Attach 4 - Asbestos Survey.pdf
PDF 14 MB Posted
- Attached to
- Z1DA--550-24-206 Chiller and Air Handler Replacement Federal contract opportunity
- Solicitation number
- 36C25224B0012
About this file
The document provided is an Asbestos Survey report related to the federal contract opportunity for the Chiller and Air Handler Replacement project at the Department of Veterans Affairs Veterans Integrated Service Network 12. The Asbestos Survey details the findings of an assessment conducted to identify the presence and condition of asbestos-containing materials in the facility prior to the chiller and air handler replacement work. The report includes a description of the survey methodology, identification of asbestos-containing materials, and recommendations for abatement and remediation. This information is critical for the contractor to understand the existing conditions and properly plan for the asbestos mitigation as part of the overall project scope.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
LOCATION:
DANVILLE VA MEDICAL CENTER
100 EMANCIPATION DR.
DANVILLE, IL 23667
PROJECT NO.: 550-18-106
CONTRACT NUMBER: 36C25218P5649
INSPECTION DATES:
OCTOBER 29 to DECEMBER 12, 2018
CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
DANVILLE VA MEDICAL CENTER - DANVILLE, IL
2018 ASBESTOS REINSPECTION REPORT
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Laboratory Reports – 2018 Sampling
Appendix E – Asbestos Laboratory Reports – Pre-2018 Samples
Appendix F - Inspector Certifications
Appendix G - Lab Certifications
Appendix H – Asbestos Locations and Sample Location Drawings
Appendix I – O&M Plan (Operations & Maintenance)
Appendix J – Asbestos Reinspection Survey Narrative
Appendix K – Asbestos Sampling and Site Safety Plan
1.0 EXECUTIVE SUMMARY
On October 29-30 and December 10-12, 2018, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 14 buildings on the site of the Danville VA Medical Center in Danville, IL. The survey was performed as part of the VA Project Number VA-550-18-106 under Contract Number 36C25218P5649. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number Building Name/Description
Total Square Footage
14 Medical Administration 27,600 19 Warehouse 25,340 22 Engineering Storage 6,155 25 Greenhouse 4,897 49 Chapel 16,621 58 Inpatient Services 101,515 64 Maintenance 8,172 69 Laundry 8,270 72 Maintenance 9,741 98 Outpatient Services 120,237
101 NHCU 85,832
102 Administrative 82,422 103 Psychiatric Services 82,687 104 Special Activities 61,288
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987 and is licensed in the State of Illinois as an Asbestos Inspector. Sam Ansara assisted on the inspection and has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility in 2001, 2004 and 2010. There was also a pipe insulation survey conducted in Building 58 in 2017 prior to the domestic water piping replacement project. There were 4 buildings in which there was no previous survey conducted which included Building 14, 19, 25, and 49. Those buildings were inspected and sampled in accordance with the SOW. The previous reinspection reports and drawings were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
2.0 STATE AND LOCAL REGULATIONS
The State of Illinois asbestos inspection and licensing regulations are similar to the Federal regulations.
State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled.
According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab P&K in Marlton, NJ. EMLab is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Building 14 - Medical Administration
• No asbestos containing materials identified. Building has undergone a comprehensive gut-rehab and remodeling.
Building 19 - Warehouse
Asbestos Containing Materials Locations Quantity Pipe Insulation Basement Rooms 010, 011, 012, 013, 014, 015, 106, 017, 018, 109, 020 525 LF
Drywall mud/joint compound 1st floor offices, break room, and restroom
(101, 102, 103) 440 SF
12” gray floor tile (neg. mastic) 1st floor supervisor office 101 360 SF
Building 22 - Engineering Storage
Pipe insulation Basement Rooms 2, 3, 9, 10, 10A, 15 455 LF 9” vinyl floor tile and mastic Rooms 1, 4, 5, 9, 10, 106A 420 SF Black mastic under negative 12” floor tile Room 108 180 SF Exterior concrete and brick paint Building exterior (all sides and levels) 5,200 SF Exterior window caulk and glazing All windows - Basement and First Floor 37 windows
Building 25 - Greenhouse
Transite cement flower bed frames Greenhouse (E. & W. side) 1,184 SF
Building 49 - Chapel
Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl spaces under both chapels 16,600 SF
Building 58 - Inpatient Services
Pipe insulation on straight runs and elbows Crawl spaces, basement, 1st floor, 2nd floor, 3rd floor, 4th floor, 5th floor, and Attic. Includes inaccessible pipe chases on all floors
3,880 LF
Mud fittings and hangers on fiberglass and black Styrofoam insulated pipes Crawl space, pipe chases, and attic 1,275 each Paper duct seam tape over fiberglass ducts 1st floor S. wing ceiling plenum and attic 7,960 SF Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl space under building 12,500 SF 9” vinyl floor tile and black mastic 1st floor, 4th floor, 5th floor 13,600 SF 12” vinyl floor tile and black mastic Basement, 1st floor, 2nd floor, 5th floor 3,110 SF Black residual floor tile mastic under non- ACM 12” floor tile 5th floor hallway/lobby by elevator 820 SF Exterior caulk on univent intake grilles 1st through 5th floors 320 each Black mastic on sink bottoms 202, C22B, 224, 323, and 424 7 sinks
Building 64 - Maintenance
Pipe insulation East shop areas and lofts 155 LF 12” vinyl floor tile and black mastic 3A, 7, 19A 120 SF Door frame caulk All entry/exit doors 4 doors Brown linoleum sheet flooring and mastic Room 20 310 SF
Building 69 - Laundry
Pipe insulation on straight runs and elbows Crawl space under building 440 LF Contaminated soils in crawl space Crawl space under building 7,120 SF 12” vinyl floor tile and black mastic Rooms 104, 105, and 107 320 SF Exterior concrete and brick paint Building exterior (all sides and levels) 5,040 SF
Building 72 - Maintenance
Pipe insulation on straight runs and elbows Shop, loft storage, plenum above lockers and toilet areas, service room off men’s toilet 220 LF
Window caulk and glazing All windows 27 window units
Exterior door frame caulk All entry/exit doors 4 doors 12” vinyl floor tile (negative mastic) Design room, conference room, hallway, drafting, and women’s restroom 890 SF
Building 98 - Outpatient Services
Pipe insulation on straight runs and elbows Basement and crawl spaces, risers in inaccessible pipe chases on all floors 2,260 LF Mud fittings on fiberglass insulated pipes Penthouse Mechanical Room 4 fittings Residual ACM debris on pipe fittings reinsulated with black foam rubber
Basement, Crawl space, ground floor, 1st floor, 2nd floor, and penthouse 660 fittings
Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl space under building 11,200 SF 12” vinyl floor tile and black mastic Room A37 120 SF Exterior caulk on univent intake grilles Ground through 2nd floor 420 each Generator exhaust muffler insulation Mech. Room BB3 110 SF
Building 101 - NHCU
Pipe insulation (mud fittings on fiberglass insulated lines)
Mechanical rooms and above ceiling tile throughout building 1,660 each
Drywall joint compound All interior walls 166,920 SF
Exterior window caulking and glazing All window units 110 window units
Building 102 - Administrative insulated lines) Above ceiling tiles throughout building 1,375 each
Exterior window caulking and glazing All window units 120 window units
Building 103 - Psychiatric Services insulated lines)
Mechanical room 120J, 126J, and above ceiling tile in center quadrants “J” 480 each
Building 104 - Special Activities insulated lines)
Mechanical rooms and above ceiling tile throughout building in catwalk 470 each
Generator muffler exhaust insulation Mechanical room by cafeteria 310 SF 9” vinyl floor tile and black mastic 118, 118 B-G, 122 A-D, 123 A-C, 134C, 139, 139A, 142, 3,280 SF
12” vinyl floor tile and black mastic 137, 137A-E 920 SF Transite cement panels Exterior soffits around building perimeter 1,320 SF Flexible fabric duct connectors Catwalk mechanical platforms 4 each
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
7.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program have been developed by the Danville VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facility, certain areas such as pipe chases and areas above fixed permanent ceilings, and fire-door interiors were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill also recommends sampling of electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Respectfully Submitted:
Brett L. Brumbaugh, REPA, CESCO Project Manager State of Illinois Asbestos Inspector License 100-09972 – Exp. 5/15/19
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
2018 ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
Facility: Danville VA Medical Center – Danville, IL Building: 14 - Medical Administration Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0 Sampler: Brett Brumbaugh Accreditation: State of Illinois – Asbestos Inspector #100-09972
PLM Laboratory Analysis Result
SAMPLE
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
22a 12” gray vinyl floor tile 1st floor stairwell S1-1 No asbestos detected 22b Yellow mastic “” No asbestos detected 23 Drywall joint compound 1st floor stairwell S1-1 No asbestos detected 24 Drywall joint compound 1st floor stairwell S1-2 No asbestos detected 25 2x2 lay-in ceiling tile 2nd floor hall C2-2 No asbestos detected 26 2x4 lay-in ceiling tile 1st floor hall C1-1 No asbestos detected 27 2x2 lay-in ceiling tile 2nd floor hall C2-1 No asbestos detected 28 Fire door interior core insulation 2nd floor stairwell S2-1 No asbestos detected 29a Tan linoleum sheet flooring Attic mech. room No asbestos detected 29b Yellow mastic “” No asbestos detected 30a Brown cove base Stairwell S2-2 No asbestos detected 30b Yellow mastic “” No asbestos detected 31 Hard plaster (base & skim coats) Attic mech. room No asbestos detected 32 Hard plaster (base & skim coats) Attic mech. room No asbestos detected 33 Hard plaster (base & skim coats) Attic mech. room No asbestos detected 34 Paper duct seam tape Attic No asbestos detected 35 Black tar on bricks Attic No asbestos detected 36 Vent pipe insulation Attic No asbestos detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
• All sample numbers on drawings are noted as: 2018-Building Number-Sample Number
Sampling notes:
▪ No roof samples taken of metal roof.
▪ No window materials sampled (new windows).
▪ Building had gut-rehab renovation within past 10 years.
Building: 19 - Warehouse Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
1 Interior wall paint on brick 1st S. storage room 104 No asbestos detected 2a 12” red floor tile 1st S. storage room 104 No asbestos detected 2b Yellow mastic “” No asbestos detected 2c Black mastic “” No asbestos detected 3a Beige cove base 1st S. storage room 104 No asbestos detected 3b Brown mastic “” No asbestos detected 4 Hard plaster (base & skim coats) 1st S. storage room 104 No asbestos detected 5 Hard plaster (base & skim coats) 1st S. storage room 104 No asbestos detected 6 Hard plaster (base & skim coats) 1st warehouse storage 105 No asbestos detected 7 Drywall sheet on ceiling 1st warehouse storage 105 No asbestos detected 8a 12” tan floor tile Supervisor office 4% Chrysotile Asbestos 8b Yellow mastic “” No asbestos detected 9a Tan linoleum sheet flooring Restroom on 1st floor No asbestos detected 9b Yellow mastic “” No asbestos detected 10 Hard plaster (base & skim coats) 1st floor N. storage 108 No asbestos detected 11 Drywall joint compound Staff break room s. wall 4% Chrysotile Asbestos 12 Rubber cove base mastic Hall by Supervisor office No asbestos detected 13 Drywall sheet Attic storage 206 No asbestos detected 14 Steam pipe insulation Basement storage 010 30% Asbestos 15 Tan textured wall paint Basement boiler room 018 No asbestos detected 16 Exterior window ledge paint (tan) E. window of loading dock <1% Chrysotile Asbestos 17 Exterior window ledge paint (tan) E. window of storage room
<1% Chrysotile Asbestos
18 Glass block caulk E. wall of storage room 100 No asbestos detected 19 Glass block caulk W. wall of room 111 No asbestos detected 20 Exterior window ledge paint (tan) W. window of room 111 <1% Chrysotile Asbestos 21 2x2 lay-in ceiling tile Break room No asbestos detected
▪ No roof samples taken – Metal roof and new dimensional asphalt shingles
Building: 22 - Engineering Storage Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
66 Asphalt roofing shingle N. side of bldg. by dock No asbestos detected 67 Tar paper underlayment/felt “” No asbestos detected 68 Exterior paint on brick (tan) N. ext. wall 2% Chrysotile Asbestos 69 Exterior paint on concrete foundation N. side of bldg. foundation 2% Chrysotile Asbestos
Building: 25 - Greenhouse Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
47 Transite sheet for growing tables Table in greenhouse 20% Chrysotile Asbestos 48 Window glazing S.W. corner of greenhouse No asbestos detected 49 Window glazing N.E. corner of greenhouse No asbestos detected 50 Window glazing S. side of greenhouse No asbestos detected 51 Drywall joint compound Mechanical room ceiling No asbestos detected 52 Drywall joint compound Mechanical room ceiling No asbestos detected 53 Window glazing W. window of storage room No asbestos detected 54 Window glazing S. window of bathroom <1% Chrysotile Asbestos 55 Asphalt roofing shingle S. side of office area No asbestos detected 56 Roofing tar paper/felt “” No asbestos detected
Building: 49 - Chapel Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
37 Brown battleship sheet flooring Loft No asbestos detected 38 Hard plaster (base and finish coats) Loft No asbestos detected 39 Hard plaster (base and finish coats) Stairs to loft No asbestos detected 40 Hard plaster (base and finish coats) Kitchen No asbestos detected 41 Hard plaster (base and finish coats) S. wall of chapel 101 No asbestos detected 42 Hard plaster (base and finish coats) N. wall of chapel 104 No asbestos detected 43 Brown stair tread and yellow mastic Stairs to loft No asbestos detected 44 2x2 lay-in ceiling tile Kitchen No asbestos detected 45 Window frame caulk W. window of chapel 101 No asbestos detected 46 Door frame caulk Door of entry 105 No asbestos detected
▪ No roof samples taken – Slate and rubber membrane roofs
▪ Soil covered with polyethylhene sheeting and assumed to be contaminated with asbestos debris.
Building: 58 - Inpatient Services Sampling Date: December 10, 2018 Analysis Date: December 18, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
75 Exterior caulking at base of brick at concrete foundation Outside Room 142 No asbestos detected
76 Exterior caulking at base of brick at concrete foundation Outside Room 135 No asbestos detected
77 Exterior caulking at base of brick at concrete foundation Outside Room 127A No asbestos detected
▪ No roof samples taken (rubber roof)
Building: 64 - Maintenance Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
61 Exterior door frame caulk Door to Room 9 8% Chrysotile Asbestos 62 Asphalt roofing shingle S. side of bldg. above Rm. 6 No asbestos detected 63 Tar paper/underlayment “” No asbestos detected
▪ No roof samples taken (metal roof)
Building: 69 - Laundry Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
64 Brick exterior paint E. side of bldg. by Rm. 103 2% Chrysotile Asbestos 65 Exterior concrete foundation paint S. side of bldg. by Rm. 107 3% Chrysotile Asbestos 70a 12” gray floor tile Room 104 No asbestos detected 70b Yellow mastic “” No asbestos detected 71 Exterior concrete paint W. side of bldg. of room 100 <1% Chrysotile asbestos 72 Roofing shingle S. side of bldg. above 101 No asbestos detected 73 Roofing tar paper/felt “” No asbestos detected 74 Ext. foundation paint S. side of bldg. by Rm. 103 <1% Chrysotile asbestos
▪ No roof samples taken – Slate and rubber membrane roofs
▪ Soil covered with polyethylhene sheeting and assumed to be contaminated with asbestos debris.
Building: 72 - Maintenance Sampling Date: October 29, 2018 Analysis Date: November 8-9, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
57 Mud fitting on fiberglass insul. Pipe Service room off men’s RR 60% Chrysotile Asbestos 58 Roof shingle Roof above carpenter shop No asbestos detected 59 Roofing tar paper/felt “” No asbestos detected 60 Door frame caulk E. door to shop 10% Chrysotile Asbestos
Building: 103 - Psychiatric Services Sampling Date: December 11, 2018 Analysis Date: December 18, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
NUMBER MATERIAL SAMPLE LOCATION LABORATORY ANALYSIS
RESULT
78 Window glazing Window of Room 109A <1% chrysotile asbestos 79 Window glazing Window of Room 122B <1% chrysotile asbestos
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
Danville VAMC - Danville, IL
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority
Repair Cost Estimate
Removal Cost Estimate
Pipe Insulation Basement Rooms 010, 011, 012, 013, 014, 015, 106, 017, 018, 109, 020 525 LF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $23,625
Drywall mud/joint compound 1st floor offices, break room, and restroom (101, 102, 103) 440 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $6,600
12” gray floor tile (neg. mastic) 1st floor supervisor office 101 360 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $3,600
TOTALS $0 $27,225
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Equipment = 10%
Building 22- Engineering Storage
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority
Repair Cost Estimate
Removal Cost Estimate
Pipe insulation Basement Rooms 2, 3, 9, 10, 10A, 15 455 LF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $20,475
9” vinyl floor tile and mastic Rooms 1, 4, 5, 9, 10, 106A 420 SF MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $4,200 Black mastic under negative 12” floor tile Room 108 180 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $1,800 Exterior concrete and brick paint Building exterior (all sides and levels) 5,200 SF MISC Non-friable 1 O&M; Remove at demolition 7 No damage $156,000
Exterior window caulk and glazing All windows - Basement and First Floor 37 windows MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $9,250
TOTALS $0 $191,725
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Building 25 - Greenhouse
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority
Repair Cost Estimate
Removal Cost Estimate
Transite cement flower bed frames Greenhouse (E. & W. side) 1,184 SF MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $8,000
TOTALS $0 $8,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Building 49 - Chapel
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority
Repair Cost Estimate
Removal Cost Estimate
Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl spaces under both chapels 16,600 SF TSI Friable 5
Isolate crawl space and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil or remove.
3 $132,000 $182,000
TOTALS $132,000 $182,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority
Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation on straight runs and elbows
Crawl spaces, basement, 1st floor, 2nd floor, 3rd floor, 4th floor, 5th floor, and Attic. Includes inaccessible pipe chases on all floors
3,880 LF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $174,600
Mud fittings and hangers on fiberglass and black Styrofoam insulated pipes Crawl spaces, pipe chases, and attic 1,275 each TSI Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $70,000
Paper duct seam tape over fiberglass ducts 1st floor S. wing ceiling plenum and attic 7,960 SF TSI Friable 5 Repair damaged areas in attic; Remove at renovation or demolitioin 3 $18,000 $278,000
Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl spaces under building 12,500 SF TSI Friable 5
Isolate crawl space and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil or remove.
3 $105,000 $137,000
9” vinyl floor tile and black mastic 1st floor, 4th floor, 5th floor 13,600 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $136,000
12” vinyl floor tile and black mastic Basement, 1st floor, 2nd floor, 5th floor 3,110 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $32,000
Black residual floor tile mastic under non-ACM 12” floor tile 5th floor hallway/lobby by elevator 820 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $3,100
Exterior caulk on univent intake grilles 1st through 5th floors 320 each MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $32,000
Black mastic on sink bottoms 202, C22B, 224, 323, and 424 7 sinks MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $1,800
TOTALS $123,000 $864,500
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation East shop areas and lofts 155 LF TSI Friable 3 O&M; Remove at renovation or demolition 5 No damage $7,000
12” vinyl floor tile and black mastic 3A, 7, 19A 120 SF MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $3,000
Door frame caulk All entry/exit doors 4 doors MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $4,000
Brown linoleum sheet flooring and mastic Room 20 310 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $4,200
TOTALS $0 $18,200
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation on straight runs and elbows Crawl space under building 440 LF TSI Friable 4
Isolate crawl space and place signs at all entrances.
Require PPE for entrance to crawl. Encapsulate soil or remove.
4 $4,500 $19,800
Contaminated soils in crawl space Crawl space under building 7,120 SF TSI Friable 5
Isolate crawl space and place signs at all entrances.
Require PPE for entrance to crawl. Encapsulate soil or remove.
3 $58,000 $82,000
12” vinyl floor tile and black mastic Rooms 104, 105, and 107 320 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $3,200
Exterior concrete and brick paint Building exterior (all sides and levels) 5,040 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $155,000
TOTALS $62,500 $260,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Building 72 - Maintenance
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation on straight runs and elbows
Shop, loft storage, plenum above lockers and toilet areas, service room off men’s toilet
220 LF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $9,900
Window caulk and glazing All windows 27 window units MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $27,000
Exterior door frame caulk All entry/exit doors 4 doors MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $4,000
12” vinyl floor tile (negative mastic)
Design room, conference room, hallway, drafting, and women’s restroom
890 SF TSI Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $8,900
TOTALS $0 $49,800
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation on straight runs and elbows Basement and crawl spaces, risers in inaccessible pipe chases on all floors
2,260 LF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $105,000
Mud fittings on fiberglass insulated pipes Penthouse Mechanical Room 4 fittings TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $1,000
Residual ACM debris on pipe fittings reinsulated with black foam rubber
Basement, Crawl space, ground floor, 1st floor, 2nd floor, and penthouse
660 fittings TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $36,000
Contaminated soils in crawl space (covered with polyethylene sheeting) Crawl space under building 11,200 SF TSI Friable 5
Isolate crawl space and place signs at all entrances. Require PPE for entrance to crawl.
Encapsulate soil or remove.
3 $89,000 $123,000
12” vinyl floor tile and black mastic Room A37 120 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $2,400
Exterior caulk on univent intake grilles Ground through 2nd floor 420 each MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $42,000
Generator exhaust muffler insulation Mech. Room BB3 110 SF TSI Friable 1 O&M; Remove at renovation or demolition 7 No damage $6,200
TOTALS $89,000 $315,600
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation (mud fittings on fiberglass insulated lines)
Mechanical rooms and above ceiling tile throughout building
1,660 each TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $91,000
Drywall joint compound All interior walls 166,920 SF MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $660,000
Exterior window caulking and glazing All window units 110 window units MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $110,000
TOTALS $0 $861,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate Pipe insulation (mud fittings on fiberglass insulated lines)
Above ceiling tiles throughout building 1,375 each TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $88,000
Exterior window caulking and glazing All window units 120 window units MISC Non-friable 2 O&M; Remove at renovation or demolition 6 No damage $120,000
TOTALS $0 $208,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation (mud fittings on fiberglass insulated lines)
Mechanical room 120J, 126J, and above ceiling tile in center quadrants “J”
480 each TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $31,000
TOTALS $0 $31,000
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
Asbestos Assessments and Cost Estimates
December 2018
Asbestos Material Locations Quantity AHERA Category Friability AHERA
Assessment Recommendation Removal Priority Repair Cost Estimate
Removal Cost
Estimate
Pipe insulation (mud fittings on fiberglass insulated lines)
Mechanical rooms and above ceiling tile throughout building in catwalk
470 each TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $30,000
Generator muffler exhaust insulation Mechanical room by cafeteria 310 SF TSI Friable 2 O&M; Remove at renovation or demolition 6 No damage $14,000
9” vinyl floor tile and black mastic 118, 118 B-G, 122 A-D, 123 A-C, 134C, 139, 139A, 142, 3,280 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $32,000
12” vinyl floor tile and black mastic 137, 137A-E 920 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $2,400
Transite cement panels Exterior soffits around building perimeter 1,320 SF MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $13,200
Flexible fabric duct connectors Catwalk mechanical platforms 4 each MISC Non-friable 1 O&M; Remove at renovation or demolition 7 No damage $2,000
TOTALS $0 $93,600
Removal Cost Estimate % Breakdown:
Labor = 70%
Materials/Disposal = 20%
APPENDIX C
PHOTOGRAPHS OF ASBESTOS MATERIALS
Photo 19-1
Pipe Insulation
Photo 19-2
Drywall mud/joint compound
Photo 19-3
12” gray floor tile (neg. mastic)
Photo 22-1 Pipe insulation
Photo 22-2
9” vinyl floor tile and mastic
Photo 22-3
Black mastic under negative 12” floor tile
Photo 22-4 Exterior concrete and brick paint
Photo 22-5
Exterior window caulk and glazing
Building 25 – Greenhouse
Photo 25-1
Transite cement flower bed frames
Photo 25-2
Transite cement flower bed frames and bottoms
Building 49 – Chapel
Photo 49-1
Contaminated soils in crawl space (covered with polyethylene sheeting)
Photo 49-2
Photo 58-1
Pipe insulation on straight runs and elbows in crawl space
Photo 58-2 runs and elbows in attic
Photo 58-3
Paper duct seam tape over fiberglass ducts in attic
Photo 58-4
Photo 58-5
9” vinyl floor tile and black mastic
Photo 58-6
12” vinyl floor tile and black
Photo 58-7
Exterior caulk on univent intake grilles
Photo 58-8
Mud fittings and hangers on fiberglass and black stryofoam insulated pipes
Photo 58-9
Paper duct seam tape over fiberglass ducts above ceiling tile in hallway on 1st floor
Photo 58-10
Black mastic on bottom of sink
Photo 64-1
Pipe insulation
Photo 64-2
Photo 64-3 Door frame caulk
Photo 64-4 Brown linoleum sheet flooring and mastic
Photo 69-1
Photo 69-2
Photo 69-3
Photo 69-4 Exterior concrete and brick paint
Building 72 – Maintenance
Photo 72-1 runs and elbows
Photo 72-2
Window caulking and glazing
Photo 72-3
Exterior door frame caulk
Photo 72-4
12” vinyl floor tile (negative mastic)
Photo 98-1
Photo 98-2
Mud fittings on fiberglass insulated pipes
Photo 98-3
Residual ACM debris on pipe fittings reinsulated with black foam rubber
Photo 98-4
Photo 98-5
Photo 98-6
Exterior caulk on univent intake grilles
Photo 98-7
Generator exhaust muffler insulation
Photo 101-1
Pipe insulation (mud fittings on fiberglass insulated lines)
Photo 101-2
Drywall joint compound
Photo 101-3
Exterior window caulking and
Photo 102-1
Photo 102-2
Exterior window caulking and
Photo 103-1
Photo 104-1
Photo 104-2
Generator muffler exhaust insulation in mechanical room
Photo 104-3
9” vinyl floor tile and black
Photo 104-4
Photo 104-5
Transite cement panels
Photo 104-6 Flexible fabric duct connectors
Photo 104-7 in catwalk
APPENDIX D
2018 ASBESTOS LABORATORY REPORTS
Approved by:
Approved Signatory Balu Krishnan
Report for:
Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566
Regarding: Project: Danville VAMC - Danville, IL; Asbestos Reinspection
EML ID: 2037580
All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the items tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.
EMLab P&K ("the Company") shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.
Dates of Analysis:
Asbestos PLM: 11-08-2018 and 11-09-2018
Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S-1267)
EMLab ID: 2037580, Page 1 of 20EMLab P&K, LLC
EMLab P&K 3000 Lincoln Drive East, Suite A, Marlton, NJ 08053
(866) 871-1984 Fax (856) 334-1040 www.emlab.com Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC - Danville, IL; Asbestos Reinspection
Date of Sampling: 10-29-2018 Date of Receipt: 11-06-2018 Date of Report: 11-09-2018
ASBESTOS PLM REPORT
Total Samples Submitted: 74 Total Samples Analyzed: 74
Total Samples with Layer Asbestos Content > 1%: 11
Location: 1, Danville VAMC Lab ID-Version‡: 9615207-1
Sample Layers Asbestos Content Tan Texture Paint, Layered with White ND
Sample Composite Homogeneity: Good
Location: 2, Danville VAMC Lab ID-Version‡: 9615208-1
Sample Layers Asbestos Content Orange Floor Tile ND
Yellow Mastic ND Black Mastic ND
Sample Composite Homogeneity: Good
Location: 3, Danville VAMC Lab ID-Version‡: 9615209-1
Sample Layers Asbestos Content Beige Tile ND
Brown Mastic ND Gray Mud ND
Sample Composite Homogeneity: Good
Location: 4, Danville VAMC Lab ID-Version‡: 9615210-1
Sample Layers Asbestos Content Beige Cementitious Material Tile ND
Sample Composite Homogeneity: Good
EMLab ID: 2037580, Page 2 of 20EMLab P&K, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by any agency of the federal government. EMLab P&K reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.
‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".
(866) 871-1984 Fax (856) 334-1040 www.emlab.com Client: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC - Danville, IL; Asbestos Reinspection
Date of Sampling: 10-29-2018 Date of Receipt: 11-06-2018 Date of Report: 11-09-2018
ASBESTOS PLM REPORT
Location: 5, Danville VAMC Lab ID-Version‡: 9615211-1
Sample Layers Asbestos Content Beige Cementitious Material Tile with Green Coating ND
Sample Composite Homogeneity: Good
Location: 6, Danville VAMC Lab ID-Version‡: 9615212-1
Sample Layers Asbestos Content Gray Cementitious Material ND
White Texture with Green Paint ND Beige Cementitious Material ND
Composite Non-Asbestos Content: 2% Cellulose Sample Composite Homogeneity: Good
Location: 7, Danville VAMC Lab ID-Version‡: 9615213-1
Sample Layers Asbestos Content Gray Plaster ND
White Drywall with Brown Paper w/Tan Paint ND Composite Non-Asbestos Content: 10% Cellulose Sample Composite Homogeneity: Good
Location: 8, Danville VAMC Lab ID-Version‡: 9615214-1
Sample Layers Asbestos Content Beige Floor Tile ND Tan Floor Tile 4% Chrysotile Yellow Mastic ND
Gray Grout ND Composite Non-Asbestos Content: 2% Cellulose Sample Composite Homogeneity: Good
EMLab ID: 2037580, Page 3 of 20EMLab P&K, LLC
The test report shall not be reproduced except in full, without written approval of the laboratory.
This is the start of the file's text. The full file is on GovTribe.