Amendement 2- RFI-6 695-23-103 VA Milwaukee B5 Roof - BID - Vol5 Appendices.pdf
PDF 19 MB Posted
- Attached to
- Z1DA--Replace Bldg. 5 Roof 695-23-103
- Solicitation number
- 36C25224B0008
About this file
This document is an Amendment to a Request for Information (RFI) for the replacement of the roof on Building 5 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project scope includes the removal and replacement of the existing asphalt shingle gambrel roof, low-slope EPDM membrane roof, associated flashing, gutters, and deteriorated second-floor decking. The project duration is 255 calendar days, with pre-construction and post-substantial completion phases. Key requirements include submission of the Accident Prevention Plan, Construction Schedule, Infection Control Plan, and other administrative documents within specified timeframes. The solicitation number is 36C25224B0008, and the project is being procured by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. No pricing information or set-aside requirements are provided in this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2- RFI 6- Hazardous Material report.pdf | ||
| S05 - Pre-Bid RFIs 695-23-103 final.xlsx | XLSX spreadsheet | |
| 36C25224B0008 0002.docx | DOCX document | |
| Amedment 2-RFI-1 695-23-103 Replace B5 Roof - RFI 01 response.pdf | ||
| Site Visit 061224.pdf | ||
| 36C25224B0008 0001.docx | DOCX document | |
| 36C25224B0008.docx | DOCX document | |
| S02 - 6c- 695-23-103 Drawings 2.pdf | ||
| S02 - 6a- 695-23-103 Specifications.pdf | ||
| S02 - Wage Determination 3.14.24.pdf | ||
| S02 - 6b- 695-23-103 Drawings 1.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Milwaukee
Replace Building 5 Roof Volume 5 – Appendices
50000 W National Avenue Milwaukee, WI 53295
Alliance|7GAE JV Project No. 222175 VA Project No. 695-23-103
Bid Documents – March 8, 2024
This page intentionally left blank
Report prepared for:
VAMC Milwaukee
50000 W National Avenue Milwaukee, WI 53295
VA Project: 695-23-103
Prepared by:
Alliance 7GAE Joint Venture
600 E. Michigan Avenue, Suite B Kalamazoo, MI 49007
P: 269.927.0144
In consultation with:
ARC Environmental
Nehil Sivak
TABLE OF CONTENTS
VOLUME 1 | DESIGN NARRATIVE
1.1 Executive Summary
1.2 Site and Landscape Narrative
1.3 Structural Narrative
1.4 Architectural Narrative
1.5 Environmental Narrative
VOLUME 2 | SPECIFICATIONS
VOLUME 3 | SCHEMATIC DESIGN DRAWINGS
VOLUME 4 | COST ESTIMATE.
VOLUME 5 | APPENDICES
A. Structural Calculations and Shoring Plan B. QA/QC Plan and Checklist C. Submittal Register D. Meeting Minutes E. Deliverables Schedule and Phasing Plan F. Hazardous Materials Report
APPENDIX A
STRUCTURAL CALCULATIONS AND
SHORING PLAN
Milwaukee, WI
Engineering Calculations
June 19, 2023
Nehil-Sivak Project No. 6559
Prepared by Thomas A. Palarz, Jr.
Wisconsin PE 45433-6 tpala Model
Basis of Design
Applicable Codes
State of Wisconsin Building Code
Interna�onal Building Code (IBC) 2015
ASCE 7 – 10
Na�onal Design Standard (NDS) 2012
Design Loads
Roof dead load = 8 psf
Roof live load = 20 psf
Roof snow load = 23 psf plus dri+ing
Roof wind load = -18 psf (joists)
+14 psf (joists)
-15 psf (beams)
12 psf (beams)
Deck dead load = 5 psf
Deck live load = 75 psf
Deck snow load = 23 psf
Deck wind load = -18 psf (joists)
+14 psf (joists)
-15 psf (beams)
12 psf (beams)
Exis�ng roof framing above decks and deck framing was field measured, with the excep�on of the roof framing above the central enclosed area. Finishes prevented viewing this area. This area will need to be opened up for viewing and field measuring prior to comple�on of a structural analysis for this por�on of roof.
The roof and deck ledger connec�on to wall analysis is not complete since the actual wall construc�on is unknown. Exploratory demoli�on is required to expose the wall system.
Special inspec�ons are not required with this scope of work falling under the category of Light Framed
Construc�on. However, the framing and connec�ons will be reviewed by the EOR.
Roof Loads
3 psf membrane
5 psf decking
TOTAL 8 psf DL
TOTAL 22.7 psf Pf Roof Snow - Base
42 psf Roof Snow - Drift Max (w=9.5')
TOTAL 20 psf LL
ROOF JOIST LOADING
Base Drift
MARK SPACING DL Snow Snow LL feet plf plf plf plf
RJ1 1.7 13.7 38.8 71.8 34.2
RJ2 1.7 13.7 38.8 71.8 34.2
RJ3 1.7 13.7 38.8 71.8 34.2
ROOF BEAM LOADING
MARK Tributary Base Drift
Width DL* Snow Snow LL feet plf plf plf plf
RB1 10.0 100 227 420 200
RB2 11.5 115 261 483 230
RB3 11.0 110 250 462 220
RB4 11.5 115 261 483 230
RB5 6.0 60 136 252 120
RB6 4 40 91 168 80 max
RB7 10 100 227 420 200
RB8 11.5 115 261 483 230
RB9 11 110 250 462 220
RB10 11.5 115 261 483 230
RB11 6 60 136 252 120
RB12 4 40 91 168 80 max
* denotes 2 psf added for joist dead load
2nd Level Loads
5 psf decking
TOTAL 5 psf DL
TOTAL 22.7 psf Pf Roof Snow
TOTAL 50 psf LL
DECK JOIST LOADING
MARK SPACING DL LL Snow feet plf plf plf
2J1 1.7 8.6 85.5 38.8
2J2 1.7 8.6 85.5 38.8
2J3 1.3 6.7 66.5 30.2
DECK BEAM LOADING
MARK Tributary
Width DL* LL SL feet plf plf plf
2B1 10.0 70 500 227.0
2B2 11.5 81 575 261.1
2B3 11.0 77 550 249.7
2B4 11.5 81 575 261.1
2B5 6.0 42 300 136.2
2B6 4 28 200 90.8
2B7 10 70 500 227.0
2B8 11.5 81 575 261.1
2B9 11 77 550 249.7
2B10 11.5 81 575 261.1
2B11 6 42 300 136.2
2B12 4 28 200 90.8
* denotes 2 psf added for joist dead load
Post Loads Base Drift
Length DL Snow Snow LL Ry DL Ry SL Ry LL feet plf plf plf plf lbs lbs lbs
RB1 12 100 227 420 200 600 2900 1200
RB2 12 115 261 483 230 690 3300 1380
RB3 12 110 250 462 220 660 3200 1320
RB4 12 115 261 483 230 690 3300 1380
RB5 12 60 136 252 120 360 1700 720
RB6 11 40 91 168 80 220 800 440
RB7 12 100 227 420 200 600 2900 1200
RB8 12 115 261 483 230 690 3300 1380
RB9 12 110 250 462 220 660 3200 1320
RB10 12 115 261 483 230 690 3300 1380
RB11 12 60 136 252 120 360 1700 720
RB12 11 40 91 168 80 220 800 440
Length DL LL SL Ry DL Ry LL SL feet plf plf plf lbs lbs lbs
2B1 12 70 500 227 420 3000 1362
2B2 12 81 575 261 483 3450 1566
2B3 12 77 550 250 462 3300 1498
2B4 12 81 575 261 483 3450 1566
2B5 12 42 300 136 252 1800 817
2B6 11 28 200 91 154 1100 499
2B7 12 70 500 227 420 3000 1362
2B8 12 81 575 261 483 3450 1566
2B9 12 77 550 250 462 3300 1498
2B10 12 81 575 261 483 3450 1566
2B11 12 42 300 136 252 1800 817
2B12 11 28 200 91 154 1100 499 l)lrj. No
IVEIIIL.SfVAI( r,,-.j.Ne.,c V.t i-',,.r,.,-.r,._ CoNSfILTTNGSTRUCTTIRAIENGTNEERS E,-,gir]".. T%p llt'r icuttl Ilr' l':tr.1c ol
I ):rtt:
t",* lo^ls
P.l = 3o P!+
C" = O'4
Cu ' I'L J-. l@
DeaK L ood
I $viil,'g o o.&ar. L'r* LJ : 5o p6r
. LLu.ol.-- lrS*fe:75p,r+ il-i Sotrth llultlick Stlrct . K:rl:rrrnzoo. Ilir:higlrn i9OOr . I)horrr 2(r9.it'i-l--lt I I . Ir:lx 269 -ilt-i-.il I2
NErIIL. STVAI( CONSLI]TING STRUCTfTRAL ENGINEBRS
Proj. No. Page_of _ 0..i.
^o-.
Engineer Date
Itcvicu ccl Bv f):rtc
Canofi w# vali{*
P: L,(GC)
E.pr*4r. g
tr. = c.w-796 (o,rs)(t.r)(o,tsx t,t ( \ro)z= Zo *or+ frrynr' 3t>. ll - l A *StE 1 ts 3f I hr.: b' hr = tto' goilF arr+ = C l2-) C l,l') = Zo ,Ll €{ } I bca,..r *tt* = lL, x lZ, : lql C+L
GCf ia'it+ bo^ uPf,r" - a'7 -O.?5 l*"r,r - O,1 -0,65
UrL o,? o,L
(r",' b,wzgf hz k r l7l<rV, gor(f p = Zo (- or{) :
P: 2o ( 4,1) :
he*, p: zo (- o,1s) p: 2a {0 ,6} :
-f?ps*
14 pr*
: -15 f tL lz Pr* il-+Sotrth[]rrrclicl<Strrct'K:tlumuzoo.i\lichillanr9OO-'lrlronc2(r9.iu3-illl.lr:rx269.llJ-l-.lll2
I)r'oj. No.
1VEIIIL. SfVAI{ Proj Narnc CoNSLILTTNG STRUCTfiRAL ENGTNEERS Engineer llcr icu'ctl Lly
C-a*O+ rjoUl
R1 = [z])Cl,r,)6-n rr{ = -1ts3 *
E,*,. {ldrn)c t.-?)c I p,r) = 5r pq* ---o,6Grr3h) r s,6 (St) . - Bo* ,rt
C*,.rr t.^ R; (z'r,-X )2, ) ( -rEp*,.) : toao * Pro_ = gfl, .tr'z)[rrD = ]6, F (t n"r -- o,G (1o*o) + o,€( jd *-*\jtb
Page of
Date iliSotrthtJtrrclickStlcct.Krrl:rnruzoo.\lichi.gur-rlgOO-'[)lrotre2(r9-]l"Jj--illi'F'rLr21r9.i13-1-fll2
I)roj. No
IJngineer
I):rgc of
NEHIL. STVAI(
CONSIILTING STRUCTf]RA.L ENGINBERS
.d!-?,lr' 61,., ?& lSla * Sjtn' l3r{* i.,$ 6-r.}.,,t
Irro j. N:ulc
I)atc
I{tvicu'ccl E}r'
:-a i\.iaFT ffirP* i{
L D
GJ I3,q. u tt " &
Ll brrtr = tz) l3trul*, J\'
+l+ South fltrr-rlitk Strcct . KlLIurnlLzoo. ,\lichigen r9(X)- . I)honc 269 .jli-l-.il I I . I::tr,269.ltij-:lI l2
Dzrte
N
I I
I j
/ c+i{r, I
I
I
=h - I .b ' j j
-tj
*,1 tpala Text Box
RJ1
tpala Text Box
RJ2
tpala Text Box
RB1
tpala Text Box
RB2
tpala Text Box
RB3
tpala Text Box
RB4
tpala Text Box
RB5
tpala Text Box
RB6
Proj. No-
Fingincer
Pirge -- of
IVEIIIL . STVAI(
CONSI]LTING STRUCTf]RAL ENGINIEERS
5&''- 5rg h: tala' fr,,"f \n "<l-
I)nrj. \lttttc [ )utc:
I)utcllcvicsccl l)1
?tt -s
N1
,1.
L I)
6.
17rf*l- C.$lr*" rq*n %'Ffv llrr, nr'?!q' e 2r,5" Ay'}I
S\pJ fntll.U $r+'"1'rr' - yt. rohl € r,l j;
vb-* b'h - d"t u.t,"F J" +lr{ .11"d- I\7
3L
ToE""i5
I fru.\ g*€,h (rPL +t f'[. bk*,r Lr*," #-'pl ok I h*.i f"t &on"& h.rJ *l; i.,i ioi.d*v
Yi
I
I lrr i t
I
I
I t
I
I
Ln
*g *L.
{rru r lr Soutli Ilr-trclit'li Strcct ' Kltl:ttttltzrltl. Ilichiglrl i9OO- ' l'honc 2(r9 .1u-i--1 I I I ' Irxx 2(r9 .ili-i-.i I l2
-/--z rz'-b' tpala Text Box
RJ3
tpala Text Box
RJ3
tpala Text Box
RB7
tpala Text Box
RB8
tpala Text Box
RB9
tpala Text Box
RB10
tpala Text Box
RB11
tpala
RB12
I)roi. No.
IJnginccr
Pagc ()f
I\IEIIIL . STVAI(
CONSI,ILTING STRUCTLTRAL ENGINEERS
l?r3 "
I)rrrj. \:rnrc llcvics ccl []r [ )atc f"tt ffi
I J rr, l
{'l:l-z13 et; N i
\J, I
I
I
I
Ui
,l
E!? r f,L'
5'rr'n-\bl L3) l't* i'it' llrzo.l?t* ee,"(1 h, =ra)
)---rtt
2"a Fl""r EarY frt-)
't) u lrt
$o E,\
DIL
7tt J l'f
(k,^ f"1{1f - !rpl...
Prt
* k'*, {'W
Lf h f,*us- €*^ 5*,;* l.Jk'J I jo;r} <a t?4r4 d* i+; /} {a+hl
$ngL,iar* "fup,>+,U hr"#r" , i'T.. T6' i:*'it <o a.,ochy LrE Ln) ,Y','t fe*t l1,- Vru\jr? eult furf,,, f*r ioi"rs- fi. Wo*\il tni) q/,*'
Irs li u glts.,,13r*. - (p)1"8'* 1v/\- a\y4 16
+ l ., s. trrh ll r-rrcl icl< Srrcct . Kul:16ruz66. NI it l-r igurr igOO* . I)honc 2(r9 lli-l-.i l l 1 . l;:tr 2(r1) -iS-i-l l l2 tpala Text Box
DJ1
tpala Text Box
DJ2
tpala Text Box 2B1 tpala Text Box 2B2 tpala Text Box 2B3 tpala Text Box 2B4 tpala Text Box 2B5 tpala
2B6
1VEIIIL . SIVAI{
CONSTTLTING STRUCTf]RA,L ENGMIEBRS
Proj. No.
IJngineer-
Pzrge of I)roj. Nelrc
Revicwccl By
I)atc
I).rtc t j I l
I I j
I
I
I
I
7.'a Ft**
ILLT
r{ K*i N.{l
- l!,4)5 Lt". rlqd, ab.
vl rll/to\^ w*"1 ufit* {non.i./*rr hcn,r" h*.t
G) I,iF.la:$, e VJ';^ 'ni iliSouthllr-rr<lickStrcct'Kulanurzoo.\,lichigar-r-i9OO-.i'honc2(r9.i13.1-.l 1ll.li.rx2(r9ili-l--1 11-2
, .tl).' ,'l
I h.D'-L' fu*u
A {1 U
L b srt r,f[ f-,, tpala Text Box 2B7 tpala Text Box 2B8 tpala Text Box 2B9 tpala Text Box 2B10 tpala Text Box 2B11 tpala Text Box 2B12 tpala
DJ3
ASCE 7-16 Snow Loads LIC# : KW-06015551, Build:20.22.12.28 NEHIL-SIVAK (c) ENERCALC INC 1983-2022
DESCRIPTION: Lower roof drift loading
VA Milwaukee
Project File: VA Milwaukee.ec6
Snow Drifts on Lower Roofs Description : Deck Roof per ASCE 7-16, Chapter 7
Balanced Snow Load 21.00
30.00 psfGround Snow Load
44.00 ftlu - upper hd : leeward 2.32 ft hd : windward 1.08 ft hd : Max 2.32 ft hd : Design 2.32 ft pd : Max Drift Only 41.49 psf pd + Balanced 62.49 psf W : Drift Width 9.27 ft
Total Snow Load @ End of Drift psf21.00 lu-lower 12.00 ft
10.00 ft pcf Height of Roof Step Snow Density 17.90 hb : Balanced 1.17 ft
8.83 fthc : Step Height - hb 7.52 1.00 hc / hb psf
Importance Factor
Wood Beam
DESCRIPTION: Roof Joist RJ1
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.0140, Lr = 0.0350, S = 0.0390 , Tributary Width = 1.0 ft, (base loads) Uniform Load : S = 0.0720 , Tributary Width = 1.0 ft
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.706: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 6.000ft
112.91 psi=
1,127.43psi
1.625 X 5.750Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 1.625 X 5.750 Maximum Shear Stress Ratio 0.727 : 1
0.000 ft=
3,050.44psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 1.839 in 78Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 2.096 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.423 0.114 0.90 1.100 1.151.00 1.00 0.28 372.9 882.3 0.09 121.51.00 13.81.00 1.00+D+Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.993 0.267 1.25 1.100 1.151.00 1.00 0.91 1,217.2 1,225.5 0.28 168.81.00 45.11.00 1.00+D+S 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.706 0.727 1.15 1.100 1.151.00 1.00 2.28 3,050.4 1,127.4 0.70 155.31.00 112.91.00 1.00+D+0.750Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.821 0.221 1.25 1.100 1.151.00 1.00 0.75 1,006.1 1,225.5 0.23 168.81.00 37.21.00 1.00+D+0.750S 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00
DESCRIPTION: Roof Joist RJ1
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 2.112 0.568 1.15 1.100 1.151.00 1.00 1.78 2,381.0 1,127.4 0.55 155.31.00 88.11.00 1.00+0.60D 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.143 0.038 1.60 1.100 1.151.00 1.00 0.17 223.7 1,568.6 0.05 216.01.00 8.31.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 2.0956 6.044 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.759 0.759 Max Upward from Load Combinations 0.759 0.759 Max Upward from Load Cases 0.666 0.666 D Only 0.093 0.093 +D+Lr 0.303 0.303 +D+S 0.759 0.759 +D+0.750Lr 0.250 0.250 +D+0.750S 0.592 0.592 +0.60D 0.056 0.056 Lr Only 0.210 0.210 S Only 0.666 0.666
DESCRIPTION: Roof Joist RJ2
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.0140, Lr = 0.0350, S = 0.0390 , Tributary Width = 1.0 ft, (base loads) Uniform Load : S = 0.0720 , Tributary Width = 1.0 ft
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 1.546: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 6.125ft
80.49 psi=
1,127.43psi
1.750 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 1.750 X 7.50 Maximum Shear Stress Ratio 0.518 : 1
11.669 ft=
1,743.10psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.836 in 175Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.957 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.250 ft 1 0.250 0.084 0.90 1.100 1.151.00 1.00 0.30 220.2 882.3 0.09 121.51.00 10.21.00 1.00+D+Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.250 ft 1 0.572 0.192 1.25 1.100 1.151.00 1.00 0.96 700.4 1,225.5 0.28 168.81.00 32.31.00 1.00+D+S 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.250 ft 1 1.546 0.518 1.15 1.100 1.151.00 1.00 2.38 1,743.1 1,127.4 0.70 155.31.00 80.51.00 1.00+D+0.750Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.250 ft 1 0.474 0.159 1.25 1.100 1.151.00 1.00 0.79 580.3 1,225.5 0.23 168.81.00 26.81.00
DESCRIPTION: Roof Joist RJ2
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.250 ft 1 1.208 0.405 1.15 1.100 1.151.00 1.00 1.86 1,362.4 1,127.4 0.55 155.31.00 62.91.00 1.00+0.60D 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.250 ft 1 0.084 0.028 1.60 1.100 1.151.00 1.00 0.18 132.1 1,568.6 0.05 216.01.00 6.11.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 0.9567 6.170 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.778 0.778 Max Upward from Load Combinations 0.778 0.778 Max Upward from Load Cases 0.680 0.680 D Only 0.098 0.098 +D+Lr 0.313 0.313 +D+S 0.778 0.778 +D+0.750Lr 0.259 0.259 +D+0.750S 0.608 0.608 +0.60D 0.059 0.059 Lr Only 0.214 0.214 S Only 0.680 0.680
DESCRIPTION: Roof Joist RJ3
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.0140, Lr = 0.0350, S = 0.0390 , Tributary Width = 1.0 ft, (base loads) Uniform Load : S = 0.0720 , Tributary Width = 1.0 ft
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 1.587: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 6.000ft
81.53 psi=
1,127.43psi
1.750 X 7.250Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 1.750 X 7.250 Maximum Shear Stress Ratio 0.525 : 1
0.000 ft=
1,789.06psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.852 in 168Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.975 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.255 0.084 0.90 1.100 1.151.00 1.00 0.29 225.1 882.3 0.09 121.51.00 10.31.00 1.00+D+Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.586 0.194 1.25 1.100 1.151.00 1.00 0.92 718.3 1,225.5 0.28 168.81.00 32.71.00 1.00+D+S 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.587 0.525 1.15 1.100 1.151.00 1.00 2.29 1,789.1 1,127.4 0.69 155.31.00 81.51.00 1.00+D+0.750Lr 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.486 0.161 1.25 1.100 1.151.00 1.00 0.76 595.0 1,225.5 0.23 168.81.00 27.11.00
DESCRIPTION: Roof Joist RJ3
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.240 0.410 1.15 1.100 1.151.00 1.00 1.79 1,398.1 1,127.4 0.54 155.31.00 63.71.00 1.00+0.60D 1.100 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.086 0.028 1.60 1.100 1.151.00 1.00 0.17 135.1 1,568.6 0.05 216.01.00 6.21.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 0.9748 6.044 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.762 0.762 Max Upward from Load Combinations 0.762 0.762 Max Upward from Load Cases 0.666 0.666 D Only 0.096 0.096 +D+Lr 0.306 0.306 +D+S 0.762 0.762 +D+0.750Lr 0.253 0.253 +D+0.750S 0.595 0.595 +0.60D 0.058 0.058 Lr Only 0.210 0.210 S Only 0.666 0.666
DESCRIPTION: Roof Beam RB1
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.10, Lr = 0.20, S = 0.2270 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.420->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.215: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
114.82 psi=
980.38psi
5.250 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 5.250 X 7.50 Maximum Shear Stress Ratio 0.740 : 1
0.000 ft=
2,171.21psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.892 in 161Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.137 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.607 0.179 0.90 1.100 1.001.00 1.00 1.91 465.8 767.3 0.57 121.51.00 21.81.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.261 0.372 1.25 1.100 1.001.00 1.00 5.51 1,343.5 1,065.6 1.65 168.81.00 62.81.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.215 0.740 1.15 1.100 1.001.00 1.00 8.91 2,171.2 980.4 3.01 155.31.00 114.81.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.055 0.311 1.25 1.100 1.001.00 1.00 4.61 1,124.1 1,065.6 1.38 168.81.00 52.61.00 1.00+D+0.750S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00
DESCRIPTION: Roof Beam RB1
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.779 0.590 1.15 1.100 1.001.00 1.00 7.15 1,744.1 980.4 2.40 155.31.00 91.61.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.205 0.061 1.60 1.100 1.001.00 1.00 1.15 279.5 1,364.0 0.34 216.01.00 13.11.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.1372 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.467 2.525 Max Upward from Load Combinations 3.467 2.525 Max Upward from Load Cases 2.831 1.888 D Only 0.637 0.637 +D+Lr 1.837 1.837 +D+S 3.467 2.525 +D+0.750Lr 1.537 1.537 +D+0.750S 2.760 2.053 +0.60D 0.382 0.382 Lr Only 1.200 1.200 S Only 2.831 1.888
DESCRIPTION: Roof Beam RB2
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.1150, Lr = 0.230, S = 0.260 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.480->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.533: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
131.30 psi=
980.38psi
5.250 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 5.250 X 7.50 Maximum Shear Stress Ratio 0.846 : 1
0.000 ft=
2,483.16psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 1.021 in 141Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.301 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.693 0.205 0.90 1.100 1.001.00 1.00 2.18 531.6 767.3 0.65 121.51.00 24.91.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.446 0.427 1.25 1.100 1.001.00 1.00 6.32 1,541.0 1,065.6 1.89 168.81.00 72.11.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.533 0.846 1.15 1.100 1.001.00 1.00 10.18 2,483.2 980.4 3.45 155.31.00 131.31.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.209 0.357 1.25 1.100 1.001.00 1.00 5.29 1,288.7 1,065.6 1.58 168.81.00 60.31.00
DESCRIPTION: Roof Beam RB2
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 2.034 0.674 1.15 1.100 1.001.00 1.00 8.18 1,994.4 980.4 2.75 155.31.00 104.71.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.234 0.069 1.60 1.100 1.001.00 1.00 1.31 319.0 1,364.0 0.39 216.01.00 14.91.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.3006 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.965 2.889 Max Upward from Load Combinations 3.965 2.889 Max Upward from Load Cases 3.238 2.162 D Only 0.727 0.727 +D+Lr 2.107 2.107 +D+S 3.965 2.889 +D+0.750Lr 1.762 1.762 +D+0.750S 3.156 2.348 +0.60D 0.436 0.436 Lr Only 1.380 1.380 S Only 3.238 2.162
DESCRIPTION: Roof Beam RB3
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.110, Lr = 0.220, S = 0.2550 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.460->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.453: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
127.04 psi=
980.38psi
5.250 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 5.250 X 7.50 Maximum Shear Stress Ratio 0.818 : 1
0.000 ft=
2,405.30psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.992 in 145Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.260 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.664 0.196 0.90 1.100 1.001.00 1.00 2.09 509.7 767.3 0.63 121.51.00 23.81.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.384 0.409 1.25 1.100 1.001.00 1.00 6.05 1,475.2 1,065.6 1.81 168.81.00 69.01.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.453 0.818 1.15 1.100 1.001.00 1.00 9.87 2,405.3 980.4 3.33 155.31.00 127.01.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.158 0.342 1.25 1.100 1.001.00 1.00 5.06 1,233.8 1,065.6 1.51 168.81.00 57.71.00
DESCRIPTION: Roof Beam RB3
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.969 0.652 1.15 1.100 1.001.00 1.00 7.92 1,930.6 980.4 2.66 155.31.00 101.21.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.224 0.066 1.60 1.100 1.001.00 1.00 1.25 305.8 1,364.0 0.38 216.01.00 14.31.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.2600 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.835 2.803 Max Upward from Load Combinations 3.835 2.803 Max Upward from Load Cases 3.138 2.107 D Only 0.697 0.697 +D+Lr 2.017 2.017 +D+S 3.835 2.803 +D+0.750Lr 1.687 1.687 +D+0.750S 3.051 2.277 +0.60D 0.418 0.418 Lr Only 1.320 1.320 S Only 3.138 2.107
DESCRIPTION: Roof Beam RB4
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.1160, Lr = 0.230, S = 0.2610 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.480->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.542: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
131.71 psi=
980.38psi
5.250 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 5.250 X 7.50 Maximum Shear Stress Ratio 0.848 : 1
0.000 ft=
2,491.87psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 1.023 in 140Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.305 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.699 0.206 0.90 1.100 1.001.00 1.00 2.20 536.0 767.3 0.66 121.51.00 25.11.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.450 0.428 1.25 1.100 1.001.00 1.00 6.34 1,545.4 1,065.6 1.90 168.81.00 72.31.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.542 0.848 1.15 1.100 1.001.00 1.00 10.22 2,491.9 980.4 3.46 155.31.00 131.71.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.213 0.358 1.25 1.100 1.001.00 1.00 5.30 1,293.1 1,065.6 1.59 168.81.00 60.51.00
DESCRIPTION: Roof Beam RB4
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 2.042 0.677 1.15 1.100 1.001.00 1.00 8.21 2,002.0 980.4 2.76 155.31.00 105.11.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.236 0.070 1.60 1.100 1.001.00 1.00 1.32 321.6 1,364.0 0.39 216.01.00 15.01.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.3052 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.977 2.901 Max Upward from Load Combinations 3.977 2.901 Max Upward from Load Cases 3.244 2.168 D Only 0.733 0.733 +D+Lr 2.113 2.113 +D+S 3.977 2.901 +D+0.750Lr 1.768 1.768 +D+0.750S 3.166 2.359 +0.60D 0.440 0.440
S Only 3.244 2.168
DESCRIPTION: Roof Beam RB5
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.060, Lr = 0.120, S = 0.140 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.250->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 1.353: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.518ft
69.95 psi=
980.38psi
5.250 X 7.50Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 5.250 X 7.50 Maximum Shear Stress Ratio 0.451 : 1
0.000 ft=
1,326.56psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.542 in 265Ratio = >=240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.695 in Ratio = >=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.378 0.112 0.90 1.100 1.001.00 1.00 1.19 290.3 767.3 0.36 121.51.00 13.61.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.767 0.226 1.25 1.100 1.001.00 1.00 3.35 816.9 1,065.6 1.00 168.81.00 38.21.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.353 0.451 1.15 1.100 1.001.00 1.00 5.44 1,326.6 980.4 1.84 155.31.00 70.01.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.643 0.190 1.25 1.100 1.001.00 1.00 2.81 685.2 1,065.6 0.84 168.81.00 32.01.00
DESCRIPTION: Roof Beam RB5
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.088 0.360 1.15 1.100 1.001.00 1.00 4.38 1,067.0 980.4 1.47 155.31.00 55.91.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.128 0.038 1.60 1.100 1.001.00 1.00 0.71 174.2 1,364.0 0.21 216.01.00 8.11.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 0.6950 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 2.111 1.550 Max Upward from Load Combinations 2.111 1.550 Max Upward from Load Cases 1.714 1.153 D Only 0.397 0.397 +D+Lr 1.117 1.117 +D+S 2.111 1.550 +D+0.750Lr 0.937 0.937 +D+0.750S 1.682 1.262 +0.60D 0.238 0.238 Lr Only 0.720 0.720 S Only 1.714 1.153
DESCRIPTION: Roof Beam RB6
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Load for Span Number 1
Varying Uniform Load : D= 0.0290->0.0, Lr= 0.060->0.0, S= 0.0910->0.0 k/ft, Extent = 0.0 -->> 11.0 ft, Trib Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.120->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 1.011: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 4.536ft
73.51 psi=
980.38psi
2x10Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 2x10 Maximum Shear Stress Ratio 0.473 : 1
0.000 ft=
990.67psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.294 in 448Ratio = >=240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.345 in Ratio = >=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 11.0 ft 1 0.188 0.085 0.90 1.100 1.001.00 1.00 0.26 144.3 767.3 0.10 121.51.00 10.31.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 11.0 ft 1 0.381 0.174 1.25 1.100 1.001.00 1.00 0.72 405.5 1,065.6 0.27 168.81.00 29.31.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 11.0 ft 1 1.011 0.473 1.15 1.100 1.001.00 1.00 1.77 990.7 980.4 0.68 155.31.00 73.51.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00
DESCRIPTION: Roof Beam RB6
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 11.0 ft 1 0.319 0.145 1.25 1.100 1.001.00 1.00 0.61 340.2 1,065.6 0.23 168.81.00 24.61.00 1.00+D+0.750S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 11.0 ft 1 0.795 0.372 1.15 1.100 1.001.00 1.00 1.39 779.0 980.4 0.53 155.31.00 57.71.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 11.0 ft 1 0.063 0.029 1.60 1.100 1.001.00 1.00 0.15 86.6 1,364.0 0.06 216.01.00 6.21.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 0.3449 5.259 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.858 0.396 Max Upward from Load Combinations 0.858 0.396 Max Upward from Load Cases 0.740 0.331 D Only 0.118 0.065 +D+Lr 0.338 0.175 +D+S 0.858 0.396 +D+0.750Lr 0.283 0.148 +D+0.750S 0.673 0.313 +0.60D 0.071 0.039 Lr Only 0.220 0.110 S Only 0.740 0.331
DESCRIPTION: Roof Beam RB7
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.10, Lr = 0.20, S = 0.2272 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.420->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.058: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
100.62 psi=
980.38psi
6.50 X 7.0Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 6.50 X 7.0 Maximum Shear Stress Ratio 0.648 : 1
0.000 ft=
2,017.81psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.887 in 162Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.132 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.568 0.158 0.90 1.100 1.001.00 1.00 1.93 435.8 767.3 0.58 121.51.00 19.21.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.173 0.326 1.25 1.100 1.001.00 1.00 5.53 1,249.6 1,065.6 1.67 168.81.00 55.01.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.058 0.648 1.15 1.100 1.001.00 1.00 8.93 2,017.8 980.4 3.05 155.31.00 100.61.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.982 0.273 1.25 1.100 1.001.00 1.00 4.63 1,046.2 1,065.6 1.40 168.81.00 46.01.00
DESCRIPTION: Roof Beam RB7
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.654 0.517 1.15 1.100 1.001.00 1.00 7.17 1,621.6 980.4 2.43 155.31.00 80.31.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.192 0.053 1.60 1.100 1.001.00 1.00 1.16 261.5 1,364.0 0.35 216.01.00 11.51.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.1324 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.474 2.532 Max Upward from Load Combinations 3.474 2.532 Max Upward from Load Cases 2.832 1.890 D Only 0.643 0.643 +D+Lr 1.843 1.843 +D+S 3.474 2.532 +D+0.750Lr 1.543 1.543 +D+0.750S 2.766 2.060 +0.60D 0.386 0.386 Lr Only 1.200 1.200 S Only 2.832 1.890
DESCRIPTION: Roof Beam RB8
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.1150, Lr = 0.230, S = 0.260 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.480->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.352: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
115.00 psi=
980.38psi
6.50 X 7.0Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 6.50 X 7.0 Maximum Shear Stress Ratio 0.741 : 1
0.000 ft=
2,306.24psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 1.014 in 142Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.294 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.648 0.180 0.90 1.100 1.001.00 1.00 2.20 496.8 767.3 0.66 121.51.00 21.91.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.344 0.374 1.25 1.100 1.001.00 1.00 6.34 1,432.7 1,065.6 1.91 168.81.00 63.01.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.352 0.741 1.15 1.100 1.001.00 1.00 10.20 2,306.2 980.4 3.49 155.31.00 115.01.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.125 0.313 1.25 1.100 1.001.00 1.00 5.30 1,198.7 1,065.6 1.60 168.81.00 52.71.00
DESCRIPTION: Roof Beam RB8
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.890 0.591 1.15 1.100 1.001.00 1.00 8.20 1,853.1 980.4 2.78 155.31.00 91.71.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.219 0.061 1.60 1.100 1.001.00 1.00 1.32 298.1 1,364.0 0.40 216.01.00 13.11.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.2943 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.971 2.894 Max Upward from Load Combinations 3.971 2.894 Max Upward from Load Cases 3.238 2.162 D Only 0.733 0.733 +D+Lr 2.113 2.113 +D+S 3.971 2.894 +D+0.750Lr 1.768 1.768 +D+0.750S 3.161 2.354 +0.60D 0.440 0.440
DESCRIPTION: Roof Beam RB9
VA Milwaukee
Project File: VA Milwaukee.ec6
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set : IBC 2021
Material Properties
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Eastern White Pine No.1
775.0 775.0
1,000.0 350.0
1,100.0 400.0
135.0
350.0 22.470
Analysis Method :
Eminbend - xx ksi Wood Species :
Wood Grade :
Fb + psi psi
Fv psi
Fb -
Ft psi
Fc - Prll psi psiFc - Perp
E : Modulus of Elasticity Ebend- xx ksi
Density pcf
Load Combination : IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading Uniform Load : D = 0.110, Lr = 0.230, S = 0.250 , Tributary Width = 1.0 ft, (base loads) Varying Uniform Load : S= 0.480->0.0 k/ft, Extent = 0.0 -->> 9.50 ft, Trib Width = 1.0 ft, (Drift)
.DESIGN SUMMARY Design N.G.
Maximum Bending Stress Ratio 2.291: 1
Load Combination +D+S
Span # where maximum occurs Span # 1 Location of maximum on span 5.474ft
112.31 psi=
980.38psi
6.50 X 7.0Section used for this span
Span # where maximum occurs Location of maximum on span
Span # 1=
Load Combination +D+S
155.25 psi==
Section used for this span 6.50 X 7.0 Maximum Shear Stress Ratio 0.723 : 1
0.000 ft=
2,245.67psi
Maximum Deflection
0 <240
Ratio = 0 <180
Max Downward Transient Deflection 0.991 in 145Ratio = <240 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 1.260 in Ratio = <180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v
Span: 1 : S Only n/a Span: 1 : +D+S n/a
.Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
D Only 0.0 0.00 0.00.0 1.00Length = 12.0 ft 1 0.621 0.173 0.90 1.100 1.001.00 1.00 2.11 476.5 767.3 0.64 121.51.00 21.01.00 1.00+D+Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.325 0.368 1.25 1.100 1.001.00 1.00 6.25 1,412.4 1,065.6 1.88 168.81.00 62.11.00 1.00+D+S 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 2.291 0.723 1.15 1.100 1.001.00 1.00 9.93 2,245.7 980.4 3.41 155.31.00 112.31.00 1.00+D+0.750Lr 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 1.106 0.307 1.25 1.100 1.001.00 1.00 5.21 1,178.4 1,065.6 1.57 168.81.00 51.81.00
DESCRIPTION: Roof Beam RB9
VA Milwaukee
Project File: VA Milwaukee.ec6
Maximum Forces & Stresses for Load Combinations
Span # Moment ValuesLoad Combination
C iCLx CCCM CF rt
Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu
1.00Length = 12.0 ft 1 1.839 0.576 1.15 1.100 1.001.00 1.00 7.97 1,802.5 980.4 2.71 155.31.00 89.51.00 1.00+0.60D 1.100 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 12.0 ft 1 0.210 0.058 1.60 1.100 1.001.00 1.00 1.26 285.9 1,364.0 0.38 216.01.00 12.61.00
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections
+D+S 1 1.2598 5.912 0.0000 0.000
Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.881 2.804 Max Upward from Load Combinations 3.881 2.804 Max Upward from Load Cases 3.178 2.102 D Only 0.703 0.703 +D+Lr 2.083 2.083 +D+S 3.881 2.804…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .