36C25220Q0236

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9.

ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE

WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15

CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTA

CHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNAT

URE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

695-20-2-6023-0732 36C25220Q0236 01-30-2020

MEAD, JENNIFER

414-844-2000 X43273 02-07-2020

12:00 NOON CST

36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 X X 541350 $8 Million N/A X 36C252 Clement J.

Zablocki VA Medical Center 5000 W. National Avenue Milwaukee WI 53295-0001 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476

Department of Veterans Affairs Financial Services Center PO Box 149971 Austin TX 78714-9971 877-353-9791 512-460-5540 See CONTINUATION Page Roof Inspection, Maintenance and Upkeep at the Clement J. Zablocki VA Medical Center in Milwaukee, WI per the Statement of Work.

Service Contract Labor Standards Apply

WD 18-4899

REV(

10) 12/23/2019

100% SMALL BUSINESS SET-ASIDE

Site Visit must take place prior to February 5, 2020.

Question and answer requests must be submitted in a written form by Febru ary 5, 2020.

To schedule a site visit, contact COR Andrew Cozad at andrew.cozad@va.gov.

VA POC

Andrew Cozad Contract Specialist Jennifer Mead See CONTINUATION Page 695-3600162-6023-8541000 2660 010050192 X X X Ashley Johnson 36C25220Q0236

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA (continuation from Standard Form 1449)

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:______________________________________ (Contractor’s Name)______________________________________ (Address)
______________________________________ (City-State-Zip)
______________________________________ (Point of Contact/Title)
PHONE NUMBER______________________________________
FAX NUMBER______________________________________
E-MAIL ADDRESS______________________________________

DUNS NUMBER NO. ______________________________________

b. GOVERNMENT: JENNIFER MEAD, CONTRACT SPECIALIST

DEPARTMENT OF VETERANS AFFAIRS

GREAT LAKES ACQUISITION CENTER

115 S. 84TH ST., STE 100

MILWAUKEE WI 53214

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

a. FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER SYSTEM – SYSTEM FOR AWARD

3. INVOICES: Invoices shall be submitted annually, in arrears in accordance with:

a. 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)

b. Upon acceptance of service

4. GOVERNMENT INVOICE ADDRESS (See SF1449 Block 18):

a. All invoices from the contractor shall be submitted electronically in accordance with 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)

b. Facsimile, e-mail, and scanned documents are not acceptable forms of submission for payment requests.

c. VA’s Electronic Invoice Presentment and Payment System – The FSC uses a third-party contractor, Tungsten Network e-Invoice, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/customer-campaigns/veterans-affairs-us/ to begin submitting electronic invoices, free of charge.

d. For assistance setting up e-Invoice, the below information is provided:

i. * Tungsten Network e-Invoice Setup Information: 1-877-489-6135

* Tungsten Network e-Invoice email: VA.Registration@ob10.com <http://VA.Registration@ob10.com/>

* FSC e-Invoice Contact Information: 1-877-353-9791

* FSC e-invoice email: vafsccshd@va.gov <http://va.gov/>

5. INVOICES:

a. Payments shall be made upon acceptance of service, in arrears upon receipt of a properly prepared invoice.

b. In order to comply with the Improper Payment Elimination and Recovery Act of 2010 (IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Network e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to VA.Registration@Tungsten-Network.com or calling 1-877-752-0900 option 2 for Enrollment.

c. Contractor shall submit an electronic invoice by the tenth (10th) of the following month services were performed to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.Tungsten-Network.com/Login.aspx. For questions regarding the submission of VA electronic invoices, Tungsten Network customer service may be contacted at 1-877-489-6135.

d. All invoices shall reference the vendor name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.

e. For questions regarding invoice receipt or payment, please call VAFSC directly at 1-877-353-9791 or email vafsccshd@va.gov

OFFERORS MUST COMPLETE AND RETURN ALL INFORMATION DESIGNATED HEREIN PRIOR TO THE TIME SPECIFIED IN BLOCK 8 OF SF 1449 IN ORDER TO BE CONSIDERED FOR AWARD.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NODATE
________________________________________________________
________________________________________________________
________________________________________________________

Offers may be submitted by e-mail to Jennifer.Mead@va.gov. A signed and dated 1449 must be included along with all other information requested herein by the due date and time. Offers must be received by the date and time specified in Block 8. CAUTION - LATE Submissions, Modifications, and Withdrawals: See provision 52.212-1. All offers are subject to all terms and conditions of this solicitation REQUIRED DOCUMENTATION: Contractor shall e-mail complete quote package with pricing information completed to Jennifer.Mead@va.gov:

1. Solicitation document with:

a. Contractor shall fill in the SF 1449 blocks 17a, 30a, 30b, and 30c.

b. Contractor shall fill in Pg. 2, 1(a).

c. Contractor shall fill in all unit and total costs under the PRICE/COST SCHEDULE or submit separately the spreadsheet with line items costs filled in.

2. Insurance, certifications, and documentation in accordance with the requirements within the performance work statement.

3. Quote documentation in accordance with 52.212-1; Instruction to Offerors:

Technical Capability: Offeror must submit the following (will be used for evaluation under the Technical Capability factor in 52.212-2):

A. Proof that Offeror has been providing the type of service listed in the Statement of Work. Proof shall include a list of companies/agencies where contractor has performed same or similar work within the past three (3) years at a facility in comparable size to the Milwaukee VA Medical Center.

B. Copies of OSHA 10 training certificates for any technician who will be providing service under this contract.

C. Proof that Field Service Engineers/Site Supervisors who will be performing under this contract have had a minimum of two (2) years of experience performing this service.

A signed, dated and scanned 1449 must be included along with all other information requested herein by the due date and time. Offers may also be submitted through the regular mail and must be received by the date and time specified in Block 8. CAUTION - LATE Submissions, Modifications, and Withdrawals: See provision 52.212-1. All offers are subject to all terms and conditions of this solicitation.

TYPE OF CONTRACT: Firm Fixed Price

ACQUISITION OF COMMERCIAL ITEMS:

This Request for Quote (RFQ) solicitation is issued under the authority of FAR Part 12 Acquisition of Commercial Items and FAR Part 13 Simplified Acquisition Procedures. FAR Part 15 will not be used. The procedures in Part 12 used in conjunction with Part 13 allow the Government to procure services resembling those in the commercial marketplace and streamline the procurement process.

The Lowest Price Technically Acceptable source selection process will be used for this procurement. This means award will be made on the basis of the lowest evaluated price of quotes meeting or exceeding the acceptability standards for non-cost factors. See 52.212-2 Evaluation – Commercial Items (Section E) for a description of the factors in addition to price that the Government will use to evaluate offers. Prospective contractors must furnish the information listed herein with their quotations to ensure they receive full consideration.

SECURITY & PRIVACY CONTROL:

The Authorization & Accreditation (A&A) requirements of VHA Handbook 6500.6 do not apply to this requirement, therefore, a Security Accreditation Package is not required. No A&A or MOU/ISA is required. Sensitive information exposure as part of this contract involves applicable security controls within the facility as part of the VA Information Security If there are any questions related to privacy, please have a member of your staff contact the VA Privacy Service at (202) 461-6309. If there are any questions related to the information security, please have a member of your staff contact the Office of Cyber Security at (304) 262-7733.

SPECIAL NOTES

In order to maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contract Specialist Jennifer.Mead@va.gov no later than NOON CENTRAL WEDNESDAY FEBRUARY 5, 2020. Contracting will issue a consolidated response via solicitation amendment posted to www.fedbizops.gov within 2 business days to all parties.

The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.

SITE VISIT

It is strongly suggested, and expected, that the offeror inspect the campus to be serviced to fully understand the nature of the work and the conditions under which the work is to be performed. In no case shall failure to inspect the campus constitute grounds for a claim after contract award. SITE VISITS MUST TAKE PLACE PRIOR TO FEBRUARY 5, 2020. TO SCHEDULE A SITE VISIT, CONTACT COR ANDREW COZAD AT 414-384-2000 x41396 ANDREW.COZAD@VA.GOV.

B.1 PRICE/COST SCHEDULE

The Contractor shall perform a roof inspection including general upkeep, maintenance and to provide an inspection report to the Clement J. Zablocki VA Medical Center located in Milwaukee, WI. Contractor shall provide all labor, material, tools, and equipment necessary to execute this requirement for twelve (12) buildings totaling approximately 475,000 square feet.

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 111, and sq. ft.: 143,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Base POP Begin: 04-01-2020 POP End: 03-31-2021

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 70, and sq. ft.: 84,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 112 and sq. ft.: 11,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 107 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 108 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 102 and sq. ft 21,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 20 and sq. ft: 18,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building: The Director’s Complex, sq. ft. 6,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 6 and sq. ft.: 58,200. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 5 and sq.ft.:16,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 4 and sq. ft. 4,400. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 123, sq. ft.: 102,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 43, sq. ft.: 32,800. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

BASE YEAR TOTAL ______________________

1.00
JB
______________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 111, and sq. ft.: 143,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Option 1 POP Begin: 04-01-2021 POP End: 03-31-2022

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 70, and sq. ft.: 84,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 112 and sq. ft.: 11,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 107 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 108 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 102 and sq. ft 21,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 20 and sq. ft: 18,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building: The Director’s Complex, sq. ft. 6,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 6 and sq. ft.: 58,200. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 5 and sq.ft.:16,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 4 and sq. ft. 4,400. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 123, sq. ft.: 102,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 43, sq. ft.: 32,800. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Option 1

OPTION YEAR 1 TOTAL ______________________

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 111, and sq. ft.: 143,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Option 2 POP Begin: 04-01-2022 POP End: 03-31-2023

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 70, and sq. ft.: 84,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 112 and sq. ft.: 11,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 107 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 108 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 102 and sq. ft 21,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 20 and sq. ft: 18,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building: The Director’s Complex, sq. ft. 6,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 6 and sq. ft.: 58,200. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 5 and sq.ft.:16,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 4 and sq. ft. 4,400. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 123, sq. ft.: 102,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 43, sq. ft.: 32,800. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

OPTION YEAR 2 TOTAL ______________________

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 111, and sq. ft.: 143,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Option 3 POP Begin: 04-01-2023 POP End: 03-31-2024

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 70, and sq. ft.: 84,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 112 and sq. ft.: 11,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 107 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 108 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 102 and sq. ft 21,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 20 and sq. ft: 18,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building: The Director’s Complex, sq. ft. 6,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 6 and sq. ft.: 58,200. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 5 and sq.ft.:16,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 4 and sq. ft. 4,400. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 123, sq. ft.: 102,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 43, sq. ft.: 32,800. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

OPTION YEAR 3 TOTAL ______________________

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 111, and sq. ft.: 143,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

Contract Period: Option 4 POP Begin: 04-01-2024 POP End: 03-31-2025

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 70, and sq. ft.: 84,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 112 and sq. ft.: 11,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 107 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 108 and sq. ft 5,700. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 102 and sq. ft 21,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 20 and sq. ft: 18,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building: The Director’s Complex, sq. ft. 6,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 6 and sq. ft.: 58,200. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 5 and sq.ft.:16,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 4 and sq. ft. 4,400. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 123, sq. ft.: 102,000. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

1.00
JB
________________

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, the price for the Service delineated by building 43, sq. ft.: 32,800. This Service is to be conducted during a three (3) week period in the spring (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work.

OPTION YEAR 4 TOTAL __________________

GRAND TOTAL ____________

MILWAUKEE VAMC CAMPUS

ROOF INSPECTION & MAINTENANCE

STATEMENT OF WORK

I. GENERAL:

Contractor to provide all labor, material, tools, and equipment necessary to execute an annual Roof Inspection, General Upkeep, Maintenance and Annual Report, This Service is to be conducted during a three (3) week period in the spring of each contract period (Late April / early May) on the Milwaukee VAMC campus, in accordance with the scope of work. The quantity and order of roof inspection is to be done as directed by the VA.

PERIOD OF PERFORMANCE:
Base Year: 04/01/2020 – 03/31/2021
Option Year 1: 04/01/2021 – 03/31/2022
Option Year 2: 04/01/2022 – 03/31/2023
Option Year 3: 04/01/2023 – 03/31/2024
Option Year 4: 04/01/2024 – 03/31/2025

A. GENERAL REQUIREMENTS

1. Roof Inspection - The Roof Inspection shall include a visual survey of the exterior condition of building roofing and related sheet metal. It will include documenting roof related problems that are found, which may arise between service cycles. The visual inspection includes deterioration or damage observed to metal wall panels, brick wall dividers and parapets. These items will be brought to the Contracting Officers Representative’s attention for further action. This inspection does not include items such as structural damage or deterioration occurring below observable roof membrane.

2. General Upkeep – General Upkeep shall consist of routine tasks, as noted, to help ensure the roofing system will function as designed. Specifically, this shall include, debris removal to accomplish inspections and to ensure roof top safety of the 507,800 sq. ft of roof surface, gutters, interior drains, and through-wall scuppers.

3. Maintenance – The Maintenance work shall include, re-caulking open metal flashing, topping off pitch pockets, re-sealing suspect mechanical and perimeter base flashing openings, re-distribute wind-blown ballast and securing drain clamping and vent pipe rings for 507,800 sq. ft. of roof surfaces and correcting those deficiencies found during the inspections. These items are considered maintenance and generally are the first place a leak would occur.

4. Annual Report - An Annual Report in digital format will be provided to the VA Contracting Officer Representative and broken out by Building Number for Roof Inspection, General Upkeep and Maintenance, hours worked for each General Requirement, a roof condition report, budgetary information, and a general overview. Also included in this report will be a roof drawing and work-related photographs. The Annual Report is also to be broken out Building Number (including sq. ft.). The Annual report shall be provided to the Contracting Officer Representative within 15 working days following the completion of the inspection.

Additional work needed to correct deficiencies or defects in the roofing system not described above would be performed by obtaining the appropriate approval. This may include such items as weather related damage and damage caused by others. Work that is NOT covered under this contract shall commence without written notification from the Contracting Officer and a separate purchase order.

II. DEFINITIONS/ACRONYMS:

A.CO - Contracting Officer
B.COR - Contracting Officer's Representative
C.Contractor and/or Supplier/Installer - Company performing work under this contract.
D.NFPA - National Fire Protection Association.
E.VAMC - Department of Veterans Affairs Medical Center
F.VAH - Department of Veterans Affairs Hospital
G.FSE - Field Service Engineer/Technician
H.UL -Underwriters Laboratories
I.OSHA – Occupational, Safety and Health Administration
J.OEM – Original Equipment Manufacturer

III. TESTING AND CERTIFICATION

Upon completing the Service, the Contractor shall personally meet with and present the COR with the Annual Report addressing questions comments and/or concerns which the COR may have after allowing for review. A field walk to the roofs may be required. Responses to COR questions comments questions and concerns shall be addressed in an updated Annual Report resubmitted to the COR. The Contractor shall certify in writing that all specified requirements of this contract have been met. Testing and Certification shall be performed at a mutually agreed upon date and time.

IV. ACCEPTANCE TESTING

The Acceptance Testing of the Service shall be verified in writing by the COR only after Testing and Certification and accepted review of updated Annual Report. Acceptance Testing shall be performed in mutually agreed upon manner. Government payments can be withheld until final Acceptance Testing.

V. HOURS OF OPERATION:

A. Normal hours of operations at the VAMC are Monday through Friday from 7:00 am to 4:30 pm, excluding holidays. All work in this contract shall be discussed with and performed during hours acceptable to the COR.

B. The Contractor and the Government shall be allowed to work weekends and Federal Holidays (not National Holidays) if both the Contractor and Government find it beneficial. The CO shall provide in writing authorizing work on the weekends and Federal Holidays. The contract is Firm Fixed Price the Government “will not” authorize or pay for any overtime.

C. Federal and National Holidays observed by the VAMC are:

New Years' DayLabor Day
Martin Luther King DayColumbus Day
Presidents' DayVeterans' Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

VI. STANDARDS

A. SAFETY DATA SHEETS – prior to commencement of services, the Contractor shall provide Safety Data Sheets to the COR in accordance with the VA and OSHA regulations.

B. SAFETY STANDARDS - The contractor is required to adhere to all VA, OSHA and EPA safety related policies, procedures, standards and regulations. The contractor shall convey to its personnel and consultants the appropriate information regarding safety requirements, including the requirements of hazard communication.

C. Only those services specified within the contract are authorized. Before performing any service or repair of a non-contract nature, the contractor must notify the Contracting Officer or COR of the nature and reasoning for additional work. If appropriate, the Contracting Officer may authorize the additional services or repairs under an amendment to the contract or a separate purchase authorization. No emergency type work is authorized.

VII. CONFORMANCE STANDARDS:

A. All work shall be performed and shall function in conformance with all VA safety standards, manufacturer's/industry standards, the latest published edition of NFPA99, FDA, OSHA, JCAHO, ISO 9000, UL and other applicable state, local, national and industry standards. Equipment shall meets EMS (Electromagnetic Compatibility) for EIC 601-1-2 CE, CSA, ETL Approved to U.L. 2601-1, second edition.

VIII. CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COR):

VA Contact Person(s): (COR): Andrew Cozad (414) 384-2000 x41396 / ALT COR: Mike Whiting (414) 384-2000 x41090. The COR shall be notified on dates and times when all service, warranty repair and/or on-site visits are accomplished. Written service report will be provided to the COR upon completion of each visit, including but not limited to warranty repairs.

CONTRACTOR SHALL BE REQUIRED TO CONTACT THE COR TO COORDINATE ON-SITE TRAINING AND INSTALLATION.

Contractor Provide telephone number(s) to call for your Service Department: ________________________ Provide name(s) of authorized contact person(s):________________________________________________

IX. FACILITY CHECK-IN/CHECK-OUT:

For any services performed on site, upon arrival at the Medical Center, the Contractor representative shall check in with the COR before performing any warranty, repairs and/or maintenance services. This check in is mandatory. When the service is completed, the contractor’s representative shall document services rendered on a legible ESR(s). A legible signed service report shall be provided directly to the COR following completion of each CLIN, and a description of work accomplished. The report shall be signed or initialed by the COR or authorized representative. Payment under this contract may be affected if a service report is not provided at the conclusion of each site visit.

X. PAYMENT:

Invoice will be paid within 30 days upon completion of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .