This document is a Request for Quote (RFQ) for fire alarm system inspection and testing services at the VA Illiana Health Care System in Danville, Illinois. The solicitation (36C25225Q0706) seeks a contractor to perform comprehensive fire safety system inspections across 30 buildings, including testing fire alarm systems, fire and smoke dampers, water-based fire protection systems, sprinkler systems, and conducting battery/charger inspections. The contract is structured with a base year and four option years from December 2025 to November 2030, with services to be performed in accordance with the latest National Fire Protection Association (NFPA) standards.
Key technical requirements include technicians certified by the International Certification Board in HVAC fire safety, who will conduct detailed inspections of various fire safety components across multiple buildings. The solicitation is set aside for small businesses, with a NAICS code of 561621 and a size standard of $25 million. Offerors must submit quotes electronically by November 24, 2025, at 9:00 am CST, including technical capabilities, experience with similar medical center systems, and firm-fixed pricing for all line items. The evaluation will consider technical capability, experience, and price, with the Government reserving the right to select the quote providing the best overall benefit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-Risk Analysis.docx | DOCX document | |
| WD 2015-5021 RV26 dtd 7-8-25.pdf | ||
| 852.219-75 Limitations of Subcontracting.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25225Q0706
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
None 550-26-1-229-0001 36C25225Q0706 Eastmead, Lori 414-844-4840 11-24-2025 9:00am
CST
Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 X X 561621 $25 Million N/A X Department of Veterans Affairs VA Illiana Health Care System 1900 E. Main St.
Danville IL 61832-5100 Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476
Department of Veterans Affairs Financial Services Center PO Box 149971 Austin TX 78714-9971 X See CONTINUATION Page Fire alarm testing and inspection at the Illiana Health Care System, 1900 E. Main St., Danville, IL 61832-5100 See CONTINUATION Page 550-3660162-229-851100-2543-010050100 X X one Lori Eastmead Contracting Officer
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA (continuation from Standard Form 1449)
OFFERORS MUST COMPLETE AND RETURN ALL INFORMATION DESIGNATED HEREIN PRIOR TO THE TIME SPECIFIED IN BLOCK 8 OF SF 1449 IN ORDER TO BE CONSIDERED FOR AWARD.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO | DATE | |
| ______________________________ | __________________________ | |
| ______________________________ | __________________________ | |
| ______________________________ | __________________________ |
1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
CONTRACTOR NAME _____________________________________
ADDRESS ________________________________________________
CITY-STATE-ZIP __________________________________________
POINT OF CONTACT/TITLE ________________________________
| PHONE NUMBER | ______________________________________ |
| FAX NUMBER | ______________________________________ |
| E-MAIL ADDRESS | ______________________________________ |
SAM UEI NO. ____________________________________________
CAGE CODE _____________________________________________
CONTRACTOR’S PAST PERFORMANCE POINT OF CONTACT
(IF DIFFERENT THAN ABOVE):
NAME: __________________________________________
EMAIL ADDRESS:_________________________________
b. GOVERNMENT:
CONTRACTING OFFICE CODE: 36C252
| DEPARTMENT OF VETERANS AFFAIRS |
| GREAT LAKES ACQUISITION CENTER |
| 115 S. 84TH ST., STE 100 |
MILWAUKEE WI 53214
2. ACQUISITION OF COMMERCIAL ITEMS:
This Request for Quote (RFQ) solicitation is issued under the authority of FAR Part 12 Acquisition of Commercial Items and FAR Part 13 Simplified Acquisition Procedures. FAR Part 15 will not be used. The procedures in Part 12 used in conjunction with Part 13 allow the Government to procure services resembling those in the commercial marketplace and streamline the procurement process. From this RFQ, the Government intends to award a firm fixed price contract where the contractor provides a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract. (Note: The terms “offeror” and “quoter” are both used in this Solicitation. For the purposes of this Solicitation, these terms are interchangeable; there is no difference in meaning between the two.)
3. SET-ASIDE (If any): See box 10 of STANDARD FORM 1449
4. SOLICITATION TIMELINE SUMMARY:
A. SITE VISIT:
It is strongly suggested and expected that the offeror inspect the campus to be serviced to fully understand the nature of the work and the conditions under which the work is to be performed. In no case shall failure to inspect the campus constitute grounds for a claim after contract award.
SITE VISIT IS SCHEDULED FOR NOVEMBER 18, 2025, AT 10:00 AM LOCAL TIME. ALL INTERESTED PARTIES CONTACT THE COR MIKE MILLER (217-554-5994) FOR INSTRUCTIONS ON LOCATION.
B. RFQ QUESTIONS:
To maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contracting Officer NAME@va.gov no later than NOVEMBER 20, 2025, 9:00AM LOCAL TIME. Contracting will issue a consolidated response via solicitation amendment to https://sam.gov Contract Opportunities within 2 business days to all parties
C. SOLICITATION CLOSES/QUOTES DUE:
See box 8 of STANDARD FORM 1449 or most recent Amendment.
D. SUBMISSION OF QUOTE:
See 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services and addendum for specific instructions to offerors.
5. CONTRACTING OFFICER AUTHORITY:
The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority, and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.
6. INVOICES:
a. All payments by the Government to the contractor will be made in accordance with: FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (OCT 2018).
b. Invoices shall be submitted upon completion of service in arrears in accordance with 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018).
c. Payments shall be made in arrears upon receipt of a properly prepared invoice.
d. Facsimile, e-mail, and scanned documents are not acceptable forms of submission for payment requests.
e. The VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. To submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to VA.Registration@Tungsten-Network.com or calling 1-877-489-6135 for Enrollment.
f. Contractor shall submit an electronic invoice by the tenth (10th) of the following month services were performed to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.Tungsten-Network.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.
g. All invoices shall reference the vendor name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any discount payment terms.
h. VA’s Electronic Invoice Presentment and Payment System – The Veterans Affairs Financial Services Center (VAFSC) uses a third-party contractor, Tungsten Network e-Invoice, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/customer-campaigns/veteransaffairs/ to begin submitting electronic invoices, free of charge.
i. As of July 1, 2020, the VA10091 form has been eliminated and the VAFSC is requiring our vendors to update and add their information in the Customer Engagement Portal (CEP) at https://www.cep.fsc.va.gov/. This is for new vendors being added to FMS only.
j. For assistance setting up e-Invoice, the below information is provided:
* Tungsten Network e-Invoice Setup Information: 1-877-489-6135
* Tungsten Network e-Invoice email: VA.Registration@Tungsten-Network.com
* FSC e-Invoice Contact Information: 1-877-353-9791
* FSC e-invoice email: vafsccshd@va.gov
7. FACILITY REQUIREMENTS: In addition to any other requirements set forth in this Contract, the Contractor, including its employees, agents, and subcontractors (collectively “the Contractor”), shall comply with the following facility requirements. Failure to comply with these requirements shall be considered a material breach of this Contract and may be a violation of Federal law resulting in charges answerable in the United States District Court.
a. The contractor is responsible for following all on-site facility policies.
b. All VA property is considered Federal property, and all Federal laws are applicable.
c. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
d. All VA facilities are drug free. Possession of drugs, to include Marijuana and all Marijuana biproducts are prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
e. All contractor personnel are required to adhere to all VA rules and regulations.
f. Smoking is prohibited on the entire campus, both inside and outside the VA Facility.
g. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
h. VHA DIRECTIVE 1192: This Veterans Health Administration (VHA) directive establishes policy and provides guidance for the prevention of seasonal influenza in VHA facilities through the vaccination or masking of health care personnel (HCP). AUTHORITY: Title 38 United States Code (U.S.C.) 7301(b), 7318(b). Contractor is responsible in ensuring that all aspects of this directive are implemented, including providing face masks and influenza vaccines for all employees working at a VA facility.
8. SECURITY & PRIVACY CONTROL:
The Authorization & Accreditation (A&A) requirements of VHA Handbook 6500.6 do not apply to this requirement, therefore, a Security Accreditation Package is not required. No A&A or MOU/ISA is required. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information Security.
If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.
RECORDS MANAGEMENT
a. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at (36) CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of (1974) (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
b. In accordance with (36 CFR 1222.32,) all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of (44)U.S.C. chapters (21), (29), (31), and (33), the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of (1974) (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
c. In accordance with (36) CFR (1222.32), Contractor shall maintain all records created for Government use or created while performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
d. VA Illiana and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VA Iliana or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by (18 U.S.C. 2701). In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA Iliana. The agency must report promptly to NARA in accordance with (36 CFR 1230).
e. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government's behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA Illiana control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
f. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub- contractor) is required to abide by Government and VA Illiana guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
g. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA policy.
h. The Contractor shall not create or maintain any records containing any non- public VA Illiana information that are not specifically tied to or authorized by the contract.
i. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of (1974) or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
j. VA Illiana owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VA Illiana shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
k. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VA Illiana-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
l. The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
SITE ACCESS
1. All personnel working on this project will be required to be in possession of a valid VA flash pass or will need to sign in at Police Service daily to obtain a visitor badge prior to working on this project. Badge application forms (0711) are available from the COR.
2. All personnel working on VA property are required to complete privacy training and comply with VA Handbook (6500.6) Appendix C, Sections (1), (6), (7), (9a), (3) and 9b.
3. All personnel on VA projects are required at a minimum to be in possession of a Ten (10) hour OSHA card.
4. Infection control permits where required will be issued by the Infection Control staff (217) 554-4804 prior to the commencement of work.
5. COR/POC will assist with coordination and escorts as required.
Statement of Work
Scope of work:
a. The vendor shall provide trained technicians to test all facets of the Simplex 4100u Central fire alarm system and ancillary peripheral connected devices and provide test results and documentation for the following buildings (14, 19, 22, 25, 35, 39, 49, 58, 60, 64, 68, 69, 72, 98, 101, 102, 103, 104, 125, 128, 129, 130, 131, 132, 133, 136, 140, 211, 212, 214 and 216) located on the campus of the VA Illiana Healthcare System at 1900 East Main Street, Danville, Il 61832. Vendor to provide trained technicians to perform inspections and diagnostic tests for all peripheral devices connected to comprise the facility fire alarm system. (The listed quantities may not be reflective of all devices currently on the system).
b. The vendor shall provide technicians certified by the International Certification Board and Accredited by the American National Standards Institute in HVAC fire safety or another nationally recognized certifying body to ISO/IEC 17024 in HVAC fire life safety to test all Fire and Smoke Dampers. All testing to be conducted to standards required by the latest edition of NFPA 25, NFPA 72 and NFPA 101. Documentation is to be provided for each device tested to include location, system address or zone location with test results and applicable voltage readings. A summary is to be provided of any deficiencies found.
c. The vendor is to provide trained technicians to conduct inspections of Water-Based Fire Protection Systems inspections in accordance with specifications in the latest edition of NFPA (25). Annual Wet Pipe Sprinkler tests and inspections to include inspecting gauges, systems valves, components, and signs; operating control valves; testing tamper and flow switches, and local alarms and signals; opening main drain to record static and residual pressure; inspecting the fire department connection and doing a building walk through to visually inspect sprinklers, piping, fitting and hangers from the floor level.
d. Where semi-annual is required, wet pipe sprinkler tests and inspections include inspecting gauges, water flow alarms, valve supervisory alarms, hydraulic nameplate, and control valves for position. Test mechanical alarms and low-pressure alarms if present. One main drain test conducted downstream of main backflows or pressure reducing valves and test flow alarms and pressure switches.
e. Where quarterly service is required wet pipe sprinkler testing and inspections includes inspecting gauges, water flow alarms, valve supervisory alarms, hydraulic name plate and control valves for position. Test mechanical alarms and low-pressure alarms if present. One main drain test conducted downstream of main backflows or pressure reducing valves. Each control valve is operated in its full range and lubricated annually. Drain test to be conducted after opening. All accessible components and devices to be logged with test results. Any discrepancies found shall be noted and a summary provided.
f. The vendor to provide trained technicians to conduct inspections of Water-Based Fire Protection Systems in accordance with standards specified in the latest edition of NFPA (25). Annual dry pipe sprinkler test and inspections to include inspecting gauges, system valves, components, and signs; operating control valves; testing tamper and pressure switches, and local alarms and signals; opening main drain to record static and residual pressures; partial trip test; draining of low point drains, inspecting fire department connections; and doing a building walkthrough to visually inspect sprinklers, piping, fittings, and hangers from floor level.
g. Where semi-annual is required, dry pipe sprinkler tests and inspections include inspecting gauges, water flow alarms, valve supervisory alarms, hydraulic nameplate, and control valves for position. Test mechanical alarms and low-pressure alarms if present. One main drain test conducted downstream of main backflows or pressure reducing valves and test flow alarms and pressure switches.
h. Where quarterly service is required, dry pipe sprinkler testing and inspections include inspecting gauges, water flow alarms, valve supervisory alarms, hydraulic nameplate and control valves for position. Test mechanical alarms and low-pressure alarms if present. One main drain test conducted downstream of main backflows or pressure reducing valves. Each control valve is operated in its full range and lubricated annually. Drain test to be conducted after opening.
i. Elevator Information:
| • | 7 of 8 have Elevator recall, 1 has fire call |
| • | All 8 elevators have smoke detectors in elevator shafts. |
Per NFPA 25 13.4.5.2.2.2 a full trip test of dry systems is required every three years, and an air leakage test of dry systems every three years per NFPA 13.4.5.2.9. for the following buildings. Years for testing shall be Base Year Fiscal Year (FY) 26, and Option Year 3 of Fiscal Year (FY) 29.
1.) Building 14 2.) Building 22/69 3.) Building 49 4.) Building 60 5.) Building 128 6.) Building 129 7.) Building 130 8.) Building 131
As of January 2020, (5) Year Internal Inspections are no longer required (see attachment 1)
j. Gauges shall be tested as a part of the five-year test and recalibrated or replaced if not accurate to within 3 percent, vendor shall purchase and install all replacement gauges, legibly marking the installation date on the face of all gauges. Pressure gauge replacement performed March 2025 with next replacement due Option Year 4, FY30.
k. The vendor is to provide trained technicians to conduct the required five (5) year standpipe flow and hydrostatic tests per the latest edition of NFPA 25 (6.3.1) Flow test and (6.3.2) Hydrostatic test.
l. COMPLIANCE REPORTING The following buildings (39, 58, 101, 103, 128, 129, 130, 131, 132, 133 and 140) require Joint Commission Reporting for the Environment of Care (02.03.05) but reporting for ALL buildings is to be provided in the same format.
DELIVERY OF SERVICES
All inspections are to be scheduled and conducted to meet the inspection and testing requirements specified in the latest edition of NFPA (25, 72 and 101) and Joint Commissions reporting requirements of Environment of Care (02.03.05.) documentation of the test results is to be provided within 10 days. Vendor shall coordinate with Michael Miller, VA Engineering Supervisor/COR (217) 554-5994 or the alternate James Blanding, VA Engineering Supervisor (217) 554-5992 to schedule work prior to arriving at the site. Work will be scheduled in such a manner as not to disrupt patient care.
Equipment to be tested, serviced and/or both by building number:
Building Breakout is as follows:
Wet and Dry System Patient Care Buildings:
| 1.) | Bld. 39 – (2) Control, (1) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) Fire Department Connection (FDC), (1) Gauge, (1) Post Indicator Valve |
| 2.) | Bld. 58 – (20) Control, (18) Tamper Switch, (26) Flow Switch, (12) Main Drain, (2) FDC, (14) Gauge, (6) Inspector Test Valve, (1) Post Indicator Valve |
| 3.) | Bld. 101 – (6) Control, (7) Tamper Switch, (6) Flow Switch, (1) Main Drain, (1) FDC, (6) Gauge, (3) Inspector Test Valve, (1) Post Indicator Valve |
| 4.) | Bld. 103 – (6) Control, (7) Tamper Switch, (6) Flow Switch, (1) Main Drain, (1) FDC, (6) Gauge, (4) Inspector Test Valve, (1) Post Indicator Valve |
| 5.) | Bld. 128 – (2) Control, (1) Supervisory Low Air Pressure Switch, (3) Tamper Switch, (1) Pressure Switch, (1) Main Drain, (1) FDC, (2) Gauge, (1) Inspector Test Valve, (1) Low Point Drain, (1) Post Indicator Valve |
| 6.) | Bld. 129 – (2) Control, (1) Supervisory Low Air Pressure Switch, (3) Tamper Switch, (1) Pressure Switch, (1) Main Drain, (1) FDC, (2) Gauge, (1) Inspector Test Valve, (1) Low Point Drain, (1) Post Indicator Valve, |
| 7.) | Bld. 130 – (5) Control, (1) Supervisory Low Air Pressure Air Switch, (6) Tamper Switch, (2) Flow Switch, (1) Pressure Switch, (3) Main Drain, (1) FDC, (4) Gauge, (1) Inspector Test Valve, (1) Low Point Drain, (1) Post Indicator Valve. |
| 8.) | Bld. 131 – (5) Control, (1) Supervisory Low Air Pressure Switch, (6) Tamper Switch, (2) Flow Switch, (1) Pressure Switch, (3) Main Drain, (1) FDC, (4) Gauge, (1) Inspector Test Valve, (1) Low Point Drain, (1) Post Indicator Valve. |
| 9.) | Bld. 132 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Post Indicator Valve. |
| 10.) | Bld. 133 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Post Indicator Valve. |
| 11.) | Bld. 140 – (4) Control, (2) Inspector Test Valve, (4) Tamper Switch, (2) Flow Switch, (1) Main Drain |
Wet and Dry System Non-Patient Care Buildings:
| 1.) | Bld. 14 – (6) Control, (1) Air Pressure Switch, (1) Supervisory Low Air Pressure Switch, (7) Tamper Switch, (2) Main Drain, (1) FDC, (9) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve, (3) Flow Switch, (1) Pressure Switch |
| 2.) | Bld. 19 – (1) Control, (1) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve |
| 3.) | Bld. 22/69 – (2) Control, (1) Supervisory Low Air Pressure Switch, (1) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (3) Gauge, (2) Inspector Test Valve, (1) Post Indicator Valve, (1) Supervisory Low Air Pressure Switch, (1) Pressure Switch |
| 4.) | Bld. 35 – (2) Control, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve |
| 5.) | Bld. 49 – (1) Supervisory Low Air Pressure Switch, (1) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (3) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve, (1) Pressure Switch |
| 6.) | Bld. 60 – (1) Control, (1) Supervisory Low Air Pressure Switch, (1) Tamper Switch, (1) Main Drain, (1) FDC, (2) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve, (1) Pressure Switch |
| 7.) | Bld. 64/72 – (4) Control, (2) Tamper Switch, (2) Flow Switch, (2) Main Drain, (2) FDC, (4) Gauge, (1) Inspector Test Valve |
| 8.) Bld. 98 – (25) Control, (17) Tamper Switch, (17) Flow Switch, (3) Main Drain, (2) FDC, (13) Gauge, (13) Inspector Test Valve, (1) Post Indicator Valve |
9.) Bld. 102 – (6) Control, (7) Tamper Switch, (6) Flow Switch, (1) Main Drain, (1) FDC, (7) Gauge, (5) Inspector Test Valve, (1) Post Indicator Valve 10.) Bld. 104 – (4) Control, (4) Tamper Switch, (3) Flow Switch, (1) Main Drain, (1) FDC, (2) Gauge, (2) Inspector Test Valve, (1) Post Indicator Valve
| 11.) | Bld. 125 – (2) Control, (2) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (2) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve |
| 12.) | Bld. 211 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve |
| 13.) | Bld. 212 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (10 Gauge, 1) Inspector Test Valve, (1) Post Indicator Valve |
| 14.) | Bld. 214 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve |
15.) Bld. 216 – (3) Control, (4) Tamper Switch, (1) Flow Switch, (1) Main Drain, (1) FDC, (1) Gauge, (1) Inspector Test Valve, (1) Post Indicator Valve
Patient Care Communications Side:
1.) Bld. 39- (1) Panel, (8) Pull Stations (28) Smoke Detectors (8) Horn/Strobe 2.) Bld. 58- 29 AHU Fan Shutdown, (1) Annunciator (1) DACT Point (Digital Alarm Communicator Transmitter), (14) Door Holder (9) Duct Detector, (15) Heat Detector, (2) Panel, (2) Remote Power Supply, (28) Pull Station, (137) Smoke Detector, (30) Horn/ Strobe, (26) Fire Damper, (14) Smoke Damper 3.) Bld. 101, Boiler Plant 211 devices included- (6) AHU Fan Shutdown, (2) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (18) Door Holder, (1) Duct Detector, (3) Heat Detector, (1) Panel, (40) Pull Station, (121) Smoke Detector, (38) Horn/ Strobe, (9) Smoke Damper 4.) Bld. 103- (6) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (23) Door Holder, (6) Duct Detector, (1) Panel, (30) Pull Station, (125) Smoke Detector, (30) Horn/ Strobe, (11) Smoke Damper 5.) Bld. 128- (1) AHU Remote Key Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (2) Door Holder, (1) Duct Detector, (4) Heat Detector, (1) Panel, (5) Pull Station, (3) Smoke Detector, (6) Horn/ Strobe, (2) Strobe, (12) Fire Damper 6.) Bld. 129- (1) AHU Remote Key Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (2) Door Holder, (1) Duct Detector, (4) Heat Detector, (1) Panel, (5) Pull Station, (3) Smoke Detector, (5) Horn/ Strobe, (2) Strobe, (12) Fire Damper 7.) Bld. 130- (2) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder (2) Duct Detector, (4) Heat Detector, 1 Panel, (8) Pull Station, (30) Smoke Detector, (9) Horn/ Strobe, (12) Strobe, (1) Fire Damper 8.) Bld. 131- (2) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder, (2) Duct Detector, (4) Heat Detector, (1) Panel, (8) Pull Station, (30) Smoke Detector, (7) Horn/ Strobe, (13) Strobe, (1) Fire Damper 9.) Bld.132- (1) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder (1) Duct Detector, (1) Panel, (6) Pull Station, (12) Smoke Detector, (18) Horn/ Strobe, (3) Strobe 10.) Bld. 133- (1) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder, (1) Duct Detector, (1) Panel, (5) Pull Station, (12) Smoke Detector, (18) Horn/ Strobe, (5) Strobe 11.) Bld. 140- (4) AHU Fan Shutdown (29), (1) Annunciator, (4) Door Holder, (4) Duct Detector, (2) Panel, (28) Pull Station, (26) Horn/ Strobe, (1) Fire Damper, (4) Smoke Damper
Non-Patient Care Communications Side:
1.) Bld. 14- (2) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder, (2) Duct Detector, (2) Heat Detector, (1) Panel, (12) Pull Station, (10) Smoke Detector, (11) Horn/ Strobe 2.) Bld. 19- (1) Annunciator, (1) Duct Detector, (1) Heat Detector, (1) Panel, (7) Pull Station, (51) Smoke Detector, (9) Horn/ Strobe, (13) Strobe 3.) Bld. 22/69- (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (4) Door Holder, (2) Duct Detector, (2) Heat Detector, (1) Panel, (11) Pull Station, (15) Smoke Detector, (10) Horn/ Strobe 4.) Bld. 25 Greenhouse- (1) DACT Point (Digital Alarm Communicator Transmitter), (1) Heat Detector, (1) Panel, (4) Pull Station, (2) Smoke Detector, (4) Horn/ Strobe 5.) Bld. 35- (1) Panel, (4) Pull Station, (13) Smoke Detector, (4) Horn/ Strobe 6.) Bld. 49- (1) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (2) Duct Detector, (1) Panel, (6) Pull Station, (30) Smoke Detector, (3) Horn/ Strobe 7.) Bld. 60- (1) DACT Point (Digital Alarm Communicator Transmitter), (1) Panel, (5) Pull Station, (18) Smoke Detector, (2) Horn/ Strobe 8.) Bld. 64/72- (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (2) Duct Detector, (1) Heat Detector, (2) Panel, (7) Pull Station, (2) Smoke Detector, (9) Horn/ Strobe, (13) Strobe, (1) Fire Damper, Smoke Damper 9.) Bld. 68/136- (1) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (1) Duct Detector, (10) Heat Detector, (1) Panel, (3) Pull Station, (4) Smoke Detector, (5) Horn/ Strobe, (4) Strobe 10.) Bld. 98- (1) AHU Fan Shutdown, (3) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (20) Door Holder, (2) Duct Detector, (16) Heat Detector, (5) Panel, (32) Pull Station, (192) Smoke Detector, (2) Horn/ Strobe, (34) Chime/Strobe.
11.) Bld. 102- (1) AHU Fan Shutdown, (2) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (19) Door Holder, (4) Duct Detector, (2) Heat Detector, (1) Panel, (24) Pull Station, (118) Smoke Detector, (36) Horn/ Strobe, (7) Strobe, (6) Fire Damper, (1) MBZAM.
12.) Bld. 104- (1) AHU Fan Shutdown, (2) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (6) Door Holder, (4) Duct Detector, (6) Heat Detector, (2) Panel, (18) Pull Station, (9) Smoke Detector, (27) Horn/ Strobe, (1) MBZAM.
13.) Bld. 125- (1) AHU Fan Shutdown, (1) Annunciator, (1) DACT Point (Digital Alarm Communicator Transmitter), (2) Door Holder, (2) Duct Detector, (1) Heat Detector, (1) Panel, (9) Pull Station, (5) Smoke Detector, (8) Horn/ Strobe, (3) Fire Damper.
14.) Bld. 211- (0) AHU Fan Shutdown, (0) Annunciator, (0) DACT Point (Digital Alarm Communicator Transmitter), (0) Door Holder, (0) Duct Detector, (0) Heat Detector, (0) Panel, (0) Pull Station, (0) Smoke Detector, (0) Horn/ Strobe, (0) Strobe, (0) Fire Damper, Smoke Damper.
15.) Bld. 212- (0) AHU Fan Shutdown, (0) Annunciator, (0) DACT Point (Digital Alarm Communicator Transmitter), (0) Door Holder, (0) Duct Detector, (0) Heat Detector, (0) Panel, (0) Pull Station, (0) Smoke Detector, (0) Horn/ Strobe, (0) Strobe, (0) Fire Damper, Smoke Damper.
16.) Bld. 214- (0) AHU Fan Shutdown, (0) Annunciator, (0) DACT Point (Digital Alarm Communicator Transmitter), (0) Door Holder, (0) Duct Detector, (0) Heat Detector, (0) Panel, (0) Pull Station, (0) Smoke Detector, (0) Horn/ Strobe, (0) Strobe, (0) Fire Damper, Smoke Damper.
17.) Bld. 216- (0) AHU Fan Shutdown, (0) Annunciator, (0) DACT Point (Digital Alarm Communicator Transmitter), (0) Door Holder, (0) Duct Detector, (0) Heat Detector, (0) Panel, (0) Pull Station, (0) Smoke Detector, (0) Horn/ Strobe, (0) Strobe, (0) Fire Damper, Smoke Damper
Vendor to perform semi-annual Valve Regulated Lead Acid (VRLA) Battery/Charger Inspections and provide documented results in inspection documentation.
NFPA 72 Table 14.4.3.2 (9) requires a semiannual test of the VRLA battery/chargers. The testing shall include the temperature, charger, cell/unit voltage and ohms. It also requires a replacement/load test every 3 years.
Acceptable test parameters:
18.) Temperature test: Check the negative terminal of each battery cell/unit with an infrared thermometer. Replace the battery if the temperature is 18 degrees F above ambient.
19.) Charger test: While the battery is fully charged and connected to the charger, measure voltage across the battery terminals. Verify that voltage is within the manufacturer's specifications. If outside of the specified limits, either adjust or replace the charger.
20.) Cell/unit test: With the battery fully charged and connected to the charger, measure voltage of each cell/unit with a voltmeter. Replace battery if reading less than 13.6V 21.) Ohmic test: With the battery charged and connected to the charger, measure the ohmic value on each cell/unit. Record the test date and ohmic value on each cell/unit. Replace battery when the ohmic measurement of any cell/unit deviates from the established baseline by 30% or more for conductance and 40% or more for resistance or impedance. When using the battery or test equipment manufacturer's baseline ohmic values, replace the battery when any cell/unit has an internal ohmic value outside of the acceptable range.
22.) Replacement/load test: (This is only required every three years) Replace the battery or conduct a load test of the battery capacity. Based on manufacturer's specifications for a discharge rate of 3 hours or more by applying the current indicated for the selected hourly discharge rate continuously, until the terminal voltage decreases to the end voltage specified by the manufacturer. Record the test duration and calculate the battery capacity including adjustment for ambient temperature. Replace the battery if capacity is less than or equal to 80% or at the next scheduled test interval if battery capacity is less than 85%. If batteries are required to be replaced due to failed test, VA Illiana will assume responsibility for purchase and replacement of failed batteries once documentation of testing has been received.
VRLA Battery/Charger Inspections to include the following on a semi-annual basis:
Fire Alarm Node Designations
Node#
Building
Inside building
Main Nodes
Node 1
Bldg.64/72
Men’s locker room
Node 2
Bldg. 98
Front entrance of 98
Node 3
Bldg.102
Cop Shop behind dispatch desk
Node 7
| Bldg. 49 |
| Chapel |
Catholic side
Node 8
Bldg. 22
South entrance
Node 9
Bldg.64
NW Entrance
Node 10
| Bldg. 68 |
| Cemetery |
Node 12
Bldg.14
Center Basement
Node 13
Bldg.125
Elec. Closet
Node 15
Bldg. 58
Basement RM-6
Node 17
Bldg.101
Big service room
Node 18
Bldg. 102
Big service room
Node 19
Bldg. 103
Big service room
Node20
Bldg.104
Big service room
Node 21
| Bldg.128 |
| Freedom |
Garage
Node23,
| Bldg. 130 |
| Honor |
Basement Rm 4
Node 24
| Bldg.131 |
| Valor |
Basement
Node 25
| Bldg. 132 |
| Independence |
Inside Rm-119
Node 26
| Bldg.133 |
| Courage |
Inside Rm-119
Node 27
| Bldg. 140 |
| Mental Health |
Service room
Node 28
| Bldg. 58 |
| MATOC |
Basement RM-6
Node29
| Bldg.19 |
| Warehouse |
1st floor
Node 30
Bldg.100
Back office
Node 31
Bldg. 60 front door
Node 32
| Bldg.98 |
| Old Panel |
Basement
Node 33
| Bldg. 129 |
| Liberty |
Garage
Node 34
| Bldg. 98 |
| New Panel |
1st floor
Node 35
| Bldg. 58 |
| New Panel |
Front door
NO Node
| Bldg. 25 |
| Greenhouse |
Inside
B.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual wet pipe sprinkler tests and inspections (See Scope of Work para. c).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026 PRINCIPAL NAICS CODE: 561621 - Security Systems Services (except Locksmiths) PRODUCT/SERVICE CODE: H363 - Inspection - Alarm, Signal, and Security Detection Systems
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-Annual wet pipe sprinkler tests and inspections (See Scope of Work para. d).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual dry pipe sprinkler test and inspections (See Scope of Work para. f).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual dry pipe sprinkler tests and inspections.
(See Scope of Work para. g).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly dry pipe sprinkler testing and inspection.
(See Scope of Work para. h).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual Dry systems full trip test (See Scope of Work para i).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly wet pipe sprinkler testing and inspections, (See Scope of Work, para e).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual VRLA battery/charger inspections (See SOW for details).
Contract Period: Base POP Begin: 12-01-2025 POP End: 11-30-2026
BASE YEAR TOTAL: $
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual wet pipe sprinkler tests and
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-Annual wet pipe sprinkler tests and inspections
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual dry pipe sprinkler test and inspections
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual dry pipe sprinkler tests and inspections.
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly dry pipe sprinkler testing and inspection.
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly wet pipe sprinkler testing and inspections, Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual VRLA battery/charger inspections
Contract Period: Option 1 POP Begin: 12-01-2026 POP End: 11-30-2027
OPTION YEAR ONE TOTAL: $
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual wet pipe sprinkler tests and
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-Annual wet pipe sprinkler tests and inspections
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual dry pipe sprinkler test and inspections
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual dry pipe sprinkler tests and inspections.
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly dry pipe sprinkler testing and inspection.
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly wet pipe sprinkler testing and inspections, Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual VRLA battery/charger inspections
Contract Period: Option 2 POP Begin: 12-01-2027 POP End: 11-30-2028
OPTION YEAR TWO TOTAL: $
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual wet pipe sprinkler tests and
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-Annual wet pipe sprinkler tests and inspections
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual dry pipe sprinkler test and inspections
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual dry pipe sprinkler tests and inspections.
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly dry pipe sprinkler testing and inspection.
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual Dry systems full trip test (See Scope of Work para i).
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly wet pipe sprinkler testing and inspections, Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual VRLA battery/charger inspections
Contract Period: Option 3 POP Begin: 12-01-2028 POP End: 11-30-2029
OPTION YEAR THREE TOTAL: $
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual wet pipe sprinkler tests and
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-Annual wet pipe sprinkler tests and inspections
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 1.00 |
| JB |
| __________________ |
| __________________ |
Annual dry pipe sprinkler test and inspections
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual dry pipe sprinkler tests and inspections.
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly dry pipe sprinkler testing and inspection.
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 1.00 |
| JB |
| __________________ |
| __________________ |
Standpipe flow and hydrostatic tests (5 year) to include gauges, recalibrated or replaced (See Scope of Work para. j and k.
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Quarterly wet pipe sprinkler testing and inspections, Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
| 2.00 |
| JB |
| __________________ |
| __________________ |
Semi-annual VRLA battery/charger inspections
Contract Period: Option 4 POP Begin: 12-01-2029 POP End: 11-30-2030
OPTION YEAR FOUR TOTAL: $
| GRAND TOTAL |
| __________________ |
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers.