S02 - Drawings Bid Set Vol 1.pdf

PDF 10 MB Posted

Attached to
Z2DZ--676-14-105 Replace Boilers B415 Tomah, Wisconsin 54660
Solicitation number
36C25220B0025
Issued by

About this file

This document provides details on a pre-solicitation notice for a federal contract opportunity to replace boilers at the Tomah VA Medical Center in Tomah, Wisconsin. The project scope includes removing and replacing three existing high-pressure steam boilers, associated utility connections and equipment, and selected boiler support piping. The contractor will also be responsible for abatement of lead paint and asbestos, and replacing boiler control devices and programming. The estimated period of performance is 490 calendar days divided into phases, with a project magnitude price range between $10 million and $20 million. The pre-solicitation and specifications will be posted on August 21, 2020 to Beta.SAM, with bids due on September 23, 2020. Two pre-bid conferences will be held. The solicitation will be issued as a 100% Service Disabled Veteran Owned Small Business set-aside.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.: 676-14-105

PROJECT TEAM

PROJECT LEADER / ARCHITECT

ELECTRICAL

FIRE PROTECTION

PENN CONSTRUCTION GROUP

375 WILLIAMSTOWNE

SUITE 101

DELAFIELD, WI 53018

VETERANS AFFAIRS MEDICAL CENTER

500 E VETERANS ST

TOMAH, WI 54660

CAMPUS MAP SHEET INDEX

IN THE CASE OF CONFLICTS OR DISCREPANCIES

WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS

OR GREATER QUANTITY OF WORK, AS DETERMINED

BY THE GOVERNMENT, SHALL BE PROVIDED.

MECHANICAL

PENN CONSTRUCTION GROUP

PLUMBING

REPLACE BOILERS B415

SHEET NUMBER SHEET NAME

ARCHITECTURAL

A001 ARCHITECTURAL LEGEND AND ABBREVIATIONS

AD101 ARCHITECTURAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION

AS101 ARCHITECTURAL BASEMENT AND GROUND FLOOR PLAN - NEW WORK

A401 ARCHITECTURAL EXTERIOR ELEVATIONS

MECHANICAL

M001 MECHANICAL LEGEND AND ABBREVIATIONS

PLUMBING

P001 PLUMBING SYMBOLS AND ABBREVIATIONS

PD100 PLUMBING FOUNDATION PLAN - DEMOLITION

PD101 PLUMBING BASEMENT AND GROUND FLOOR PLAN - DEMOLITION

FIRE PROTECTION

ELECTRICAL

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED101 ELECTRICAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION

M501 MECHANICAL DETAILS

PENN CONSTRUCTION GROUP

PENN CONSTRUCTION GROUP

PENN CONSTRUCTION GROUP

GENERAL INFORMATION

GI001 TITLE SHEET

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GI001

KAB

TITLE SHEET

HFB

MD101 MECHANICAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION

MD102 MECHANICAL MEZZANINE PLAN - DEMOLITION

MD103 MECHANICAL UPPER MEZZANINE PLAN - DEMOLITION

MD401 MECHANICAL PIPING DIAGRAM - DEMOLITION

GC101

GC102

GC104

GC103

PD102 PLUMBING MEZZANINE PLAN - DEMOLITION

PROJECT

LOCATION

375 WILLIAMSTOWNE

SUITE 101

DELAFIELD, WI 53018

375 WILLIAMSTOWNE

SUITE 101

DELAFIELD, WI 53018

375 WILLIAMSTOWNE

SUITE 101

DELAFIELD, WI 53018

375 WILLIAMSTOWNE

SUITE 101

DELAFIELD, WI 53018

MD104 MECHANICAL ROOF PLAN - DEMOLITION

HAZARDOUS MATERIALS

HA101 HAZARDOUS MATERIALS ASBESTOS ABATEMENT

HL101 HAZARDOUS MATERIALS LEAD PAINT ABATEMENT

FL101 FIRE PROTECTION LIFE SAFETY FLOOR PLAN

A501 ARCHITECTURAL EXTERIOR SECTIONS AND DETAILS

A601 ARCHITECTURAL SCHEDULES, INTERIOR ELEVATIONS, AND DETAILS

A602 ARCHITECTURAL INTERIOR DETAILS

AD104 ARCHITECTURAL ROOF PLAN - DEMOLITION

AS104 ARCHITECTURAL ROOF PLAN - NEW WORK

MP101 MECHANICAL BASEMENT AND GROUND FLOOR PLAN - NEW WORK

MECHANICAL PIPING DIAGRAM - NEW WORKM401

ED102 ELECTRICAL UPPER MEZZANINE AND ROOF PLAN - DEMOLITION

MP102

MP103

AD103

AD102

ARCHITECTURAL UPPER MEZZANINE PLAN - DEMOLITION

ARCHITECTURAL MEZZANINE PLAN - DEMOLITION

AS103 ARCHITECTURAL UPPER MEZZANINE PLAN - NEW WORK

AS102 ARCHITECTURAL MEZZANINE PLAN - NEW WORK

EP101 ELECTRICAL BASEMENT AND GROUND FLOOR POWER PLAN - NEW WORK

EL101 ELECTRICAL LIGHTING PLAN - NEW WORK

E601 ELECTRICAL ONE-LINE DIAGRAM & ELEVATIONS

E602 ELECTRICAL SCHEDULES

E501 ELECTRICAL DETAILS

GC105

GC106

PHASING DIAGRAM PHASE 1 - PART 1

PHASING DIAGRAM PHASE 1 - PART 2

PHASING DIAGRAM PHASE 2 - PART 1

P100

P101

P102

PLUMBING FOUNDATION PLAN - NEW WORK

PLUMBING BASEMENT AND GROUND FLOOR PLAN - NEW WORK

PLUMBING MEZZANINE PLAN - NEW WORK

MECHANICAL SECTIONSM301

M601 MECHANICAL SCHEDULES

MECHANICAL MEZZANINE PLAN - NEW WORK

MECHANICAL UPPER MEZZANINE PLAN - NEW WORK

MP104 MECHANICAL ROOF PLAN - NEW WORK

MECHANICAL SECTIONSM302

GC107

PHASING PLANS - PHASE 1

PHASING PLANS - PHASE 2

GC108

GC109

PHASING DIAGRAM PHASE 3 - PART 1

GC110

PHASING DIAGRAM PHASE 3 - PART 2

GC111

PHASING PLANS - PHASE 3

PHASING DIAGRAM PHASE 2 - PART 2

MECHANICAL SECTIONSM303

M502 MECHANICAL DETAILS

M503 MECHANICAL DIAGRAMS

M504 MECHANICAL DIAGRAMS

PHASING PLANS DETAILS

PHASING PLANS SITE PLAN AND LEGEND - NEW WORK

MECHANICAL SECTIONSM304

M602 MECHANICAL SCHEDULES

M701 MECHANICAL CONTROL DIAGRAMS

M702 MECHANICAL CONTROL POINTS LIST

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GC101

KABHFB

PHASING PLANS -

PHASE 1

1/8" = 1'-0"

BASEMENT & GROUND FLOOR PLAN

NORTH

1/8" = 1'-0"

MEZZANINE PLAN

NORTH

1/8" = 1'-0"

ROOF PLAN

NORTH

1/8" = 1'-0"

UPPER MEZZANINE PLAN

NORTH

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. REPAINTING OF LEAD PAINT ABATED SURFACES TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.

AutoCAD SHX Text

ELECTRICAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: INSTALL PANELS DP-1, LP-1 AT THE BEGINNING OF THIS PHASE. BEGIN TO TRANSFER LOADS THROUGHOUT THIS PHASE FROM LIGHTING PANEL E-4 LOCATED IN MCC TO NEW PANEL LP-1, TO BE COMPLETE BY END OF PHASE. PROVIDE NEW CONDENSATE PUMPS CRP-1A & B AND BRANCH CIRCUIT WIRING TO PANEL DP-1. WHEN NEW CONDENSATE PUMPS ARE FULLY OPERATIONAL, DE-ENERGIZE AND REMOVE CP-1 AND CP-2, ALL FEEDERS, CONTROLS, EQUIPMENT AND CONTROLS WIRING BACK TO POINT OF ORIGIN. PROVIDE NEW CONDENSATE TRANSFER PUMPS CTP-1, CTP-2 IN PLACE OF PUMPS CP-1, CP-2. PROVIDE VFD FOR CONTROL AND BRANCH CIRCUIT WIRING TO DP-1. DE-ENERGIZE EXISTING FWP-1 AND PROVIDE NEW BFP-1. PROVIDE VFD FOR CONTROL AND BRANCH CIRCUIT WIRING TO DP-1. REMOVE FWP-1 ALL FEEDERS, CONTROLS, EQUIPMENT AND CONTROL WIRING WHEN BFP-1 IS FULLY OPERATIONAL. REPEAT THIS PROCESS FOR BFP-2/FWP-2, FOLLOWED BY BFP-3, FWP-3. DE-ENERGIZE ROOF VENTILATORS PRIOR TO DEMOLITION OF EQUIPMENT AND REMOVE FEEDER CONDUIT & CONTROLS BACK TO MCC. POWER NEW EXHAUST FANS FROM ASSIGNED BREAKER IN DP-1. COORDINATE WITH MC DEMOLITION AND INSTALLATION WORK, AND COMPLETE PRIOR TO THE START OF PHASE 2 WORK.

AutoCAD SHX Text

ARCHITECTURAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. BASEMENT PUMP ROOM: REPLACE EXISTING WINDOWS WITH GLASS BLOCK. INSTALL NEW CONCRETE SLAB FOR RAISED TELECOMM ROOM. PROVIDE NEW CONSTRUCTION FOR TELECOM ROOM INCLUDING NEW PARTITIONS, ACT CEILING, FLOOR & WALL FINISHES. CONTROL ROOM & LABORATORY: REPLACE EXISTING GLAZING AT INTERIOR WINDOWS REMOVE EXISTING FINISHES AND CABINETRY. PROVIDE NEW STAINLESS STEEL CABINETS AND COUNTERTOP, AND NEW CEILING, FLOOR AND WALL FINISHES. ROOF: PROVIDE NEW ROOF OPENING & NEW EXHAUST FAN EF-2. REMOVE VENTILATORS #1 & #3 AND REPLACE WITH EXHAUST FANS EF-1 AND EF-3, RESPECTIVELY. SITE: PROVIDE NEW EQUIPMENT PAD FOR MAKEUP AIR UNIT.

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WH

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

REF

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

BENCH

AutoCAD SHX Text

FD

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

UP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

DN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

SANDBLASTER

AutoCAD SHX Text

WORK TABLE W/ VISE

AutoCAD SHX Text

WORK TABLE W/ DRILL

AutoCAD SHX Text

WORK TABLE

AutoCAD SHX Text

GRINDER

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

415-BFP-1

AutoCAD SHX Text

VFD

AutoCAD SHX Text

415-BFP-2

AutoCAD SHX Text

VFD

AutoCAD SHX Text

415-BFP-3

AutoCAD SHX Text

VFD

AutoCAD SHX Text

415-CTP-1

AutoCAD SHX Text

VFD

AutoCAD SHX Text

415-CTP-2

AutoCAD SHX Text

VFD

AutoCAD SHX Text

415-CRP-1B

AutoCAD SHX Text

415-CRP-1A

AutoCAD SHX Text

LP-1

AutoCAD SHX Text

DP-1

AutoCAD SHX Text

415-EF-3

AutoCAD SHX Text

TO ROOF LEVEL

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

415-MAU-1

AutoCAD SHX Text

415-AC-1

AutoCAD SHX Text

415-ACCU-1

AutoCAD SHX Text

415-EF-2

AutoCAD SHX Text

TO ROOF LEVEL

AutoCAD SHX Text

415-EF-1

AutoCAD SHX Text

TO ROOF LEVEL

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

OPEN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OPEN

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 2" VENT

AutoCAD SHX Text

EXIST. 6" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. 10" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. POWER ROOF VENTILATOR

AutoCAD SHX Text

EXIST. VENT

AutoCAD SHX Text

EXIST. 4" STM VENT

AutoCAD SHX Text

EXIST. ROOF HATCH

AutoCAD SHX Text

GRAVITY VENTILATOR

AutoCAD SHX Text

415-EF-1

AutoCAD SHX Text

415-EF-2

AutoCAD SHX Text

415-EF-3

AutoCAD SHX Text

TO WALL MOUNTED VFD

AutoCAD SHX Text

TO WALL MOUNTED VFD

AutoCAD SHX Text

TO WALL MOUNTED VFD

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GC102

KABHFB

PHASING PLANS -

PHASE 2

1/8" = 1'-0"

BASEMENT & GROUND FLOOR PLAN

NORTH

1/8" = 1'-0"

MEZZANINE PLAN

NORTH

1/8" = 1'-0"

ROOF PLAN

NORTH

1/8" = 1'-0"

UPPER MEZZANINE PLAN

NORTH

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.

AutoCAD SHX Text

ELECTRICAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: AT THE BEGINNING OF THIS PHASE, PROVIDE POWER TO TEMPORARY BOILER. PROVIDE NEW 200A/3P CIRCUIT BREAKER IN MAIN SWITCHBOARD AND PROVIDE A 200A/3P FUSED DISCONNECT SWITCH MOUNTED TO BUILDING EXTERIOR. REFER TO SHEET E601 FOR ADDITIONAL INFORMATION. DE-ENERGIZE BOILER 3. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. PROVIDE COMBINATION STARTER/DISCONNECT IN PLACE OF EXISTING SAFETY SWITCH SERVING COMB. AIR FAN. REFEED FAN FROM NEW PANEL DP-1. INTERCEPT EXISTING UNDERGROUND CONDUIT ENTERING BUILDING FROM PROPANE PUMP YARD. RUN FEEDER INTO JUNCTION BOX MOUNTED ON BUILDING EXTERIOR, AND REFEED FROM PANEL DP-1. POWER NEW BOILER #3. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. PROVIDE COMBINATION STARTER/DISCONNECTS IN PLACE OF EXISTING SAFETY SWITCHES SERVING AIR COMPRESSORS. RECIRCUIT COMPRESSORS TO NEW PANEL DP-1 IN ASSIGNED BREAKERS.

AutoCAD SHX Text

ARCHITECTURAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. AT THE BEGINNING OF THIS PHASE, PROVIDE CONCRETE EQUIPMENT PAD FOR TEMPORARY BOILER. REMOVE AND REINSTALL METAL RAILING AT MEZZANINE LEVEL FOR CONDENSATE TANK REPLACEMENT. REMOVE AND REINSTALL STEEL FRAMING, METAL RAILINGS AND METAL GRATING AT DEAERATOR PLATFORM FOR CONDENSATE & DEAERATOR TANK REPLACEMENT AT UPPER MEZZANINE. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #3. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS AT BOILER #3. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #3. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #3. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #3. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WH

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

REF

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

BENCH

AutoCAD SHX Text

FD

AutoCAD SHX Text

METAL ACCESS/PLATFORM BOILER #3

AutoCAD SHX Text

HANDRAIL

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

UP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

DN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

SANDBLASTER

AutoCAD SHX Text

WORK TABLE W/ VISE

AutoCAD SHX Text

WORK TABLE W/ DRILL

AutoCAD SHX Text

WORK TABLE

AutoCAD SHX Text

GRINDER

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text J

AutoCAD SHX Text

TEMPORARY BOILER CONTROL PANEL

AutoCAD SHX Text J

AutoCAD SHX Text

PROPANE PUMPS

AutoCAD SHX Text

ELECTRICAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: AT THE BEGINNING OF THIS PHASE, PROVIDE POWER TO TEMPORARY BOILER. PROVIDE NEW 200A/3P CIRCUIT BREAKER IN MAIN SWITCHBOARD AND PROVIDE A 200A/3P FUSED DISCONNECT SWITCH MOUNTED TO BUILDING EXTERIOR. REFER TO SHEET E601 FOR ADDITIONAL INFORMATION. DE-ENERGIZE BOILER 3. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. PROVIDE COMBINATION STARTER/DISCONNECT IN PLACE OF EXISTING SAFETY SWITCH SERVING COMB. AIR FAN. REFEED FAN FROM NEW PANEL DP-1. INTERCEPT EXISTING UNDERGROUND CONDUIT ENTERING BUILDING FROM PROPANE PUMP YARD. RUN FEEDER INTO JUNCTION BOX MOUNTED ON BUILDING EXTERIOR, AND REFEED FROM PANEL DP-1. POWER NEW BOILER #3. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. PROVIDE COMBINATION STARTER/DISCONNECTS IN PLACE OF EXISTING SAFETY SWITCHES SERVING AIR COMPRESSORS. RECIRCUIT COMPRESSORS TO NEW PANEL DP-1 IN ASSIGNED BREAKERS.

AutoCAD SHX Text

ARCHITECTURAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. AT THE BEGINNING OF THIS PHASE, PROVIDE CONCRETE EQUIPMENT PAD FOR TEMPORARY BOILER. REMOVE AND REINSTALL METAL RAILING AT MEZZANINE LEVEL FOR CONDENSATE TANK REPLACEMENT. REMOVE AND REINSTALL STEEL FRAMING, METAL RAILINGS AND METAL GRATING AT DEAERATOR PLATFORM FOR CONDENSATE & DEAERATOR TANK REPLACEMENT AT UPPER MEZZANINE. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #3. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS AT BOILER #3. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #3. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #3. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #3. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.

AutoCAD SHX Text

KNOCKOUT PANEL

AutoCAD SHX Text

NEW CONCRETE PAD FOR TEMPORARY BOILER

AutoCAD SHX Text

BOILER 3 FAN

AutoCAD SHX Text

VFD

AutoCAD SHX Text

AC-3

AutoCAD SHX Text

AC-2

AutoCAD SHX Text

AC-1

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

OPEN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

COMB. AIR FAN

AutoCAD SHX Text

STEEL FRAMING AND HANDRAIL

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 2" VENT

AutoCAD SHX Text

EXIST. 6" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. 10" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. POWER ROOF VENTILATOR

AutoCAD SHX Text

EXIST. VENT

AutoCAD SHX Text

EXIST. 4" STM VENT

AutoCAD SHX Text

EXIST. ROOF HATCH

AutoCAD SHX Text

GRAVITY VENTILATOR

AutoCAD SHX Text

BOILER #3 STACK

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GC103

KABHFB

PHASING PLANS -

PHASE 3

1/8" = 1'-0"

BASEMENT & GROUND FLOOR PLAN

NORTH

1/8" = 1'-0"

MEZZANINE PLAN

NORTH

1/8" = 1'-0"

ROOF PLAN

NORTH

1/8" = 1'-0"

UPPER MEZZANINE PLAN

NORTH

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.

AutoCAD SHX Text

ELECTRICAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: WHEN NEW BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 2. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. POWER NEW BOILER #2. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE TEMPORARY BOILER. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. LEAVE SPARE BREAKER IN PANEL DP-1 AFTER REMOVING FEED TO TEMPORARY BOILER. RECIRCUIT TRANSFORMERS FEEDING PANELS E-2 AND E-3 FROM BREAKERS ASSIGNED TO PANEL DP-1. LIMIT INTERRUPTION OF SYSTEM POWER TO THE MINIMUM AMOUNT OF TIME POSSIBLE. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 1. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. DE-ENERGIZE TRANSFORMERS T-E-2 & T-E-3 & RECIRCUIT TO PANEL DP-1 IN ASSIGNED BREAKER. ENERGIZE EXISTING TRANSFORMERS & ENSURE ALL LOADS SERVED BY EXISTING PANELS E-2 & E-3 ARE OPERATIONAL BEFORE PROCEEDING. UPON SUCCESSFUL DE-ENERGIZATION OF BOILER 1 AND REMOVAL OF ALL LOADS FED BY MCC, BEGIN TO REMOVE MCC AND ALL OVERHEAD WIREWAY. REMOVE ASSOCIATED FEEDER CONDUIT AND WIRING BACK TO MAIN SWITCH GEAR. UNDERGROUND CONDUIT TO BE CUT & FLUSH WITH FLOOR AND CAPPED. DE-ENERGIZE EXISTING TRANSFORMER T-3. INSTALL NEW PANEL E-3 AND NEW TRANSFORMER T-E-3 IN SAME LOCATION AS EXISTING AND REFEED WITH EXISTING WIRING FROM PANEL DP-1. RECONNECT ALL LOADS SERVED BY EXISTING E-3 TO NEW E-3. MINIMIZE INTERRUPTIONS TO LOADS SERVED BY PANEL E-3 BY COMPLETING THIS WORK IN THE SHORTEST TIME POSSIBLE. THIS CAN HAPPEN AT ANY TIME FOLLOWING THE CHANGE IN CIRCUITRY OF EXISTING TRANSFORMER T-E-3. E.C. TO NOTIFY BOILER PLANT MANAGER OF EXPECTED DOWNTIME. INSTALL NEW PANEL E-2 AND NEW TRANSFORMER T-E-2. PROVIDE BRANCH CIRCUIT WIRING FROM PANEL DP-1 TO POWER PANEL IN ASSIGNED BREAKERS. SEE ONE-LINE DIAGRAM AND PANEL SCHEDULE FOR PANEL DP-1 FOR LOAD CONFIGURATIONS. BEGIN TRANSFERRING LOADS FROM EXISTING PANEL E-2 TO NEW PANEL E-2. WHEN ALL LOADS FROM EXISTING E-2 ARE SUCCESSFULLY TRANSFERRED TO NEW PANEL E-2, REMOVE EXISTING PANEL E-2, EXISTING TRANSFORMER T-E-2, ALL BRANCH CIRCUIT WIRING, AND FEEDERS FROM PANEL DP-1 TO EXISTING EQUIPMENT. LEAVE SPARE BREAKER IN PANEL DP-1.

AutoCAD SHX Text

ARCHITECTURAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #2. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #2. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #2. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #2. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #2. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #1. INFILL WITH NEW SLAB. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #1. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #1. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #1. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #1. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WH

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

REF

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

BENCH

AutoCAD SHX Text

FD

AutoCAD SHX Text

METAL ACCESS/PLATFORM BOILER #2

AutoCAD SHX Text

METAL ACCESS/PLATFORM BOILER #1

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

UP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

DN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

SUMP PUMP

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

SANDBLASTER

AutoCAD SHX Text

WORK TABLE W/ VISE

AutoCAD SHX Text

WORK TABLE W/ DRILL

AutoCAD SHX Text

WORK TABLE

AutoCAD SHX Text

GRINDER

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

BOILER 2 FAN

AutoCAD SHX Text

VFD

AutoCAD SHX Text

ELECTRICAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: WHEN NEW BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 2. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. POWER NEW BOILER #2. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE TEMPORARY BOILER. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. LEAVE SPARE BREAKER IN PANEL DP-1 AFTER REMOVING FEED TO TEMPORARY BOILER. RECIRCUIT TRANSFORMERS FEEDING PANELS E-2 AND E-3 FROM BREAKERS ASSIGNED TO PANEL DP-1. LIMIT INTERRUPTION OF SYSTEM POWER TO THE MINIMUM AMOUNT OF TIME POSSIBLE. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 1. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. DE-ENERGIZE TRANSFORMERS T-E-2 & T-E-3 & RECIRCUIT TO PANEL DP-1 IN ASSIGNED BREAKER. ENERGIZE EXISTING TRANSFORMERS & ENSURE ALL LOADS SERVED BY EXISTING PANELS E-2 & E-3 ARE OPERATIONAL BEFORE PROCEEDING. UPON SUCCESSFUL DE-ENERGIZATION OF BOILER 1 AND REMOVAL OF ALL LOADS FED BY MCC, BEGIN TO REMOVE MCC AND ALL OVERHEAD WIREWAY. REMOVE ASSOCIATED FEEDER CONDUIT AND WIRING BACK TO MAIN SWITCH GEAR. UNDERGROUND CONDUIT TO BE CUT & FLUSH WITH FLOOR AND CAPPED. DE-ENERGIZE EXISTING TRANSFORMER T-3. INSTALL NEW PANEL E-3 AND NEW TRANSFORMER T-E-3 IN SAME LOCATION AS EXISTING AND REFEED WITH EXISTING WIRING FROM PANEL DP-1. RECONNECT ALL LOADS SERVED BY EXISTING E-3 TO NEW E-3. MINIMIZE INTERRUPTIONS TO LOADS SERVED BY PANEL E-3 BY COMPLETING THIS WORK IN THE SHORTEST TIME POSSIBLE. THIS CAN HAPPEN AT ANY TIME FOLLOWING THE CHANGE IN CIRCUITRY OF EXISTING TRANSFORMER T-E-3. E.C. TO NOTIFY BOILER PLANT MANAGER OF EXPECTED DOWNTIME. INSTALL NEW PANEL E-2 AND NEW TRANSFORMER T-E-2. PROVIDE BRANCH CIRCUIT WIRING FROM PANEL DP-1 TO POWER PANEL IN ASSIGNED BREAKERS. SEE ONE-LINE DIAGRAM AND PANEL SCHEDULE FOR PANEL DP-1 FOR LOAD CONFIGURATIONS. BEGIN TRANSFERRING LOADS FROM EXISTING PANEL E-2 TO NEW PANEL E-2. WHEN ALL LOADS FROM EXISTING E-2 ARE SUCCESSFULLY TRANSFERRED TO NEW PANEL E-2, REMOVE EXISTING PANEL E-2, EXISTING TRANSFORMER T-E-2, ALL BRANCH CIRCUIT WIRING, AND FEEDERS FROM PANEL DP-1 TO EXISTING EQUIPMENT. LEAVE SPARE BREAKER IN PANEL DP-1.

AutoCAD SHX Text

ARCHITECTURAL PHASING NOTES:

AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #2. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #2. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #2. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #2. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #2. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #1. INFILL WITH NEW SLAB. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #1. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #1. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #1. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #1. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.

AutoCAD SHX Text

NEW CONCRETE PAD FOR TEMPORARY BOILER

AutoCAD SHX Text

KNOCKOUT PANEL

AutoCAD SHX Text

BOILER 1 FAN

AutoCAD SHX Text

VFD

AutoCAD SHX Text

NEW PANEL E-2

AutoCAD SHX Text

NEW TRANSFORMER T-E-2. MOUNT AT 8'-6" AFF

AutoCAD SHX Text

NEW PANEL E-3

AutoCAD SHX Text

NEW TRANSFORMER T-E-3. MOUNT AT 8'-6"

AutoCAD SHX Text

VFD

AutoCAD SHX Text

BOILER 3 FAN

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

OPEN

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OPEN

AutoCAD SHX Text

OPEN

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 24" GRAVITY VENTILATOR

AutoCAD SHX Text

EXIST. 2" VENT

AutoCAD SHX Text

EXIST. 6" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. 10" SAFETY VALVE VENT

AutoCAD SHX Text

EXIST. POWER ROOF VENTILATOR

AutoCAD SHX Text

EXIST. VENT

AutoCAD SHX Text

EXIST. 4" STM VENT

AutoCAD SHX Text

EXIST. ROOF HATCH

AutoCAD SHX Text

GRAVITY VENTILATOR

AutoCAD SHX Text

BOILER #2 STACK

AutoCAD SHX Text

BOILER #1 STACK

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

NTS

PHASING DIAGRAM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GC104

JMD

PHASING DIAGRAM

PHASE 1 - PART 1

HFB

AutoCAD SHX Text

DEAERATOR TANK

AutoCAD SHX Text

CONDENSATE TANK

AutoCAD SHX Text

FWP-1

AutoCAD SHX Text

FWP-2

AutoCAD SHX Text

FWP-3

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text 6"V

AutoCAD SHX Text

CTP-1

AutoCAD SHX Text

CTP-2

AutoCAD SHX Text

2"HPS

AutoCAD SHX Text

TO SEWER

AutoCAD SHX Text

CRP-1

AutoCAD SHX Text

CONDENSATE SUMP

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text 2"D

AutoCAD SHX Text

10"RV-3

AutoCAD SHX Text

2"C FROM LAUNDRY

AutoCAD SHX Text

5"C FROM HOSPITAL

AutoCAD SHX Text

4"HPS TO LAUNDRY

AutoCAD SHX Text

10"MPS TO HOSPITAL

AutoCAD SHX Text

4"OFL TO SUMP PUMP

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

2"SW FROM SOFTENERS

AutoCAD SHX Text P

AutoCAD SHX Text

COMBUSTION AIR AHU

AutoCAD SHX Text

3"LPS

AutoCAD SHX Text

3"LPS

AutoCAD SHX Text

6"RV-4

AutoCAD SHX Text 6"V

AutoCAD SHX Text 6"V

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

2" BYPASS

AutoCAD SHX Text

4" BYPASS

AutoCAD SHX Text 10"V

AutoCAD SHX Text

PRV-2

AutoCAD SHX Text

PRV-1A

AutoCAD SHX Text

PRV-1

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

3"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"MPS

AutoCAD SHX Text

6"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"HPS

AutoCAD SHX Text

10"HPS

AutoCAD SHX Text

10"HPS BLIND FLANGE

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

2"HPS TO STEAM WHISTLE

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text 4"

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text 4"

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

2"HPS RETURN

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

2"CW

AutoCAD SHX Text

6"RV-2

AutoCAD SHX Text 6"V

AutoCAD SHX Text

FILL VALVE

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

1"CTPD RECIRC

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text 4"D

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

3"CTPD BYPASS

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

3"CTPD

AutoCAD SHX Text

4"CTPS

AutoCAD SHX Text

4"CTPS

AutoCAD SHX Text 4"

AutoCAD SHX Text

4"CTPS

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text 1"C

AutoCAD SHX Text

4" EMERGENCY CONNECTION

AutoCAD SHX Text

DEAERATOR STACK

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

NC

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text PROVIDE NEW CONDENSATE SUMP AND PUMPS CRP-1. CUT-IN NEW CONDENSATE PIPES, ONE AT 5" HOSPITAL CONDENSATE RETURN AND ONE AT 2" LAUNDRY CONDENSATE RETURN, JOIN PIPES TO ONE 4" CONDENSATE RETURN AND CONNECT TO NEW CONDENSATE RETURN SUMP. CUT-IN 3 NEW SHUT-OFF VALVES V101, V102, AND V103 AT EXISTING 3"CPD BYPASS PIPE WITH NEW 3" TEE. CLOSE NEW VALVE V103. PROVIDE PIPING FROM 2 NEW CONDENSATE PUMPS CRP-1 AND CRP-2 TO EXISTING 3" BYPASS PIPING BETWEEN DEAERATOR TANK AND CONDENSATE TANK. PROVIDE VFD AND WIRE CRP-1 AND CRP-2 TO NEW PANEL DP-1. OPEN EXISTING 3" CPD BY-PASS VALVE. WHEN NEW CONDENSATE RETURN SUMP AND PUMPS CRP-1 ARE FULLY OPERATIONAL DEMOLISH EXISTING CONDENSATE SUMP, ASSOCIATED PUMPS CP-1, PIPING, SUPPORTS AND HANGERS. CLOSE VALVE AT CONDENSATE TANK AND DE-ENERGIZE EXISTING PUMPS CTP-1 AND CTP-2. REMOVE ALL FEEDERS. PROVIDE CAPS AT EXISTING 5" HOSPITAL CONDENSATE RETURN AND EXISTING 2" LAUNDRY CONDENSATE RETURN. PROVIDE NEW 2-4" TEES WITH 2-4" VALVES, TV1 - CLOSED, AND TV2 - CLOSED. CLOSE ALL VALVES TO CONDENSATE TANK. REMOVE AND REPLACE EXISTING SOLENOID VALVES ON MAKE-UP WATER VALVES TO CONDENSATE TANK. CUT-IN NEW VALVE, V104 - CLOSED, ON 2" HPS. DRAIN DOWN CONDENSATE TANK. CLOSE 3" VALVE FROM EXISTING CRP-1 AT DEAERATOR TANK. REMOVE EXISTING 6" VENT THROUGH ROOF AND PROVIDE TEMPORARY CAP AT ROOF OPENING. REMOVE CONDENSATE TANK, CONNECTED PIPING, PIPE SUPPORTS AND HANGERS, UNUSED VALVES AND TANK SUPPORTS. REMOVE CTP-1 AND CTP-2, ASSOCIATED PIPING, HANGERS AND SUPPORTS, AND CONTROLS.

AutoCAD SHX Text

PHASE 1 - PART 1:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONDENSATE SUMP

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

AutoCAD SHX Text 2"C

AutoCAD SHX Text 4"C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text V1O2

AutoCAD SHX Text V1O3

AutoCAD SHX Text V1O1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TV2

AutoCAD SHX Text

TV1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text V1O4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

FROM BOILERS 1, 2, & 3

AutoCAD SHX Text

TO HPR

AutoCAD SHX Text M

AutoCAD SHX Text

GENERAL PLAN NOTES

AutoCAD SHX Text

1. REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND ARCHITECTURAL PLANS FOR ADDITIONAL NEW WORK. ALL WORK FOR WALL, CEILING AND FLOOR ASSEMBLIES NECESSARY TO FACILITATE COMPLETE MEP SYSTEM IS PART OF THE CONTRACTOR'S SCOPE OF WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW CONSTRUCTION WORK. 4. MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS AND ALL SPACES IN BUILDING 415 NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR FOR ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK. 5. CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT SHUTDOWNS. 6. PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER AND SYSTEM CONNECTIONS TO BOILERS, PUMPS, FANS, HVAC TERMINAL UNITS, MUAU, CONTROL DEVICES AND VALVES. CONTRACTOR SHALL REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND ARCHITECTURAL DEMOLITION AND NEW PLANS, DETAILS, AND DIAGRAMS FOR CONNECTIONS TO EQUIPMENT. 7. ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ELECTRONIC CONTROLLERS.

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

FILL VALVE

AutoCAD SHX Text 9A

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

1"CTPD RECIRC

AutoCAD SHX Text

1"CTPD RECIRC

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

3"CTPD BYPASS

AutoCAD SHX Text

3"CW FROM BLDG REDUCED PRESSURE ZONE ASSEMBLY

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

FILL VALVE

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

3"CTPD

AutoCAD SHX Text

3"CTPD

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

NC

AutoCAD SHX Text

2"CW

AutoCAD SHX Text 6"V

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

3"CTPD

AutoCAD SHX Text

3"CTPD

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NC

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

LPS TO B415

AutoCAD SHX Text

LPR

AutoCAD SHX Text

415-CRP-1

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Tomah, Wisconsin

676-14-105

Office of

Facilities

Management

BID SET

July 22, 2020

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

UNSPRINKLERED

Replace Boilers B415

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

GC105

JMD

PHASING DIAGRAM

PHASE 1 - PART 2

HFB

AutoCAD SHX Text

DEAERATOR TANK

AutoCAD SHX Text

FWP-1

AutoCAD SHX Text

FWP-2

AutoCAD SHX Text

FWP-3

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

4"OFL

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

NC

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

NC

AutoCAD SHX Text

10"RV-3

AutoCAD SHX Text

2"C FROM LAUNDRY

AutoCAD SHX Text

5"C FROM HOSPITAL

AutoCAD SHX Text

4"HPS TO LAUNDRY

AutoCAD SHX Text

10"MPS TO HOSPITAL

AutoCAD SHX Text

6"OFL TO SUMP PUMP

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

2"SW FROM SOFTENERS

AutoCAD SHX Text P

AutoCAD SHX Text

COMBUSTION AIR AHU

AutoCAD SHX Text

3"LPS

AutoCAD SHX Text

3"LPS

AutoCAD SHX Text

6"RV-4

AutoCAD SHX Text 6"V

AutoCAD SHX Text 6"V

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

2" BYPASS

AutoCAD SHX Text

4" BYPASS

AutoCAD SHX Text 10"V

AutoCAD SHX Text

PRV-2

AutoCAD SHX Text

PRV-1A

AutoCAD SHX Text

PRV-1

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

3"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

6"HPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"MPS

AutoCAD SHX Text

6"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"HPS

AutoCAD SHX Text

10"HPS

AutoCAD SHX Text

10"HPS BLIND FLANGE

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

2"HPS TO STEAM WHISTLE

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

8"LPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text

1 "RECIRC12"RECIRC

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text 4"

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

2"SW

AutoCAD SHX Text

2"CW

AutoCAD SHX Text

2"CW

AutoCAD SHX Text

6"RV-2

AutoCAD SHX Text 6"V

AutoCAD SHX Text 1 "12"

AutoCAD SHX Text

1-1/2"RECIRC

AutoCAD SHX Text 4"D

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

6"LPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

10"MPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

4"HPS

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

4" EMERGENCY CONNECTION

AutoCAD SHX Text

DEAERATOR STACK

AutoCAD SHX Text

6"OFL

AutoCAD SHX Text

6"OFL

AutoCAD SHX Text

NC

AutoCAD SHX Text

AutoCAD SHX Text

CONDENSATE SUMP

AutoCAD SHX Text 2"C

AutoCAD SHX Text 4"C

AutoCAD SHX Text V1O2

AutoCAD SHX Text V1O3

AutoCAD SHX Text V1O1

AutoCAD SHX Text

CONDENSATE TANK

AutoCAD SHX Text 4"V

AutoCAD SHX Text 4"V

AutoCAD SHX Text

NC

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text 1-1/2"

AutoCAD SHX Text

3"PC

AutoCAD SHX Text

4"CTPS

AutoCAD SHX Text

CTP

AutoCAD SHX Text

AutoCAD SHX Text

CTP

AutoCAD SHX Text

AutoCAD SHX Text

CRT

AutoCAD SHX Text

AutoCAD SHX Text SET NEW CONDENSATE TANK IN PLACE OF DEMOLISHED CONDENSATE TANK. CONNECT NEW PIPING TO NEW CONDENSATE TANK. SET NEW CONDENSATE TRANSFER PUMPS CTP-1 AND CTP-2 IN PLACE OF DEMOLISHED PUMPS CTP-1 AND CTP-2. SEE DETAIL FOR PUMP PIPING AND ACCESSORIES. PROVIDE 3"CTPD PIPING FROM CTP-1 AND CTP-2 TO DEAERATOR TANK CONNECTION, 3"CTPD BYPASS AND 4"CTPD TO CTP-1 AND CTP-2. PROVIDE 4"V FROM CONDENSATE TANK THROUGH ROOF, SEE DETAIL FOR 4"V THROUGH ROOF AND TERMINATION ON ROOF. PROVIDE 2"D AND 2-4"OFL PIPES FROM CONDENSATE TANK TO EXISTING OVERFLOW PIPING. REMOVE CAP AT 2" DRAIN AND CONNECT TO EXIST DRAIN PIPE. PROVIDE 1"CTPD RECIRC PIPE FROM CTP-1 AND CTP-2 TO CONNECTION AT NEW CONDENSATE TANK. PROVIDE 4"CTPD FROM NEW CONDENSATE TANK TO CTP-1 AND CTP-2 INLET PIPE. PROVIDE NEW 4" FWPS HEADER FOR PUMPS INLET, 4" FWPS HEADER FOR BOILER FEED, 1-1/2" RECIRC HEADER, ALL TEES, AND SHUT-OFF VALVES FOR NEW FWP-1, FWP-2 AND FWP-3. PROVIDE NEW HEADER SUPPLY TO BOILERS THROUGH FLOW METER. PROVIDE TEE AND VALVE IN FWPS PUMP INLET HEADER FOR 4" DEAERATOR TANK BOILER FEED-WATER CONNECTION. CUT-IN EXISTING 4" FWPS PIPE WITH NEW 4" FWPS PIPE. PROVIDE TEE AND VALVE IN FWPS PUMP INLET HEADER FOR 4"FWPS BY-PASS CONNECTION FROM CTP-1 AND CTP-2. CUT-IN EXISTING 3"CTPD BY-PASS AND CONNECT TO NEW VALVE. PROVIDE 4"FWPD FROM NEW FLOW METER TO EXISTING 3"FWPD, INCLUDING 2-4" SHUT-OFF VALVES AT 2-3"FWPD CUT-IN TO EXISTING FWPD PIPES TO BOILERS DE-ENERGIZE EXISTING FWP-1. CLOSE ALL FWP-1 VALVES. PROVIDE NEW BFP-1. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-1 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-1 WHEN NEW BFP-1 IS OPERATIONAL. REMOVE TUBE CLEANING PIPING COMPLETELY. DE-ENERGIZE EXISTING FWP-2. CLOSE ALL FWP-2 VALVES. PROVIDE NEW BFP-2. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-2 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-2 WHEN NEW BFP-2 IS OPERATIONAL. DE-ENERGIZE EXISTING FWP-3. CLOSE ALL FWP-3 VALVES. PROVIDE NEW BFP-3. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-3 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-3 WHEN NEW BFP-3 IS OPERATIONAL. REMOVE EXISTING 3"FWPS AND FWPD PIPING HEADERS, VALVES AND SUPPORTS. PROVIDE 1-1/2" FWPD RECIRC TO EXISTING FWPD RECIRC AT EXISTING DEAERATOR TANK, CLOSE EXISTING 1-1/2" CTPD RECIRC VALVE FROM DEMOLISHED FW PUMPS AND REMOVE EXISTING 1-1/2" RECIRC CTPD PIPING.

AutoCAD SHX Text

PHASE 1 - PART 2:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NC

AutoCAD SHX Text

3"CW

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

4"FWPS

AutoCAD SHX Text 4"

AutoCAD SHX Text

BFP

AutoCAD SHX Text

AutoCAD SHX Text

BFP

AutoCAD SHX Text

AutoCAD SHX Text

BFP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3"FWPD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .