This document contains pre-bid requests for information (RFIs) related to Solicitation 36C25224B0015 for the Danville VAMC 550-24-202 project to demolish Buildings 31, 32, 33, 34, 37, 38, 75, 81, and 83. The RFIs and responses cover topics such as lead paint removal, the requirement for a designated site superintendent, and the availability of a site visit sign-in sheet. The solicitation is being issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 12. The RFI responses indicate that lead paint must be abated prior to demolition, the contractor must have a dedicated site superintendent, and a site visit sign-in sheet will be provided. No additional details on the specific products, services, pricing, or other key solicitation terms are included in this document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid RFIs Danville VAMC 550-24-202 Demolish Buildings 31, 32, 33, 34, 37, 38, 75, 81, and 83
| Pre-Bid RFIs Amend 002 | 36C25224B0015 | |||
| No. | Date Submitted | SUBJECT/COMMENT | Response | Included in Amendment # |
| 1 | 9/19/24 | The lead paint removal spec indicates all lead paint to be abated prior to demolition. Please confirm this requirement can all lead paint be removed with general demolition debris. | See previous response regarding lead paint removal. | |
| 2 | 9/20/24 | Does this project require a designated superintendent? | Per FAR 52.236-6 - At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. | |
| 3 | 9/20/24 | will it be a requirement for the general contractor to have a designated superintendent to this project that cannot perform work on other contracts? | Site Superintendent will be assigned to this project solely for the performance of the contract | |
| 1 | 9/24/24 | Is there a site vist sign in sheet? | Document attached with Amendment 002 posting. |