695-22-101 VA Milkwaukee Renovate Bldg 111 Elevators - Addendum No 1R - Write-up 2024 06 03.pdf

PDF 106 KB Posted

Attached to
Z1DA--695-22-101 Renovate Bldg 111 Elevators (A, B, C Bank)
Solicitation number
36C25223B0031
Issued by

About this file

This document is Addendum No. 1 for the Request for Proposal for the VA Project 695-22-101 to renovate the elevators in Building 111 at the VA Medical Center in Milwaukee, Wisconsin.

The addendum revises several specification sections and drawings, including updating the table of contents, drawing index, specification sections related to joint sealants, aluminum windows, elevator modernization, and commissioning requirements. It also provides clarifications and changes to the mechanical, plumbing, electrical, and low voltage systems, such as revising demolition notes, updating mechanical room plans, and modifying elevator bank names and card reader locations. The overall intent is to amplify, clarify, and correct the original bid documents for this elevator renovation project. The related federal contract opportunity is Solicitation Number 36C25223B0031 for the "Renovate Bldg 111 Elevators (A, B, C Bank)".

View the file

Other files

File Type Posted
36C25223B0031 0006.docx DOCX document
S05 - Pre-Bid RFIs 695-20-101 08.05.2024-final.xlsx XLSX spreadsheet
SAM WD 08.01.2024.pdf PDF
36C25223B0031 0005.docx DOCX document
695-22-101 VA Milkwaukee Renovate Bldg 111 Elevators - Drawings - ADDENDUM 1 2024 05 31.pdf PDF
S05 - Pre-Bid RFIs 695-20-101.20240604.xlsx XLSX spreadsheet
36C25223B0031 0004.docx DOCX document
695-22-101 VA Milkwaukee Renovate Bldg 111 Elevators - 100pc CD - Vol 2 Specifications.pdf PDF
36C25223B0031 0003.docx DOCX document
36C25223B0031 0002.docx DOCX document
695-22-101 Site Visit 02.06.24.pdf PDF
695-22-101 Site Visit 02.08.24.pdf PDF
P07 Wage Determination 1.2024.pdf PDF
36C25223B0031 0001.docx DOCX document
S02 695-22-101 Drawing set - sheets 4-6.pdf PDF
S02 695-22-101 Drawing set - sheets 1-2.pdf PDF
S02 695-22-101 Drawing set - sheets 7-12.pdf PDF
S02 695-22-101 Drawing set - sheets 33-51.pdf PDF
36C25223B0031_1.docx DOCX document
S02 695-22-101 Drawing set - sheets 3.pdf PDF
S02 695-20-101 Firestop_SingleSourceJustification_MPT to SAT R1.pdf PDF
S02 695-22-101 Specifications.pdf PDF
S02 695-20-101 HVAC_BAS_Contorls_SingleSourceJustification_MPT to SAT R1.pdf PDF
P07 Wage Determination.pdf PDF
S02 695-22-101 Drawing set - sheets 13-32.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project 695-22-101 ALLIANCE | 7GAE Joint Venture Page 1 of 4

ADDENDUM NO. 1

Project: 221234 VA Milwaukee, WI AE Renovate Bldg. 111 Elevators

VA Project No. 695-22-101

Date: May 31, 2024

Notice: This Addendum is issued by the Architect to all known individuals, firms, or corporations who have obtained or received bidding documents and contract documents for the above-listed project. This Addendum is hereby made a portion of bidding documents or contract documents, as appropriate. It is issued for the purpose of amplifying, clarifying, or correcting originally issued bid documents. Bidders are required to acknowledge receipt of this Addendum in the appropriate space on the bid form.

AD1-1 GENERAL

A. SPECIFICATION ITEMS

1. Specification Section Cover Page Vol 2 Specifications (Reissued):

a. Remove table of contents from cover page referencing Design Narrative

2. Specification Section 00 01 10 Table of Contents (Reissued):

a. Updated to reflect the impacted specifications.

b. Deleted Sections:

1) 01 32 16.01 Architectural and Engineering CPM Schedules, dated March 2020.

2) 02 83 11 Traditional Asbestos Abatement dated January 2021.

3) 02 83 33.13 Lead-Based Paint Removal and Disposal dated January 2021.

4) 06 20 00 Finish Carpentry dated January 2021.

3. Specification Section 00 01 15 List of Drawing Sheets (Reissued):

a. Add drawing SOC – AESOC-10 – TENTH FLOOR PLAN to list of drawing sheet

b. Add drawing ARCHITECTURE – AEOBP110 COMPOSITE PLAN – TENTH FLOOR to list of drawing sheet

4. Specification Section 01 00 00 General Requirements (Reissued):

a. Revise phasing language Section 1.6.G.4 to match phasing listed in drawing

5. Specification Section 01 45 35 Special Inspections (Reissued):

a. Specification is to be incorporated into the documents dated May 2024.

6. Specification Section 01 91 00 General Commissioning Requirements (New Issue):

a. Specification is to be incorporated into the documents dated May 2024.

B. DRAWING ITEMS

1. Drawing G002 GENERAL INFO., SYMBOL LEGEND & DRAWING INDEX (Reissued):

a. Add new sheet AESOC-10 TENTH FLOOR SOC PLAN

b. Add new sheet AE0BP110 TENTH FLOOR COMPOSITE PLAN

c. Rename sheet T101 to PENTHOUSE ROOM LOW VOLTAGE PLANS

ALLIANCE | 7GAE Joint Venture Page 2 of 4

AD1-2 ARCHITECTURAL

A. SPECIFICATION ITEMS

1. Specification Section 07 92 00 Joint Sealants (Reissued):

a. Add Section 2.1 A Exterior sealant for windows.

2. Specification Section 08 51 13 Aluminum Windows (New Issue):

a. Add entire Section 08 51 13 for Aluminum Windows.

3. Specification Section 14 08 00 Commissioning of Conveying Systems (Reissued):

a. Specification is to be incorporated into the documents, dated May 2024.

4. Specification Section 14 21 00 Modernization of Traction Elevator (Reissued):

a. Revised specification is to be incorporated into the documents, dated May 2024.

B. DRAWING ITEMS

1. Drawing AESOC-10 TENTH FLOOR SOC PLAN (New Issue):

a. Add new sheet to identify fire wall and smoke wall separation.

2. Drawing AE0BP110 TENTH FLOOR COMPOSITE PLAN (New Issue):

a. Add new sheet to identify IT Comm Rooms for the 10th floor.

3. Drawing AIC100 INFECTION CONTROL PLAN (Reissued):

a. Add Corridor C2B12 and surrounding rooms to show additional content for the infection control wall locations

b. Add IFC Plan Key Notes:

• TEMP. WALLS SHOULD BE REPLACED ON EVERY FLOOR OF THE SHAFTS

UNDER CONSTRUCTION

• TEMP. WALLS NOT TO BLOCK ACCESS TO DOORS ADJACENT TO ELEVATOR

LOBBIES

• TEMP. WALLS NOT TO BLOCK ACCESS TO ANY MAINTENANCE ROOMS

• PROVIDE HEPA MACHINES AS REQUIRED IN BASEMENT (OR MAIN WORK

FLOOR) AND OR LOBBY ENCLOSURE

4. Drawing AD112 MECHANICAL DEMOLITION PLAN (Reissued):

a. ADD Demolition Key Notes:

#5 EXISTING ELEVATOR EQUIPMENT DETAILED IN DOTTED LINES TO BE REMOVED BY

ELEVATOR CONTRACTOR PER NEW CONFIGURATION

#6 REMOVED EXISTING VENT FAN AND POWER BACK TO ITS SOURCE. PATCH AND

REPAIR WALL AS NECESSARY AND PREPARE SURFACE FOR NEW WINDOW

#7 EXISTING FIRE DAMPERS AND ASSOCIATED GRILLS TO BE REMOVED. WALL TO BE

PATCHED TO MATCH EX.

5. Drawing AE112A MECHANICAL ROOM PLAN (Reissued):

a. Add Mechanical Room Elevator Note

b. Add Key Note #6: “ CONTRACTOR TO REMOVE EX. WINDOW FAN & PANEL. INSTALL NEW

WINDOW WITH INTERIOR SET AND SEAL PERIMETER AS REQUIRED PER

ALLIANCE | 7GAE Joint Venture Page 3 of 4

MANUFACTURES GUIDELINES. REFER TO SPECIFICATION 08 51 13 FOR ADDITIONAL

INFORMATION.”

6. Drawing AE300 ELEVATOR SECTIONS (Reissued):

a. Remove Key Note #3

AD1-3 FIRE PROTECTION

A. DRAWING ITEMS

1. Drawing FX112 (Reissued):

a. Revise General Notes as shown on revised drawing.

AD1-4 MECHANICAL

B. SPECIFICATION ITEMS

1. Specification Section 23 3100 HVAC DUCTS AND CASINGS (Reissued):

a. Delete paragraph 3.1 D as shown in the reissued specification section.

C. DRAWING ITEMS

2. Drawing MD112 (Reissued):

a. Revise keynote 3 as shown on revised drawing.

AD1-5 PLUMBING

A. DRAWING ITEMS

1. Drawing P100 (Reissued):

a. Revise elevator bank names as shown on revised drawing.

2. Drawing P100S (Reissued):

a. Revise elevator bank names as shown on revised drawing.

AD1-6 ELECTRICAL

A. DRAWING ITEMS

1. Drawing E100PA (Reissued):

a. Revise circuiting of pit lighting as shown on revised drawing.

b. Revise elevator bank names as shown on revised drawing.

2. Drawing E110A (Reissued):

a. Revise circuiting of hoistway lighting as shown on revised drawing

b. Revise elevator bank names as shown on revised drawing.

3. Drawing E111A (Reissued):

a. Revise elevator bank names as shown on revised drawing.

ALLIANCE | 7GAE Joint Venture Page 4 of 4

4. Drawing E200PA (Reissued):

a. Revise elevator bank names as shown on revised drawing.

5. Drawing E211 (Reissued):

a. Revise elevator bank names as shown on revised drawing.

AD1-7 LOW VOLTAGE

B. DRAWING ITEMS

6. Drawing T-101(Reissued):

a. Add detail for typical Bank B Card reader locations

b. Add typical Bank A Wanderguard location in elevator shaft

c. Add typical Bank C wanderguard location in elevator shaft

d. Add locations for wall phone outlets for Cat 6A cables for Bank A, B and C Mechanical

Room

e. Add Keyed Note #2: “WANDERGUARD (ACCUTECH IS 3200 PATIENT WANDERING

PREVENTION SYSTEM) CURRENTLY ON THE 9TH FLOOR FOR BOTH THE A AND C BANKS.

SEE SPEC 14 21 10 FOR ADDITIONAL INFORMATION.

WANDERGUARD INTEGRATION:

ACCUTECH SECURITY

ATTN: JASON GUERRERO

10125 S 52ND STREET

FRANKLIN, WI 53132

PH: 800-356-2671 X1133

f. Add Keyed Note #3: “INSTALL CARD READER IN THE FLOOR LANDING PUSH BUTTON

FIXTURE ABOVE THE PUSH BUTTONS. PROVISIONS SHALL BE MADE FOR CALLING

ELEVATOR(S) B9 AND B12 TO FLOORS SERVED BY THE ELEVATOR ON AN EMERGENCY

BASIS, OPERATING INDEPENDENTLY FROM THE DISPATCH SIGNALS AND LANDING

CALL SIGNALS. CONTRACTOR TO COORDINATE WITH VA OIT TO COORDINATE

INTERFACE TO HOSPITAL NETWORK AND EXISTING ACCESS CONTROL SYSTEM

CONTRACTOR TO ASSURE COST ASSOCIATED WITH ACCESS CONTROL INTEGRATION

IS INCLUDED.”

End of Addendum No. 1

RO/JY

P:\2021 Projects\221236 VA Milwaukee, WI AE Renovate Bldg 111 Elevators\02_Documents\03_Construction Administration\Addenda\Addendum No 1 R\Addendum No 1R - Write-up.docx

AD1-1 GENERAL
AD1-2 ARCHITECTURAL
AD1-3 FIRE PROTECTION
AD1-4 MECHANICAL
AD1-5 PLUMBING
AD1-6 ELECTRICAL
AD1-7 LOW VOLTAGE