22MAR16_00 BD Set.pdf
PDF 1 MB Posted
- Attached to
- Z1DA--585-21-116 Replace Chiller Plant Phase 1
- Solicitation number
- 36C25222Q0458
About this file
This solicitation requests bids for a replace chiller plant project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project involves demolishing existing architectural, mechanical, and electrical systems and installing new systems in the sub-basement and on grounds. Drawings and specifications are provided by Berners-Schober Associates, Inc. Bidders will furnish all labor, materials, equipment, insurance, and supervision to complete the project, which includes replacing piping for an existing chiller. The period of performance is 90 calendar days from notice to proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25222Q0458 0002.docx | DOCX document | |
| 36C25222Q0458 0001.docx | DOCX document | |
| S06 - MP101-1 Attachment for Amendment 0001.pdf | ||
| 21FED0400_BD-SPEC_2022-02-18.pdf | ||
| 36C25222Q0458.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHERE (2) STUD MOUNTED
DEVICES ARE SCHEDULED,
ALIGN HEIGHTS OF FINISHED
PRODUCT.
WHERE MULTIPLE DEVICES
ARE SCHEDULED TO OCCUR
WITHIN 16" OF EACH OTHER,
ALIGN DEVICES ON (1) FACE
OF STUD
STUDS
DOOR
WHERE MULTIPLE DEVICES ARE SCHEDULED,
ALONG A DOOR, DEVICES SHALL BE ALIGNED ON (1)
FACE OF METAL STUD AND SHALL OCCUR AT
SWING/ LATCH SIDE OF DOOR. EXC THERMOSTATS
ROOM
CORRIDOR
WHERE MULTIPLE DEVICES
ARE SCHEDULED IN CLOSE
PROXIMITY IN HEIGHT, ALIGN
DEVICES.
POSITION ROOM THERMOSTAT TO
ALIGN TOP OF THERMOSTAT WITH
LIGHT SWITCH COVER PLATE
WHERE MULTIPLE DEVICES ARE
SCHEDULED IN CLOSE PROXIMITY IN
HEIGHT, ALIGN DEVICES.
4' -0
" T O
T O
P
ITEMS ARE TO BE LOCATED ABOVE UNLESS NOTED OTHERWISE
TITLE SHEET - PHASE 1
G001-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
FEBRUARY 18, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VAMC
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENT SET
Comm. Number: 21FED04.00
50% OWNER REVIEW 01-27-2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
95% OWNER REVIEW 02-08-2022
100% OWNER REVIEW 02-16-2022
BID DOCUMENT SET 02-18-2022
REPLACE CHILLER PLANT PHASE 1,
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MI 49801
BID DOCUMENT SET
FEBRUARY 18, 2022
SHEET INDEXGENERAL NOTES
DIRECTOR
ASSOCIATE DIRECTOR
ASSOCIATE DIRECTOR FOR N&PCS
CHIEF OF POLICE
CHIEF OF ENGINEERING
INFECTION CONTROL NURSE
PATIENT SAFETY
A.F.G.E.
INDUSTRIAL HYGIENIST
APPROVALS
CHIEF OF STAFF
SAFETY
VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.
GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.
A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING
B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS
C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS
WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING
SEPARATION RATINGS.
3.
GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE AND PLASTER CEILINGS WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE AND PATCH PLASTER WHEN WORK ABOVE CEILING
HAS BEEN COMPLETED.
4.
CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL
EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.
5.
SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK
TIME LIMITATIONS
6.
FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE7.
WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS
STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.
8.
ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN
PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED BELOW.
9.
C5 G001
G001-1
C5 DEVICE MOUNTING SCHEDULE
1/4" = 1'-0" 2'0" 1' 4' 6'
4'0" 2' 8' 12'
2'0" 1' 4' 6'
1'0" 6" 2' 3'
8"0" 4" 16" 24"
6"0" 3" 12" 18"
4"0" 2" 8" 12"
2"0" 1" 4" 6"
1/8" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
3/4" = 1'-0"
1" = 1'-0"
1 1/2" = 1'-0"
3" = 1'-0"
SCALE VERIFICATION
10. FURNISH AND INSTALL FIRESTOPS IN WALLS, FLOORS, AND PARTITIONS AND AROUND PENETRATIONS OF PIPE, DUCT, CABLE AND OTHER ELECTRICAL DEVICES OR IN BLANK OPENINGS AS INDICATED AT FIRE RATED LOCATION ON THE REFLECTED CEILING PLAN. FIRE STOPPING SHALL BE INSTALLED AND TESTED AS LISTED IN ASTM E814, E119, AND UNDERWRITERS LABORATORIES: FIRE RESISTANCE DIRECTORY. WHERE THERE IS NO SPECIFIC THIRD PARTY TESTED ASSEMBLY, ENGINEERING JUDGEMENTS SHALL BE BASED UPON THE REFERENCED DOCUMENTS AND MUST BE PROVIDED VIA THIRD PARTY AND SUBMITTED TO THE AHJ FOR APPROVAL PRIOR TO INSTALLATION. COSTS ASSOCIATED WITH THE ENGINEERING JUDGEMENT SHALL BE THE RESPONSIBILITY OF THE FIRESTOPPING TRADE. FIRESTOPPING OF ALL PENETRATIONS SHALL BE BY A LICENSED FIRESTOPPING TRADE. UPON COMPLETION OF THE FIRESTOPPING SYSTEM, PROVIDE A RECORD IN THE O&M MANUAL OF THE INSTALLED SYSTEMS INDICATING THE UL REFERENCE, LOCATION OF THE PENETRATION AND INSTALLED HOURLY RATING. ALL PENETRATIONS SHALL BE LABELED WITH A PERMANENT TAG INDICATED THE HOURLY RATING, SYSTEM REFERENCE NUMBER, INSTALLERS NAME, ADDRESS, PHONE NUMBER AND DATE OF INSTALLATION. TAGS SHALL BE LABELED WITH “WARNING FIRESTOPPING DO NOT
DISTURB. NOTIFY BUILDING MANAGEMENT OF ANY DAMAGE” OR SIMILAR.
A. FIRESTOPPING MATERIALS SHALL CONFORM TO FLAME (F) AND TEMPERATURE (T) RATINGS AS REQUIRED BY LOCAL BUILDING CODE AND AS TESTED BY NATIONALLY ACCEPTED TEST AGENCIES PER ASTM E814, UL 1479, OR UL 2079. THE F RATING MUST BE A MINIMUM OF ONE
(1) HOUR BUT NOT LESS THAN THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED. T RATING, WHEN REQUIRED BY CODE AUTHORITY, SHALL BE BASED ON THE MEASUREMENT OF THE TEMPERATURE RISE ON THE PENETRATING ITEM(S). THE FIRE TEST
PRESSURE DIFFERENTIAL OF A MINIMUM 0.01" OF WATER COLUMN IS REQUIRED.
B. T AND F RATINGS AT FLOOR PENETRATIONS SHALL BE EQUAL AND NOT LESS THAN 2 HOUR.
C. PENETRATIONS THRU WALL SHALL HAVE AN F RATING EQUAL TO THAT OF THE RATED WALL ASSEMBLY D. SYSTEM SHALL WITHSTAND THE PASSAGE OF COLD SMOKE EITHER AS AN INHERENT PROPERTY OF THE SYSTEM OR BY THE USE OF E. SEPARATE PRODUCT INCLUDED AS A PART OF THE UL SYSTEM OR DEVICE AND DESIGNED TO PERFORM THIS FUNCTION.
1.1. AT SMOKE BARRIER WALLS - 1S, 2S, AND 3S WALLS IN HOSPITAL OCCUPANCY, WALL ASSEMBLIES MUST HAVE A MAXIMUM L RATING OF 50
CFM PER 100SF OF WALL ASSEMBLY.
F. SMOKE RATED WALLS SHALL BE SEALED WITH A PRODUCT TO RESIST THE PASSAGE OF SMOKE.
G. FIRESTOPPING PRODUCTS SHALL BE ASBESTOS-FREE, FREE OF ANY PCBS, AND FREE OF ANY LEAD.
H. FOR ALL CABLING FIRE PENETRATIONS AT WALLS, PROVIDE THE EZ-PATH FIRE RATED PATHWAY SYSTEM BY SPECIFIED TECHNOLOGIES, INC. OR EQUIVALENT SYSTEM BY HILTI CORPORATION.
12. PROVIDE MANUFACTURER'S STANDARD WARRANTY ON ALL ITEMS.
13. REMOVE ALL WALL OUTLETS AND SWITCH COVERS AS REQUIRED FOR REPAINT; REINSTALL COVERS UPON COMPLETION OF
WORK
14. INFILL ALL NAIL HOLES IN WALLS SCHEDULED FOR NEW FINISH
11. WHERE MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH FLOOR SLABS ARE REMOVED, OR CUT FOR NEW WORK, PATCH HOLES
THROUGH THE SLAB.
B. FILL HOLES 3" TO 12" IN DIAMETER WITH CLASS B CONCRETE. ANCHOR TO SLAB WITH TWO NO. 4 DOWELS.
C. FILL HOLES 12" X 12" TO 36" X 36" WITH NO. 4 DOWELS, 8" O.C. BOTH WAYS.
15. THE SEALANT SCHEDULE IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE BELOW SCHEDULE APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS)). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION:
D. ALL HOLES TO BE FILLED IN STRUCTURAL FLOOR SLABS SHALL BE FILLED OR FORMED IN SUCH A MANNER AS
TO PREVENT NEW CURED CONCRETE FROM FALLING TO FLOOR BELOW.
E. PATCH EXISTING SLABS ON GRADE WHERE FLOOR HAS BEEN CUT FOR PLUMBING, HEATING AND OTHER REMODELING WORK. REINFORCE CUTS GREATER THAN 24" IN EACH DIRECTION WITH 6 X 6 WL.4 X WL.4 WIRE MESH. REINFORCE TRENCHES LESS THAN 24" WIDE WITH TWO #3 RODS CONTINUOUS. REPAIR UNDERSLAB
VAPOR RETARDER WITH MATERIAL EQUAL TO ORIGINAL INSTALLATION.
A. FILL HOLES 3" AND SMALLER IN DIAMETER WITH NON-SHRINK GROUT.
1. ALL PRESENT SERVICES INSTALLED AND OPERATING SHALL BE KEPT
IN OPERATION THROUGH THE NEW CONSTRUCTION UNTIL EQUAL
NEW SERVICES OR TEMPORARY LINES SATISFACTORY TO OWNER
ARE INSTALLED AND OPERATING
2. PARTITIONS SHOWN TO BE REMOVED SHALL BE COMPLETELY
REMOVED FROM STRUCTURE ABOVE TO STRUCTURAL FLOOR SLAB
3. CUT OPENINGS IN EXISTING WALLS. OPENINGS IN MASONRY AND
CONCRETE SHALL BE SAWCUT; EXECUTE WORK WITH A MINIMUM
DISTURBANCE TO EXISTING CONSTRUCTION WHICH REMAINS
4. UNLESS NOTED OTHERWISE ON THE PLANS, REMOVE EXISTING BASE
AS REQUIRED TO INSTALL NEW BASE. BASE SHALL BE REMOVED
DOWN TO ORIGINAL FINISHED WALL SURFACE; REMOVE ALL
ADHESIVE RESIDUE WHICH WILL INTERFERE WITH INSTALLATION OF
NEW BASE
5. ALL MATERIALS, RUBBISH, AND DEBRIS SHALL BE REMOVED FROM
THE BUILDING AND FROM THE PREMISES AS SOON AS IT
ACCUMULATES; REMOVAL OF RUBBISH AND DEBRIS SHALL BE
CONDUCTED IN SUCH A WAY THAT A MINIMUM OF DUST IS CAUSED
6. MAINTAIN OWNER OCCUPIED AREAS AS CLEAN AS POSSIBLE TO
AVOID INTERFERENCE WITH OWNER'S OPERATIONS
DEMOLITION NOTES
SEALANT SCHEDULE
SILICONE - 50% MOVEMENT -
CLASS 50
SILICONE - 25%
MOVEMENT/MILDEW
RESISTANT - CLASS
SINGLE
COMPONENT
URETHANE - 35%
MOVEMENT -
CLASS 35
MULTI-COMPONENT
URETHANE - 50%
MOVEMENT - CLASS
TAMPER RESISTANT
URETHANE - 12.5%
MOVEMENT CLASS
12.5 , ASTM D-412
375 TENSILE
STRENGTH
TAMPER PROOF
EPOXY - 0%
MOVEMENT CLASS 0
ASTM C-882 3530
BOND STRENGTH
LATEX - NO MOVEMENT -
CLASS 12.5
ACOUSTICAL
SEALANT -
NON-HEAD OF
WALL - 12.5%
MOVEMENT
ACOUSTICAL SEALANT
- HEAD OF WALL -
EXPANSION JOINTS -
33% MOVEMENT
BUILDING
INTERIOR -
UTILIZE
TAMPER
RESISTANT/
PROOF
PRODUCTS
ONLY IN
PSYCHIATRIC
CARE AREAS
BELOW
CEILING
LINES
JOINT BETWEEN SILLS AND
EXTERIOR FENESTRATIONS:
GRADE NS
JOINTS BETWEEN
PLUMBING FIXTURES
AND ADJOINING
MATERIALS: GRADE
NS
CONTROL JOINTS
SCHEDULED TO
BE CAULKED:
GRADE NS
EXPANSION JOINTS
NOT EXPOSED TO
UV: GRADE NS -
VERTICAL (AND
CEILING), GRADE P,
USE T - HORIZONTAL
CONTROL JOINTS/
EXPANSION
SCHEDULED TO BE
CAULKED: GRADE
NS AT VERTICAL,
GRADE P USE T AT
HORIZONTAL
JOINT BETWEEN
WALLS AND
ACOUSTICAL GRID:
GRADE NS
INTERIOR DOOR FRAMES
NOT EXPOSED TO UV, AT
INTERSECTION OF WALL
AND FRAME: GRADE NS, P
TYPICAL. USE SINGLE
COMPONENT URETHANE
SEALANT GRADE NS, T AT
FLOOR INTERSECTION
WALL
PERIMETERS
HEAD OF WALL JOINTS
JOINT BETWEEN INTEGRAL
BASE AND DOOR FRAMES:
GRADE NS
VERTICAL JOINTS AT
INSIDE CORNERS OF
CERAMIC TILE
CONDITIONS: GRADE
NS
PENETRATIONS
OF MECHANICAL
EQUIPMENT IN
SMOKE TIGHT
WALLS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS: GRADE
NS
INTERIOR DOOR
FRAMES NOT
EXPOSED TO UV, AT
INTERSECTION OF
WALL AND FRAME:
GRADE NS, P
TYPICAL.
JOINTS WHERE NO
MOVEMENT IS EXPECTED:
GRADE NS
SMOKE RESISTANT
EXPANSION JOINTS
(WHERE SILICONE
SEALANTS ARE NOT
UTILIZED)
EXPANSION JOINTS EXPOSED
TO UV: GRADE NS VERTICAL,
GRADE P USE T - HORIZONTAL
JOINT BETWEEN
TILED FLOOR AND
WALL
INTERSECTIONS:
GRADE NS, USE T
TERMINATION OF
VINYL WALL
COVERING:
GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES,
JOINTS BETWEEN
SILLS AND
EXTERIOR
FENESTRATIONS:
GRADE NS
JOINTS WHERE NO
MOVEMENT IS
EXPECTED: GRADE
NS
JOINTS BETWEEN DIS-SIMILAR
MATERIALS SUBJECT TO UV
EXPOSURE: GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES:
GRADE NS
JOINT BETWEEN
WALLS AND
ACOUSTICAL
GRID: GRADE NS
JOINTS BETWEEN
PLUMBING
FIXTURES AND
ADJOINING
MATERIALS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS NOT
SUBJECT TO UV
EXPOSURE:
GRADE NS
JOINT BETWEEN
INTEGRAL BASE
AND DOOR FRAMES:
GRADE NS
1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW
2. SILICONE SEALANT
2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT
2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000
2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT
2.4. TREMCO: SPECTREM 1
3. URETHANE JOINT SEALANTS
3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1
3.2. BOSTIK, INC.: CHEM-CALK 2020
3.3. SIKA CORPORATION: SIKAFLEX-1A
4. MULTI-COMPONENT NON-SAG URETHANE
4.1. DYNATROL II
4.2. TREMCO DYMERIC 240/240FC
5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)
5.1. PECORA AC-20 FTR
5.2. USG SHEETROCK ACOUSTICAL SEALANT
6. ACOUSTICAL SEALANT (HEAD OF WALL)
6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000
6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345
7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT
7.1. PECORA DYNAFLEX
7.2. BASF MASTERSEAL CR 195
7.3. SIKAFLEX 2C NS TG
8. TAMPER PROOF EPOXY SEALANT
8.1. PECORA DYNAPOXY EP-1200
SEALANT NOTES
M.V. K.K.S.
DWG. 01 OF 04
Sheet Number Sheet Title
GENERAL
G001-1 TITLE SHEET
HVAC
MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1
M601-1 DETAILS AND SCHEDULES - PHASE 1
ELECTRICAL
E101-1 SUB-BASEMENT WORK PLANS
AutoCAD SHX Text S
STAIR 5
UP TA
DN
2"
1" COND. DN
TO OPEN SITE
6" CWS/R
4" CWR
4" CWS
CH-1
EXISTING
CH-3
UNDERGROUND PIPING
TO SUBBASEMENT
UNDERGROUND
PIPING
6" CWR6" CWS
UNDERGROUND
PIPING
6" CWR
6" CWS
(2)6"CWS AND
(2)6"CWR TO
SUB-BASEMENT
6"CWS/R TO
SUB-BASEMENT
6" CWR
6" CWS
6"CWS/R TO
SUB-BASEMENT
DD
F
F
F
RESUPPORT 1/2"
TEMPERATURE
CONTROL CONDUIT
ROUTED BETWEEN
MODIFIED SUPPORTS.
EE
REMOVE ISOLATION VALVE.
REPLACE WITH NEW.
REMOVE ISOLATION VALVE.
REPLACE WITH NEW.
REMOVE
DRAIN VALVE
REMOVE STRAINER.
REPLACE WITH NEW.
REMOVE VALVES
AND AIR VENT. REMOVE ROLLER SUPPORTS
AND REPLACE (TYP.)
REMOVE
DRAIN VALVE
4" CWS
4" CWR
4"CWS/R STACKED
TO SUB-BASEMENT
3'-0" HIGH PLATFORM
W/ LADDER
REMOVE 6"CWS/R PIPING AND REPLACE
WITH 8". REMOVE INSULATION AND
ALUMINUM METAL JACKETS.
E
STAIR 5
UP TA
DN
2"
1" COND. DN
TO OPEN SITE
6" CWS/R
4" CWR
4" CWS
CH-1
EXISTING
CH-3
UNDERGROUND PIPING
TO SUBBASEMENT
UNDERGROUND
PIPING
6" CWR6" CWS
UNDERGROUND
PIPING
6" CWR
6" CWS
(2)6"CWS AND
(2)6"CWR TO
SUB-BASEMENT
6"CWS/R TO
SUB-BASEMENT
6" CWR
6" CWS
8"CWS/R
8"CWS/R TO
SUB-BASEMENT
8"
NEW DRAIN
VALVE
NEW STRAINER
NEW VALVES AND
AIR VENT PIPE TO
MATCH EXISTING
NEW ISOLATION
VALVE
NEW ISOLATION
VALVE
PROVIDE NEW ROLLER
SUPPORTS ON EXISTING
STEEL BASE SUPPORTS (TYP.)
RESUPPORTED
TEMPERATURE
CONTROL CONDUIT
"NOT SHOWN".
NEW DRAIN
VALVE
(5) MODIFIED PIPE
SUPPORTS. SEE
NOTE F
NOTE: PROVIDE ALUMINUM
JACKET OVER INSULATION ALL
OUTDOOR PIPING TO MATCH
EXISTING CONDITIONS.
4" CWS
4" CWR
4"CWS/R STACKED
TO SUB-BASEMENT
3'-0" HIGH PLATFORM
W/ LADDER
E
4" VALVE AND CAP
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
REMOVE 6"CWS/R PIPING AND REPLACE WITH 8"
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
HX-3
HX-4
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
6"CWS/R TO
BASEMENT PLAN
CW
S
CW
R
A
B
C
6"
TCP
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
A
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=9'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
HX-3
HX-4
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT PLAN
TCP
8"
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
4" VALVE
AND CAP
NEW
ISOLATION
VALVE
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=5'-2"
EXISTING
EXPANSION
TANK
10"
8" 10
10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR X=6'-5"
2"
2"
3 1/2"
3 12"
6"
2"
6"
4"
2 1/2"
6"
3" 6" 10"
4"CPD
1"
4"CPD
X=9'-4"
6" LPS
4" X=6'-8"
4" HPC
3/4" HPC
2" HPC
2" HPC
2" HPC
1 1/2" NG
2" NG
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
EXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
2"
CPD
1" 20 PSI STEAM
SUPPLY AND
CONDENSATE
RETURN
1"
2"
CPD
CP
D
V
2"HPS
6"
3/4"
TO KITCHEN
PRV
6" MPS-UP
2" MPC-UP
X= 7'-
4" X=9'-3"
X=8'-1"X=7'-8" X=7'-8"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
X=6'-10"
4" LPS
HX-3
HX-4
3" TO DOM. WH
6"
4"
3"
3"
4"
3"
2"
3/4"
X=1'-9"
X=2'-0"
X=9'-9"
2" X=9'-8"
X=8'-2"
3"LPC-UP
4"
2"MPS
6" LPS
HEADER
6"MPS
2"
2-1/2"
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT PLAN
3"
1 "12
X=1'-3"
3"V X=7'-8"
TCP
3/4"
8"
X= 5'-
6"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'-
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
X=9'-7"
X=8'-8"
X=10'-4"
X=7'-0"
X=7'-2"
X= 7'-
0"
X=9'-4"
X=9'-3"
X=8'-4"
8"
8"
X=9'-4"
4" VALVE
AND CAP
NEW
ISOLATION
VALVE
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
SUB-BASEMENT AND BASEMENT
FLOOR PLANS - PHASE 1
MP101-1M.V. K.K.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
FEBRUARY 18, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VAMC
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENT SET
Comm. Number: 21FED04.00
50% OWNER REVIEW 01-27-2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
95% OWNER REVIEW 02-08-2022
100% OWNER REVIEW 02-16-2022
BID DOCUMENT SET 02-18-2022
MP101-1
F4 BASEMENT DEMOLITION PLAN - PHASE 1
1/8" = 1'-0" MP101-1
F7 BASEMENT NEW WORK PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D4 SUB-BASEMENT DEMOLITION PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D7 SUB-BASEMENT NEW WORK PLAN - PHASE 1
1/8" = 1'-0"
MP101-1
D1 SUB-BASEMENT COORDINATION PLAN - FOR REFERENCE ONLY
1/8" = 1'-0"
KEYPLAN
NO SCALE
N
DWG. 02 OF 04
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
PROVIDE REDUCER AND NEW CONNECTION AT ISOLATION VALVES.
REINSTALL FLOW METER IN NEW PIPING. RECALIBRATE FOR 8" PIPE
INSTALLATION. ALTERNATIVELY, A NEW 8" OMICRON FLOW PROBE
MATCHING EXISTING UNIT MAY BE INSTALLED.
PROVIDE REDUCER AND NEW CONNECTION AT EXISTING VALVE.
NEW PIPING TO FOLLOW EXISTING ROUTE. ADJUST TO ALLOW
ENLARGED PIPE INSTALLATION.
CORE DRILL TO ENLARGE OPENING FOR PIPING. SEAL PIPE THROUGH
VALVE
PROVIDE NEW 8" FLEXIBLE CONNECTORS TO MATCH EXISTING TYPE.
PROVIDE REDUCER AT CONNECTION TO CHILLER. PROVIDE NEW
PRESSURE GAUGES, THERMOMETERS, VENTS AND DRAINS IN SAME
LOCATION AS ALL DEMOLISHED DEVICES.
INSTALL AND CONNECT CHILLER FLOW/TEMPERATURE SENSORS.
1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING
PURPOSES ASSUME 8'-0" OF PIPE TO BE LOWERED TO AVOID NEW 8"
PIPING. LOWER PIPE FROM EAST SIDE OF NEW PIPE TO PIPE
DROP/OFFSET LOCATION SHOWN. PATCH INSULATION TO MATCH
EXISTING. UTILIZE STEEL PIPE MATCHING VA STANDARDS. ASTM
A53/A53M, GRADE B, SEAMLESS OR ERW; OR ASTM A106/A106M,
GRADE B, SEAMLESS; SCHEDULE 80.
A
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
B
REMOVE PIPING BACK TO ISOLATION VALVE/T-DUTY. SALVAGE THE
FLOW METER AND REINSTALL IN NEW PIPING OR TURN OVER TO
OWNER. SEE NEW WORK PLAN KEYED NOTE 1.
REMOVE PIPING BACK TO ISOLATION VALVE.
REMOVE PIPE HANGERS AND REPLACE WITH NEW FOR ENTIRE
INDOOR PIPE ROUTE.
REMOVE FIELD INSTALLED PIPING TO CHILLER CONNECTIONS.
REMOVE FLEXIBLE CONNECTORS AND REPLACE WITH LARGER
DEVICES. DEMOLISH PRESSURE GAUGES, THERMOMETERS, VENTS,
DRAINS AND REINSTALL ON NEW PIPING.
SALVAGE CHILLER SENSOR (FLOW/TEMPERATURE) FOR
REINSTALLATION.
5 PLACES: PIPE SUPPORT IS HORIZONTAL 6x2" C-CHANNEL
SUPPORTED BY (2) 2.5" VERTICAL PIPE SUPPORTS. PIPES ARE HUNG
BELOW C-CHANNEL.
SHORTEN THE (2) 2.5" VERTICAL PIPE SUPPORTS AND REINSTALL THE
HORIZONTAL C-CHANNEL TO ALLOW PIPES TO BE SUPPORTED WITH
PIPE ROLLERS ON TOP OF THE HORIZONTAL C-CHANNEL SIMILAR TO
SUPPORTS ON SOUTH SIDE OF EXISTING CHILLER CH-3.
1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING
PURPOSES ASSUME REMOVAL AND REROUTING OF 8'-0" OF PIPE TO
NEW AVOID NEW 8" PIPING.
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR
EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.
- INSTALL NEW TEMPERATURE SENSORS IN SUPPLY AND RETURN
PIPING IN SIMILAR LOCATION TO EXISTING DEVICES. DISPLAY ON DDC
SYSTEM.
- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR
SHOWN DASHED.
- REMOVE TEMPERATURE SENSOR DEVICES ON SUPPLY AND RETURN
PIPING.
- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO
BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE
ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID
WITH FACILITY STAFF.
- ALL AIR VENTS, DRAINS AND ACCESSORIES ON EXISTING REMOVED
PIPING SHALL BE SALVAGED AND INSTALLED ON NEW PIPING IN
SIMILAR MANNER.
C
D
E
F
DOMESTIC HEATING
EQUIPMENT NOT SHOWN.
G
G 7
NEW CONNECTIONNEW
CONNECTION
1"
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.
[453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA.
HANGER RODS WITH
36" [900mm] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER INSULATION
SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
[2 5m m
1" M
AX
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
DETAILS AND SCHEDULES - PHASE 1
M601-1M.V. K.K.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
FEBRUARY 18, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VAMC
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENT SET
Comm. Number: 21FED04.00
50% OWNER REVIEW 01-27-2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
95% OWNER REVIEW 02-08-2022
100% OWNER REVIEW 02-16-2022
BID DOCUMENT SET 02-18-2022
M601-1
F5 PIPE HANGERS
NO SCALE
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCI SPINAL CODE INJURY
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH - ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT
(SUBMISSION1)
DD-2 DESIGN DEVELOPMENT
(SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
(TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY
(FROM COOLING TOWER)
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BMT BONE MARROW TRANSPLANT
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTC BLOWOFF TANK CONTROL VALVE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
BWT BOILER PLANT WATER TUBE
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE
DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HVD HOISTWAY VENT DAMPER
HX HEAT EXCHANGER
HZ HERTZ
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OR OPERATING ROOM
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
M METER, SI UNIT
M/s METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
YR YEAR
W WATTS
WAG WASTE ANETHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
UC UNDER CUT
UC UNIT COOLER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
A/E ARCHITECT/ENGINEER
BC BOOSTER COIL
CSFD COMBINATION SMOKE AND FIRE DAMPER
DN DOWN
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FPI FINS PER INCH
FRPS FIRE RATED PIPE SLEEVE
GPC GENERAL PRIME CONTRACTOR
GT GENERAL TRADE
GR GRILLE OR DIFFUSER
HP HORSE POWER
MBTU 1,000 BRITISH THERMAL UNITS PER HOUR
MOCP MAXIMUM OVER CURRENT PROTECTION
NC NO CHANGE
PH PHASE
PT PLUMBING TRADE
PVC POLYVINLY CHLORIDE
RM ROOM
SEER SEASONAL ENERGY EFFICIENCY RATIO
SWSI SINGLE WIDTH SINGLE INLET
TB TIGHT TO BEAM
TC TEMPERATURE CONTROL
TS TIP SPEED
TV TURNING VANE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VENT
WS WALL SLEEVE
ABBREVIATIONS SCHEDULEGENERAL SYMBOLS
MAKE-UP WATERMW
X=
OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.
DISTANCE FROM FINISHED FLOOR TO CENTERLINE
E=
LPCR
LPS
MPCR
MPS
HPCR
HPS
CPD
V D
CWR
CWS
LTHWR
LTHWS
HWR
HWS
T
CAP DUCTWORK - SEAL ALL JOINTS
EXTERNAL DUCT INSULATION
INTERNAL DUCT INSULATION
RISE OR DROP IN DUCT (AS NOTED)
OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.
ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,
UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)
TEMPERATURE SENSOR AT FIVE FEET ABOVE FINISH FLOOR
PRESSURE GAUGE
THERMOMETER
STRAINER
BUTTERFLY VALVE
BALL VALVE
GATE OR GLOBE VALVE
RELIEF VALVE
CONTROL VALVES (3-WAY OR 2-WAY)
STEAM CONDENSATE TRAP
CAP PIPING
UNION
REDUCER OR INCREASER
AS DASHED SHALL BE REMOVED.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
WITH AN (X) IMPLIES PIPING IS EXISTING.
ANY OF THE ABOVE PIPING SYMBOLS INDICATED
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM (0-15 psi)
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16-99 psi)
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM (100 psi +)
CONDENSATE PUMP DISCHARGE
VENT
DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
LOW TEMPERATURE HOT WATER RETURN (120°F)
LOW TEMPERATURE HOT WATER SUPPLY (130°F)
HOT WATER RETURN (155°F)
HOT WATER SUPPLY (180°F)
DESCRIPTIONSYMBOL
D OR P
CONTROL OR BACKDRAFT DAMPER
C CARBON DIOXIDE SENSOR.
DWG. 03 OF 04
AutoCAD SHX Text X
AutoCAD SHX Text X
X
LIF
E
SA
FE
TY
U
PS
CRITICAL UPS
ATS
CN
TR
L
BM
S
BM
S
BM
S
BM
S
J
AHU-12
ATS MONITOR
PNL
CNTRL
SBP-B
EX LIGHTING
CONTROLS
SLP
CN
TR
L JOCKEY
PUMP CONTROLLER
FIRE PUMP
CONTROL
PANEL
FLO-COLD
BMS
EQ-A
CN
TR
L
SUMP
EF-34
EF-34
ERV-1
SBL
FA EQ CR
SBA
BCR
ATS-CR
ATS-EQ
ATS-LS
ATS-XRAY
ATS-FP
CR-DIST
(CR-UPS)
EQ-2
SBP- C
EQ-5
LS-UPS
ADP
SPLICE BOX
LS
ATS ATS ATS ATS
AT
S
AT
S
ATS-CR2
ATS-CR3
AT
S
ATS-EQ2
XRAY DIST.
PNL
SBP-A
SBP
HCHILL
REF
DP-EQ1
UNI-STRUT
DDC
CONTROL
PNLS
DDC CTRL
PNL
F.P.
CONTROLLER
PORTABLE
GENERATOR
DISC.
1600A
SQ-D TERM. BOX
PORTABLE
GENERATOR
CONNECTION
CN
TR
L
MTS-HCHILL
EX
EX
EX
EX EX
EX EX
EX
PUMP
EX
PUMP
EX
X-AHU-12
EX
EX
EX
SBP.9
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
P3
P4
P5
P6
P1
P2
P2A P1
P2
P3P3
P4
P5
P6
P1 P2 P2AEX
CHILLER
PUMP PUMP
PUMP
PUMP
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX EX EX
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
BM
S
BM
S
BM
S
BM
S
ATS MONITOR
PNL
SBP-B SLP
FLO-COLD
EQ-A
SBL
FA EQ CR
SBA
BCR
CR-DIST
(CR-UPS)
EQ-2
SBP- C
EQ-5
LS-UPS
LS
XRAY DIST.
PNL
SBP-A
SBP
HCHILL
REF
DP-EQ1
UNI-STRUT
DDC
CONTROL
PNLS
MTS-HCHILL
ALL EXISTING PANELS
ATS AND BMS
EQUIPMENT
TO REMAIN AS IS
A
B
EXISTING CHILLER
PIPING BEING
REPLACED BY MECH.
CONTRACTOR
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EXEX
EX EX
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
SUB-BASEMENT FLOOR PLANS -
PHASE 1
E101-1MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
FEBRUARY 18, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VAMC
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENT SET
Comm. Number: 21FED04.00
50% OWNER REVIEW 01-27-2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
95% OWNER REVIEW 02-08-2022
100% OWNER REVIEW 02-16-2022
BID DOCUMENT SET 02-18-2022
DWG. 04 OF 04
E101-1
F2 SUB-BASEMENT NEW WORK PLAN
1/8" = 1'-0" E101-1
F6 SUB-BASEMENT DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12' 4'0" 2' 8' 12'
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
MODIFIED CONDUIT AND WIRING PER DEMOLITION NOTE 'A'.
REINSTALL LIGHT FIXTURE SALVAGED FROM DEMOLITION. UTILIZE
EXISTING CIRCUIT/SWITCHING SCHEME. PROVIDE ADDITIONAL
CONDUIT AND WIRING AS REQUIRED.
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A
B
MODIFY TWO (2) EXISTING 1" CONDUITS (WITH WIRING) AND ONE (1)
3/4" CONDUIT (WITH WIRING) IN WAY OF DEMOLITION AND NEW WORK
WITH REGARDS TO THE CHILLER PIPING BEING REPLACED. THE
CONDUITS AND WIRING NEED TO BE OFF-SET/LOWERED DUE TO THE
FACT THAT THE NEW PIPING AND INSULATION WILL BE LARGER.
COORDINATE WITH MECHANICAL CONTRACTOR.
TEMPORARILY DISCONNECT AND REMOVE LIGHT FIXTURE IN WAY OF
DEMOLITION AND NEW WORK. SALVAGE CIRCUITS AND WIRING FOR
RE-USE. COORDINATE WITH MECHANICAL CONTRACTOR.
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
AHU
| G001-1 TITLE SHEET - PHASE 1 |
| G001-1 TITLE SHEET - PHASE 1 |
| DEVICE-MNT-SCH |
| MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1 |
| MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1 |
| X616301AWF00 |
| OGJMC_HX_00 |
| OGJMC_HX_SB |
| X616301AWFSB |
| OGJMC_HX_SB(2) |
| M601-1 DETAILS AND SCHEDULES - PHASE 1 |
| M601-1 DETAILS AND SCHEDULES - PHASE 1 |
| X001 - SD230511-21 PIPE HANGERS |
| E101-1 SUB-BASEMENT FLOOR PLANS - PHASE 1 |
| E101-1 SUB-BASEMENT FLOOR PLANS - PHASE 1 |
| OGJMC_EX_SB |
| OGJMC_EX_SB(2) |
| MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1.pdf |
| Sheets and Views |
| MP101-1 |
| X616301AWF00 |
| OGJMC_HX_00 |
| OGJMC_HX_SB |
| X616301AWFSB |
| OGJMC_HX_SB(2) |
File details come from the government source that posted it. Updated .