER AND CONNECT TO START FAN.

• "DATA" = PROVIDE WITH DATA CONNECTION FROM NEAREST DATA NETWORK COMMUNICATIONS ROOM.

• "CONDUIT" = PROVIDE EMPTY 3/4" CONTROLS CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT TO ACCOMMODATE CONTROL CABLING BY MECHANICAL OR TEMPERATURE CONTROLS CONTRACTOR.

D. "DISCONNECT BY" :

• "MECHANICAL" = DISCONNECT IS FURNISHED BY MECHANICAL CONTRACTOR OR PROVIDED WITH MECHANICAL EQUIPMENT.

• ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS FURNISHED BY THE MECHANICAL CONTRACTOR.

• "ELECTRICAL" = DISCONNECT IS FURNISHED BY ELECTRICAL CONTRACTOR. COORDINATE EXACT REQUIREMENTS WITH EQUIPMENT FURNISHED BY MECHANICAL CONTRACTOR.

• "MANUFACTURER" = DISCONNECT IS FURNISHED BY EQUIPMENT MANUFACTURER. ELECTRICAL CONTRACTOR SHALL PROVIDE MOUNTING AND ADDITIONAL CONNECTIONS REQUIRED FOR LOOSE DISCONNECTS

FURNISHED BY EQUIPMENT MANUFACTURER.

E. "DISCONNECT TYPE" - PROVIDE DISCONNECT/RECEPTACLE AT EQUIPMENT LOCATION AND ASSOCIATED CONNECTION TO EQUIPMENT AND BRANCH CIRCUIT:

• "NEMA-___" = DUPLEX (TYP) RECEPTACLE TO ACCOMMODATE CORD AND PLUG CONNECTION (CORD AND PLUG FURNISHED WITH EQUIPMENT UNLESS NOTED OTHERWISE)

• "REC/SW" = PROVIDE 20A 120V RECEPTACLE OR 20A TOGGLE SWITCH DISCONNECT.

• COORDINATE REQUIRED SELECTION WITH EQUIPMENT.

• "NF" = NON-FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED. 20/1 AND SMALLER SHALL BE TOGGLE SWITCH DISCONNECT.

• "F" = FUSED DISCONNECT. SIZE AND POLE QUANTITY AS INDICATED.

• FUSE PER MANUFACTURER'S RECOMMENDATIONS.

• "FUSTAT" = SWITCH AND FUSTAT. FUSE SIZE PER EQUIPMENT MANUFACTURER.

• LOCATE SWITCH IN CONCEALED ACCESSIBLE LOCATION.

• "ENCL CB" = ENCLOSED CIRCUIT BREAKER DISCONNECT.

• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED.

• "ENCL MCSW" = ENCLOSED MOLDED CASE SWITCH DISCONNECT.

• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED.

• "SHUNT ENCL CB" = SHUNT TRIP ENCLOSED CIRCUIT BREAKER DISCONNECT.

• SIZE, POLE QUANTITY, AND FLUSH/SURFACE MOUNTING AS INDICATED. PROVIDE WITH INTEGRAL 120V CONTROL TRANSFORMER SERVED FROM LINE SOURCE WITH PRIMARY AND SECONDARY FUSING.

COORDINATE ENCLOSURE AND COVER SIZE TO ACCOMMODATE TRANSFORMER. PROVIDE WITH EQUIPMENT GROUND BAR AND SEPARATE INSULATED ISOLATED GROUND BAR. WHERE NEUTRAL CONDUCTOR IS UTILIZED. PROVIDE SOLID NEUTRAL BAR. CONNECT SHUNT TRIP VOLTAGE SOURCE AND ACTUATOR TO ASSOCIATED EMERGENCY POWER (EPO) SWITCHES. PROVIDE EPO AND COORDINATE

LOCATION.

• "LOCK CB" = CIRCUIT BREAKER CAPABLE OF BEING LOCKED IN THE OPEN POSITION, LOCATED IN THE SOURCE ELECTRICAL PANEL. THE PROVISIONS FOR LOCKING MUST REMAIN IN PLACE WITH OR WITHOUT THE

LOCK INSTALLED.

• "MAG" = COMBINATION MAGNETIC MOTOR STARTER WITH DISCONNECT (COORDINATE COIL VOLTAGE WITH CONTROL SOURCE). LOCATE COMBINATION MAGNETIC MOTOR STARTER TO SERVE AS THE MOTOR DISCONNECT. WHERE STARTER SERVES OUTDOOR EQUIPMENT, LOCATE STARTER IN THE SOURCE ELECTRICAL ROOM.

• "MAN" = COMBINATION MANUAL MOTOR STARTER WITH DISCONNECT. LOCATE COMBINATION MANUAL MOTOR STARTER TO SERVE AS THE MOTOR DISCONNECT. WHERE STARTER SERVES OUTDOOR

EQUIPMENT, LOCATE STARTER IN THE SOURCE ELECTRICAL ROOM.

• "VFD" = VARIABLE FREQUENCY DRIVE CONTROLLER. LOCATE VARIABLE FREQUENCY DRIVE CONTROL TO SERVE AS THE MOTOR DISCONNECT.

• "INT" = DISCONNECT IS MANUFACTURED INTEGRAL TO THE EQUIPMENT.

• "HW" = HARDWIRE. DISCONNECT NOT REQUIRED.

• LOCATE DISCONNECT ADJACENT TO EQUIPMENT PER NEC - PROVIDE WITH STRUT MOUNTING AS REQUIRED.

• LOCATE RECEPTACLE OR JUNCTION BOX TO DIRECTLY SERVE EQUIPMENT.

• COORDINATE EXACT LOCATION WITH ARCHITECT, ARCHITECTURAL DETAILS, AND EQUIPMENT MANUFACTURER'S REQUIREMENTS.

• WHERE DISCONNECT SERVES OUTDOOR EQUIPMENT, PROVIDE AS NEMA-3R.

• PROVIDE DISCONNECT WITH EQUIPMENT GROUND KIT.

• WHERE FEEDER INDICATED UTILIZES A NEUTRAL, PROVIDE DISCONNECT WITH SOLID NEUTRAL KIT.

• WHERE FEEDER INDICATED UTILIZES AN ISOLATED GROUND, PROVIDE DISCONNECT WITH ADDITIONAL INSULATED GROUND KIT.

• DISCONNECTS NOT SHOWN AS "F" OR "NF" SHALL BE NON-FUSED.

• DISCONNECTS OF MOTORS SERVED FROM A VFD SHALL CONTAIN AUXILIARY CONTACTS CONNECTED TO THE VFD TO DISABLE VFD UPON DISCONNECTION.

• WHERE STARTERS OR VFD'S CONTAIN INTEGRAL DISCONNECTS AND ARE LOCATED PER NEC TO SATISFY AS THE EQUIPMENT DISCONNECT, AN ADDITIONAL EQUIPMENT DISCONNECT IS NOT REQUIRED.

F. "GEN" - EQUIPMENT IS SERVED FROM A SOURCE PANEL PROVIDED WITH GENERATOR BACK-UP.

G. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF

THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR.

REMARKS: (LIGHTING FIXTURE SCHEDULE)

1. GYP CEILING MOUNTING - PROVIDE WITH MANUFACTURER'S FLANGE MOUNTING KIT/ACCESSORY(S) TO ALLOW FOR

RECESSED MOUNTING OF LUMINAIRE WITHIN GYP CEILING.

GENERAL NOTES: (LIGHTING FIXTURE SCHEDULE)

A. CATALOG NUMBER VERIFICATION - CONTRACTOR SHALL VERIFY LIGHTING FIXTURE INSTALLATION REQUIREMENTS

AND CATALOG NUMBER PRIOR TO ORDERING.

B. SUBSTITUTIONS - WHERE INDICATED WITH 'N' (NO), NO SUBSTITUTIONS WILL BE ACCEPTED. WHERE INDICATED WITH

'P' (PRIOR APPROVAL), SUBSTITUTIONS MUST BE APPROVED PRIOR TO BID WITH ACCEPTANCE ISSUED BY ADDENDUM.

WHERE INDICATED WITH 'Y' (YES), THE FOLLOWING MANUFACTURER'S ARE CONSIDERED ACCEPTABLE EQUIVALENT MANUFACTURER'S, PROVIDED THE EQUIVALENT FIXTURE IS OF THE SAME QUALITY, EFFICIENCY, PERFORMANCE AND

CHARACTERISTICS AS THAT SCHEDULED:

1. ACUITY BRANDS

2. EATON/COOPER BRANDS

3. HUBBELL

4. WILLIAMS

5. PHILLIPS/SIGNIFY BRANDS

C. DOWNLIGHT - PROVIDE DOWNLIGHT REFLECTOR FINISH/COLOR AS SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE.

SELECT CEILING TRIM FINISH/COLOR TO COORDINATE WITH CEILING TYPE. "WHITE" TRIM FOR DOWNLIGHTS MOUNTED IN WHITE ACOUSTICAL TILE CEILINGS. "CLEAR" (TO MATCH REFLECTOR FINISH/COLOR) FOR DOWNLIGHTS MOUNTED

IN PAINTED GYPSUM BOARD CEILINGS.

D. COVE – DRAWINGS PROVIDE GENERAL ILLUSTRATION OF COVE LAYOUT. COORDINATE EXACT UNIT LENGTHS AND QUANTITIES WITH ARCHITECTURAL DETAILS TO PROVIDE CONTINUOUS ILLUMINATION FOR ENTIRE LENGTH OF COVE.

LED COVE LIGHTING FIXTURES SHALL BE INSTALLED END-TO-END (NO GAP BETWEEN FIXTURES) WITH A MAXIMUM 6” GAP AT COVE ENDS AND CORNERS. SELECT UNIT LENGTHS AND QUANTITIES TO ACHIEVE THE ABOVE REQUIRED

PERFORMANCE (SHORTER UNIT LENGTHS IN GREATER QUANTITIES MAY BE REQUIRED).

E. TRACK – PROVIDE SINGLE-CIRCUIT TRACK SYSTEM WITH ALL NECESSARY COMPONENTS FOR A COMPLETE INSTALLATION, INCLUDING, BUT NOT LIMITED TO: POWER FEEDS, STAND OFFS, CONNECTORS, END CAPS, AND TRANSFORMERS. TRACK AND ACCESSORY FINISH SHALL MATCH FINISH OF SPECIFIED TRACK HEAD. PROVIDE TRACK LENGTHS AND TRACK HEAD QUANTITIES PER PLANS. COORDINATE TRACK TYPE FOR COMPATIBILITY WITH SPECIFIED TRACK HEAD FIXTURE. PROVIDE REMOTE TRANSFORMER QUANTITIES AND SIZES TO ACCOMMODATE LOAD OF TRACK HEADS INDICATED. PROVIDE POWER FEEDS AND TRACK CONNECTORS AS NEEDED TO PROVIDE TRACK LENGTH INDICATED. MOUNT REMOTE TRANSFORMER ABOVE NEAREST ACCESSIBLE CEILING. COORDINATE LENGTH OF

STANDOFFS AND POWER FEEDS AND EXACT SHAPE OF CURVED TRACKS WITH ARCHITECT.

F. UNDERCABINET- PROVIDE ALL NECESSARY MANUFACTURER'S INSTALLATION ACCESSORIES TO ACCOMMODATE INSTALLATION, INCLUDING, BUT NOT LIMITED TO: SPLICE BOXES, END CONNECTORS, AND JUMPER/DAISY CHAIN

CONNECTORS.

G. FIXTURE FINISH - WHERE CATALOG NUMBER LISTED INDICATES '**' IN LIEU OF MANUFACTURER'S FINISH OPTION, COORDINATE WITH ARCHITECT FOR EXACT FINISH PRIOR TO ORDERING.

H. WALL-TO-WALL MOUNTING - PROVIDE FIXTURE WITH CONTINUOUS ILLUMINATION FROM WALL TO WALL. COORDINATE EXACT WALL DIMENSIONS WITH GENERAL CONTRACTOR AND ARCHITECTURAL DETAILS. PROVIDE MANUFACTURER'S

WALL-TO-WALL MOUNTING ACCESSORY(S) AS REQUIRED FOR A COMPLETE INSTALLATION.

GENERAL NOTES: (LIGHTING CONTROL SCHEDULE)

A. SUBMIT MANUFACTURER INTERCONNECTION DIAGRAMS INDICATING DEVICE QUANTITIES, LOCATIONS, AND ASSOCIATED CONTROLS CABLING FOR APPROVAL.

B. REFER TO LIGHTING PLAN FOR WALL DEVICE TYPES, QUANTITIES, AND LOCATIONS. REFER TO SYMBOL LEGEND FOR LIGHTING PUSH BUTTON TYPE DESCRIPTIONS.

C. DEVICE QUANTITIES NOT INDICATED. PROVIDE TYPE AND QUANTITY OF DEVICES AS REQUIRED TO PROVIDE COMPLETE COVERAGE OF SPACE AND INTENDED SYSTEM

OPERATION.

D. WHERE BI-LEVEL SWITCHING AND AUTO ON TO 50% ARE USED IN THE SAME SPACE, THE ZONE THAT IS AUTOMATICALLY TURNED ON SHALL BE CONTROLLED BY THE BOTTOM

BUTTON OF WALL DEVICES.

E. WHERE PHOTOCELLS ARE BEING UTILIZED FOR DAYLIGHT HARVESTING, PROVIDE ADDITIONAL COMPONENTS AS NEEDED TO CONTROL LIGHTING WITHIN DAYLIGHT ZONES

INDEPENDENT OF GENERAL AREA LIGHTING WITHIN SPACE. PROVIDE MINIMUM OF (1) PHOTOCELL DEVICE PER DAYLIGHT ZONE.

F. UNLESS NOTED OTHERWISE, LIGHTING SHALL UTILIZE CONTINUOUS DIMMING AND EXTERIOR LIGHTING SHALL UTILIZE MULTI-LEVEL STEP DIMMING.

G. UNDERCABINET LIGHTING SHALL BE SWITCHED SEPARATELY FROM MAIN ROOM LIGHTING. UNDERCABINET LIGHTING SHALL BE CONTROLLED BY THE AUTO OFF FUNCTION OF

OCCUPANCY SENSORS.

H. WHERE PHOTOCELLS ARE UTILIZED FOR DAYLIGHT HARVESTING, TARGET ILLUMINANCE LEVELS SHALL BE MEASURED AT WORK PLANE OF PRIMARY TASK IN SPACE.

I. COORDINATE PROGRAMMING OF BUSINESS HOURS WITH OWNER PRIOR TO OCCUPANCY.

J. "DEVICES":

• "OCC" - OCCUPANCY SENSOR. PROVIDE TYPE INDICATED BELOW. CEILING MOUNT UNLESS NOTED OTHERWISE.

• "IR" = PASSIVE INFRARED

• "US" = ULTRASONIC/MICROPHONIC

• "DT" = DUAL TECHNOLOGY

• "N" = NO OCCUPANCY SENSOR

• "DAYLIGHT" - DAYLIGHT CONTROLS. CEILING MOUNT UNLESS NOTED OTHERWISE.

• "Y" = PROVIDE DAYLIGHT PHOTOCELL. PHOTOCELLS MAY NOT BE COMBINED WITH OCCUPANCY SENSORS UNLESS NOTED OTHERWISE.

• "N" = NO DAYLIGHT PHOTOCELL.

• "AUX" - AUXILIARY CONTACT.

• "Y" = PROVIDE AUXILIARY CONTACT/RELAY TO INDICATE OCCUPANCY FOR USE BY OTHER SYSTEMS. AUXILIARY CONTACT/RELAY MAY BE INTEGRATED WITH OCCUPANCY

SENSOR. AUXILIARY CONTACTS MAY BE OMITTED IF SYSTEM IS FULLY NETWORKED AND ROOM STATUS IS COMMUNICATED TO OTHER SYSTEMS THROUGH SOFTWARE INTEGRATION. COORDINATE WITH OTHER SYSTEMS AND CONFIRM THIS DESIGN IS ACCEPTABLE WITH OWNER AND ENGINEER PRIOR TO ORDERING PARTS.

• "N" = NO AUXILIARY CONTACT.

• "NETWK" - NETWORKED LIGHTING CONTROL COMMUNICATIONS.

• "Y" = NETWORK ROOM DEVICES TO BUILDING-WIDE LIGHTING CONTROLS NETWORK COMMUNICATIONS.

• "N" = BUILDING-WIDE LIGHTING CONTROLS NETWORK COMMUNICATIONS NOT REQUIRED TO THIS ROOM.

• "REC" - CONTROLLED RECEPTACLES

• "Y" = PROVIDE AUTOMATIC CONTROL OF SELECTED RECEPTACLES WITHIN SPACE. REFER TO POWER PLAN FOR RECEPTACLES TO BE CONTROLLED.

• "N" = NO CONTROLLED RECEPTACLES.

10360 Ellison Circle Omaha, NE 68134 Phone:

402.991.5520

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

DESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10

100% CONSTRUCTION DOCUMENTS

321 4 5 6

05/27/2025 www.specializedeng.com

SES Project : 23022.008

05/27/2025

A u to d e s k D o c s /2

.0

V A

L o v e ll

S u rg ic a l H

V A

C S y s te m s R e p la c e m e n t/

.B

.M E

P T

R

.r v t

/1

/2

:4

:0

P

M

E700

ELECTRICAL SCHEDULES SURGICAL HVAC SYSTEMS

REPLACEMENT

3001 Green Bay Rd, North Chicago, IL 60064

556-23-127

133 & 133CA

05/27/2025 KSB MEA

EQUIPMENT CONNECTION SCHEDULE

MARK DESCRIPTION ROOM NAME ROOM # HP KW FLA MCA MOCP VOLTS PHASE POLES

LOAD

[VA]

CONTROL

TYPE

DISCONNECT

BY

DISCONNEC

T TYPE FEEDER PANEL

CIRCUIT

NUMBER SCCR GEN REMARKS

VOLTAGE DROP

AHU-1 AIR HANDLER CONTROLS COOLING TOWER 3C102 0 0 1 1.3 15 120 1 1 120 INT MECHANICAL SW (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 1 5 Yes 1 0.2

AHU-12 AIR HANDLER CONTROLS MECHANICAL 3D134 0 0 1 1.3 15 120 1 1 120 INT MECHANICAL SW (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 3 5 Yes 1 0.35

CWP-3A CONDENSOR WATER PUMPS MECHANICAL EQUIPMENT-1 3C100A-1 7.5 0 11 13.8 30 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-DP-001-3C100 1 5 No 1,3 0.24

CWP-3B CONDENSOR WATER PUMPS MECHANICAL EQUIPMENT-1 3C100A-1 7.5 0 11 13.8 30 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-DP-001-3C100 2 5 No 1,3 0.25

EF-41 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 1,3,5 5 Yes 1,3 0.06

EF-42 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 7,9,11 5 Yes 1,3 0.23

EF-43 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 13,15,17 5 Yes 1,3 0.1

EF-44 EXHAUST FAN 0.33 0 1.1 1.4 15 120 1 1 914 DDC MANUFACTURER INT (1M1) (1/6 - 1 HP 120V) 2-#12 CU, #12 CU GND - 3/4"C. 133-PNL-003-3C100 5 5 Yes 1 2.41

EF-45 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 31,33,35 5 Yes 1,3 0.05

EF-46 EXHAUST FAN 0.5 0 1.1 1.4 15 480 3 3 914 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 19,21,23 5 Yes 1,3 0.04

EF-47 EXHAUST FAN 1.5 0 3 3.8 15 480 3 3 2494 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C. 133-PNL-001-3C100 25,27,29 5 Yes 1,3 0.08

RF-12 RETURN FAN 7.5 0 11 13.8 15 480 3 3 9145 DDC MECHANICAL VFD, REMARK 3 (10M4) (1/2 - 10 HP 480V) 3-#12 CU, #12 CU GND - 3/4"C.