This document is a price/cost schedule for a solicitation seeking water testing services at the Tomah VA Medical Center in Wisconsin. The solicitation includes line items for monthly, quarterly, and annual heterotrophic plate count, hardness/ionic contaminant, endotoxin, and total organic carbon testing over a base period and four option years. Additional line items cover emergency samples, validation testing, and a secure web-based reporting system. Testing is required at the Tomah VAMC and Wausau CBOC locations. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 12 and responses were due by August 28, 2023 at 12:00pm CDT. Pricing is requested for each CLIN to calculate an overall total price for the requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25223Q0892 0002.docx | DOCX document | |
| 36C25223Q0892 0001.docx | DOCX document | |
| 36C25223Q0892.docx | DOCX document | |
| P07 - Monroe County WI WD 15-4929 (Rev-23) dated 06.30.2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None Department of Veterans Affairs
GLAC (69D)
115 South 84th Street, Suite 101 Milwaukee
WI
53214-1476 Department of Veterans Affairs
GLAC-MILWAUKEE (69D)
Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee
WI
53214-1476 To all Offerors/Bidders
36C25223Q0892 08-24-2023
X X X
8/28/2023 AT 12:00 p.m. CDT See CONTINUATION Page X The purpose of this Amendment 0003:
1. Extend the deadline for submitting a quote for SPS Water Testing, Tomah, Wisconsin (See number 11).
2. Provide answers to clarification questions submitted by potential offerors.
3. Provide an updated Price/Cost Schedule based upon questions summitted by potential offerors.
All other items and conditions of the solicitation remain the same.
James R. Hedman Contracting Officer
CONTINUATION PAGE
AMENDMENT 0003 Updated Answers to Questions: 9, 10 and 11
| 9. The PWS states “Contractor shall provide for the use of secure password protected web-based reporting system by the Tomah VAMC, with history of reports maintained on vendor database and exportable as excel and pdf documents.” Will the VA provide for a separate contract line item the pricing of the web-based reporting system? The inclusion of this is at an additional cost to provide and maintain user accounts by the vendor and the VA should provide a means of pricing this service. |
| Cost/Price Schedule updated to include new line-items, 0011-0013, 1011-1013, 2011-2013, 3011-3013, 4011-4013. |
10. The PWS states at E.2.a.ii “VA requires monthly, quarterly, and annual source water samples for analysis plus 36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary.” The VA should include separate contract line items for any testing and analysis intended by this statement. The current contract line items do not clearly provide for this requirement. Please clarify.
Cost/Price Schedule updated to include new line-items, 0011-0013, 1011-1013, 2011-2013, 3011-3013, 4011-4013.
11. This does not appear to be a complete statement or sentence E.3.a “Validation Testing. In the event of critical water system repairs, replacement, or modifications, testing intervals”. Please clarify the intent of this incomplete sentence.
Cost/Price Schedule updated to include new line-items, 0011-0013, 1011-1013, 2011-2013, 3011-3013, 4011-4013.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 288.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) - 24 samples. Frequency of testing - Monthly.
Contract Period: Base POP Begin: 09-01-2023 POP End: 08-31-2024 PRINCIPAL NAICS CODE: 541380 - Testing Laboratories and Services PRODUCT/SERVICE CODE: H146 - Quality Control - Water Purification and Sewage Treatment Equipment
| 264.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) Tomah - 54 samples. Wausau CBOC - 12 samples. Frequency of testing -Quarterly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 40.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. SPS Hardness/Ionic Contaminants Panel - 10 samples each for 7 contaminants per panel. Frequency of testing - Quarterly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Limulus Amoebocyte Lysate (LAL)/Endotoxin - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Total Organic Carbon (TOC) - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 240.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) - Not to exceed 240 samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 132.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) Tomah - Not to exceed 108 samples per year. Wausau CBOC - Not to exceed 24 quarterly samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - SPS Hardness/Ionic Contaminants Panel - Not to exceed 50 samples each, for 7 contaminants per panel, per year. Frequency of testing - Monthly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Limulus Amoebocyte Lysate (LAL)/Endotoxin - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Total Organic Carbon (TOC) - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 1.00 |
| EA |
| __________________ |
| __________________ |
Secure password protected web-based reporting system
POP Begin: 09-01-2023 POP End: 08-31-2024
| 17.00 |
| EA |
| __________________ |
| __________________ |
Monthly, quarterly, and annual source water samples for analysis.
POP Begin: 09-01-2023 POP End: 08-31-2024
| 36.00 |
| EA |
| __________________ |
| __________________ |
36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary
POP Begin: 09-01-2023 POP End: 08-31-2024
| 288.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) - 24 samples. Frequency of testing - Monthly.
Contract Period: Option 1 POP Begin: 09-01-2024 POP End: 08-31-2025
| 264.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) Tomah - 54 samples. Wausau CBOC - 12 samples. Frequency of testing -Quarterly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 40.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. SPS Hardness/Ionic Contaminants Panel - 10 samples each for 7 contaminants per panel. Frequency of testing - Quarterly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Limulus Amoebocyte Lysate (LAL)/Endotoxin - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Total Organic Carbon (TOC) - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 240.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) - Not to exceed 240 samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 132.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) Tomah - Not to exceed 108 samples per year. Wausau CBOC - Not to exceed 24 quarterly samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - SPS Hardness/Ionic Contaminants Panel - Not to exceed 50 samples each, for 7 contaminants per panel, per year. Frequency of testing - Monthly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Limulus Amoebocyte Lysate (LAL)/Endotoxin - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Total Organic Carbon (TOC) - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 1.00 |
| EA |
| __________________ |
| __________________ |
Secure password protected web-based reporting system
POP Begin: 09-01-2024 POP End: 08-31-2025
| 17.00 |
| EA |
| __________________ |
| __________________ |
Monthly, quarterly, and annual source water samples for analysis.
POP Begin: 09-01-2024 POP End: 08-31-2025
| 36.00 |
| EA |
| __________________ |
| __________________ |
36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary
POP Begin: 09-01-2024 POP End: 08-31-2025
| 288.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) - 24 samples. Frequency of testing - Monthly.
Contract Period: Option 2 POP Begin: 09-01-2025 POP End: 08-31-2026
| 264.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) Tomah - 54 samples. Wausau CBOC - 12 samples. Frequency of testing -Quarterly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 40.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. SPS Hardness/Ionic Contaminants Panel - 10 samples each for 7 contaminants per panel. Frequency of testing - Quarterly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Limulus Amoebocyte Lysate (LAL)/Endotoxin - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Total Organic Carbon (TOC) - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 240.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) - Not to exceed 240 samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 132.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) Tomah - Not to exceed 108 samples per year. Wausau CBOC - Not to exceed 24 quarterly samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - SPS Hardness/Ionic Contaminants Panel - Not to exceed 50 samples each, for 7 contaminants per panel, per year. Frequency of testing - Monthly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Limulus Amoebocyte Lysate (LAL)/Endotoxin - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Total Organic Carbon (TOC) - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
Secure password protected web-based reporting system
POP Begin: 09-01-2025 POP End: 08-31-2026
| 17.00 |
| EA |
| __________________ |
| __________________ |
Monthly, quarterly, and annual source water samples for analysis.
POP Begin: 09-01-2025 POP End: 08-31-2026
| 3,600.00 |
| EA |
| __________________ |
| __________________ |
36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary
POP Begin: 09-01-2025 POP End: 08-31-2026
| 288.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) - 24 samples. Frequency of testing - Monthly.
Contract Period: Option 3 POP Begin: 09-01-2026 POP End: 08-31-2027
| 264.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) Tomah - 54 samples. Wausau CBOC - 12 samples. Frequency of testing -Quarterly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 40.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. SPS Hardness/Ionic Contaminants Panel - 10 samples each for 7 contaminants per panel. Frequency of testing - Quarterly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Limulus Amoebocyte Lysate (LAL)/Endotoxin - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Total Organic Carbon (TOC) - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 240.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) - Not to exceed 240 samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 132.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) Tomah - Not to exceed 108 samples per year. Wausau CBOC - Not to exceed 24 quarterly samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - SPS Hardness/Ionic Contaminants Panel - Not to exceed 50 samples each, for 7 contaminants per panel, per year. Frequency of testing - Monthly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Limulus Amoebocyte Lysate (LAL)/Endotoxin - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Total Organic Carbon (TOC) - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
Secure password protected web-based reporting system
POP Begin: 09-01-2026 POP End: 08-31-2027
| 17.00 |
| EA |
| __________________ |
| __________________ |
Monthly, quarterly, and annual source water samples for analysis.
POP Begin: 09-01-2026 POP End: 08-31-2027
| 36.00 |
| EA |
| __________________ |
| __________________ |
36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary
POP Begin: 09-01-2026 POP End: 08-31-2027
| 288.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) - 24 samples. Frequency of testing - Monthly.
Contract Period: Option 4 POP Begin: 09-01-2027 POP End: 08-31-2028
| 264.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Heterotrophic Plate Counts (HPC) Tomah - 54 samples. Wausau CBOC - 12 samples. Frequency of testing -Quarterly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 40.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. SPS Hardness/Ionic Contaminants Panel - 10 samples each for 7 contaminants per panel. Frequency of testing - Quarterly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Limulus Amoebocyte Lysate (LAL)/Endotoxin - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 68.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Total Organic Carbon (TOC) - 17 samples. Frequency of testing - Quarterly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 240.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) - Not to exceed 240 samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 132.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Heterotrophic Plate Counts (HPC) Tomah - Not to exceed 108 samples per year. Wausau CBOC - Not to exceed 24 quarterly samples per year. Frequency of testing - Weekly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - SPS Hardness/Ionic Contaminants Panel - Not to exceed 50 samples each, for 7 contaminants per panel, per year. Frequency of testing - Monthly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Limulus Amoebocyte Lysate (LAL)/Endotoxin - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 50.00 |
| EA |
| __________________ |
| __________________ |
SPS/Dental Water Testing, Tomah VA Medical Center. Validation, System Repair, and Interventional Testing - Total Organic Carbon (TOC) - Not to exceed 50 samples per year. Frequency of testing - Monthly.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 1.00 |
| EA |
| __________________ |
| __________________ |
Secure password protected web-based reporting system
POP Begin: 09-01-2027 POP End: 08-31-2028
| 17.00 |
| EA |
| __________________ |
| __________________ |
Monthly, quarterly, and annual source water samples for analysis.
POP Begin: 09-01-2027 POP End: 08-31-2028
| 36.00 |
| EA |
| __________________ |
| __________________ |
36 emergency samples for Endotoxins and Heterotrophic Plate Counts (HPC) if necessary
POP Begin: 09-01-2027 POP End: 08-31-2028
| GRAND TOTAL |
| __________________ |
A.2 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
288.00
264.00
40.00
68.00
68.00
240.00
132.00
50.00
50.00
50.00
1.00
17.00
36.00
288.00
264.00
40.00
68.00
68.00
240.00
132.00
50.00
50.00
50.00
1.00
17.00
36.00
288.00
264.00
40.00
68.00
68.00
240.00
132.00
50.00
50.00
50.00
1.00
17.00
3,600.00
288.00
264.00
40.00
68.00
68.00
240.00
132.00
50.00
50.00
50.00
1.00
17.00
36.00
288.00
264.00
40.00
68.00
68.00
240.00
132.00
50.00
50.00
50.00
1.00
17.00
36.00
Water Testing.