36C25220R0060 A00001.docx

DOCX document 28 KB Posted

Attached to
Z1DZ--Tomah Construction MATOC FY'20 $22mil, 5yrs
Solicitation number
36C25220R0060
Issued by

View the file

Other files

File Type Posted
36C25220R0060 A00004.docx DOCX document
S06 - Att - A00004 - Sol Q_A Rd.2 - 9.11.2020.pdf PDF
S06 - Att - A00004 - Sign-In Sheet dated 9.9.2020.pdf PDF
36C25220R0060 A00003.docx DOCX document
S06 - Att - B10 DayCare Window Schedule.pdf PDF
S06 - Att - Combined floor plans.pdf PDF
S06 - Att - Handbook_0730-4.pdf PDF
S06 - Att - Sol Questions and Answers - MATOC.pdf PDF
S06 - Att - VA Physical Security Design Manual.pdf PDF
S06 - Att - B403 1st Floor Window Screen.pdf PDF
S06 - Att - B10 DayCare Door Schedule and Floor Plan.pdf PDF
S06 - Att - B401 1st Floor Window Screen.pdf PDF
36C25220R0060 A00002.docx DOCX document
TS06 - A00001 - Att - SOW Rev.1 - Final - 676-20-006.pdf PDF
TS06 - A00001 - Att - Plans - 676-20-006.pdf PDF
S02 - Sol - Att 1 - Sub Consent.pdf PDF
S02 - Sol - Att 3 - EMR.pdf PDF
S02 - Sol - Att 7 - SEED Pricing Schedule.pdf PDF
S02 - Sol - Att 9 - SOW Seed Project - Final.pdf PDF
S02 - Sol - Att 5 - Financial Disclosure Questionnaire.pdf PDF
S02 - Sol - Att 6 - PPQ.pdf PDF
S02 - Sol - Att 8 - Specs Final - 676-20-006 - 4.30.2020.pdf PDF
36C25220R0060.docx DOCX document
S02 - Sol - Att 10 - Wages - Monroe Cty iss 7.23.2020.pdf PDF
S02 - Sol - Att 4 - Gen Info.pdf PDF
S02 - Sol - Att 2 - Surety Limits.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF30 Continuation Page

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00001 08-12-2020 676-20-3-6985-0040 676-20-2-6985-0005 Per Task Order Y 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 Y 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25220R0060 08-05-2020

X X X

Amendment A00001 - Includes Changes to the Scope of Work for the MATOC Seed project and adds the Seed Project plans.

***See the SF30 continuation page for additional details

Kristi Kluck Contracting Officer Solicitation: 36C25220R0060 Project: Correct Security and Environmental Deficiencies Construction (MATOC Seed) Project #: 676-20-006 At the Tomah VA Medical Center, Tomah, WI 54660 A00001 – Revised Seed Project SOW, Plans

1) Revised Seed Project SOW: Change to Section SW-3, #5 Description of Work and remove SW-4 Bid Alternates:

a) Section SW-3, #5: The window count has changed from 14 windows to 15 windows.

b) Section SW-4 Bid Alternates has been removed.

c) Section numbering (SW-#) has been updated to reflect changes.

d) See the attached Revised Scope of Work

2) Plans, Equipment Location Schedule, and Day Care Schedule: The plans and schedules for the MATOC Seed project have added. See the attached plans and schedule.

*** Contractor is required to acknowledge all amendments in Block 19 on the 2nd page of the SF-1442 prior to the date and time set for the Bid Opening.

See attached document: TS06 - A00001 - Att - SOW Rev.1 - Final - 676-20-006.

See attached document: TS06 - A00001 - Att - Plans - 676-20-006.

File details come from the government source that posted it. Updated .