S06 - MP101-1 Attachment for Amendment 0001.pdf

PDF 603 KB Posted

Attached to
Z1DA--585-21-116 Replace Chiller Plant Phase 1
Solicitation number
36C25222Q0458
Issued by

About this file

This solicitation is for a construction project to replace a chiller plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The contractor shall demolish some existing mechanical, electrical, and architectural systems and install new mechanical, electrical, and architectural systems as outlined in the drawings and specifications provided by Berners-Schober Associates, Inc. The period of performance for the project is 90 calendar days from the notice to proceed. The scope of work involves replacing piping and equipment for the chiller plant in the sub-basement and on the grounds of the medical center. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files

File Type Posted
36C25222Q0458 0002.docx DOCX document
36C25222Q0458 0001.docx DOCX document
21FED0400_BD-SPEC_2022-02-18.pdf PDF
36C25222Q0458.docx DOCX document
22MAR16_00 BD Set.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STAIR 5

UP TA

DN

2"

1" COND. DN

TO OPEN SITE

6" CWS/R

4" CWR

4" CWS

CH-1

EXISTING

CH-3

UNDERGROUND PIPING

TO SUBBASEMENT

UNDERGROUND

PIPING

6" CWR6" CWS

UNDERGROUND

PIPING

6" CWR

6" CWS

(2)6"CWS AND

(2)6"CWR TO

SUB-BASEMENT

6"CWS/R TO

SUB-BASEMENT

6" CWR

6" CWS

6"CWS/R TO

SUB-BASEMENT

DD

F

F

F

RESUPPORT 1/2"

TEMPERATURE

CONTROL CONDUIT

ROUTED BETWEEN

MODIFIED SUPPORTS.

EE

REMOVE ISOLATION VALVE.

REPLACE WITH NEW.

REMOVE ISOLATION VALVE.

REPLACE WITH NEW.

REMOVE

DRAIN VALVE

REMOVE STRAINER.

REPLACE WITH NEW.

REMOVE VALVES

AND AIR VENT. REMOVE ROLLER SUPPORTS

AND REPLACE (TYP.)

REMOVE

DRAIN VALVE

4" CWS

4" CWR

4"CWS/R STACKED

TO SUB-BASEMENT

3'-0" HIGH PLATFORM

W/ LADDER

REMOVE 6"CWS/R PIPING AND REPLACE

WITH 8". REMOVE INSULATION AND

ALUMINUM METAL JACKETS.

E

STAIR 5

UP TA

DN

2"

1" COND. DN

TO OPEN SITE

6" CWS/R

4" CWR

4" CWS

CH-1

EXISTING

CH-3

UNDERGROUND PIPING

TO SUBBASEMENT

UNDERGROUND

PIPING

6" CWR6" CWS

UNDERGROUND

PIPING

6" CWR

6" CWS

(2)6"CWS AND

(2)6"CWR TO

SUB-BASEMENT

6"CWS/R TO

SUB-BASEMENT

6" CWR

6" CWS

8"CWS/R

8"CWS/R TO

SUB-BASEMENT

8"

NEW DRAIN

VALVE

NEW STRAINER

NEW VALVES AND

AIR VENT PIPE TO

MATCH EXISTING

NEW ISOLATION

VALVE

NEW ISOLATION

VALVE

PROVIDE NEW ROLLER

SUPPORTS ON EXISTING

STEEL BASE SUPPORTS (TYP.)

RESUPPORTED

TEMPERATURE

CONTROL CONDUIT

"NOT SHOWN".

NEW DRAIN

VALVE

(5) MODIFIED PIPE

SUPPORTS. SEE

NOTE F

NOTE: PROVIDE ALUMINUM

JACKET OVER INSULATION ALL

OUTDOOR PIPING TO MATCH

EXISTING CONDITIONS.

4" CWS

4" CWR

4"CWS/R STACKED

TO SUB-BASEMENT

3'-0" HIGH PLATFORM

W/ LADDER

E

4" VALVE AND CAP

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

3" CWS/R-UP

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

REMOVE 6"CWS/R PIPING AND REPLACE WITH 8"

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

X= 7'-

4"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

HX-3

HX-4

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

6"CWS/R TO

BASEMENT PLAN

CW

S

CW

R

A

B

C

6"

TCP

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

A

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=9'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

3" CWS/R-UP

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

X= 7'-

4"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

HX-3

HX-4

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

8"CWS/R TO

BASEMENT PLAN

TCP

8"

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

4" VALVE

AND CAP

NEW

ISOLATION

VALVE

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

2"

2"

3 1/2"

3 12"

6"

2"

6"

4"

2 1/2"

6"

3" 6" 10"

4"CPD

1"

4"CPD

X=9'-4"

6" LPS

4" X=6'-8"

4" HPC

3/4" HPC

2" HPC

2" HPC

2" HPC

1 1/2" NG

2" NG

1" NG

1 1/2" NG

1 1/2" NG

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

2"

CPD

1" 20 PSI STEAM

SUPPLY AND

CONDENSATE

RETURN

1"

2"

CPD

CP

D

V

2"HPS

6"

3/4"

TO KITCHEN

PRV

6" MPS-UP

2" MPC-UP

X= 7'-

4" X=9'-3"

X=8'-1"X=7'-8" X=7'-8"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

X=6'-10"

4" LPS

HX-3

HX-4

3" TO DOM. WH

6"

4"

3"

3"

4"

3"

2"

3/4"

X=1'-9"

X=2'-0"

X=9'-9"

2" X=9'-8"

X=8'-2"

3"LPC-UP

4"

2"MPS

6" LPS

HEADER

6"MPS

2"

2-1/2"

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

8"CWS/R TO

BASEMENT PLAN

3"

1 "12

X=1'-3"

3"V X=7'-8"

TCP

3/4"

8"

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

4" VALVE

AND CAP

NEW

ISOLATION

VALVE

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

SUB-BASEMENT AND BASEMENT

FLOOR PLANS - PHASE 1

MP101-1M.V. K.K.S.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

FEBRUARY 18, 2022

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VAMC

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENT SET

Comm. Number: 21FED04.00

50% OWNER REVIEW 01-27-2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

95% OWNER REVIEW 02-08-2022

100% OWNER REVIEW 02-16-2022

BID DOCUMENT SET 02-18-2022

MP101-1

F4 BASEMENT DEMOLITION PLAN - PHASE 1

1/8" = 1'-0" MP101-1

F7 BASEMENT NEW WORK PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D4 SUB-BASEMENT DEMOLITION PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D7 SUB-BASEMENT NEW WORK PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D1 SUB-BASEMENT COORDINATION PLAN - FOR REFERENCE ONLY

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

DWG. 02 OF 04

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

PROVIDE REDUCER AND NEW CONNECTION AT ISOLATION VALVES.

REINSTALL FLOW METER IN NEW PIPING. RECALIBRATE FOR 8" PIPE

INSTALLATION. ALTERNATIVELY, A NEW 8" OMICRON FLOW PROBE

MATCHING EXISTING UNIT MAY BE INSTALLED.

PROVIDE REDUCER AND NEW CONNECTION AT EXISTING VALVE.

NEW PIPING TO FOLLOW EXISTING ROUTE. ADJUST TO ALLOW

ENLARGED PIPE INSTALLATION.

CORE DRILL TO ENLARGE OPENING FOR PIPING. SEAL PIPE THROUGH

VALVE

PROVIDE NEW 8" FLEXIBLE CONNECTORS TO MATCH EXISTING TYPE.

PROVIDE REDUCER AT CONNECTION TO CHILLER. PROVIDE NEW

PRESSURE GAUGES, THERMOMETERS, VENTS AND DRAINS IN SAME

LOCATION AS ALL DEMOLISHED DEVICES.

INSTALL AND CONNECT CHILLER FLOW/TEMPERATURE SENSORS.

1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING

PURPOSES ASSUME 8'-0" OF PIPE TO BE LOWERED TO AVOID NEW 8"

PIPING. LOWER PIPE FROM EAST SIDE OF NEW PIPE TO PIPE

DROP/OFFSET LOCATION SHOWN. PATCH INSULATION TO MATCH

EXISTING. UTILIZE STEEL PIPE MATCHING VA STANDARDS. ASTM

A53/A53M, GRADE B, SEAMLESS OR ERW; OR ASTM A106/A106M,

GRADE B, SEAMLESS; SCHEDULE 80.

A

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

B

REMOVE PIPING BACK TO ISOLATION VALVE/T-DUTY. SALVAGE THE

FLOW METER AND REINSTALL IN NEW PIPING OR TURN OVER TO

OWNER. SEE NEW WORK PLAN KEYED NOTE 1.

REMOVE PIPING BACK TO ISOLATION VALVE.

REMOVE PIPE HANGERS AND REPLACE WITH NEW FOR ENTIRE

INDOOR PIPE ROUTE.

REMOVE FIELD INSTALLED PIPING TO CHILLER CONNECTIONS.

REMOVE FLEXIBLE CONNECTORS AND REPLACE WITH LARGER

DEVICES. DEMOLISH PRESSURE GAUGES, THERMOMETERS, VENTS,

DRAINS AND REINSTALL ON NEW PIPING.

SALVAGE CHILLER SENSOR (FLOW/TEMPERATURE) FOR

REINSTALLATION.

5 PLACES: PIPE SUPPORT IS HORIZONTAL 6x2" C-CHANNEL

SUPPORTED BY (2) 2.5" VERTICAL PIPE SUPPORTS. PIPES ARE HUNG

BELOW C-CHANNEL.

SHORTEN THE (2) 2.5" VERTICAL PIPE SUPPORTS AND REINSTALL THE

HORIZONTAL C-CHANNEL TO ALLOW PIPES TO BE SUPPORTED WITH

PIPE ROLLERS ON TOP OF THE HORIZONTAL C-CHANNEL SIMILAR TO

SUPPORTS ON SOUTH SIDE OF EXISTING CHILLER CH-3.

1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING

PURPOSES ASSUME REMOVAL AND REROUTING OF 8'-0" OF PIPE TO

NEW AVOID NEW 8" PIPING.

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.

- INSTALL NEW TEMPERATURE SENSORS IN SUPPLY AND RETURN

PIPING IN SIMILAR LOCATION TO EXISTING DEVICES. DISPLAY ON DDC

SYSTEM.

- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR

SHOWN DASHED.

- REMOVE TEMPERATURE SENSOR DEVICES ON SUPPLY AND RETURN

PIPING.

- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO

BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE

ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID

WITH FACILITY STAFF.

- ALL AIR VENTS, DRAINS AND ACCESSORIES ON EXISTING REMOVED

PIPING SHALL BE SALVAGED AND INSTALLED ON NEW PIPING IN

SIMILAR MANNER.

C

D

E

F

DOMESTIC HEATING

EQUIPMENT NOT SHOWN.

G

G 7

NEW CONNECTIONNEW

CONNECTION

1"

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

AHU

AutoCAD SHX Text ksperber Pen C ksperber Pen ksperber Pen C ksperber Pen ksperber Pen ksperber Pen N ksperber Pen ksperber Arrow ksperber Pen ksperber Pen M

VHAIRODemeuD Polygon Aditional Valve

File details come from the government source that posted it. Updated .