Key details revealed through the Q&A include: required equipment certifications for Simplex fire alarm systems (with written approval needed for Autocall certifications), NICET Level II required for both Fire & Sprinkler, at least one onsite technician required during business hours with backup coverage, minor repairs/deficiencies like smoke detector replacements included in base contract while major repairs require separate quotes, and current device counts of 3,901 components across fire alarm (3,279) and sprinkler systems (622). The amendment also provides a supplemental CLIN bid table and complete facility device inventory list. The incumbent contract number is 36C25220C0133. Equipment includes Square D and GE panels, 1,026 fire extinguishers (mainly 10lb & 15lb), 63 hydrants, and 7 ANSUL kitchen suppression systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-15-2025 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road North Chicago IL 60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road North Chicago IL 60064 To all Offerors/Bidders

36C25225Q0210

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-24-2025 10:00 CST x

The purpose of this amendment is to answer the submitted vendor questions in regards to the solicitation 36C25225Q0210 and extend the the hour and date for reciept of offers to 02-24-2025 at 10:00 AM CST.

Please see the attached page for questions and answers and sign and submit this amendment with your offer.

***Attached is a additional CLIN Bid Table to assit in filling out section B of the RFQ Schedule, also attached is the FA Inventory - Hines VA Point List to assist you***

AARON ROGERS

CONTRACTING OFFICER

CONTINUATION PAGE

Pre-Bid Site Visit – QUESTIONS

1. What kind of circuit breaker panels you had installed in your VA locations?

SQUARE D or GE panels

2. What should the billing be for this account the Name and Address?

GLAC - Please see page one of the RFQ.

3. Is there a way to get all the reports for each location?

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

4. Is there a Fire pump at the clinic location in Joliet?

No, but there is a Fire Department Connection

5. How many VA maintained Hydrants are at the locations?

6. What are the counts of Extinguishers (size and types)?

ABC; majority are 10lb & 15lb

7. Do we need to have Tech(s) there weekly? Will it be (2) techs 40 hours a week?

The VA suggests the availability of at least 1 tech to be onsite to help maintain the Fire Alarm System. Through experience, it would be beneficial to have 2 techs due to the size of the campus.

8. Please provide copies of the following inspection reports from 2024:

See response to question 3. - Historic data/reports can be provided to the awarded contractor.

a. Fire Alarm Testing & Inspection Reports

b. Kitchen Hood Testing & Inspection Reports

c. Sprinkler Testing & Inspection Reports

d. Fire Pump Testing & Inspection Reports

e. Damper Testing & Inspection Report from 2024. (Not due until 2029).

f. Off-site transmission equipment Testing & Inspection Reports

9. What systems are required to be tested after normal business hours?

EC.02.03.05 - EP 11 – Fire Pump Under Flow between 7:30 am – 12:00 pm on a Saturday EC.02.03.05 - EP 13 – Fire Suppression & Automatic Suppression System Devices Bldg 200 – Kitchen 4am

10. Who is the incumbent?

Please see FPDS for contract 36C25220C0133 information.

11. Does the RFQ require two techs at the facility everyday or is it one tech, everyday, with a back-up tech if the first one takes a day off?

The VA prefers to at least 1 tech to be available onsite during normal business hours.

The VA is not so much concerned with the amount of hours the technician is onsite, but more with the availability to repair deficiencies and ongoing daily/weekly issues with the Fire Alarm system. with a backup is essential, 2 onsite would be beneficial for the technicians.

12. Please provide the number of wet systems by building number.

Refer to Question 23 – (Table provided by current contractor).

Also, refer to document named “FA Inventory – Hines VA Point List”.

13. Please provide additional information regarding the six kitchen suppression systems such as type of system. Also, how many fusible links per system, how many tanks per system, and how many nozzles per system?

7 Automatic Suppression Systems for EP 13 Bldg 45 – (ANSUL r102 1 tank) – Grill Bldg 45 – (ANSUL r102 1 tank) – Fry Grill Bldg 45 – (ANSUL r102 1 tank) – Pizza Bldg 45 - (ANSUL r102 2 tank) – Island Bldg 200 – (ANSUL r102 2 tank) – Small Bldg 200 – (ANSUL r102 4 tank) – Main Bldg 217 – (ANSUL r102 1 tank) – Main

14. How many Fire Department Connections are onsite by building?

Minimum of 1 FDC per bldg. Some Bldgs like Bldg 200 have multiple.

Refer to document named “FA Inventory – Hines VA Point List” for additional information.

15. Fire panels are listed in the RFI as generic fire alarm control panel. Pleases provide specific manufacturer and model numbers for each system by building.

Simplex 4100-8001; 4020-8001; 4120-8001

16. 51 roll up doors are listed in the RFP. Please provide type and size of each door.

Refer to document named “FA Inventory – Hines VA Point List”.

17. Are fire hose connection valves included in the bid? If so, please provide a list of total quantities by building.

No, old standpipe system has been abandoned per the pipe shop.

18. It was mentioned during the site visit that fire hydrants are included in the bid. Please provide a total count of fire hydrants.

See question 5.

19. For sensitivity reporting of smoke detectors, this is to be done every other year. When were these sensitivity tests last performed? Please provide this info by building unless all sensitivity tests were completed during the same contract year.

Sensitivity reports for smoke detectors are currently performed annually at Hines VA.

20. Several buildings do not list audio visual device counts. These buildings are 7, 13, 18, 33, 37, 48, 100, 113, 128, 205, 218, 220, 221, 228, 229, 230, and RMH. Please provide quantities of notification devices located in these buildings.

Refer to Question 23 Table provided by current contractor.

Also, refer to document named “FA Inventory – Hines VA Point List”.

21. For building 37, all that it is showing is a fire alarm panel without any detection or notification devices. Please provide the quantity of fire alarm system peripherals e.g. smoke/heat sensors, pull stations, flow/tamper switches, notification devices, etc. in this bldg.

Refer to Question 23 Table provided by current contractor.

Also, refer to document named “FA Inventory – Hines VA Point List”.

22. For building 218, all that it is showing is an annunciator without any detection or notification devices. Please provide the quantity of fire alarm system peripherals e.g. smoke/heat sensors, pull stations, flow/tamper switches, notification devices, etc. in this bldg.

Refer to Question 23 Table provided by current contractor.

Also, refer to document named “FA Inventory – Hines VA Point List”.

23. The device counts across both fire alarm and fire sprinkler provided within the attachments equate to 2,834 devices with multiple areas defined as “ALL”. Based upon 2024 inspection reports, Optimum has accounted for 3,901 components required to be inspected; less battery counts. To ensure the VAMC is providing more accurate information in an effort to deter change orders and manipulation of contract post award we felt it was worth mentioning and providing our internal count for review and disbursement (all data extracted from 2024 Annual Inspection Reports):

The Table List below was downloaded from JCI in Nov 2024. An additional document has been created identifying the Hines VA Point List for devices named “FA Inventory – Hines VA Point List”.

Fire Alarm Devices
Fire Sprinkler Devices
Bldg
Device qty
Bldg
Device qty
2
28
2
7
3
11
3
5
4
27
4
6
7
11
7
6
8
40
8
6
9
25
9
8
10
0
10
6
12
58
12
11
13
55
13
32
17
57
17
0
45
35
45
8
48
22
48
2
100
109
100
4
113
252
113
19
128
227
128
27
200
666
200
286
205
41
205
0
217
412
217
17
220
82
220
25
221
95
221
18
222
7
222
0
223
9
223
0
224
7
224
0
228
412
228
61
229
9
229
6
230
5
230
6
1 - B
35
1 - B
7
1 - C
43
1 - C
7
1 - E
62
1 - E
5
1 - F
87
1 - F
7
1 - G
101
1 - G
5
JOLIET
216
JOLIET
13
RMH
33
RMH
12
Total FA & FS Components
3901

24. Under the section of the SOW titled “Service Technicians” verbiage details the technicians servicing the system shall be equipment certified. With the Hines campus being a Simplex (Johnson Controls) network will the VA accept Autocall Certifications? For reference Autocall is the private branding of the Simplex product and panels. The two share the same part numbers, UL listing and programming logic.

With written and signed approval from an authorized JCI/Simplex official verifying Autocall certifications are acceptable to allow technicians the ability to work on Simplex/JCI proprietary equipment, then yes. Without expressed written and signed approval from JCI/Simplex, No.

25. Pertaining to the NICET requirements, it does not state what field or level is required. Is the correct assumption that these certifications shall adhere to: Fire Alarm Level II and Fire Sprinkler ITM Level II?

NICET Level II for both Fire & Sprinkler. NICET II is listed in the SOW.

26. Will NICET certifications be required to be included within the proposal at the time of submission for the proposed personnel to be utilized for these services?

Proposals should include certifications.

27. Under the section of the SOW titled “On-Site Technicians for Deficiencies & Maintenance”; we read this as Day Porter service for the fire protection systems. Is this the intent?

a. Is the intent to have two technicians or one technician with a competent/equal replacement for days missed/unavailable?

The intent is to have at least 1 technician available to be onsite M-F if there are issues with the Fire Alarm system (which will include troubleshooting and repairs to deficiencies found during scheduled testing). If there are no issues or deficiencies, the VA will not require the technician to be onsite. However, it is not common to have days or weeks without issues or deficiencies with the Fire Alarm system.

b. When dealing with day to day issues, troubles etc is the intent for the on site technicians to respond and correct the deficiencies within a set period of time or is the intent to have this team to be on site Monday - Friday, less holidays?

M-F is acceptable, Nights and Weekends can be listed as premium hours for rates.

c. Is it the intent of the VA to have this team on site to curtail all costs associated with labor as it pertains to trouble, supervisory and alarm response as well as repairs?

Minor issues or deficiencies will fall Smoke detector replacements will fall under the cost for the contractor, for example: Replacing Smoke Detectors, Batteries, Fire Alarm Pulls. Major repairs will be quoted and sent to VA COR, for example: Tamper Switch, Waterflows, etc.

d. Will an office space be provided by the VA for this team to work out of? If so, will internet access be provided as well?

Currently, a small room where the True-Site Workstation can be utilized by the technicians and internet is available.

28. Within the SOW under section, “Parts / Software” it references preventive maintenance and repairs however it does not state how these will be handled.

a. Will this requirement have the awarded vendor provide a repair quote for the materials required for correction and utilize the personnel dedicated to the site to perform said repairs?

Yes, the technicians onsite can be utilized for repairs. However, this would be decided on a case-by-case basis dependent on the type of repair and if the quote is fair and reasonable.

b. If a major repair is warranted and additional personnel, or specific specialists are required will the vendor have the ability to account for that additional cost within the repair quotation?

Due to the proprietary connection with the Simplex devices, this would be a case-by-case basis. The purpose of this contract is to ensure the Fire Alarm system is functioning properly and reports.

29. Annual inspection of Fire Extinguishers are included however the SOW does not include any verbiage regarding replacements, 6 year tear downs or 12 year hydrostatic testing. Will these additional testing requirements be priced as needed?

Annual inspection of Fire Extinguishers is all that is required under this particular contract.

30. The SOW states the dampers were inspected in 2024; per Joint Commission these are required every 6 years. Will this requirement need to be assigned to the Option 4 period, CLIN 5001?

The VA has decided to have this test performed every 5 years.

31. The SOW states that 5-year internal obstruction testing shall be performed during this contract, however the SOW does not detail a date or CLIN to attach this to. Based on previous inspections the 5-year internal obstruction testing was started in 2023 and completed in 2024; with that information available shall we assume to include 5 year internal obstruction testing as well as 5 year hydrostatic testing of standpipes in 2028-2029 period highlighted by CLIN 4001?

If it is listed in the SOW, include it in the bid.

If it is not listed on the SOW, do not include it in the bid.

32. In regard to the instructions to Offerors, is it the intent of the VA for each vendor to provide 4 individual submissions: (Price, Experience, Technical Capability and Past Performance)? Or can we provide Price as a stand-alone volume and the other 3 items combined in a singular volume?

GLAC - Price will used the Section B and all other information can be supplied together.

33. We are requesting copies of the inspection reports from last year for the fire alarm systems to assess the number of devices on each system.

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

34. Could you please advise if these reports are available and how I might obtain them? Your assistance would be greatly appreciated as it will help facilitate the quoting process.

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

35. Can you provide previous inspection reports for all buildings and systems?

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

36. Can you provide the manufacturer(s) and models of the fire alarm systems installed throughout the buildings?

See Question 15

37. Are backflow preventers required to be inspected under this contract? If so, please provide the total quantity of backflows and the desired frequency of inspections (i.e., annual and 5-year inspections).

No

38. From the device list there appears to be 2 fire pumps as part of this scope of work, can you please provide the size and manufacturer of these fire pumps?

6” and 8’ Distribution

39. The list of devices provided does not appear to include fire extinguishers, fire dampers, fire hydrants, FDC’s, number of fans requiring shutdown verification, or elevator recall. Can you please provide quantities for all these elements to ensure we’re providing an accurate quote?

Refer to document named “FA Inventory – Hines VA Point List” for more detailed info.

· fire extinguishers = 1026; fire hydrants = 63; fire dampers = 45

40. Is sensitivity testing of the 85 analog smoke detectors in Building 217 expected to be completed as part of this contract? If so, what year(s) will these tests be required?

Yes, Annually

41. Can you confirm the rolling shutter doors and annual link replacements are not part of this contract?

Replacements to the above indicated are not part of this contract.

42. Can you please provide the manufacturer for the kitchen fire protection systems to ensure we have the appropriate licensed and certified personnel?

7 Automatic Suppression Systems for EP 13

· Bldg 45 – (ANSUL r102 1 tank) – Grill

· Bldg 45 – (ANSUL r102 1 tank) – Fry Grill

· Bldg 45 – (ANSUL r102 1 tank) – Pizza

· Bldg 45 - (ANSUL r102 2 tank) – Island

· Bldg 200 – (ANSUL r102 2 tank) – Small

· Bldg 200 – (ANSUL r102 4 tank) – Main

· Bldg 217 – (ANSUL r102 1 tank) – Main

43. Are there any drawings available for these systems that you can share with us?

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

44. Section 8 discusses security& privacy control, the 2nd sentence states “No A&A or MOU/ISA is required.” A few paragraphs below, it mentions “National MOU/ISA is in place and applies to this contract.” Can you please clarify this requirement?

GLAC - It is not required.

45. Please clarify the scope of work is limited to only the EP’s listed in the table provided on page 9 and 10 of the solicitation and no other periodic inspections will be required (i.e., 3-year dry system tests, 5-year sprinkler internal, etc).

a. If other periodic testing is required, please identify the option year of the contract each of the services need to be performed, or the date of last inspection and we can determine when it’s required next.

If it is listed in the SOW, include it in the bid.

If it is not listed on the SOW, do not include it in the bid.

46. Under “On-Site Technicians for Deficiencies & Maintenance”, the 3rd paragraph defines the Primary Technician shall be on-site to perform weekly maintenance and resolve any deficiencies found during scheduled testing. Can you clarify the weekly maintenance requirement and how many hours per week the Primary Technician is expected to be on-site? None of the elements of performance from the Joint Commission standards referenced in the solicitation identifies weekly inspections.

a. Also related to this, it mentions the Primary Technician must resolve deficiencies. There is no CLIN for repair parts and labor, does this mean we are to try and predict expected parts and labor for repairs over the next 5 years? Or will repairs be handled through a separate contract or modification to this contract?

During the current contract, the on-site technician performs weekly maintenance to ensure the Fire Alarm system is running as intended. Examples:

Minor Deficiencies (handled by the on-site technician at no additional cost to the VA):

· Replacing Smoke Detectors

· Fire Alarm Pull Stations Major Deficiencies examples:

· Replacing Waterflow devices

· Replace Tamper Switch An additional document shall be provided showing a breakdown of CLINs for this contract.

47. Will you extend the solicitation deadline by 7 business days following the responses to questions to allow offerors enough time to develop fair and reasonable pricing?

GLAC - Please see the amendment for new offer date.

48. Can the Government provide a copy of the sign-in sheet from the site visit that took place on Friday, February 7th, to determine what contractors were present?

· Azimuth

· Siemens

· Optimum

· Esscoe

· Convergent

· Everon/HurtVet

· Chicago Fire

· Reliable

· Allegiant

· Cintas

· Marmic Fire

49. Approximately how long is the “Orientation for Contractor Personnel”?

Overall duration of orientation regarding Badging can take anywhere from 2-8 weeks depending on the background checks and information provided by the applicant.

50. Will the Government confirm that reporting formatting is required per The Joint Commission (TJC) standard code, Environment of Care 02.03.05? More specifically, please confirm that the required Environment of Care (EC) codes and Elements of Performance (EP) codes are required to be listed within reports to meet compliance with TJC standards.

Testing and Reports for ALL of the EP/EC codes listed in the SOW are required for this contract.

51. Will the Government confirm that reporting is NOT required per DNV Accreditation standards?

The purpose of this contract is to obtain reports pertaining to The Joint Commission standards that apply to VA Hospitals.

52. Page 3 of the RFQ under, “Inspection, Testing, & Preventative Maintenance” section states that EP 05 Off-site transmission equipment should be tested quarterly. On Page 6, it states that the frequency of EC.02.03.05 – EP 05 – Emergency Services Notification Transmission equipment should be tested on an annual basis. Can the Government confirm the frequency that is being requested for EP 05 equipment? Note: Under current EC03.02.05, EP 05 code – “Annual testing of fire alarm notification to off-sire fire responders” is required.

Frequency of EP 05 is being performed Quarterly at Hines VAMC

53. Can the Government confirm that all testing/inspecting under this Contract shall be performed during normal business hours, as defined under the “Business Days” section of the RFQ? Additionally, if there are off-hours testing required, please confirm the location, equipment, and the start and end time that is being requested.

No, not all testing can be performed during Business Days/Business hours. Some testing is required to be performed during Non-Business hours or weekends.

54. Can the Government provide copies of the most recent inspection reports for all systems/equipment referenced in this RFQ? This will allow contractors to verify equipment/device counts. As noted on “M25-005 – FA – DEVICE LIST – by Bldg v2” there is equipment/device count information missing. Under the “Qty” section, some equipment is listed as “ALL”. Contractors will need more information in order to provide most accurate pricing. If reports are unavailable, can the Government clarify the quantities.

GLAC - These are property of the VA and the incumbent and they will be released to the awardee.

55. Can the Government provide the addresses of all buildings included under this RFQ? Currently, the name of buildings is listed, but no corresponding addresses.

A Campus site map with Bldg #s can be provided to the awarded contractor.

Hines VA Campus address is:

Edward Hines Jr. VA Hospital 5000 S. Fifth Avenue Hines, IL 60141

56. Can the Government confirm that they are requiring the awarded contractor to have a technician available for service-related requests, but that they will provide all necessary equipment and programming as it relates to the Simplex fire alarm systems, for repairs. I.e. For smoke detector replacement, the Government will provide the smoke detector and the programming of the smoke detector, but awarded contractor will replace the smoke detector.

No, the smoke detectors fall under the category of Minor Deficiencies and under the contractor’s responsibility to procure and install.

57. Is a HEPA cart of man-lift required for testing in any part of the building? If so, will the Government provide the HEPA cart or man-lift, or will that be the responsibility of the awarded contractor? If a lift or HEPA cart is required, please provide the building name(s) and address(es) where required.

Not needed for Hines VA.

58. Can the Government provide the quantity of elevator banks per building? This will be used to accurately price elevator recall testing at the required buildings.

60 elevators for the campus

59. For the attachments listing Fire Alarm Devices included in the solicitation, please provide the bid quantity for devices with quantity “All” in the inventory.

See question 23 & document named “FA Inventory – Hines VA Point List”

60. Based upon responses to RFQs to further clarify the scope of the necessary repair work, existing defects, and unknown quantity of devices, a second pre-bid site walk is requested to observe and clarify complex or ambiguous site conditions. There are concerns regarding potential risks or unknowns that can only be adequately assessed through a second visit.

Refer to document named “FA Inventory – Hines VA Point List” for more detailed info on device quantities. For a 2nd pre-bid site walk, this must be requested through the CO.

61. Should the contractor take steps to address defects and execute minor repairs (taking less than 15 minutes) while onsite with the device rather than documenting the defect to avoid creating additional administrative costs in tracking the repair activity, not to exceed $500 per repair item.

Yes, this is preferred. The less deficiencies on reports, the better for the VA.

62. Will items over $500 per repair be eligible for separate billing against a repair cost line item?

No, see question 27c and 46. Also see breakdown on CLINs provided.

63. Will the contract have a not to exceed repair cost line item to include parts and labor to repair defects per year?

The CLINs for Parts & Repairs have been requested to be included; however, this decision falls on the CO.

64. Is the contractor allowed to refuse repairing certain items if the VA and contractor cannot agree on the scope or cost of the repair, or if the repair activity itself is complicated, unknown, or scoping repair work proposals is beyond the scope of inspection and maintenance contract?

See question 27c, 46, & 62. Repairs that fall under minor maintenance shall be included in this contract. Major repairs will require a Proposal and scope of work and will either be a stand-alone separate contract or included as a MOD on this contract. Again, this all depends on the type of repair in question.

65. How will equipment that is deemed beyond economical repair be handled for repair?

The VA will need to confirm If equipment is beyond repair. Then a quote can be created for replacement equipment. The replacement work will either go as a set aside separate contract, or a modification to this contract. This is dependent on the specific equipment deemed beyond repair.

66. Does this contract require programming of control panels for new equipment or defect correction? Programming of the proprietary devices needs to be coordinated with Simplex/JCI.

67. What software does the incumbent firm use to manage inventory and work tracking?

GLAC - This information is property of the VA and the incumbent and they will be released to the awardee.

68. Will the inventory from current software populated by the current testing firm be provided for all buildings and devices?

Refer to document named “FA Inventory – Hines VA Point List” downloaded in Nov 2024.

69. Can the list of current defects in the system be provided?

Can be provided to awarded contractor.

70. When did the facility last complete Joint Commission and Long-Term Care Inspection Life Safety Visits?

TJC – Feb/March 2024 LTCI – Feb/March 2024

SUPPLEMENTAL CLIN BID TABLE

CLIN
DESCRIPTION OF SERVICES
QTY
Type
PRICE
SUBTOTAL
Enter $ per QTY
Multiply QTY x PRICE
0001
EC.02.03.05 - EP 01 - Quarterly - Supervisory Signal Devices
4
Test
0002
EC.02.03.05 - EP 02 - Quarterly; & Annual - Tamper Switches & Waterflow Devices
4
Test
0003
EC.02.03.05 - EP 03 - Annual - Detectors (Smoke, Heat, Duct) & Manual FA Pull Boxes
1
Test
0004
EC.02.03.05 - EP 04 - Annual - Devices - Audible, Visual, Door Release
1
Test
0005
EC.02.03.05 - EP 05 - Quarterly - Off-site transmission equipment
4
Test
0006
EC.02.03.05 - EP 09 - Annual - Riser Main Drain Tests
1
Test
0007
EC.02.03.05 - EP 10 - Quarterly - Outside Fire Department Connections
4
Test
0008
EC.02.03.05 - EP 11 - Annual - Fire Pump Under Flow
1
Test
0009
EC.02.03.05 - EP 13 - Semi-Annual - Automatic Kitchen systems
2
Test
0010
EC.02.03.05 - EP 16 - Annual - Portable Fire Extinguishers - Yearly
1
Test
0011
EC.02.03.05 - EP 18 - 5 yr - Fire Damper - Tested in 2024
0
Test
0012
EC.02.03.05 - EP 19 - Annual - HVAC Smoke Detection Shutdown devices
1
Test
0013
LS.02.01.35 - EP 07 - Annual - Fire Hydrants
1
Test
0014
LS.02.01.50 - EP 07 - Annual - Elevator Recall System
1
Test
0015
Labor - OnSite Support - NICET II Technician (Business Hours)
1500
hrs
0016
Labor - OnSite Support - NICET II Technician (Non-Business Hours)
500
hrs
0017
Parts & Materials for Repairs
1
lump

TOTAL -->>>

FA INVENTORY – HINES VA POINT LIST

Node
Name
Device Type
Point Type
DEVICE QTY = 4063

Description Value

2
M1‐1‐0
ADRPUL
PULL
BLDG 2‐ BASEMENT WORK RM 016 M1‐1
2
M1‐10‐0
ADRPUL
PULL
BLDG 2‐ 1 FLR BY OFFICES 123
2
M1‐11‐0
ADRPUL
PULL
BLDG 2‐1 FLR BY OFFICE 101
2
M1‐12‐0
IAM
WATER
BLDG 2 ‐ 2 FLR H.A.C. 224
2
M1‐13‐0
ADRPUL
PULL
BLDG 2 ‐ 2ND FLR BY STAIRS BY RM 224
2
M1‐14‐0
IAM
WATER
BLDG 2 ‐ 2ND FLR H.A.C. RM 208
2
M1‐15‐0
ADRPUL
PULL
BLDG 2 ‐ 2 FLR BY STAIRS BY RM 208
2
M1‐16‐0
PHOTO
SMOKE
BLDG 2 ‐ BSMT ELEVATOR LOBBY
2
M1‐17‐0
PHOTO
SMOKE
BLDG 2‐ 1ST FLR ELEVATOR LOBBY
2
M1‐18‐0
PHOTO
SMOKE
BLDG 2‐ 2ND FLR ELEVATOR LOBBY
2
M1‐19‐0
PHOTO
SMOKE
BLDG 2 ‐ ELEVATOR TOP OF SHAFT
2
M1‐2‐0
PHOTO
SMOKE
BLDG 2‐ BASEMENT STORAGE 301 SF M1‐2
2
M1‐20‐0
PHOTO
SMOKE
BLDG 2 ‐ 1ST FLR OUTSIDE ELEV MACH RM
2
M1‐21‐0
RIAM
RELAY
BLDG 2 ‐ PRIMARY RECALL
2
M1‐22‐0
RIAM
RELAY
BLDG 2 ‐ ALTERNATE RECALL
2
M1‐3‐0
ADRPUL
PULL
BLDG 2 ‐BASEMENT (E) EXITM1 ‐3
2
M1‐4‐0
IAM
WATER
BLDG 2‐ BASEMENT H.A.C. RM 026 M1‐4
2
M1‐5‐0
ADRPUL
PULL
BLDG 2 ‐BASEMENT (N) EXIT BY RM 247
2
M1‐6‐0
ADRPUL
PULL
BLDG 2 ‐BASEMENT (S) EXITM1‐6
2
M1‐7‐0
IAM
WATER
BLDG 2‐BASEMENT H.A.C. RM 010 M1‐7
2
M1‐8‐0
ADRPUL
PULL
BLDG 2 ‐1ST BY STORAGE 114
2
M1‐9‐0
ADRPUL
PULL
BLDG 2 ‐ 1ST MAIN ENTRY 111
2
SIG10
PSSIGB
SQALERT
BLDG 2 ‐ SIG10
2
SIG11
PSSIGB
SQALERT
BLDG 2 ‐ SIG11
2
SIG12
PSSIGB
SQALERT
BLDG 2 ‐ SIG12
2
SIG13
SPKRB
SPEAKER
BLDG 2 ‐ SIG13
2
SIG14
SPKRB
SPEAKER
BLDG 2 ‐ SIG14
2
SIG15
SPKRB
SPEAKER
BLDG 2 ‐ SIG15
2
SIG16
SPKRB
SPEAKER
BLDG 2 ‐ SIG16
2
SIG17
SPKRB
SPEAKER
BLDG 2 ‐ SIG17
2
SIG18
SPKRB
SPEAKER
BLDG 2 ‐ SIG18
2
SIG3
PSSIGB
SUPRELS
SIGNAL CARD 1 CIRCUIT SIG3
2
SIG7
PSSIGB
SQALERT
BLDG 2 ‐ SIG7
2
SIG8
PSSIGB
SQALERT
BLDG 2 ‐ SIG8
2
SIG9
PSSIGB
SQALERT
BLDG 2 ‐ SIG9
3
AUX10
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX10
3
AUX11
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX11
3
AUX12
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX12
3
AUX13
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX13
3
AUX6
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX6
3
AUX7
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX7
3
AUX8
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX8
3
AUX9
RELAY
RELAY
AUX RELAY CARD 10 RELAY CKT AUX9
3
M1‐1‐0
ADRPUL
PULL
BLDG 3‐PIPE STORAGE RM 103M1‐1
3
M1‐2‐0
ADRPUL
PULL
BLDG 3‐ (W) HALLWAY BY ELECT RM M1‐2
3
M1‐3‐0
ADRPUL
PULL
BLDG 3‐ BREAK RM . 110M1‐3
3
M1‐5‐0
IAM
SO
BLDG 3‐STORAGE/WELDING SHOP RM 109 M1‐5
3
M1‐6‐0
IAM
WATER
BLDG 3‐STORAGE/WELDING SHOP RM 109 M1‐6
3
M1‐7‐0
ADRPUL
PULL
BLDG 3‐ EQUIPMENT STORAGE RM 108 M1‐7
3
SIG10
PSSIGB
SQALERT
BLDG 3‐ SIG10
3
SIG11
PSSIGB
SQALERT
BLDG 3‐ SIG11
3
SIG12
PSSIGB
SQALERT
BLDG 3‐ SIG12
3
SIG13
SPKRB
SPEAKER
BLDG 3‐ SIG13
3
SIG14
SPKRB
SPEAKER
BLDG 3‐ SIG14
3
SIG15
SPKRB
SPEAKER
BLDG 3‐ SIG15
3
SIG16
SPKRB
SPEAKER
BLDG 3‐ SIG16
3
SIG17
SPKRB
SPEAKER
BLDG 3‐ SIG17
3
SIG18
SPKRB
SPEAKER
BLDG 3‐ SIG18
3
SIG3
PSSIGB
SUPRELS
SIGNAL CARD 1 CIRCUIT SIG3
3
SIG7
PSSIGB
SQALERT
BLDG 3‐ SIG7
3
SIG8
PSSIGB
SQALERT
BLDG 3‐ SIG8
3
SIG9
PSSIGB
SQALERT
BLDG 3‐ SIG9
4
M1‐1‐0
PHOTO
SMOKE
BLDG 4 ‐ DATA CLOSET 108A
4
M1‐10‐0
ADRPUL
PULL
BLDG 4‐ BOARDWALK WEST EXIT BY CREDIT UN
4
M1‐11‐0
ADRPUL
PULL
BLDG 4‐ BOARDWALK WEST EXIT BY BLDG A
4
M1‐12‐0
ADRPUL
PULL
BLDG 4‐ BOARDWALK EXIT BY 126AM1‐12
4
M1‐2‐0
PHOTO
SMOKE
BLDG 4‐ ELECTRICAL RM 108
4
M1‐3‐0
PHOTO
SMOKE
BLDG4‐ BOARDWALK (D/H) BY CREDIT UNION
4
M1‐4‐0
PHOTO
SMOKE
BLDG4‐ BOARDWALK (D/H) BY CREDIT UNION
4
M1‐5‐0
IAM
SO
BLDG 4‐ SPRINKLER VLV (BOTTOM)
4
M1‐6‐0
IAM
SO
BLDG 4‐ SPRINKLER VLV (TOP)
4
M1‐7‐0
IAM
WATER
BLDG 4‐ SPRINKLER
4
M1‐8‐0
ADRPUL
PULL
BLDG 4‐ WEST FIRE ROOM 116 EXIT
4
M1‐9‐0
ADRPUL
PULL
BLDG 4‐ BOARDWALK WEST EXIT BY BLDG 4
4
SIG10
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #4
4
SIG11
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #5
4
SIG12
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #6
4
SIG13
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #1 OFFICE
4
SIG14
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #2 BOARDWALK
4
SIG15
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #3
4
SIG16
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #4
4
SIG17
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #5
4
SIG18
SPKRB
SPEAKER
BLDG 4‐ SPEAKER CKT #6
4
SIG3
PSSIGB
SUPRELS
BLDG 4‐ SIGNAL CARD 1 CIRCUIT SIG3
4
SIG7
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #1
4
SIG8
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #2
4
SIG9
PSSIGB
SQALERT
BLDG 4‐ VISUAL CKT #3
6
M1‐1‐0
ADRPUL
PULL
113‐1ST FL ‐ WEST EXIT BY STAIRS
6
M1‐10‐0
IAM
SO
113‐1ST FL ‐ WEST ELEVATOR #2 PIT TAMPER
6
M1‐100‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST CORR. BY OFFICE B201
6
M1‐101‐0
PHOTO
SMOKE
113‐2ND FL ‐ CENTER CORR. BY OFFICE A228
6
M1‐102‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST ELEVATOR #1 LOBBY
6
M1‐103‐0
PHOTO
SMOKE
113‐2ND FL‐TOP OF EAST ELEVATOR #1 SHAFT
6
M1‐104‐0
HEAT
HEAT
113‐2ND FL‐TOP OF EAST ELEVATOR #1 SHAFT
6
M1‐105‐0
HEAT
HEAT
113‐2ND FL ‐ NORTH JANITOR'S CLOSET
6
M1‐106‐0
PHOTO
SMOKE
113‐2ND FL ‐ STORAGE ROOM A230
6
M1‐107‐0
PHOTO
SMOKE
113‐2ND FL ‐ CENTER CORRIDOR BY RM A232
6
M1‐108‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH CAT EQUIP. ROOM A232
6
M1‐109‐0
PHOTO
SMOKE
113‐2ND FL ‐ E. PHONE CLOSET IN RM A233
6
M1‐110‐0
PHOTO
SMOKE
113‐2ND FL ‐ CENTER CORRIDOR BY RM A233
6
M1‐111‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH O & M STORAGE RM A206
6
M1‐112‐0
PHOTO
SMOKE
113‐2ND FL ‐ O & M SPECIALIST ROOM A233
6
M1‐113‐0
PHOTO
SMOKE
113‐2ND FL ‐ CENTER CORRIDOR BY RM A234
6
M1‐115‐0
PHOTO
SMOKE
113‐2ND FL ‐ WEST TELEPHONE CLOSET A234
6
M1‐116‐0
PHOTO
SMOKE
113‐2ND FL ‐ WEST ELECTRIC ROOM A235
6
M1‐117‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST CORRIDOR BY RESTROOMS
6
M1‐118‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST CORRIDOR NORTH END
6
M1‐119‐0
PHOTO
SMOKE
113‐2ND FL ‐ N/E ELECTRIC ROOM A215
6
M1‐12‐0
PHOTO
SMOKE
113‐1ST FL‐WEST CORR. NORTH OF DBL DOORS
6
M1‐120‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH CORRIDOR EAST END
6
M1‐121‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH CORRIDOR E/CTR DET.
6
M1‐122‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH STAFF LOCKERS RM A208
6
M1‐123‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH CORRIDOR W/CTR DET.
6
M1‐124‐0
PHOTO
SMOKE
113‐2ND FL ‐ NORTH CORRIDOR WEST END
6
M1‐125‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST CORRIDOR BY STAIRS
6
M1‐126‐0
ADRPUL
PULL
113‐PENTHOUSE ‐ BY WEST STAIRS
6
M1‐127‐0
HEAT
HEAT
113‐PENTHOUSE ‐ WEST ELEVATOR #2 MECH RM
6
M1‐128‐0
PHOTO
SMOKE
113‐PENTHOUSE ‐ WEST ELEVATOR #2 MECH RM
6
M1‐129‐0
RIAM
PRIMARY
113‐PENTHOUSE ‐ WEST ELEVATOR #2 PRIMARY
6
M1‐13‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST ELEVATOR #2 PIT
6
M1‐130‐0
RIAM
ALTERN
113‐PENTHOUSE ‐ WEST ELEVATOR #2 ALTERN.
6
M1‐131‐0
RIAM
RELAY
113‐PENTHOUSE ‐ WEST ELEVATOR #2 SHUNT
6
M1‐132‐0
RIAM
RELAY
113‐PENTHOUSE ‐WEST ELEVATOR #2 FIRE HAT
6
M1‐133‐0
IAM
TROUBLE
113‐W. ELEV #2 SHUNT TRIP POWER LOSS
6
M1‐134‐0
HEAT
HEAT
113‐PENTHOUSE ‐ CENTER HEAT DETECTOR
6
M1‐135‐0
RPHOTO
DUCT
113‐PENTHOUSE ‐ AHU SUPPLY DETECTOR
6
M1‐136‐0
HEAT
HEAT
113‐PENTHOUSE ‐ EAST HEAT DETECTOR
6
M1‐137‐0
RPHOTO
DUCT
113‐PENTHOUSE ‐ AHU RETURN DETECTOR
6
M1‐138‐0
PHOTO
SMOKE
113‐PENTHOUSE ‐ EAST ELEVATOR #1 MECH RM
6
M1‐139‐0
HEAT
HEAT
113‐PENTHOUSE ‐ EAST ELEVATOR #1 MECH RM
6
M1‐14‐0
PHOTO
SMOKE
113‐1ST FL‐WEST CORR. SOUTH OF DBL DOORS
6
M1‐140‐0
RIAM
PRIMARY
113‐PENTHOUSE ‐ EAST ELEVATOR #1 PRIMARY
6
M1‐141‐0
RIAM
ALTERN
113‐PENTHOUSE ‐ EAST ELEVATOR #1 ALTERN.
6
M1‐142‐0
RIAM
RELAY
113‐PENTHOUSE ‐ EAST ELEVATOR #1 SHUNT
6
M1‐143‐0
RIAM
RELAY
113‐PENTHOUSE‐ EAST ELEVATOR #1 FIRE HAT
6
M1‐144‐0
IAM
TROUBLE
113‐E. ELEV #1 SHUNT TRIP POWER LOSS
6
M1‐145‐0
4009A4
SIGNAL
113‐1ST FL ‐ NAC #1
6
M1‐145‐1
MSIGB
RSYNVIS
113‐1ST FL ‐ WEST VISUALSSIG11
6
M1‐145‐2
MSIGB
RSYNVIS
113‐1ST FL ‐ CENTER/EAST VISUALS SIG12
6
M1‐145‐3
MSIGB
RSYNVIS
113‐ SPARESIG13
6
M1‐145‐4
MSIGB
RSYNVIS
113‐2ND FL ‐ NORTHEAST VISUALS SIG14
6
M1‐146‐0
4009A4
SIGNAL
113‐1ST FL ‐ NAC #2
6
M1‐146‐1
MSIGB
RSYNVIS
113‐2ND FL ‐ NORTHWEST VISUALS SIG21
6
M1‐146‐2
MSIGB
RSYNVIS
113‐2ND FL ‐ EAST VISUALSSIG22
6
M1‐146‐3
MSIGB
RSYNVIS
113‐ 2ND FL ‐ WEST VISUALSSIG23
6
M1‐146‐4
MSIGB
RSYNVIS
113‐ ROOF / CANOPYSIG24
6
M1‐147‐0
RPHOTO
DUCT
113‐1ST FL ‐ WEST DBL DOORS PLENUM SMOKE
6
M1‐149‐0
RPHOTO
DUCT
113‐1ST FL ‐ EAST DBL DOORS PLENUM SMOKE
6
M1‐15‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST ENTRANCE TO COURTYARD
6
M1‐151‐0
RPHOTO
DUCT
113‐2ND FL ‐ WEST DBL DOORS PLENUM SMOKE
6
M1‐152‐0
RPHOTO
DUCT
113‐2ND FL ‐ EAST DBL DOORS PLENUM SMOKE
6
M1‐154‐0
RPHOTO
DUCT
113‐1ST FL ‐ WEST VENDING PLENUM SMOKE
6
M1‐155‐0
RIAM
RELAY
113‐1ST FL ‐ WEST CORR. DOORHOLDER RELAY
6
M1‐156‐0
RPHOTO
DUCT
113‐1ST FL‐ W. ROOM B128 (A/C)
6
M1‐157‐0
RPHOTO
DUCT
113‐1ST FL ‐ DINING RM PLENUM SMOKE
6
M1‐158‐0
RPHOTO
DUCT
113‐1ST FL‐ S. ROOM B113 (A/C)
6
M1‐159‐0
RPHOTO
DUCT
113‐1ST FL‐E. ROOM B103 (A/C)
6
M1‐16‐0
PHOTO
SMOKE
113‐1ST FL ‐ DINING/LOUNGE RM B127 (N.)
6
M1‐160‐0
RPHOTO
DUCT
113‐1ST FL‐E. ROOM B102 (A/C)
6
M1‐161‐0
RIAM
RELAY
113‐1ST FL ‐ EAST CORR. DOORHOLDER RELAY
6
M1‐162‐0
RPHOTO
DUCT
113‐1ST FL ‐ REPORTS RM PLENUM SMOKE
6
M1‐163‐0
RPHOTO
DUCT
113‐1ST FL‐CENTER RESTROOMS PLENUM SMOKE
6
M1‐164‐0
RPHOTO
DUCT
113‐1ST FL‐CTR ROOM A133 (A/C)
6
M1‐165‐0
RPHOTO
DUCT
113‐1ST FL‐E. ROOM A117 (A/C)
6
M1‐166‐0
RPHOTO
DUCT
113‐1ST FL ‐ N. ELECTRIC RM PLENUM SMOKE
6
M1‐167‐0
RPHOTO
DUCT
113‐1ST FL‐ S. ROOM B119 (A/C)
6
M1‐168‐0
RPHOTO
DUCT
113‐1ST FL‐N. CONFERENCE RM PLENUM SMOKE
6
M1‐169‐0
RIAM
RELAY
113‐2ND FL ‐ WEST CORR. DOORHOLDER RELAY
6
M1‐17‐0
PHOTO
SMOKE
113‐1ST FL ‐ DINING/LOUNGE RM B127 (S.)
6
M1‐170‐0
RIAM
RELAY
113‐2ND FL ‐ SOUTH CORR DOORHOLDER RELAY
6
M1‐171‐0
RIAM
RELAY
113‐2ND FL ‐ EAST CORR. DOORHOLDER RELAY
6
M1‐173‐0
IAM
WSO
113‐2ND FL‐ W. STAIRWEL SOUTH WING RISER
6
M1‐174‐0
IAM
WSO
113‐PENTHOUSE ‐ WEST STAIRWELL RISER
6
M1‐175‐0
HEAT
HEAT
113‐PENTHOUSE ‐ WEST HEAT DETECTOR
6
M1‐176‐0
IAM
WSO
113‐2ND FL‐ W. STAIRWEL NORTH WING RISER
6
M1‐177‐0
RIAM
RELAY
113‐1ST FLR‐S LINK CORRIDOR B1C6‐1 DRHDR
6
M1‐178‐0
IAM
SO
113‐PENTHOUSE ‐ ELEVATOR 2 MECH ROOM
6
M1‐179‐0
IAM
SO
113‐PENTHOUSE ‐ ELEVATOR 1 MECH ROOM
6
M1‐18‐0
PHOTO
SMOKE
113‐1ST FL‐WEST CORR. BY DINING CTR DOOR
6
M1‐19‐0
PHOTO
SMOKE
113‐1ST FL ‐WEST CORR. BY DINING S. DOOR
6
M1‐2‐0
HEAT
HEAT
113‐1ST FL ‐ RESIDENCE KITCHEN RM B131
6
M1‐20‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST SOILED LINEN ROOM B125
6
M1‐21‐0
PHOTO
SMOKE
113‐1ST FL ‐ SOUTH CORRIDOR WEST END
6
M1‐22‐0
HEAT
HEAT
113‐1ST FL ‐ S/W JANITOR'S CLOSET B122
6
M1‐23‐0
ADRPUL
PULL
113‐1ST FL ‐ S/W EXIT DOOR
6
M1‐24‐0
PHOTO
SMOKE
113‐1ST FL ‐ S/W LAUNDRY ROOM B121
6
M1‐25‐0
PHOTO
SMOKE
113‐1ST FL ‐ SOUTH CORRIDOR TO HOSPITAL
6
M1‐26‐0
ADRPUL
PULL
113‐1ST FL ‐ SOUTH CORRIDOR TO HOSPITAL
6
M1‐27‐0
PHOTO
SMOKE
113‐1ST FL ‐ SOUTH CORRIDOR W/CTR DET.
6
M1‐28‐0
PHOTO
SMOKE
113‐1ST FL ‐ SOUTH CORRIDOR E/CTR DET.
6
M1‐29‐0
PHOTO
SMOKE
113‐1ST FL ‐ SOUTH CORRIDOR EAST END
6
M1‐3‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST ELEVATOR #2 LOBBY
6
M1‐30‐0
PHOTO
SMOKE
113‐1ST FL ‐ S/E ELECTRIC ROOM B110
6
M1‐31‐0
PHOTO
SMOKE
113‐1ST FL ‐ S/E CLEAN LINEN ROOM B109
6
M1‐32‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST CORRIDOR BY LAUNDRY
6
M1‐33‐0
ADRPUL
PULL
113‐1ST FL ‐ EAST EXIT BY STAIRS
6
M1‐34‐0
PHOTO
SMOKE
113‐1ST FL ‐ S/E LAUNDRY ROOM B106
6
M1‐35‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST CORRIDOR S/CTR DET.
6
M1‐36‐0
PHOTO
SMOKE
113‐1ST FL‐EAST CORR. SOUTH OF DBL DOORS
6
M1‐37‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST ENTRANCE TO COURTYARD
6
M1‐38‐0
PHOTO
SMOKE
113‐1ST FL‐EAST CORR. NORTH OF DBL DOORS
6
M1‐39‐0
IAM
SO
113‐1ST FL ‐ EAST ELEVATOR #1 PIT TAMPER
6
M1‐4‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST VENDING ROOM A152
6
M1‐41‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST ELEVATOR #1 LOBBY
6
M1‐42‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST ELEVATOR #1 PIT
6
M1‐43‐0
PHOTO
SMOKE
113‐1ST FL ‐ CENTER CORRIDOR EAST END
6
M1‐44‐0
PHOTO
SMOKE
113‐1ST FL ‐CENTER CORR. BY ROOM A128
6
M1‐45‐0
HEAT
HEAT
113‐1ST FL ‐ EAST ELEVATOR #1 PIT
6
M1‐46‐0
ADRPUL
PULL
113‐1ST FL ‐ NURSE STATION
6
M1‐47‐0
PHOTO
SMOKE
113‐1ST FL‐CENTER CORR. BY NURSE STATION
6
M1‐48‐0
HEAT
HEAT
113‐1ST FL ‐ NORTH JANITOR'S CLOSET A137
6
M1‐49‐0
PHOTO
SMOKE
113‐1ST FL ‐ CENTER CORRIDOR WEST END
6
M1‐5‐0
PHOTO
SMOKE
113‐1ST FL ‐ SPRINKLER ROOM
6
M1‐50‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST TELEPHONE ROOM A139
6
M1‐51‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST ELECTRIC ROOM A140
6
M1‐52‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST TELEPHONE CLOSET A119
6
M1‐53‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST CORRIDOR BY ROOM A115
6
M1‐54‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST STORAGE BY ROOM A116
6
M1‐55‐0
PHOTO
SMOKE
113‐1ST FL ‐ EAST CORRIDOR NORTH END
6
M1‐56‐0
ADRPUL
PULL
113‐1ST FL ‐ N/E EXIT DOOR
6
M1‐57‐0
PHOTO
SMOKE
113‐1ST FL ‐ N/E O & M STORAGE ROOM
6
M1‐58‐0
PHOTO
SMOKE
113‐1ST FL ‐ CENTER CORRIDOR EAST END
6
M1‐59‐0
PHOTO
SMOKE
113‐1ST FL ‐ N/E ELECTRIC CLOSET
6
M1‐6‐0
IAM
SO
113‐1ST FL ‐ SPRINKLER MAIN TAMPERS (2)
6
M1‐60‐0
PHOTO
SMOKE
113‐1ST FL ‐ INDEPENDENT LIVING RM EAST
6
M1‐61‐0
PHOTO
SMOKE
113‐1ST FL‐NORTH CORR BY INDEPENDENT RMS
6
M1‐62‐0
ADRPUL
PULL
113‐1ST FL‐NORTH CORR BY INDEPENDENT RMS
6
M1‐63‐0
PHOTO
SMOKE
113‐1ST FL ‐ INDEPENDENT LIVING RM WEST
6
M1‐64‐0
PHOTO
SMOKE
113‐1ST FL ‐ NORTH MAIN ENTRANCE
6
M1‐65‐0
PHOTO
SMOKE
113‐1ST FL ‐ MAIN RECEPTION AREA
6
M1‐66‐0
PHOTO
SMOKE
113‐1ST FL ‐ NORTH CORRIDOR W/CTR DET.
6
M1‐67‐0
PHOTO
SMOKE
113‐1ST FL ‐ NORTH CORRIDOR BY ROOM A148
6
M1‐68‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST CORR BY ROOM A143
6
M1‐69‐0
PHOTO
SMOKE
113‐1ST FL ‐ WEST CONFERENCE ROOM A144
6
M1‐7‐0
IAM
WSO
113‐1ST FL ‐ SPRINKLER SOUTH RISER
6
M1‐71‐0
HEAT
HEAT
113‐1ST FL ‐ WEST ELEVATOR #2 PIT
6
M1‐72‐0
PHOTO
SMOKE
113‐2ND FL ‐ WEST ELEVATOR #2 LOBBY
6
M1‐73‐0
ADRPUL
PULL
113‐2ND FL ‐ BY WEST STAIRS
6
M1‐74‐0
PHOTO
SMOKE
113‐2ND FL‐TOP OF WEST ELEVATOR #2 SHAFT
6
M1‐75‐0
HEAT
HEAT
113‐2ND FL‐TOP OF WEST ELEVATOR #2 SHAFT
6
M1‐76‐0
PHOTO
SMOKE
113‐2ND FL‐WEST CORR. NORTH OF DBL DOORS
6
M1‐77‐0
PHOTO
SMOKE
113‐2ND FL‐WEST CORR. SOUTH OF DBL DOORS
6
M1‐78‐0
PHOTO
SMOKE
113‐2ND FL ‐ LEATHER WEAVING & CERAMICS
6
M1‐79‐0
HEAT
HEAT
113‐2ND FL ‐ LEATHER WEAVING PREP B236‐A
6
M1‐8‐0
IAM
WSO
113‐1ST FL ‐ SPRINKLER NORTH RISER
6
M1‐80‐0
HEAT
HEAT
113‐2ND FL ‐ LEATHER WEAVING KILN B236‐B
6
M1‐81‐0
PHOTO
SMOKE
113‐2ND FL‐EAST CORR M.S. WOODS N. DOOR
6
M1‐82‐0
HEAT
HEAT
113‐2ND FL‐M.S. WOODS/LEATHER SHOP NORTH
6
M1‐83‐0
PHOTO
SMOKE
113‐2ND FL ‐ M.S. WOODS STORG RM B234‐A
6
M1‐84‐0
IAM
HEAT
113‐2ND FL ‐ M.S. WOODS FINISH ROOM
6
M1‐85‐0
HEAT
HEAT
113‐2ND FL‐M.S. WOODS/LEATHER SHOP SOUTH
6
M1‐86‐0
PHOTO
SMOKE
113‐2ND FL‐EAST CORR. M.S. WOODS S. DOOR
6
M1‐87‐0
HEAT
HEAT
113‐2ND FL ‐ S/W JANITOR'S CLOSET B232
6
M1‐88‐0
HEAT
HEAT
113‐2ND FL ‐ S/W METAL SHOP ROOM B231
6
M1‐89‐0
PHOTO
SMOKE
113‐2ND FL‐SOUTH CORRIDOR BY ROOM B229
6
M1‐90‐0
PHOTO
SMOKE
113‐2ND FL‐SOUTH CORRIDOR BY ROOM B228
6
M1‐91‐0
PHOTO
SMOKE
113‐2ND FL ‐ S/W VS STORAGE ROOM B228
6
M1‐92‐0
PHOTO
SMOKE
113‐2ND FL ‐ SOUTH CORRIDOR BY ROOM B225
6
M1‐93‐0
PHOTO
SMOKE
113‐2ND FL ‐ SOUTH CORRIDOR BY ROOM B229
6
M1‐94‐0
PHOTO
SMOKE
113‐2ND FL ‐ SOUTH CORRIDOR BY ROOM B216
6
M1‐95‐0
ADRPUL
PULL
113‐2ND FL ‐ BY EAST STAIRS
6
M1‐96‐0
PHOTO
SMOKE
113‐2ND FL ‐ EAST CORR. BY ELEC. RM B213
6
M1‐97‐0
PHOTO
SMOKE
113‐2ND FL ‐ S/E ELECTRIC ROOM B213
6
M1‐98‐0
PHOTO
SMOKE
113‐2ND FL‐EAST CORR. SOUTH OF DBL DOORS
6
M1‐99‐0
PHOTO
SMOKE
113‐2ND FL‐EAST CORR. NORTH OF DBL DOORS
6
SIG10
PSSIGB
RSYNVIS
SPARE VISUAL CIRCUITSIG10
6
SIG11
PSSIGB
RSYNVIS
SPARE VISUAL CIRCUITSIG11
6
SIG15
SPKRB
SPEAKER
BRC ‐ EAST ELEVATOR #1SIG15
6
SIG16
SPKRB
SPEAKER
BRC ‐ WEST ELEVATOR #2SIG16
6
SIG17
SPKRB
SPEAKER
BRC 1ST FL ‐ NORTHSIG17
6
SIG18
SPKRB
SPEAKER
BRC 1ST FL ‐ SOUTHSIG18
6
SIG19
SPKRB
SPEAKER
BRC 2ND FL ‐ NORTHSIG19
6
SIG20
SPKRB
SPEAKER
BRC 2ND FL ‐ SOUTHSIG20
6
SIG21
SPKRB
SPEAKER
BRC ‐ ROOF / CANAOPYSIG21
6
SIG22
SPKRB
SPEAKER
BRC SPARE SIG22
6
SIG23
SPKRB
SPEAKER
BRC SPARE SIG23
6
SIG24
SPKRB
SPEAKER
BRC SPARE SIG24
6
SIG25
SPKRB
SPEAKER
BRC SPARE SIG25
6
SIG26
SPKRB
SPEAKER
BRC SPARE SIG26
6
SIG3
PSSIGB
RSYNVIS
BRC 1ST FLR ‐ NORTHWEST VISUALS SIG 3
6
SIG4
PSSIGB
RSYNVIS
BRC 1ST FLR ‐ NORTHEAST VISUALS SIG 4
6
SIG5
PSSIGB
RSYNVIS
SPARE VISUAL CIRCUITSIG5
6
SIG9
PSSIGB
RSYNVIS
SPARE VISUAL CIRCUITSIG9
7
M1‐1‐0
PHOTO
SMOKE
BLDG 128 BASEMENT / CORRIDOR BY STAIRS
7
M1‐10‐0
HEAT
HEAT
BLDG 128 BASEMENT / ELEVATOR MECH ROOM
7
M1‐100‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C111
7
M1‐101‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / S.CORR BY RM C106
7
M1‐102‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C106
7
M1‐103‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C104
7
M1‐104‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C103
7
M1‐105‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / S.CORR BY RM C101
7
M1‐106‐0
OHEAT
HEAT
BLDG 128 FLR‐1 NORTH / ROOM C102
7
M1‐107‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / W.CORR BY RM C125
7
M1‐108‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / W.CORR BY RM C124
7
M1‐109‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C115
7
M1‐11‐0
PHOTO
SMOKE
BLDG 128 BASEMENT / ELEVATOR MECH ROOM
7
M1‐110‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C123
7
M1‐111‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C122
7
M1‐112‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / W.CORR BY RM C116
7
M1‐113‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C120
7
M1‐114‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C117
7
M1‐115‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / NURSE STATION (S)
7
M1‐116‐0
RIAM
RELAY
BLDG 128 FLR‐1 NORTH / RET DMPR RM C117
7
M1‐117‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C116
7
M1‐118‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / W.CORR BY RM B127
7
M1‐119‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM C119
7
M1‐12‐0
RIAM
PRIMARY
BLDG 128 BSMT / ELEV PRIMRY RECALL RELAY
7
M1‐120‐0
ADRPUL
PULL
BLDG 128 FLR‐1 NORTH / BY CNTR STAIRS
7
M1‐121‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / W.CORR BY RM B126
7
M1‐122‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / ROOM B126
7
M1‐123‐0
4009A4
SIGNAL
BLDG 128 NAC‐1 (IN CNTR CORR ELECT RM)
7
M1‐123‐1
MSIGB
RSYNVIS
BLDG 128 ROOF & CANOPY VISUALS NAC 1;1
7
M1‐123‐2
MSIGB
RSYNVIS
BLDG 128 1ST FLOOR CENTR VISUALS NAC 1;2
7
M1‐123‐3
MSIGB
RSYNVIS
BLDG 128 1ST FLOOR NORTH VISUALS NAC 1;3
7
M1‐123‐4
MSIGB
RSYNVIS
BLDG 128 1ST FLOOR NORTH VISUALS NAC 1;4
7
M1‐124‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 CNTR CORR ELECTRICAL RM
7
M1‐125‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 CNTR CORRIDOR BY RM A150
7
M1‐126‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 CNTR CORRIDOR ROOM A151
7
M1‐127‐0
PHOTO
SMOKE
BLDG 128 FLR ‐1 CNTR CORRIDOR BY RM A149
7
M1‐128‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B125
7
M1‐129‐0
RPHOTO
DUCT
BLDG 128 FLR‐1 SOUTH / RET DUCT (B129)
7
M1‐13‐0
RIAM
ALTERN
BLDG 128 BSMT / ELEV ALTERN RECALL RELAY
7
M1‐130‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / W.CORR BY RM B130
7
M1‐131‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B123
7
M1‐132‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B130
7
M1‐133‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / W.CORR BY RM B122
7
M1‐134‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B122
7
M1‐135‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B131
7
M1‐136‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / W.CORR BY RM B120
7
M1‐137‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B120
7
M1‐138‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / NURSE STATION (N)
7
M1‐139‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B119
7
M1‐14‐0
RIAM
RELAY
BLDG 128 BSMT / ELEV POWER SHUNT RELAY
7
M1‐140‐0
ADRPUL
PULL
BLDG 128 FLR‐1 SOUTH / NURSE STATION
7
M1‐141‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / N.CORR BY RM B136
7
M1‐142‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B135
7
M1‐143‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B136
7
M1‐144‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / N.CORR BY RM B141
7
M1‐145‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B140
7
M1‐146‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B143
7
M1‐147‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B142
7
M1‐148‐0
OHEAT
HEAT
BLDG 128 FLR‐1 SOUTH / N. JAN RM B144
7
M1‐149‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / N.CORR BY RM B145
7
M1‐15‐0
RIAM
RELAY
BLDG 128 BSMT / ELEV HAT FLASH RELAY
7
M1‐150‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B146
7
M1‐151‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B118
7
M1‐152‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / W.CORR BY RM B116
7
M1‐153‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B117
7
M1‐154‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B116
7
M1‐155‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / W. BY SOUTH EXIT
7
M1‐156‐0
ADRPUL
PULL
BLDG 128 FLR‐1 SOUTH / W. BY SOUTH EXIT
7
M1‐157‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B115
7
M1‐158‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B113
7
M1‐159‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B114
7
M1‐16‐0
IAM
TROUBLE
BLDG 128 BASEMENT / ELEV POWER MONITOR
7
M1‐160‐0
ADRPUL
PULL
BLDG 128 PENTHOUSE / BY STAIRS
7
M1‐161‐0
HEAT
HEAT
BLDG 128 PENTHOUSE / CENTER
7
M1‐162‐0
RPHOTO
DUCT
BLDG 128 PENTHOUSE / SUPPLY DUCT
7
M1‐163‐0
PHOTO
SMOKE
BLDG 128 1ST FLR SOUTH / ROOM B129
7
M1‐164‐0
RIAM
RELAY
BLDG 128 1ST FLR SOUTH / W. CORR FIRE DR
7
M1‐165‐0
RIAM
RELAY
BLDG 128 1ST FLR NORTH / W. CORR FIRE DR
7
M1‐166‐0
RIAM
RELAY
BLDG 128 1ST FLR SOUTH / E. CORR FIRE DR
7
M1‐167‐0
RIAM
RELAY
BLDG 128 1ST FLR NORTH / E. CORR FIRE DR
7
M1‐168‐0
4009A4
SIGNAL
BLDG 128 NAC‐2 (IN CNTR CORR ELECT RM)
7
M1‐168‐1
MSIGB
RSYNVIS
BLDG128 BASEMENT VISUALSNAC 2;1
7
M1‐168‐2
MSIGB
RSYNVIS
BLDG 128 SPARE VISUAL CIRCUIT NAC 2;2
7
M1‐168‐3
MSIGB
RSYNVIS
BLDG 128 SPARE VISUAL CIRCUIT NAC 2;3
7
M1‐168‐4
MSIGB
RSYNVIS
BLDG 128 SPARE VISUAL CIRCUIT NAC 2;4
7
M1‐169‐0
IAM
SO
BLDG 128 BASEMENT ELEV SHAFT VLV TMPR
7
M1‐17‐0
PHOTO
SMOKE
BLDG 128 BASEMENT / TELEPHONE CLOST S003
7
M1‐170‐0
IAM
WATER
BLDG 128 BASEMENT ELEV SHAFT FLOW
7
M1‐171‐0
RPHOTO
DUCT
BLDG 128 PENTHOUSE / RETURN DUCT
7
M1‐172‐0
RIAM
RELAY
BLDG 128 BASEMENT DRHLDR AT LINK DBL DRS
7
M1‐173‐0
PHOTO
SMOKE
BLDG 128 BASEMENT BY LINK DOUBLE DOORS
7
M1‐174‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 NORTH / RECEPTION AREA
7
M1‐175‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 CNTR/ PUBLIC WAITING AREA
7
M1‐176‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 CNTR/ MAIN ENTRANCE LOBBY
7
M1‐177‐0
RIAM
DHOLDER
BLDG 128 MAIN ENTRANCE DOOR RELEASE
7
M1‐178‐0
RIAM
DHOLDER
BLDG 128 NORTH ENTRANCE DOOR RELEASE
7
M1‐179‐0
RIAM
DHOLDER
BLDG 128 SOUTH ENTRANCE DOOR RELEASE
7
M1‐2‐0
ADRPUL
PULL
BLDG 128 BASEMENT / CORRIDOR BY STAIRS
7
M1‐22‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / NURSE STATION (S)
7
M1‐23‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / S. CORR ELEC RM
7
M1‐24‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH/ S. CORR BY RM B109
7
M1‐25‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B109
7
M1‐26‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B108
7
M1‐27‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B107
7
M1‐28‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B105
7
M1‐29‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B106
7
M1‐3‐0
PHOTO
SMOKE
BLDG 128 BASEMENT / ELEVATOR LOBBY
7
M1‐30‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / S.CORR BY RM B105
7
M1‐31‐0
PHOTO
SMOKE
BLDG 128 FLR‐1 SOUTH / ROOM B104
7
M1‐32‐0
PHOTO
SMOKE

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .