S06 - MP101-1 Attachment for Amendment 0001.pdf
PDF 603 KB Posted
- Attached to
- Z1DA--585-21-116 Replace Chiller Plant Phase 1
- Solicitation number
- 36C25222Q0458
About this file
This solicitation is for a construction project to replace a chiller plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The contractor shall demolish some existing mechanical, electrical, and architectural systems and install new mechanical, electrical, and architectural systems as outlined in the drawings and specifications provided by Berners-Schober Associates, Inc. The period of performance for the project is 90 calendar days from the notice to proceed. The scope of work involves replacing piping and equipment for the chiller plant in the sub-basement and on the grounds of the medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25222Q0458 0002.docx | DOCX document | |
| 36C25222Q0458 0001.docx | DOCX document | |
| 21FED0400_BD-SPEC_2022-02-18.pdf | ||
| 36C25222Q0458.docx | DOCX document | |
| 22MAR16_00 BD Set.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STAIR 5
UP TA
DN
2"
1" COND. DN
TO OPEN SITE
6" CWS/R
4" CWR
4" CWS
CH-1
EXISTING
CH-3
UNDERGROUND PIPING
TO SUBBASEMENT
UNDERGROUND
PIPING
6" CWR6" CWS
UNDERGROUND
PIPING
6" CWR
6" CWS
(2)6"CWS AND
(2)6"CWR TO
SUB-BASEMENT
6"CWS/R TO
SUB-BASEMENT
6" CWR
6" CWS
6"CWS/R TO
SUB-BASEMENT
DD
F
F
F
RESUPPORT 1/2"
TEMPERATURE
CONTROL CONDUIT
ROUTED BETWEEN
MODIFIED SUPPORTS.
EE
REMOVE ISOLATION VALVE.
REPLACE WITH NEW.
REMOVE ISOLATION VALVE.
REPLACE WITH NEW.
REMOVE
DRAIN VALVE
REMOVE STRAINER.
REPLACE WITH NEW.
REMOVE VALVES
AND AIR VENT. REMOVE ROLLER SUPPORTS
AND REPLACE (TYP.)
REMOVE
DRAIN VALVE
4" CWS
4" CWR
4"CWS/R STACKED
TO SUB-BASEMENT
3'-0" HIGH PLATFORM
W/ LADDER
REMOVE 6"CWS/R PIPING AND REPLACE
WITH 8". REMOVE INSULATION AND
ALUMINUM METAL JACKETS.
E
STAIR 5
UP TA
DN
2"
1" COND. DN
TO OPEN SITE
6" CWS/R
4" CWR
4" CWS
CH-1
EXISTING
CH-3
UNDERGROUND PIPING
TO SUBBASEMENT
UNDERGROUND
PIPING
6" CWR6" CWS
UNDERGROUND
PIPING
6" CWR
6" CWS
(2)6"CWS AND
(2)6"CWR TO
SUB-BASEMENT
6"CWS/R TO
SUB-BASEMENT
6" CWR
6" CWS
8"CWS/R
8"CWS/R TO
SUB-BASEMENT
8"
NEW DRAIN
VALVE
NEW STRAINER
NEW VALVES AND
AIR VENT PIPE TO
MATCH EXISTING
NEW ISOLATION
VALVE
NEW ISOLATION
VALVE
PROVIDE NEW ROLLER
SUPPORTS ON EXISTING
STEEL BASE SUPPORTS (TYP.)
RESUPPORTED
TEMPERATURE
CONTROL CONDUIT
"NOT SHOWN".
NEW DRAIN
VALVE
(5) MODIFIED PIPE
SUPPORTS. SEE
NOTE F
NOTE: PROVIDE ALUMINUM
JACKET OVER INSULATION ALL
OUTDOOR PIPING TO MATCH
EXISTING CONDITIONS.
4" CWS
4" CWR
4"CWS/R STACKED
TO SUB-BASEMENT
3'-0" HIGH PLATFORM
W/ LADDER
E
4" VALVE AND CAP
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
REMOVE 6"CWS/R PIPING AND REPLACE WITH 8"
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
HX-3
HX-4
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
6"CWS/R TO
BASEMENT PLAN
CW
S
CW
R
A
B
C
6"
TCP
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
A
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=9'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
HX-3
HX-4
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT PLAN
TCP
8"
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
4" VALVE
AND CAP
NEW
ISOLATION
VALVE
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
2"
2"
3 1/2"
3 12"
6"
2"
6"
4"
2 1/2"
6"
3" 6" 10"
4"CPD
1"
4"CPD
X=9'-4"
6" LPS
4" X=6'-8"
4" HPC
3/4" HPC
2" HPC
2" HPC
2" HPC
1 1/2" NG
2" NG
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
2"
CPD
1" 20 PSI STEAM
SUPPLY AND
CONDENSATE
RETURN
1"
2"
CPD
CP
D
V
2"HPS
6"
3/4"
TO KITCHEN
PRV
6" MPS-UP
2" MPC-UP
X= 7'-
4" X=9'-3"
X=8'-1"X=7'-8" X=7'-8"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
X=6'-10"
4" LPS
HX-3
HX-4
3" TO DOM. WH
6"
4"
3"
3"
4"
3"
2"
3/4"
X=1'-9"
X=2'-0"
X=9'-9"
2" X=9'-8"
X=8'-2"
3"LPC-UP
4"
2"MPS
6" LPS
HEADER
6"MPS
2"
2-1/2"
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT PLAN
3"
1 "12
X=1'-3"
3"V X=7'-8"
TCP
3/4"
8"
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
4" VALVE
AND CAP
NEW
ISOLATION
VALVE
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
SUB-BASEMENT AND BASEMENT
FLOOR PLANS - PHASE 1
MP101-1M.V. K.K.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
FEBRUARY 18, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VAMC
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENT SET
Comm. Number: 21FED04.00
50% OWNER REVIEW 01-27-2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
95% OWNER REVIEW 02-08-2022
100% OWNER REVIEW 02-16-2022
BID DOCUMENT SET 02-18-2022
MP101-1
F4 BASEMENT DEMOLITION PLAN - PHASE 1
1/8" = 1'-0" MP101-1
F7 BASEMENT NEW WORK PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D4 SUB-BASEMENT DEMOLITION PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D7 SUB-BASEMENT NEW WORK PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D1 SUB-BASEMENT COORDINATION PLAN - FOR REFERENCE ONLY
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
DWG. 02 OF 04
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
PROVIDE REDUCER AND NEW CONNECTION AT ISOLATION VALVES.
REINSTALL FLOW METER IN NEW PIPING. RECALIBRATE FOR 8" PIPE
INSTALLATION. ALTERNATIVELY, A NEW 8" OMICRON FLOW PROBE
MATCHING EXISTING UNIT MAY BE INSTALLED.
PROVIDE REDUCER AND NEW CONNECTION AT EXISTING VALVE.
NEW PIPING TO FOLLOW EXISTING ROUTE. ADJUST TO ALLOW
ENLARGED PIPE INSTALLATION.
CORE DRILL TO ENLARGE OPENING FOR PIPING. SEAL PIPE THROUGH
VALVE
PROVIDE NEW 8" FLEXIBLE CONNECTORS TO MATCH EXISTING TYPE.
PROVIDE REDUCER AT CONNECTION TO CHILLER. PROVIDE NEW
PRESSURE GAUGES, THERMOMETERS, VENTS AND DRAINS IN SAME
LOCATION AS ALL DEMOLISHED DEVICES.
INSTALL AND CONNECT CHILLER FLOW/TEMPERATURE SENSORS.
1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING
PURPOSES ASSUME 8'-0" OF PIPE TO BE LOWERED TO AVOID NEW 8"
PIPING. LOWER PIPE FROM EAST SIDE OF NEW PIPE TO PIPE
DROP/OFFSET LOCATION SHOWN. PATCH INSULATION TO MATCH
EXISTING. UTILIZE STEEL PIPE MATCHING VA STANDARDS. ASTM
A53/A53M, GRADE B, SEAMLESS OR ERW; OR ASTM A106/A106M,
GRADE B, SEAMLESS; SCHEDULE 80.
A
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
B
REMOVE PIPING BACK TO ISOLATION VALVE/T-DUTY. SALVAGE THE
FLOW METER AND REINSTALL IN NEW PIPING OR TURN OVER TO
OWNER. SEE NEW WORK PLAN KEYED NOTE 1.
REMOVE PIPING BACK TO ISOLATION VALVE.
REMOVE PIPE HANGERS AND REPLACE WITH NEW FOR ENTIRE
INDOOR PIPE ROUTE.
REMOVE FIELD INSTALLED PIPING TO CHILLER CONNECTIONS.
REMOVE FLEXIBLE CONNECTORS AND REPLACE WITH LARGER
DEVICES. DEMOLISH PRESSURE GAUGES, THERMOMETERS, VENTS,
DRAINS AND REINSTALL ON NEW PIPING.
SALVAGE CHILLER SENSOR (FLOW/TEMPERATURE) FOR
REINSTALLATION.
5 PLACES: PIPE SUPPORT IS HORIZONTAL 6x2" C-CHANNEL
SUPPORTED BY (2) 2.5" VERTICAL PIPE SUPPORTS. PIPES ARE HUNG
BELOW C-CHANNEL.
SHORTEN THE (2) 2.5" VERTICAL PIPE SUPPORTS AND REINSTALL THE
HORIZONTAL C-CHANNEL TO ALLOW PIPES TO BE SUPPORTED WITH
PIPE ROLLERS ON TOP OF THE HORIZONTAL C-CHANNEL SIMILAR TO
SUPPORTS ON SOUTH SIDE OF EXISTING CHILLER CH-3.
1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING
PURPOSES ASSUME REMOVAL AND REROUTING OF 8'-0" OF PIPE TO
NEW AVOID NEW 8" PIPING.
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR
EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.
- INSTALL NEW TEMPERATURE SENSORS IN SUPPLY AND RETURN
PIPING IN SIMILAR LOCATION TO EXISTING DEVICES. DISPLAY ON DDC
SYSTEM.
- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR
SHOWN DASHED.
- REMOVE TEMPERATURE SENSOR DEVICES ON SUPPLY AND RETURN
PIPING.
- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO
BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE
ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID
WITH FACILITY STAFF.
- ALL AIR VENTS, DRAINS AND ACCESSORIES ON EXISTING REMOVED
PIPING SHALL BE SALVAGED AND INSTALLED ON NEW PIPING IN
SIMILAR MANNER.
C
D
E
F
DOMESTIC HEATING
EQUIPMENT NOT SHOWN.
G
G 7
NEW CONNECTIONNEW
CONNECTION
1"
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
AutoCAD SHX Text ksperber Pen C ksperber Pen ksperber Pen C ksperber Pen ksperber Pen ksperber Pen N ksperber Pen ksperber Arrow ksperber Pen ksperber Pen M
VHAIRODemeuD Polygon Aditional Valve
File details come from the government source that posted it. Updated .