22MAR16_00 BD Set.pdf

PDF 1 MB Posted

Attached to
Z1DA--585-21-116 Replace Chiller Plant Phase 1
Solicitation number
36C25222Q0458
Issued by

About this file

This solicitation requests bids for a replace chiller plant project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project involves demolishing existing architectural, mechanical, and electrical systems and installing new systems in the sub-basement and on grounds. Drawings and specifications are provided by Berners-Schober Associates, Inc. Bidders will furnish all labor, materials, equipment, insurance, and supervision to complete the project, which includes replacing piping for an existing chiller. The period of performance is 90 calendar days from notice to proceed. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files

File Type Posted
36C25222Q0458 0002.docx DOCX document
36C25222Q0458 0001.docx DOCX document
S06 - MP101-1 Attachment for Amendment 0001.pdf PDF
21FED0400_BD-SPEC_2022-02-18.pdf PDF
36C25222Q0458.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHERE (2) STUD MOUNTED

DEVICES ARE SCHEDULED,

ALIGN HEIGHTS OF FINISHED

PRODUCT.

WHERE MULTIPLE DEVICES

ARE SCHEDULED TO OCCUR

WITHIN 16" OF EACH OTHER,

ALIGN DEVICES ON (1) FACE

OF STUD

STUDS

DOOR

WHERE MULTIPLE DEVICES ARE SCHEDULED,

ALONG A DOOR, DEVICES SHALL BE ALIGNED ON (1)

FACE OF METAL STUD AND SHALL OCCUR AT

SWING/ LATCH SIDE OF DOOR. EXC THERMOSTATS

ROOM

CORRIDOR

WHERE MULTIPLE DEVICES

ARE SCHEDULED IN CLOSE

PROXIMITY IN HEIGHT, ALIGN

DEVICES.

POSITION ROOM THERMOSTAT TO

ALIGN TOP OF THERMOSTAT WITH

LIGHT SWITCH COVER PLATE

WHERE MULTIPLE DEVICES ARE

SCHEDULED IN CLOSE PROXIMITY IN

HEIGHT, ALIGN DEVICES.

4' -0

" T O

T O

P

ITEMS ARE TO BE LOCATED ABOVE UNLESS NOTED OTHERWISE

TITLE SHEET - PHASE 1

G001-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

FEBRUARY 18, 2022

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VAMC

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENT SET

Comm. Number: 21FED04.00

50% OWNER REVIEW 01-27-2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

95% OWNER REVIEW 02-08-2022

100% OWNER REVIEW 02-16-2022

BID DOCUMENT SET 02-18-2022

REPLACE CHILLER PLANT PHASE 1,

OSCAR G. JOHNSON VA MEDICAL CENTER

IRON MOUNTAIN, MI 49801

BID DOCUMENT SET

FEBRUARY 18, 2022

SHEET INDEXGENERAL NOTES

DIRECTOR

ASSOCIATE DIRECTOR

ASSOCIATE DIRECTOR FOR N&PCS

CHIEF OF POLICE

CHIEF OF ENGINEERING

INFECTION CONTROL NURSE

PATIENT SAFETY

A.F.G.E.

INDUSTRIAL HYGIENIST

APPROVALS

CHIEF OF STAFF

SAFETY

VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.

GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.

A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING

B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS

C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS

WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING

SEPARATION RATINGS.

3.

GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE AND PLASTER CEILINGS WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE AND PATCH PLASTER WHEN WORK ABOVE CEILING

HAS BEEN COMPLETED.

4.

CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL

EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.

5.

SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK

TIME LIMITATIONS

6.

FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE7.

WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS

STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.

8.

ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN

PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED BELOW.

9.

C5 G001

G001-1

C5 DEVICE MOUNTING SCHEDULE

1/4" = 1'-0" 2'0" 1' 4' 6'

4'0" 2' 8' 12'

2'0" 1' 4' 6'

1'0" 6" 2' 3'

8"0" 4" 16" 24"

6"0" 3" 12" 18"

4"0" 2" 8" 12"

2"0" 1" 4" 6"

1/8" = 1'-0"

1/4" = 1'-0"

1/2" = 1'-0"

3/4" = 1'-0"

1" = 1'-0"

1 1/2" = 1'-0"

3" = 1'-0"

SCALE VERIFICATION

10. FURNISH AND INSTALL FIRESTOPS IN WALLS, FLOORS, AND PARTITIONS AND AROUND PENETRATIONS OF PIPE, DUCT, CABLE AND OTHER ELECTRICAL DEVICES OR IN BLANK OPENINGS AS INDICATED AT FIRE RATED LOCATION ON THE REFLECTED CEILING PLAN. FIRE STOPPING SHALL BE INSTALLED AND TESTED AS LISTED IN ASTM E814, E119, AND UNDERWRITERS LABORATORIES: FIRE RESISTANCE DIRECTORY. WHERE THERE IS NO SPECIFIC THIRD PARTY TESTED ASSEMBLY, ENGINEERING JUDGEMENTS SHALL BE BASED UPON THE REFERENCED DOCUMENTS AND MUST BE PROVIDED VIA THIRD PARTY AND SUBMITTED TO THE AHJ FOR APPROVAL PRIOR TO INSTALLATION. COSTS ASSOCIATED WITH THE ENGINEERING JUDGEMENT SHALL BE THE RESPONSIBILITY OF THE FIRESTOPPING TRADE. FIRESTOPPING OF ALL PENETRATIONS SHALL BE BY A LICENSED FIRESTOPPING TRADE. UPON COMPLETION OF THE FIRESTOPPING SYSTEM, PROVIDE A RECORD IN THE O&M MANUAL OF THE INSTALLED SYSTEMS INDICATING THE UL REFERENCE, LOCATION OF THE PENETRATION AND INSTALLED HOURLY RATING. ALL PENETRATIONS SHALL BE LABELED WITH A PERMANENT TAG INDICATED THE HOURLY RATING, SYSTEM REFERENCE NUMBER, INSTALLERS NAME, ADDRESS, PHONE NUMBER AND DATE OF INSTALLATION. TAGS SHALL BE LABELED WITH “WARNING FIRESTOPPING DO NOT

DISTURB. NOTIFY BUILDING MANAGEMENT OF ANY DAMAGE” OR SIMILAR.

A. FIRESTOPPING MATERIALS SHALL CONFORM TO FLAME (F) AND TEMPERATURE (T) RATINGS AS REQUIRED BY LOCAL BUILDING CODE AND AS TESTED BY NATIONALLY ACCEPTED TEST AGENCIES PER ASTM E814, UL 1479, OR UL 2079. THE F RATING MUST BE A MINIMUM OF ONE

(1) HOUR BUT NOT LESS THAN THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED. T RATING, WHEN REQUIRED BY CODE AUTHORITY, SHALL BE BASED ON THE MEASUREMENT OF THE TEMPERATURE RISE ON THE PENETRATING ITEM(S). THE FIRE TEST

PRESSURE DIFFERENTIAL OF A MINIMUM 0.01" OF WATER COLUMN IS REQUIRED.

B. T AND F RATINGS AT FLOOR PENETRATIONS SHALL BE EQUAL AND NOT LESS THAN 2 HOUR.

C. PENETRATIONS THRU WALL SHALL HAVE AN F RATING EQUAL TO THAT OF THE RATED WALL ASSEMBLY D. SYSTEM SHALL WITHSTAND THE PASSAGE OF COLD SMOKE EITHER AS AN INHERENT PROPERTY OF THE SYSTEM OR BY THE USE OF E. SEPARATE PRODUCT INCLUDED AS A PART OF THE UL SYSTEM OR DEVICE AND DESIGNED TO PERFORM THIS FUNCTION.

1.1. AT SMOKE BARRIER WALLS - 1S, 2S, AND 3S WALLS IN HOSPITAL OCCUPANCY, WALL ASSEMBLIES MUST HAVE A MAXIMUM L RATING OF 50

CFM PER 100SF OF WALL ASSEMBLY.

F. SMOKE RATED WALLS SHALL BE SEALED WITH A PRODUCT TO RESIST THE PASSAGE OF SMOKE.

G. FIRESTOPPING PRODUCTS SHALL BE ASBESTOS-FREE, FREE OF ANY PCBS, AND FREE OF ANY LEAD.

H. FOR ALL CABLING FIRE PENETRATIONS AT WALLS, PROVIDE THE EZ-PATH FIRE RATED PATHWAY SYSTEM BY SPECIFIED TECHNOLOGIES, INC. OR EQUIVALENT SYSTEM BY HILTI CORPORATION.

12. PROVIDE MANUFACTURER'S STANDARD WARRANTY ON ALL ITEMS.

13. REMOVE ALL WALL OUTLETS AND SWITCH COVERS AS REQUIRED FOR REPAINT; REINSTALL COVERS UPON COMPLETION OF

WORK

14. INFILL ALL NAIL HOLES IN WALLS SCHEDULED FOR NEW FINISH

11. WHERE MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH FLOOR SLABS ARE REMOVED, OR CUT FOR NEW WORK, PATCH HOLES

THROUGH THE SLAB.

B. FILL HOLES 3" TO 12" IN DIAMETER WITH CLASS B CONCRETE. ANCHOR TO SLAB WITH TWO NO. 4 DOWELS.

C. FILL HOLES 12" X 12" TO 36" X 36" WITH NO. 4 DOWELS, 8" O.C. BOTH WAYS.

15. THE SEALANT SCHEDULE IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE BELOW SCHEDULE APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS)). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION:

D. ALL HOLES TO BE FILLED IN STRUCTURAL FLOOR SLABS SHALL BE FILLED OR FORMED IN SUCH A MANNER AS

TO PREVENT NEW CURED CONCRETE FROM FALLING TO FLOOR BELOW.

E. PATCH EXISTING SLABS ON GRADE WHERE FLOOR HAS BEEN CUT FOR PLUMBING, HEATING AND OTHER REMODELING WORK. REINFORCE CUTS GREATER THAN 24" IN EACH DIRECTION WITH 6 X 6 WL.4 X WL.4 WIRE MESH. REINFORCE TRENCHES LESS THAN 24" WIDE WITH TWO #3 RODS CONTINUOUS. REPAIR UNDERSLAB

VAPOR RETARDER WITH MATERIAL EQUAL TO ORIGINAL INSTALLATION.

A. FILL HOLES 3" AND SMALLER IN DIAMETER WITH NON-SHRINK GROUT.

1. ALL PRESENT SERVICES INSTALLED AND OPERATING SHALL BE KEPT

IN OPERATION THROUGH THE NEW CONSTRUCTION UNTIL EQUAL

NEW SERVICES OR TEMPORARY LINES SATISFACTORY TO OWNER

ARE INSTALLED AND OPERATING

2. PARTITIONS SHOWN TO BE REMOVED SHALL BE COMPLETELY

REMOVED FROM STRUCTURE ABOVE TO STRUCTURAL FLOOR SLAB

3. CUT OPENINGS IN EXISTING WALLS. OPENINGS IN MASONRY AND

CONCRETE SHALL BE SAWCUT; EXECUTE WORK WITH A MINIMUM

DISTURBANCE TO EXISTING CONSTRUCTION WHICH REMAINS

4. UNLESS NOTED OTHERWISE ON THE PLANS, REMOVE EXISTING BASE

AS REQUIRED TO INSTALL NEW BASE. BASE SHALL BE REMOVED

DOWN TO ORIGINAL FINISHED WALL SURFACE; REMOVE ALL

ADHESIVE RESIDUE WHICH WILL INTERFERE WITH INSTALLATION OF

NEW BASE

5. ALL MATERIALS, RUBBISH, AND DEBRIS SHALL BE REMOVED FROM

THE BUILDING AND FROM THE PREMISES AS SOON AS IT

ACCUMULATES; REMOVAL OF RUBBISH AND DEBRIS SHALL BE

CONDUCTED IN SUCH A WAY THAT A MINIMUM OF DUST IS CAUSED

6. MAINTAIN OWNER OCCUPIED AREAS AS CLEAN AS POSSIBLE TO

AVOID INTERFERENCE WITH OWNER'S OPERATIONS

DEMOLITION NOTES

SEALANT SCHEDULE

SILICONE - 50% MOVEMENT -

CLASS 50

SILICONE - 25%

MOVEMENT/MILDEW

RESISTANT - CLASS

SINGLE

COMPONENT

URETHANE - 35%

MOVEMENT -

CLASS 35

MULTI-COMPONENT

URETHANE - 50%

MOVEMENT - CLASS

TAMPER RESISTANT

URETHANE - 12.5%

MOVEMENT CLASS

12.5 , ASTM D-412

375 TENSILE

STRENGTH

TAMPER PROOF

EPOXY - 0%

MOVEMENT CLASS 0

ASTM C-882 3530

BOND STRENGTH

LATEX - NO MOVEMENT -

CLASS 12.5

ACOUSTICAL

SEALANT -

NON-HEAD OF

WALL - 12.5%

MOVEMENT

ACOUSTICAL SEALANT

- HEAD OF WALL -

EXPANSION JOINTS -

33% MOVEMENT

BUILDING

INTERIOR -

UTILIZE

TAMPER

RESISTANT/

PROOF

PRODUCTS

ONLY IN

PSYCHIATRIC

CARE AREAS

BELOW

CEILING

LINES

JOINT BETWEEN SILLS AND

EXTERIOR FENESTRATIONS:

GRADE NS

JOINTS BETWEEN

PLUMBING FIXTURES

AND ADJOINING

MATERIALS: GRADE

NS

CONTROL JOINTS

SCHEDULED TO

BE CAULKED:

GRADE NS

EXPANSION JOINTS

NOT EXPOSED TO

UV: GRADE NS -

VERTICAL (AND

CEILING), GRADE P,

USE T - HORIZONTAL

CONTROL JOINTS/

EXPANSION

SCHEDULED TO BE

CAULKED: GRADE

NS AT VERTICAL,

GRADE P USE T AT

HORIZONTAL

JOINT BETWEEN

WALLS AND

ACOUSTICAL GRID:

GRADE NS

INTERIOR DOOR FRAMES

NOT EXPOSED TO UV, AT

INTERSECTION OF WALL

AND FRAME: GRADE NS, P

TYPICAL. USE SINGLE

COMPONENT URETHANE

SEALANT GRADE NS, T AT

FLOOR INTERSECTION

WALL

PERIMETERS

HEAD OF WALL JOINTS

JOINT BETWEEN INTEGRAL

BASE AND DOOR FRAMES:

GRADE NS

VERTICAL JOINTS AT

INSIDE CORNERS OF

CERAMIC TILE

CONDITIONS: GRADE

NS

PENETRATIONS

OF MECHANICAL

EQUIPMENT IN

SMOKE TIGHT

WALLS: GRADE

NS

JOINTS BETWEEN

DIS-SIMILAR

MATERIALS: GRADE

NS

INTERIOR DOOR

FRAMES NOT

EXPOSED TO UV, AT

INTERSECTION OF

WALL AND FRAME:

GRADE NS, P

TYPICAL.

JOINTS WHERE NO

MOVEMENT IS EXPECTED:

GRADE NS

SMOKE RESISTANT

EXPANSION JOINTS

(WHERE SILICONE

SEALANTS ARE NOT

UTILIZED)

EXPANSION JOINTS EXPOSED

TO UV: GRADE NS VERTICAL,

GRADE P USE T - HORIZONTAL

JOINT BETWEEN

TILED FLOOR AND

WALL

INTERSECTIONS:

GRADE NS, USE T

TERMINATION OF

VINYL WALL

COVERING:

GRADE NS

BETWEEN

COUNTERTOP AND

WALL SURFACES,

JOINTS BETWEEN

SILLS AND

EXTERIOR

FENESTRATIONS:

GRADE NS

JOINTS WHERE NO

MOVEMENT IS

EXPECTED: GRADE

NS

JOINTS BETWEEN DIS-SIMILAR

MATERIALS SUBJECT TO UV

EXPOSURE: GRADE NS

BETWEEN

COUNTERTOP AND

WALL SURFACES:

GRADE NS

JOINT BETWEEN

WALLS AND

ACOUSTICAL

GRID: GRADE NS

JOINTS BETWEEN

PLUMBING

FIXTURES AND

ADJOINING

MATERIALS: GRADE

NS

JOINTS BETWEEN

DIS-SIMILAR

MATERIALS NOT

SUBJECT TO UV

EXPOSURE:

GRADE NS

JOINT BETWEEN

INTEGRAL BASE

AND DOOR FRAMES:

GRADE NS

1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW

2. SILICONE SEALANT

2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT

2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000

2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT

2.4. TREMCO: SPECTREM 1

3. URETHANE JOINT SEALANTS

3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1

3.2. BOSTIK, INC.: CHEM-CALK 2020

3.3. SIKA CORPORATION: SIKAFLEX-1A

4. MULTI-COMPONENT NON-SAG URETHANE

4.1. DYNATROL II

4.2. TREMCO DYMERIC 240/240FC

5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)

5.1. PECORA AC-20 FTR

5.2. USG SHEETROCK ACOUSTICAL SEALANT

6. ACOUSTICAL SEALANT (HEAD OF WALL)

6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000

6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345

7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT

7.1. PECORA DYNAFLEX

7.2. BASF MASTERSEAL CR 195

7.3. SIKAFLEX 2C NS TG

8. TAMPER PROOF EPOXY SEALANT

8.1. PECORA DYNAPOXY EP-1200

SEALANT NOTES

M.V. K.K.S.

DWG. 01 OF 04

Sheet Number Sheet Title

GENERAL

G001-1 TITLE SHEET

HVAC

MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1

M601-1 DETAILS AND SCHEDULES - PHASE 1

ELECTRICAL

E101-1 SUB-BASEMENT WORK PLANS

AutoCAD SHX Text S

STAIR 5

UP TA

DN

2"

1" COND. DN

TO OPEN SITE

6" CWS/R

4" CWR

4" CWS

CH-1

EXISTING

CH-3

UNDERGROUND PIPING

TO SUBBASEMENT

UNDERGROUND

PIPING

6" CWR6" CWS

UNDERGROUND

PIPING

6" CWR

6" CWS

(2)6"CWS AND

(2)6"CWR TO

SUB-BASEMENT

6"CWS/R TO

SUB-BASEMENT

6" CWR

6" CWS

6"CWS/R TO

SUB-BASEMENT

DD

F

F

F

RESUPPORT 1/2"

TEMPERATURE

CONTROL CONDUIT

ROUTED BETWEEN

MODIFIED SUPPORTS.

EE

REMOVE ISOLATION VALVE.

REPLACE WITH NEW.

REMOVE ISOLATION VALVE.

REPLACE WITH NEW.

REMOVE

DRAIN VALVE

REMOVE STRAINER.

REPLACE WITH NEW.

REMOVE VALVES

AND AIR VENT. REMOVE ROLLER SUPPORTS

AND REPLACE (TYP.)

REMOVE

DRAIN VALVE

4" CWS

4" CWR

4"CWS/R STACKED

TO SUB-BASEMENT

3'-0" HIGH PLATFORM

W/ LADDER

REMOVE 6"CWS/R PIPING AND REPLACE

WITH 8". REMOVE INSULATION AND

ALUMINUM METAL JACKETS.

E

STAIR 5

UP TA

DN

2"

1" COND. DN

TO OPEN SITE

6" CWS/R

4" CWR

4" CWS

CH-1

EXISTING

CH-3

UNDERGROUND PIPING

TO SUBBASEMENT

UNDERGROUND

PIPING

6" CWR6" CWS

UNDERGROUND

PIPING

6" CWR

6" CWS

(2)6"CWS AND

(2)6"CWR TO

SUB-BASEMENT

6"CWS/R TO

SUB-BASEMENT

6" CWR

6" CWS

8"CWS/R

8"CWS/R TO

SUB-BASEMENT

8"

NEW DRAIN

VALVE

NEW STRAINER

NEW VALVES AND

AIR VENT PIPE TO

MATCH EXISTING

NEW ISOLATION

VALVE

NEW ISOLATION

VALVE

PROVIDE NEW ROLLER

SUPPORTS ON EXISTING

STEEL BASE SUPPORTS (TYP.)

RESUPPORTED

TEMPERATURE

CONTROL CONDUIT

"NOT SHOWN".

NEW DRAIN

VALVE

(5) MODIFIED PIPE

SUPPORTS. SEE

NOTE F

NOTE: PROVIDE ALUMINUM

JACKET OVER INSULATION ALL

OUTDOOR PIPING TO MATCH

EXISTING CONDITIONS.

4" CWS

4" CWR

4"CWS/R STACKED

TO SUB-BASEMENT

3'-0" HIGH PLATFORM

W/ LADDER

E

4" VALVE AND CAP

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

3" CWS/R-UP

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

REMOVE 6"CWS/R PIPING AND REPLACE WITH 8"

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

X= 7'-

4"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

HX-3

HX-4

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

6"CWS/R TO

BASEMENT PLAN

CW

S

CW

R

A

B

C

6"

TCP

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

A

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=9'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

3" CWS/R-UP

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

X= 7'-

4"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

HX-3

HX-4

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

8"CWS/R TO

BASEMENT PLAN

TCP

8"

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

4" VALVE

AND CAP

NEW

ISOLATION

VALVE

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

2 1/2"

(2)6"CWS AND

(2)6"CWR STACKED

X=7'-0", X=5'-2"

EXISTING

EXPANSION

TANK

10"

8" 10

10" CWS/R-UP

1"

1"

1"

CONDENSER RACK 1 1/2"

4" CWR

4" CWS

4" CWR

NCNC

NC

2 1/2" CWS/R UP

THRU FLOOR

2 1/2"CWS/R

X=8'-4"

4" CWS

X=6'-8"

3" CWS

X=6'-8"

4" CWR

X=6'-6"

3" CWR X=6'-5"

2"

2"

3 1/2"

3 12"

6"

2"

6"

4"

2 1/2"

6"

3" 6" 10"

4"CPD

1"

4"CPD

X=9'-4"

6" LPS

4" X=6'-8"

4" HPC

3/4" HPC

2" HPC

2" HPC

2" HPC

1 1/2" NG

2" NG

1" NG

1 1/2" NG

1 1/2" NG

1 1/2" NG

EXISTING

FANCOIL

EXISTING

FANCOIL

EXISTING

COOLING

COIL

1 1/4"

1"

1 1/4"

EXISTING

FANCOIL

2"

EXISTING

FANCOIL

4" HWS/R-UP

IN TUNNEL

6" CWS/R TO

BASEMENT PLAN

TO PUMP #3

EXISTING HR

CHILLER - CH9

EXISTING

FANCOIL

2"

CPD

1" 20 PSI STEAM

SUPPLY AND

CONDENSATE

RETURN

1"

2"

CPD

CP

D

V

2"HPS

6"

3/4"

TO KITCHEN

PRV

6" MPS-UP

2" MPC-UP

X= 7'-

4" X=9'-3"

X=8'-1"X=7'-8" X=7'-8"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=7'-3"

X=6'-10"

4" LPS

HX-3

HX-4

3" TO DOM. WH

6"

4"

3"

3"

4"

3"

2"

3/4"

X=1'-9"

X=2'-0"

X=9'-9"

2" X=9'-8"

X=8'-2"

3"LPC-UP

4"

2"MPS

6" LPS

HEADER

6"MPS

2"

2-1/2"

(2)6"CWS,

(2)6"CWR AND

4"CWS/R TO

BASEMENT PLAN

6"

10" 10"

8"CWS/R TO

BASEMENT PLAN

3"

1 "12

X=1'-3"

3"V X=7'-8"

TCP

3/4"

8"

X= 5'-

6"

4"HWS/R

X=8'-6"

X=6'-8"

X= 6'-

X= 7'-

X=8'-4"

X=7'-1"

CWR

CWS

ABANDONED FILTER

X=8'-2"

X=6'-7"

X=9'-7"

X=8'-8"

X=10'-4"

X=7'-0"

X=7'-2"

X= 7'-

0"

X=9'-4"

X=9'-3"

X=8'-4"

8"

8"

X=9'-4"

4" VALVE

AND CAP

NEW

ISOLATION

VALVE

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

SUB-BASEMENT AND BASEMENT

FLOOR PLANS - PHASE 1

MP101-1M.V. K.K.S.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

FEBRUARY 18, 2022

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VAMC

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENT SET

Comm. Number: 21FED04.00

50% OWNER REVIEW 01-27-2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

95% OWNER REVIEW 02-08-2022

100% OWNER REVIEW 02-16-2022

BID DOCUMENT SET 02-18-2022

MP101-1

F4 BASEMENT DEMOLITION PLAN - PHASE 1

1/8" = 1'-0" MP101-1

F7 BASEMENT NEW WORK PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D4 SUB-BASEMENT DEMOLITION PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D7 SUB-BASEMENT NEW WORK PLAN - PHASE 1

1/8" = 1'-0"

MP101-1

D1 SUB-BASEMENT COORDINATION PLAN - FOR REFERENCE ONLY

1/8" = 1'-0"

KEYPLAN

NO SCALE

N

DWG. 02 OF 04

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

PROVIDE REDUCER AND NEW CONNECTION AT ISOLATION VALVES.

REINSTALL FLOW METER IN NEW PIPING. RECALIBRATE FOR 8" PIPE

INSTALLATION. ALTERNATIVELY, A NEW 8" OMICRON FLOW PROBE

MATCHING EXISTING UNIT MAY BE INSTALLED.

PROVIDE REDUCER AND NEW CONNECTION AT EXISTING VALVE.

NEW PIPING TO FOLLOW EXISTING ROUTE. ADJUST TO ALLOW

ENLARGED PIPE INSTALLATION.

CORE DRILL TO ENLARGE OPENING FOR PIPING. SEAL PIPE THROUGH

VALVE

PROVIDE NEW 8" FLEXIBLE CONNECTORS TO MATCH EXISTING TYPE.

PROVIDE REDUCER AT CONNECTION TO CHILLER. PROVIDE NEW

PRESSURE GAUGES, THERMOMETERS, VENTS AND DRAINS IN SAME

LOCATION AS ALL DEMOLISHED DEVICES.

INSTALL AND CONNECT CHILLER FLOW/TEMPERATURE SENSORS.

1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING

PURPOSES ASSUME 8'-0" OF PIPE TO BE LOWERED TO AVOID NEW 8"

PIPING. LOWER PIPE FROM EAST SIDE OF NEW PIPE TO PIPE

DROP/OFFSET LOCATION SHOWN. PATCH INSULATION TO MATCH

EXISTING. UTILIZE STEEL PIPE MATCHING VA STANDARDS. ASTM

A53/A53M, GRADE B, SEAMLESS OR ERW; OR ASTM A106/A106M,

GRADE B, SEAMLESS; SCHEDULE 80.

A

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

B

REMOVE PIPING BACK TO ISOLATION VALVE/T-DUTY. SALVAGE THE

FLOW METER AND REINSTALL IN NEW PIPING OR TURN OVER TO

OWNER. SEE NEW WORK PLAN KEYED NOTE 1.

REMOVE PIPING BACK TO ISOLATION VALVE.

REMOVE PIPE HANGERS AND REPLACE WITH NEW FOR ENTIRE

INDOOR PIPE ROUTE.

REMOVE FIELD INSTALLED PIPING TO CHILLER CONNECTIONS.

REMOVE FLEXIBLE CONNECTORS AND REPLACE WITH LARGER

DEVICES. DEMOLISH PRESSURE GAUGES, THERMOMETERS, VENTS,

DRAINS AND REINSTALL ON NEW PIPING.

SALVAGE CHILLER SENSOR (FLOW/TEMPERATURE) FOR

REINSTALLATION.

5 PLACES: PIPE SUPPORT IS HORIZONTAL 6x2" C-CHANNEL

SUPPORTED BY (2) 2.5" VERTICAL PIPE SUPPORTS. PIPES ARE HUNG

BELOW C-CHANNEL.

SHORTEN THE (2) 2.5" VERTICAL PIPE SUPPORTS AND REINSTALL THE

HORIZONTAL C-CHANNEL TO ALLOW PIPES TO BE SUPPORTED WITH

PIPE ROLLERS ON TOP OF THE HORIZONTAL C-CHANNEL SIMILAR TO

SUPPORTS ON SOUTH SIDE OF EXISTING CHILLER CH-3.

1" LPCR TO BE REMOVED IN FED VA PROJECT 585-20-111. FOR BIDDING

PURPOSES ASSUME REMOVAL AND REROUTING OF 8'-0" OF PIPE TO

NEW AVOID NEW 8" PIPING.

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.

- INSTALL NEW TEMPERATURE SENSORS IN SUPPLY AND RETURN

PIPING IN SIMILAR LOCATION TO EXISTING DEVICES. DISPLAY ON DDC

SYSTEM.

- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR

SHOWN DASHED.

- REMOVE TEMPERATURE SENSOR DEVICES ON SUPPLY AND RETURN

PIPING.

- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO

BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE

ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID

WITH FACILITY STAFF.

- ALL AIR VENTS, DRAINS AND ACCESSORIES ON EXISTING REMOVED

PIPING SHALL BE SALVAGED AND INSTALLED ON NEW PIPING IN

SIMILAR MANNER.

C

D

E

F

DOMESTIC HEATING

EQUIPMENT NOT SHOWN.

G

G 7

NEW CONNECTIONNEW

CONNECTION

1"

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

HPC

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PCHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

PHW

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text 2A

AutoCAD SHX Text

AHU

5 FT

THRU [20]

6 8 10

[32][25] [40]

[65]

[50]

[75]

-1312 14 -16 -

[125][100]

[150]

[250]

[200]

[300]

[400]

[350]

[450]

[600]

[500]

20 241814 16128 1064 532 2 1/21 1/21 1 1/4

[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]

--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]

THRU 3/4

[2100] [2100]

[2100]

[2700]

[2400]

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.

[453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 -

SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE 43 -

SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9 PSF

MIN. DENSITY) UNDER INSULATION

SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

IN.

[mm]

FT.

[mm]

FT.

[mm]

[2 5m m

1" M

AX

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

DETAILS AND SCHEDULES - PHASE 1

M601-1M.V. K.K.S.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

FEBRUARY 18, 2022

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VAMC

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENT SET

Comm. Number: 21FED04.00

50% OWNER REVIEW 01-27-2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

95% OWNER REVIEW 02-08-2022

100% OWNER REVIEW 02-16-2022

BID DOCUMENT SET 02-18-2022

M601-1

F5 PIPE HANGERS

NO SCALE

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCI SPINAL CODE INJURY

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PEF PROPELLER (TYPE) EXHAUST FAN

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH - ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT

(SUBMISSION1)

DD-2 DESIGN DEVELOPMENT

(SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

CD-2 CONSTRUCTION DOCUMENTS

(SUBMISSION2)

CENT CENTRIFICAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXODE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

(TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BMT BONE MARROW TRANSPLANT

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL

DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL

DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

C CENTIGRADE (CELCIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CD-1 CONSTRUCTION DOCUMENTS

(SUBMISSION1)

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OR OPERATING ROOM

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

M METER, SI UNIT

M/s METERS PER SECOND (OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

IRH INTRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

YR YEAR

W WATTS

WAG WASTE ANETHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION

A/E ARCHITECT/ENGINEER

BC BOOSTER COIL

CSFD COMBINATION SMOKE AND FIRE DAMPER

DN DOWN

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FPI FINS PER INCH

FRPS FIRE RATED PIPE SLEEVE

GPC GENERAL PRIME CONTRACTOR

GT GENERAL TRADE

GR GRILLE OR DIFFUSER

HP HORSE POWER

MBTU 1,000 BRITISH THERMAL UNITS PER HOUR

MOCP MAXIMUM OVER CURRENT PROTECTION

NC NO CHANGE

PH PHASE

PT PLUMBING TRADE

PVC POLYVINLY CHLORIDE

RM ROOM

SEER SEASONAL ENERGY EFFICIENCY RATIO

SWSI SINGLE WIDTH SINGLE INLET

TB TIGHT TO BEAM

TC TEMPERATURE CONTROL

TS TIP SPEED

TV TURNING VANE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

V VENT

WS WALL SLEEVE

ABBREVIATIONS SCHEDULEGENERAL SYMBOLS

MAKE-UP WATERMW

X=

OF PIPE, OR BOTTOM OF DUCT OR EQUIPMENT.

DISTANCE FROM FINISHED FLOOR TO CENTERLINE

E=

LPCR

LPS

MPCR

MPS

HPCR

HPS

CPD

V D

CWR

CWS

LTHWR

LTHWS

HWR

HWS

T

CAP DUCTWORK - SEAL ALL JOINTS

EXTERNAL DUCT INSULATION

INTERNAL DUCT INSULATION

RISE OR DROP IN DUCT (AS NOTED)

OR BOTTOM OF DUCT OR EQUIPMENT FROM DATUM.

ELEVATION - DISTANCE FROM CENTERLINE OF PIPE,

UNLESS OTHERWISE NOTED. (DIGITAL OR PNEUMATIC)

TEMPERATURE SENSOR AT FIVE FEET ABOVE FINISH FLOOR

PRESSURE GAUGE

THERMOMETER

STRAINER

BUTTERFLY VALVE

BALL VALVE

GATE OR GLOBE VALVE

RELIEF VALVE

CONTROL VALVES (3-WAY OR 2-WAY)

STEAM CONDENSATE TRAP

CAP PIPING

UNION

REDUCER OR INCREASER

AS DASHED SHALL BE REMOVED.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

WITH AN (X) IMPLIES PIPING IS EXISTING.

ANY OF THE ABOVE PIPING SYMBOLS INDICATED

LOW PRESSURE CONDENSATE RETURN

LOW PRESSURE STEAM (0-15 psi)

MEDIUM PRESSURE CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16-99 psi)

HIGH PRESSURE CONDENSATE RETURN

HIGH PRESSURE STEAM (100 psi +)

CONDENSATE PUMP DISCHARGE

VENT

DRAIN

CHILLED WATER RETURN

CHILLED WATER SUPPLY

LOW TEMPERATURE HOT WATER RETURN (120°F)

LOW TEMPERATURE HOT WATER SUPPLY (130°F)

HOT WATER RETURN (155°F)

HOT WATER SUPPLY (180°F)

DESCRIPTIONSYMBOL

D OR P

CONTROL OR BACKDRAFT DAMPER

C CARBON DIOXIDE SENSOR.

DWG. 03 OF 04

AutoCAD SHX Text X

AutoCAD SHX Text X

X

LIF

E

SA

FE

TY

U

PS

CRITICAL UPS

ATS

CN

TR

L

BM

S

BM

S

BM

S

BM

S

J

AHU-12

ATS MONITOR

PNL

CNTRL

SBP-B

EX LIGHTING

CONTROLS

SLP

CN

TR

L JOCKEY

PUMP CONTROLLER

FIRE PUMP

CONTROL

PANEL

FLO-COLD

BMS

EQ-A

CN

TR

L

SUMP

EF-34

EF-34

ERV-1

SBL

FA EQ CR

SBA

BCR

ATS-CR

ATS-EQ

ATS-LS

ATS-XRAY

ATS-FP

CR-DIST

(CR-UPS)

EQ-2

SBP- C

EQ-5

LS-UPS

ADP

SPLICE BOX

LS

ATS ATS ATS ATS

AT

S

AT

S

ATS-CR2

ATS-CR3

AT

S

ATS-EQ2

XRAY DIST.

PNL

SBP-A

SBP

HCHILL

REF

DP-EQ1

UNI-STRUT

DDC

CONTROL

PNLS

DDC CTRL

PNL

F.P.

CONTROLLER

PORTABLE

GENERATOR

DISC.

1600A

SQ-D TERM. BOX

PORTABLE

GENERATOR

CONNECTION

CN

TR

L

MTS-HCHILL

EX

EX

EX

EX EX

EX EX

EX

PUMP

EX

PUMP

EX

X-AHU-12

EX

EX

EX

SBP.9

EX

EX

EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX

EX

EX

EX

EX EX

P3

P4

P5

P6

P1

P2

P2A P1

P2

P3P3

P4

P5

P6

P1 P2 P2AEX

CHILLER

PUMP PUMP

PUMP

PUMP

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX EX EX

ST

EA

M

TU

NN

EL

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

BM

S

BM

S

BM

S

BM

S

ATS MONITOR

PNL

SBP-B SLP

FLO-COLD

EQ-A

SBL

FA EQ CR

SBA

BCR

CR-DIST

(CR-UPS)

EQ-2

SBP- C

EQ-5

LS-UPS

LS

XRAY DIST.

PNL

SBP-A

SBP

HCHILL

REF

DP-EQ1

UNI-STRUT

DDC

CONTROL

PNLS

MTS-HCHILL

ALL EXISTING PANELS

ATS AND BMS

EQUIPMENT

TO REMAIN AS IS

A

B

EXISTING CHILLER

PIPING BEING

REPLACED BY MECH.

CONTRACTOR

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EXEX

EX EX

ST

EA

M

TU

NN

EL

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

SUB-BASEMENT FLOOR PLANS -

PHASE 1

E101-1MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

FEBRUARY 18, 2022

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VAMC

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENT SET

Comm. Number: 21FED04.00

50% OWNER REVIEW 01-27-2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

95% OWNER REVIEW 02-08-2022

100% OWNER REVIEW 02-16-2022

BID DOCUMENT SET 02-18-2022

DWG. 04 OF 04

E101-1

F2 SUB-BASEMENT NEW WORK PLAN

1/8" = 1'-0" E101-1

F6 SUB-BASEMENT DEMOLITION PLAN

1/8" = 1'-0" 4'0" 2' 8' 12' 4'0" 2' 8' 12'

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

MODIFIED CONDUIT AND WIRING PER DEMOLITION NOTE 'A'.

REINSTALL LIGHT FIXTURE SALVAGED FROM DEMOLITION. UTILIZE

EXISTING CIRCUIT/SWITCHING SCHEME. PROVIDE ADDITIONAL

CONDUIT AND WIRING AS REQUIRED.

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A

B

MODIFY TWO (2) EXISTING 1" CONDUITS (WITH WIRING) AND ONE (1)

3/4" CONDUIT (WITH WIRING) IN WAY OF DEMOLITION AND NEW WORK

WITH REGARDS TO THE CHILLER PIPING BEING REPLACED. THE

CONDUITS AND WIRING NEED TO BE OFF-SET/LOWERED DUE TO THE

FACT THAT THE NEW PIPING AND INSULATION WILL BE LARGER.

COORDINATE WITH MECHANICAL CONTRACTOR.

TEMPORARILY DISCONNECT AND REMOVE LIGHT FIXTURE IN WAY OF

DEMOLITION AND NEW WORK. SALVAGE CIRCUITS AND WIRING FOR

RE-USE. COORDINATE WITH MECHANICAL CONTRACTOR.

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

G001-1 TITLE SHEET - PHASE 1
G001-1 TITLE SHEET - PHASE 1
DEVICE-MNT-SCH
MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1
MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1
X616301AWF00
OGJMC_HX_00
OGJMC_HX_SB
X616301AWFSB
OGJMC_HX_SB(2)
M601-1 DETAILS AND SCHEDULES - PHASE 1
M601-1 DETAILS AND SCHEDULES - PHASE 1
X001 - SD230511-21 PIPE HANGERS
E101-1 SUB-BASEMENT FLOOR PLANS - PHASE 1
E101-1 SUB-BASEMENT FLOOR PLANS - PHASE 1
OGJMC_EX_SB
OGJMC_EX_SB(2)
MP101-1 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 1.pdf
Sheets and Views
MP101-1
X616301AWF00
OGJMC_HX_00
OGJMC_HX_SB
X616301AWFSB
OGJMC_HX_SB(2)

File details come from the government source that posted it. Updated .