S02 - Drawings Bid Set Vol 1.pdf
PDF 10 MB Posted
- Solicitation number
- 36C25220B0025
About this file
This document provides details on a pre-solicitation notice for a federal contract opportunity to replace boilers at the Tomah VA Medical Center in Tomah, Wisconsin. The project scope includes removing and replacing three existing high-pressure steam boilers, associated utility connections and equipment, and selected boiler support piping. The contractor will also be responsible for abatement of lead paint and asbestos, and replacing boiler control devices and programming. The estimated period of performance is 490 calendar days divided into phases, with a project magnitude price range between $10 million and $20 million. The pre-solicitation and specifications will be posted on August 21, 2020 to Beta.SAM, with bids due on September 23, 2020. Two pre-bid conferences will be held. The solicitation will be issued as a 100% Service Disabled Veteran Owned Small Business set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - Drawings Bid Set Vol 2.pdf | ||
| S02 - Specifications Bid Set Vol 2.pdf | ||
| S02 - Wage Rates WD WI20200011 08.20.2020.pdf | ||
| S02 - Drawings Bid Set Vol 3 Revised.pdf | ||
| S02 - Specifications Bid Set Vol 1.pdf | ||
| S02 - Final 36C25220B0025 for beta.SAM.docx | DOCX document | |
| 36C25220B0025_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.: 676-14-105
PROJECT TEAM
PROJECT LEADER / ARCHITECT
ELECTRICAL
FIRE PROTECTION
PENN CONSTRUCTION GROUP
375 WILLIAMSTOWNE
SUITE 101
DELAFIELD, WI 53018
VETERANS AFFAIRS MEDICAL CENTER
500 E VETERANS ST
TOMAH, WI 54660
CAMPUS MAP SHEET INDEX
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
MECHANICAL
PENN CONSTRUCTION GROUP
PLUMBING
REPLACE BOILERS B415
SHEET NUMBER SHEET NAME
ARCHITECTURAL
A001 ARCHITECTURAL LEGEND AND ABBREVIATIONS
AD101 ARCHITECTURAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION
AS101 ARCHITECTURAL BASEMENT AND GROUND FLOOR PLAN - NEW WORK
A401 ARCHITECTURAL EXTERIOR ELEVATIONS
MECHANICAL
M001 MECHANICAL LEGEND AND ABBREVIATIONS
PLUMBING
P001 PLUMBING SYMBOLS AND ABBREVIATIONS
PD100 PLUMBING FOUNDATION PLAN - DEMOLITION
PD101 PLUMBING BASEMENT AND GROUND FLOOR PLAN - DEMOLITION
FIRE PROTECTION
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED101 ELECTRICAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION
M501 MECHANICAL DETAILS
PENN CONSTRUCTION GROUP
PENN CONSTRUCTION GROUP
PENN CONSTRUCTION GROUP
GENERAL INFORMATION
GI001 TITLE SHEET
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GI001
KAB
TITLE SHEET
HFB
MD101 MECHANICAL BASEMENT AND GROUND FLOOR PLAN - DEMOLITION
MD102 MECHANICAL MEZZANINE PLAN - DEMOLITION
MD103 MECHANICAL UPPER MEZZANINE PLAN - DEMOLITION
MD401 MECHANICAL PIPING DIAGRAM - DEMOLITION
GC101
GC102
GC104
GC103
PD102 PLUMBING MEZZANINE PLAN - DEMOLITION
PROJECT
LOCATION
375 WILLIAMSTOWNE
SUITE 101
DELAFIELD, WI 53018
375 WILLIAMSTOWNE
SUITE 101
DELAFIELD, WI 53018
375 WILLIAMSTOWNE
SUITE 101
DELAFIELD, WI 53018
375 WILLIAMSTOWNE
SUITE 101
DELAFIELD, WI 53018
MD104 MECHANICAL ROOF PLAN - DEMOLITION
HAZARDOUS MATERIALS
HA101 HAZARDOUS MATERIALS ASBESTOS ABATEMENT
HL101 HAZARDOUS MATERIALS LEAD PAINT ABATEMENT
FL101 FIRE PROTECTION LIFE SAFETY FLOOR PLAN
A501 ARCHITECTURAL EXTERIOR SECTIONS AND DETAILS
A601 ARCHITECTURAL SCHEDULES, INTERIOR ELEVATIONS, AND DETAILS
A602 ARCHITECTURAL INTERIOR DETAILS
AD104 ARCHITECTURAL ROOF PLAN - DEMOLITION
AS104 ARCHITECTURAL ROOF PLAN - NEW WORK
MP101 MECHANICAL BASEMENT AND GROUND FLOOR PLAN - NEW WORK
MECHANICAL PIPING DIAGRAM - NEW WORKM401
ED102 ELECTRICAL UPPER MEZZANINE AND ROOF PLAN - DEMOLITION
MP102
MP103
AD103
AD102
ARCHITECTURAL UPPER MEZZANINE PLAN - DEMOLITION
ARCHITECTURAL MEZZANINE PLAN - DEMOLITION
AS103 ARCHITECTURAL UPPER MEZZANINE PLAN - NEW WORK
AS102 ARCHITECTURAL MEZZANINE PLAN - NEW WORK
EP101 ELECTRICAL BASEMENT AND GROUND FLOOR POWER PLAN - NEW WORK
EL101 ELECTRICAL LIGHTING PLAN - NEW WORK
E601 ELECTRICAL ONE-LINE DIAGRAM & ELEVATIONS
E602 ELECTRICAL SCHEDULES
E501 ELECTRICAL DETAILS
GC105
GC106
PHASING DIAGRAM PHASE 1 - PART 1
PHASING DIAGRAM PHASE 1 - PART 2
PHASING DIAGRAM PHASE 2 - PART 1
P100
P101
P102
PLUMBING FOUNDATION PLAN - NEW WORK
PLUMBING BASEMENT AND GROUND FLOOR PLAN - NEW WORK
PLUMBING MEZZANINE PLAN - NEW WORK
MECHANICAL SECTIONSM301
M601 MECHANICAL SCHEDULES
MECHANICAL MEZZANINE PLAN - NEW WORK
MECHANICAL UPPER MEZZANINE PLAN - NEW WORK
MP104 MECHANICAL ROOF PLAN - NEW WORK
MECHANICAL SECTIONSM302
GC107
PHASING PLANS - PHASE 1
PHASING PLANS - PHASE 2
GC108
GC109
PHASING DIAGRAM PHASE 3 - PART 1
GC110
PHASING DIAGRAM PHASE 3 - PART 2
GC111
PHASING PLANS - PHASE 3
PHASING DIAGRAM PHASE 2 - PART 2
MECHANICAL SECTIONSM303
M502 MECHANICAL DETAILS
M503 MECHANICAL DIAGRAMS
M504 MECHANICAL DIAGRAMS
PHASING PLANS DETAILS
PHASING PLANS SITE PLAN AND LEGEND - NEW WORK
MECHANICAL SECTIONSM304
M602 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROL DIAGRAMS
M702 MECHANICAL CONTROL POINTS LIST
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC101
KABHFB
PHASING PLANS -
PHASE 1
1/8" = 1'-0"
BASEMENT & GROUND FLOOR PLAN
NORTH
1/8" = 1'-0"
MEZZANINE PLAN
NORTH
1/8" = 1'-0"
ROOF PLAN
NORTH
1/8" = 1'-0"
UPPER MEZZANINE PLAN
NORTH
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. REPAINTING OF LEAD PAINT ABATED SURFACES TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.
AutoCAD SHX Text
ELECTRICAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: INSTALL PANELS DP-1, LP-1 AT THE BEGINNING OF THIS PHASE. BEGIN TO TRANSFER LOADS THROUGHOUT THIS PHASE FROM LIGHTING PANEL E-4 LOCATED IN MCC TO NEW PANEL LP-1, TO BE COMPLETE BY END OF PHASE. PROVIDE NEW CONDENSATE PUMPS CRP-1A & B AND BRANCH CIRCUIT WIRING TO PANEL DP-1. WHEN NEW CONDENSATE PUMPS ARE FULLY OPERATIONAL, DE-ENERGIZE AND REMOVE CP-1 AND CP-2, ALL FEEDERS, CONTROLS, EQUIPMENT AND CONTROLS WIRING BACK TO POINT OF ORIGIN. PROVIDE NEW CONDENSATE TRANSFER PUMPS CTP-1, CTP-2 IN PLACE OF PUMPS CP-1, CP-2. PROVIDE VFD FOR CONTROL AND BRANCH CIRCUIT WIRING TO DP-1. DE-ENERGIZE EXISTING FWP-1 AND PROVIDE NEW BFP-1. PROVIDE VFD FOR CONTROL AND BRANCH CIRCUIT WIRING TO DP-1. REMOVE FWP-1 ALL FEEDERS, CONTROLS, EQUIPMENT AND CONTROL WIRING WHEN BFP-1 IS FULLY OPERATIONAL. REPEAT THIS PROCESS FOR BFP-2/FWP-2, FOLLOWED BY BFP-3, FWP-3. DE-ENERGIZE ROOF VENTILATORS PRIOR TO DEMOLITION OF EQUIPMENT AND REMOVE FEEDER CONDUIT & CONTROLS BACK TO MCC. POWER NEW EXHAUST FANS FROM ASSIGNED BREAKER IN DP-1. COORDINATE WITH MC DEMOLITION AND INSTALLATION WORK, AND COMPLETE PRIOR TO THE START OF PHASE 2 WORK.
AutoCAD SHX Text
ARCHITECTURAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. BASEMENT PUMP ROOM: REPLACE EXISTING WINDOWS WITH GLASS BLOCK. INSTALL NEW CONCRETE SLAB FOR RAISED TELECOMM ROOM. PROVIDE NEW CONSTRUCTION FOR TELECOM ROOM INCLUDING NEW PARTITIONS, ACT CEILING, FLOOR & WALL FINISHES. CONTROL ROOM & LABORATORY: REPLACE EXISTING GLAZING AT INTERIOR WINDOWS REMOVE EXISTING FINISHES AND CABINETRY. PROVIDE NEW STAINLESS STEEL CABINETS AND COUNTERTOP, AND NEW CEILING, FLOOR AND WALL FINISHES. ROOF: PROVIDE NEW ROOF OPENING & NEW EXHAUST FAN EF-2. REMOVE VENTILATORS #1 & #3 AND REPLACE WITH EXHAUST FANS EF-1 AND EF-3, RESPECTIVELY. SITE: PROVIDE NEW EQUIPMENT PAD FOR MAKEUP AIR UNIT.
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
REF
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FD
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
UP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
SANDBLASTER
AutoCAD SHX Text
WORK TABLE W/ VISE
AutoCAD SHX Text
WORK TABLE W/ DRILL
AutoCAD SHX Text
WORK TABLE
AutoCAD SHX Text
GRINDER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
415-BFP-1
AutoCAD SHX Text
VFD
AutoCAD SHX Text
415-BFP-2
AutoCAD SHX Text
VFD
AutoCAD SHX Text
415-BFP-3
AutoCAD SHX Text
VFD
AutoCAD SHX Text
415-CTP-1
AutoCAD SHX Text
VFD
AutoCAD SHX Text
415-CTP-2
AutoCAD SHX Text
VFD
AutoCAD SHX Text
415-CRP-1B
AutoCAD SHX Text
415-CRP-1A
AutoCAD SHX Text
LP-1
AutoCAD SHX Text
DP-1
AutoCAD SHX Text
415-EF-3
AutoCAD SHX Text
TO ROOF LEVEL
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
415-MAU-1
AutoCAD SHX Text
415-AC-1
AutoCAD SHX Text
415-ACCU-1
AutoCAD SHX Text
415-EF-2
AutoCAD SHX Text
TO ROOF LEVEL
AutoCAD SHX Text
415-EF-1
AutoCAD SHX Text
TO ROOF LEVEL
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
OPEN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OPEN
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 2" VENT
AutoCAD SHX Text
EXIST. 6" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. 10" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. POWER ROOF VENTILATOR
AutoCAD SHX Text
EXIST. VENT
AutoCAD SHX Text
EXIST. 4" STM VENT
AutoCAD SHX Text
EXIST. ROOF HATCH
AutoCAD SHX Text
GRAVITY VENTILATOR
AutoCAD SHX Text
415-EF-1
AutoCAD SHX Text
415-EF-2
AutoCAD SHX Text
415-EF-3
AutoCAD SHX Text
TO WALL MOUNTED VFD
AutoCAD SHX Text
TO WALL MOUNTED VFD
AutoCAD SHX Text
TO WALL MOUNTED VFD
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC102
KABHFB
PHASING PLANS -
PHASE 2
1/8" = 1'-0"
BASEMENT & GROUND FLOOR PLAN
NORTH
1/8" = 1'-0"
MEZZANINE PLAN
NORTH
1/8" = 1'-0"
ROOF PLAN
NORTH
1/8" = 1'-0"
UPPER MEZZANINE PLAN
NORTH
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.
AutoCAD SHX Text
ELECTRICAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: AT THE BEGINNING OF THIS PHASE, PROVIDE POWER TO TEMPORARY BOILER. PROVIDE NEW 200A/3P CIRCUIT BREAKER IN MAIN SWITCHBOARD AND PROVIDE A 200A/3P FUSED DISCONNECT SWITCH MOUNTED TO BUILDING EXTERIOR. REFER TO SHEET E601 FOR ADDITIONAL INFORMATION. DE-ENERGIZE BOILER 3. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. PROVIDE COMBINATION STARTER/DISCONNECT IN PLACE OF EXISTING SAFETY SWITCH SERVING COMB. AIR FAN. REFEED FAN FROM NEW PANEL DP-1. INTERCEPT EXISTING UNDERGROUND CONDUIT ENTERING BUILDING FROM PROPANE PUMP YARD. RUN FEEDER INTO JUNCTION BOX MOUNTED ON BUILDING EXTERIOR, AND REFEED FROM PANEL DP-1. POWER NEW BOILER #3. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. PROVIDE COMBINATION STARTER/DISCONNECTS IN PLACE OF EXISTING SAFETY SWITCHES SERVING AIR COMPRESSORS. RECIRCUIT COMPRESSORS TO NEW PANEL DP-1 IN ASSIGNED BREAKERS.
AutoCAD SHX Text
ARCHITECTURAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. AT THE BEGINNING OF THIS PHASE, PROVIDE CONCRETE EQUIPMENT PAD FOR TEMPORARY BOILER. REMOVE AND REINSTALL METAL RAILING AT MEZZANINE LEVEL FOR CONDENSATE TANK REPLACEMENT. REMOVE AND REINSTALL STEEL FRAMING, METAL RAILINGS AND METAL GRATING AT DEAERATOR PLATFORM FOR CONDENSATE & DEAERATOR TANK REPLACEMENT AT UPPER MEZZANINE. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #3. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS AT BOILER #3. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #3. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #3. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #3. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
REF
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FD
AutoCAD SHX Text
METAL ACCESS/PLATFORM BOILER #3
AutoCAD SHX Text
HANDRAIL
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
UP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
SANDBLASTER
AutoCAD SHX Text
WORK TABLE W/ VISE
AutoCAD SHX Text
WORK TABLE W/ DRILL
AutoCAD SHX Text
WORK TABLE
AutoCAD SHX Text
GRINDER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text J
AutoCAD SHX Text
TEMPORARY BOILER CONTROL PANEL
AutoCAD SHX Text J
AutoCAD SHX Text
PROPANE PUMPS
AutoCAD SHX Text
ELECTRICAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: AT THE BEGINNING OF THIS PHASE, PROVIDE POWER TO TEMPORARY BOILER. PROVIDE NEW 200A/3P CIRCUIT BREAKER IN MAIN SWITCHBOARD AND PROVIDE A 200A/3P FUSED DISCONNECT SWITCH MOUNTED TO BUILDING EXTERIOR. REFER TO SHEET E601 FOR ADDITIONAL INFORMATION. DE-ENERGIZE BOILER 3. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. PROVIDE COMBINATION STARTER/DISCONNECT IN PLACE OF EXISTING SAFETY SWITCH SERVING COMB. AIR FAN. REFEED FAN FROM NEW PANEL DP-1. INTERCEPT EXISTING UNDERGROUND CONDUIT ENTERING BUILDING FROM PROPANE PUMP YARD. RUN FEEDER INTO JUNCTION BOX MOUNTED ON BUILDING EXTERIOR, AND REFEED FROM PANEL DP-1. POWER NEW BOILER #3. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. PROVIDE COMBINATION STARTER/DISCONNECTS IN PLACE OF EXISTING SAFETY SWITCHES SERVING AIR COMPRESSORS. RECIRCUIT COMPRESSORS TO NEW PANEL DP-1 IN ASSIGNED BREAKERS.
AutoCAD SHX Text
ARCHITECTURAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. AT THE BEGINNING OF THIS PHASE, PROVIDE CONCRETE EQUIPMENT PAD FOR TEMPORARY BOILER. REMOVE AND REINSTALL METAL RAILING AT MEZZANINE LEVEL FOR CONDENSATE TANK REPLACEMENT. REMOVE AND REINSTALL STEEL FRAMING, METAL RAILINGS AND METAL GRATING AT DEAERATOR PLATFORM FOR CONDENSATE & DEAERATOR TANK REPLACEMENT AT UPPER MEZZANINE. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #3. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS AT BOILER #3. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #3. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #3. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #3. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.
AutoCAD SHX Text
KNOCKOUT PANEL
AutoCAD SHX Text
NEW CONCRETE PAD FOR TEMPORARY BOILER
AutoCAD SHX Text
BOILER 3 FAN
AutoCAD SHX Text
VFD
AutoCAD SHX Text
AC-3
AutoCAD SHX Text
AC-2
AutoCAD SHX Text
AC-1
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
OPEN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
COMB. AIR FAN
AutoCAD SHX Text
STEEL FRAMING AND HANDRAIL
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 2" VENT
AutoCAD SHX Text
EXIST. 6" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. 10" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. POWER ROOF VENTILATOR
AutoCAD SHX Text
EXIST. VENT
AutoCAD SHX Text
EXIST. 4" STM VENT
AutoCAD SHX Text
EXIST. ROOF HATCH
AutoCAD SHX Text
GRAVITY VENTILATOR
AutoCAD SHX Text
BOILER #3 STACK
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC103
KABHFB
PHASING PLANS -
PHASE 3
1/8" = 1'-0"
BASEMENT & GROUND FLOOR PLAN
NORTH
1/8" = 1'-0"
MEZZANINE PLAN
NORTH
1/8" = 1'-0"
ROOF PLAN
NORTH
1/8" = 1'-0"
UPPER MEZZANINE PLAN
NORTH
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1. ASBESTOS ABATEMENT AND LEAD PAINT ASBESTOS ABATEMENT AND LEAD PAINT ABATEMENT TO BE COMPLETED DURING PHASE 1. 2. SEE MECHANICAL PHASING SHEETS STARTING ON SEE MECHANICAL PHASING SHEETS STARTING ON GC104. 3. THESE PLANS ARE INDICATIVE OF WORK SPECIFIC THESE PLANS ARE INDICATIVE OF WORK SPECIFIC TO A CERTAIN PHASE OF THE PROJECT. ANY SEQUENCING REQUIREMENTS FOR WORK WILL BE EXPLICITLY STATED. ALL WORK NOT SHOWN ON THESE SHEETS IS NOT REQUIRED DURING A SPECIFIC PHASE.
AutoCAD SHX Text
ELECTRICAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: WHEN NEW BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 2. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. POWER NEW BOILER #2. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE TEMPORARY BOILER. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. LEAVE SPARE BREAKER IN PANEL DP-1 AFTER REMOVING FEED TO TEMPORARY BOILER. RECIRCUIT TRANSFORMERS FEEDING PANELS E-2 AND E-3 FROM BREAKERS ASSIGNED TO PANEL DP-1. LIMIT INTERRUPTION OF SYSTEM POWER TO THE MINIMUM AMOUNT OF TIME POSSIBLE. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 1. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. DE-ENERGIZE TRANSFORMERS T-E-2 & T-E-3 & RECIRCUIT TO PANEL DP-1 IN ASSIGNED BREAKER. ENERGIZE EXISTING TRANSFORMERS & ENSURE ALL LOADS SERVED BY EXISTING PANELS E-2 & E-3 ARE OPERATIONAL BEFORE PROCEEDING. UPON SUCCESSFUL DE-ENERGIZATION OF BOILER 1 AND REMOVAL OF ALL LOADS FED BY MCC, BEGIN TO REMOVE MCC AND ALL OVERHEAD WIREWAY. REMOVE ASSOCIATED FEEDER CONDUIT AND WIRING BACK TO MAIN SWITCH GEAR. UNDERGROUND CONDUIT TO BE CUT & FLUSH WITH FLOOR AND CAPPED. DE-ENERGIZE EXISTING TRANSFORMER T-3. INSTALL NEW PANEL E-3 AND NEW TRANSFORMER T-E-3 IN SAME LOCATION AS EXISTING AND REFEED WITH EXISTING WIRING FROM PANEL DP-1. RECONNECT ALL LOADS SERVED BY EXISTING E-3 TO NEW E-3. MINIMIZE INTERRUPTIONS TO LOADS SERVED BY PANEL E-3 BY COMPLETING THIS WORK IN THE SHORTEST TIME POSSIBLE. THIS CAN HAPPEN AT ANY TIME FOLLOWING THE CHANGE IN CIRCUITRY OF EXISTING TRANSFORMER T-E-3. E.C. TO NOTIFY BOILER PLANT MANAGER OF EXPECTED DOWNTIME. INSTALL NEW PANEL E-2 AND NEW TRANSFORMER T-E-2. PROVIDE BRANCH CIRCUIT WIRING FROM PANEL DP-1 TO POWER PANEL IN ASSIGNED BREAKERS. SEE ONE-LINE DIAGRAM AND PANEL SCHEDULE FOR PANEL DP-1 FOR LOAD CONFIGURATIONS. BEGIN TRANSFERRING LOADS FROM EXISTING PANEL E-2 TO NEW PANEL E-2. WHEN ALL LOADS FROM EXISTING E-2 ARE SUCCESSFULLY TRANSFERRED TO NEW PANEL E-2, REMOVE EXISTING PANEL E-2, EXISTING TRANSFORMER T-E-2, ALL BRANCH CIRCUIT WIRING, AND FEEDERS FROM PANEL DP-1 TO EXISTING EQUIPMENT. LEAVE SPARE BREAKER IN PANEL DP-1.
AutoCAD SHX Text
ARCHITECTURAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #2. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #2. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #2. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #2. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #2. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #1. INFILL WITH NEW SLAB. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #1. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #1. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #1. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #1. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WH
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
REF
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
FD
AutoCAD SHX Text
METAL ACCESS/PLATFORM BOILER #2
AutoCAD SHX Text
METAL ACCESS/PLATFORM BOILER #1
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
UP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
SANDBLASTER
AutoCAD SHX Text
WORK TABLE W/ VISE
AutoCAD SHX Text
WORK TABLE W/ DRILL
AutoCAD SHX Text
WORK TABLE
AutoCAD SHX Text
GRINDER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
BOILER 2 FAN
AutoCAD SHX Text
VFD
AutoCAD SHX Text
ELECTRICAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT ELECTRICAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE IN THE FOLLOWING SEQUENCE, UNLESS NOTED OTHERWISE HEREIN: WHEN NEW BOILER 3 AND TEMPORARY BOILER ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 2. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. POWER NEW BOILER #2. PROVIDE VFD FOR CONTROL, ALL CONTROL WIRING, AND BRANCH CIRCUIT WIRING. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE TEMPORARY BOILER. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. LEAVE SPARE BREAKER IN PANEL DP-1 AFTER REMOVING FEED TO TEMPORARY BOILER. RECIRCUIT TRANSFORMERS FEEDING PANELS E-2 AND E-3 FROM BREAKERS ASSIGNED TO PANEL DP-1. LIMIT INTERRUPTION OF SYSTEM POWER TO THE MINIMUM AMOUNT OF TIME POSSIBLE. WHEN NEW BOILER 2 AND BOILER 3 ARE FULLY OPERATIONAL AND COMMISSIONED, DE-ENERGIZE BOILER 1. REMOVE ALL ELECTRICAL FEEDERS, WIRING, AND CONTROLS BACK TO POINT OF ORIGIN. DE-ENERGIZE TRANSFORMERS T-E-2 & T-E-3 & RECIRCUIT TO PANEL DP-1 IN ASSIGNED BREAKER. ENERGIZE EXISTING TRANSFORMERS & ENSURE ALL LOADS SERVED BY EXISTING PANELS E-2 & E-3 ARE OPERATIONAL BEFORE PROCEEDING. UPON SUCCESSFUL DE-ENERGIZATION OF BOILER 1 AND REMOVAL OF ALL LOADS FED BY MCC, BEGIN TO REMOVE MCC AND ALL OVERHEAD WIREWAY. REMOVE ASSOCIATED FEEDER CONDUIT AND WIRING BACK TO MAIN SWITCH GEAR. UNDERGROUND CONDUIT TO BE CUT & FLUSH WITH FLOOR AND CAPPED. DE-ENERGIZE EXISTING TRANSFORMER T-3. INSTALL NEW PANEL E-3 AND NEW TRANSFORMER T-E-3 IN SAME LOCATION AS EXISTING AND REFEED WITH EXISTING WIRING FROM PANEL DP-1. RECONNECT ALL LOADS SERVED BY EXISTING E-3 TO NEW E-3. MINIMIZE INTERRUPTIONS TO LOADS SERVED BY PANEL E-3 BY COMPLETING THIS WORK IN THE SHORTEST TIME POSSIBLE. THIS CAN HAPPEN AT ANY TIME FOLLOWING THE CHANGE IN CIRCUITRY OF EXISTING TRANSFORMER T-E-3. E.C. TO NOTIFY BOILER PLANT MANAGER OF EXPECTED DOWNTIME. INSTALL NEW PANEL E-2 AND NEW TRANSFORMER T-E-2. PROVIDE BRANCH CIRCUIT WIRING FROM PANEL DP-1 TO POWER PANEL IN ASSIGNED BREAKERS. SEE ONE-LINE DIAGRAM AND PANEL SCHEDULE FOR PANEL DP-1 FOR LOAD CONFIGURATIONS. BEGIN TRANSFERRING LOADS FROM EXISTING PANEL E-2 TO NEW PANEL E-2. WHEN ALL LOADS FROM EXISTING E-2 ARE SUCCESSFULLY TRANSFERRED TO NEW PANEL E-2, REMOVE EXISTING PANEL E-2, EXISTING TRANSFORMER T-E-2, ALL BRANCH CIRCUIT WIRING, AND FEEDERS FROM PANEL DP-1 TO EXISTING EQUIPMENT. LEAVE SPARE BREAKER IN PANEL DP-1.
AutoCAD SHX Text
ARCHITECTURAL PHASING NOTES:
AutoCAD SHX Text CARRY OUT THE FOLLOWING ARCHITECTURAL DEMOLITION AND NEW CONSTRUCTION WORK FOR THIS PHASE, UNLESS NOTED OTHERWISE HEREIN. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #2. INFILL WITH NEW SLAB. REMOVE EXISTING KNOCKOUT PANEL AT EXTERIOR WALL. PROTECT OPENING WITH TEMPORARY WEATHERTIGHT POLY WALL. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #2. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #2. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #2. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #2. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. SAWCUT & REMOVE EXISTING CONCRETE FLOOR SLAB FOR PLUMBING REPLACEMENT AT BOILER #1. INFILL WITH NEW SLAB. REMOVE UNUSED EXISTING EQUIPMENT PADS ASSOCIATED WITH BOILER #1. ENLARGE EXIST. EQUIPMENT PAD AT BOILER #1. PROVIDE NEW METAL ACCESS PLATFORM & LADDER AT BOILER #1. PROVIDE ROOF CURBS FOR NEW MECHANICAL PENETRATIONS AT BOILER #1. PATCH ROOF WHERE EXISTING VENTS HAVE BEEN REMOVED. REMOVE TEMPORARY POLY WALL. REINSTALL KNOCK-OUT PANEL TO MATCH EXISTING.
AutoCAD SHX Text
NEW CONCRETE PAD FOR TEMPORARY BOILER
AutoCAD SHX Text
KNOCKOUT PANEL
AutoCAD SHX Text
BOILER 1 FAN
AutoCAD SHX Text
VFD
AutoCAD SHX Text
NEW PANEL E-2
AutoCAD SHX Text
NEW TRANSFORMER T-E-2. MOUNT AT 8'-6" AFF
AutoCAD SHX Text
NEW PANEL E-3
AutoCAD SHX Text
NEW TRANSFORMER T-E-3. MOUNT AT 8'-6"
AutoCAD SHX Text
VFD
AutoCAD SHX Text
BOILER 3 FAN
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
OPEN
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OPEN
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 24" GRAVITY VENTILATOR
AutoCAD SHX Text
EXIST. 2" VENT
AutoCAD SHX Text
EXIST. 6" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. 10" SAFETY VALVE VENT
AutoCAD SHX Text
EXIST. POWER ROOF VENTILATOR
AutoCAD SHX Text
EXIST. VENT
AutoCAD SHX Text
EXIST. 4" STM VENT
AutoCAD SHX Text
EXIST. ROOF HATCH
AutoCAD SHX Text
GRAVITY VENTILATOR
AutoCAD SHX Text
BOILER #2 STACK
AutoCAD SHX Text
BOILER #1 STACK
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
NTS
PHASING DIAGRAM
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC104
JMD
PHASING DIAGRAM
PHASE 1 - PART 1
HFB
AutoCAD SHX Text
DEAERATOR TANK
AutoCAD SHX Text
CONDENSATE TANK
AutoCAD SHX Text
FWP-1
AutoCAD SHX Text
FWP-2
AutoCAD SHX Text
FWP-3
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text 6"V
AutoCAD SHX Text
CTP-1
AutoCAD SHX Text
CTP-2
AutoCAD SHX Text
2"HPS
AutoCAD SHX Text
TO SEWER
AutoCAD SHX Text
CRP-1
AutoCAD SHX Text
CONDENSATE SUMP
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text 2"D
AutoCAD SHX Text
10"RV-3
AutoCAD SHX Text
2"C FROM LAUNDRY
AutoCAD SHX Text
5"C FROM HOSPITAL
AutoCAD SHX Text
4"HPS TO LAUNDRY
AutoCAD SHX Text
10"MPS TO HOSPITAL
AutoCAD SHX Text
4"OFL TO SUMP PUMP
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
2"SW FROM SOFTENERS
AutoCAD SHX Text P
AutoCAD SHX Text
COMBUSTION AIR AHU
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
6"RV-4
AutoCAD SHX Text 6"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
2" BYPASS
AutoCAD SHX Text
4" BYPASS
AutoCAD SHX Text 10"V
AutoCAD SHX Text
PRV-2
AutoCAD SHX Text
PRV-1A
AutoCAD SHX Text
PRV-1
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
3"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"MPS
AutoCAD SHX Text
6"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS BLIND FLANGE
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
2"HPS TO STEAM WHISTLE
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text 4"
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text 4"
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
2"HPS RETURN
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
6"RV-2
AutoCAD SHX Text 6"V
AutoCAD SHX Text
FILL VALVE
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text 4"D
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
3"CTPD BYPASS
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
4"CTPS
AutoCAD SHX Text
4"CTPS
AutoCAD SHX Text 4"
AutoCAD SHX Text
4"CTPS
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text 1"C
AutoCAD SHX Text
4" EMERGENCY CONNECTION
AutoCAD SHX Text
DEAERATOR STACK
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
NC
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PROVIDE NEW CONDENSATE SUMP AND PUMPS CRP-1. CUT-IN NEW CONDENSATE PIPES, ONE AT 5" HOSPITAL CONDENSATE RETURN AND ONE AT 2" LAUNDRY CONDENSATE RETURN, JOIN PIPES TO ONE 4" CONDENSATE RETURN AND CONNECT TO NEW CONDENSATE RETURN SUMP. CUT-IN 3 NEW SHUT-OFF VALVES V101, V102, AND V103 AT EXISTING 3"CPD BYPASS PIPE WITH NEW 3" TEE. CLOSE NEW VALVE V103. PROVIDE PIPING FROM 2 NEW CONDENSATE PUMPS CRP-1 AND CRP-2 TO EXISTING 3" BYPASS PIPING BETWEEN DEAERATOR TANK AND CONDENSATE TANK. PROVIDE VFD AND WIRE CRP-1 AND CRP-2 TO NEW PANEL DP-1. OPEN EXISTING 3" CPD BY-PASS VALVE. WHEN NEW CONDENSATE RETURN SUMP AND PUMPS CRP-1 ARE FULLY OPERATIONAL DEMOLISH EXISTING CONDENSATE SUMP, ASSOCIATED PUMPS CP-1, PIPING, SUPPORTS AND HANGERS. CLOSE VALVE AT CONDENSATE TANK AND DE-ENERGIZE EXISTING PUMPS CTP-1 AND CTP-2. REMOVE ALL FEEDERS. PROVIDE CAPS AT EXISTING 5" HOSPITAL CONDENSATE RETURN AND EXISTING 2" LAUNDRY CONDENSATE RETURN. PROVIDE NEW 2-4" TEES WITH 2-4" VALVES, TV1 - CLOSED, AND TV2 - CLOSED. CLOSE ALL VALVES TO CONDENSATE TANK. REMOVE AND REPLACE EXISTING SOLENOID VALVES ON MAKE-UP WATER VALVES TO CONDENSATE TANK. CUT-IN NEW VALVE, V104 - CLOSED, ON 2" HPS. DRAIN DOWN CONDENSATE TANK. CLOSE 3" VALVE FROM EXISTING CRP-1 AT DEAERATOR TANK. REMOVE EXISTING 6" VENT THROUGH ROOF AND PROVIDE TEMPORARY CAP AT ROOF OPENING. REMOVE CONDENSATE TANK, CONNECTED PIPING, PIPE SUPPORTS AND HANGERS, UNUSED VALVES AND TANK SUPPORTS. REMOVE CTP-1 AND CTP-2, ASSOCIATED PIPING, HANGERS AND SUPPORTS, AND CONTROLS.
AutoCAD SHX Text
PHASE 1 - PART 1:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONDENSATE SUMP
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
AutoCAD SHX Text 2"C
AutoCAD SHX Text 4"C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text V1O2
AutoCAD SHX Text V1O3
AutoCAD SHX Text V1O1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TV2
AutoCAD SHX Text
TV1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text V1O4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FROM BOILERS 1, 2, & 3
AutoCAD SHX Text
TO HPR
AutoCAD SHX Text M
AutoCAD SHX Text
GENERAL PLAN NOTES
AutoCAD SHX Text
1. REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE REFER TO PHASING PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH THE PHASES IDENTIFIED. 2. GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND GENERAL CONTRACTOR TO REVIEW MECHANICAL, ELECTRICAL, PLUMBING AND ARCHITECTURAL PLANS FOR ADDITIONAL NEW WORK. ALL WORK FOR WALL, CEILING AND FLOOR ASSEMBLIES NECESSARY TO FACILITATE COMPLETE MEP SYSTEM IS PART OF THE CONTRACTOR'S SCOPE OF WORK. 3. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL NEW CONSTRUCTION WORK. 4. MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS MAINTAIN CONTINUOUS STEAM AND CONDENSATE SERVICE TO CAMPUS BUILDINGS AND ALL SPACES IN BUILDING 415 NOT AFFECTED BY THIS WORK. COORDINATE WITH VA COR FOR ANY DISRUPTION IN SERVICES REQUIRED TO PERFORM WORK. 5. CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT CONTRACTOR SHALL PROVIDE 3 WEEK WRITTEN NOTICE FOR ALL TOTAL PLANT SHUTDOWNS. 6. PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER PLANS AND SECTIONS MAY NOT SHOW ALL REQUIRED PIPE, CONTROL, POWER AND SYSTEM CONNECTIONS TO BOILERS, PUMPS, FANS, HVAC TERMINAL UNITS, MUAU, CONTROL DEVICES AND VALVES. CONTRACTOR SHALL REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND ARCHITECTURAL DEMOLITION AND NEW PLANS, DETAILS, AND DIAGRAMS FOR CONNECTIONS TO EQUIPMENT. 7. ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ALL PNEUMATIC CONTROLLERS SHALL BE REMOVED AND REPLACED WITH ELECTRONIC CONTROLLERS.
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
FILL VALVE
AutoCAD SHX Text 9A
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
1"CTPD RECIRC
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
3"CTPD BYPASS
AutoCAD SHX Text
3"CW FROM BLDG REDUCED PRESSURE ZONE ASSEMBLY
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
FILL VALVE
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
NC
AutoCAD SHX Text
2"CW
AutoCAD SHX Text 6"V
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
3"CTPD
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NC
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
LPS TO B415
AutoCAD SHX Text
LPR
AutoCAD SHX Text
415-CRP-1
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Tomah, Wisconsin
676-14-105
Office of
Facilities
Management
BID SET
July 22, 2020
CONSULTANTS:
500 E VETERANS ST
TOMAH, WI 54660
MEDICAL CENTER
VETERANS AFFAIRS
UNSPRINKLERED
Replace Boilers B415
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
GC105
JMD
PHASING DIAGRAM
PHASE 1 - PART 2
HFB
AutoCAD SHX Text
DEAERATOR TANK
AutoCAD SHX Text
FWP-1
AutoCAD SHX Text
FWP-2
AutoCAD SHX Text
FWP-3
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
4"OFL
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
NC
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
NC
AutoCAD SHX Text
10"RV-3
AutoCAD SHX Text
2"C FROM LAUNDRY
AutoCAD SHX Text
5"C FROM HOSPITAL
AutoCAD SHX Text
4"HPS TO LAUNDRY
AutoCAD SHX Text
10"MPS TO HOSPITAL
AutoCAD SHX Text
6"OFL TO SUMP PUMP
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
2"SW FROM SOFTENERS
AutoCAD SHX Text P
AutoCAD SHX Text
COMBUSTION AIR AHU
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
3"LPS
AutoCAD SHX Text
6"RV-4
AutoCAD SHX Text 6"V
AutoCAD SHX Text 6"V
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
2" BYPASS
AutoCAD SHX Text
4" BYPASS
AutoCAD SHX Text 10"V
AutoCAD SHX Text
PRV-2
AutoCAD SHX Text
PRV-1A
AutoCAD SHX Text
PRV-1
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
3"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
6"HPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"MPS
AutoCAD SHX Text
6"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS
AutoCAD SHX Text
10"HPS BLIND FLANGE
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
2"HPS TO STEAM WHISTLE
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
8"LPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text
1 "RECIRC12"RECIRC
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 4"
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"SW
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
6"RV-2
AutoCAD SHX Text 6"V
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
1-1/2"RECIRC
AutoCAD SHX Text 4"D
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
6"LPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
10"MPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
4"HPS
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
4" EMERGENCY CONNECTION
AutoCAD SHX Text
DEAERATOR STACK
AutoCAD SHX Text
6"OFL
AutoCAD SHX Text
6"OFL
AutoCAD SHX Text
NC
AutoCAD SHX Text
AutoCAD SHX Text
CONDENSATE SUMP
AutoCAD SHX Text 2"C
AutoCAD SHX Text 4"C
AutoCAD SHX Text V1O2
AutoCAD SHX Text V1O3
AutoCAD SHX Text V1O1
AutoCAD SHX Text
CONDENSATE TANK
AutoCAD SHX Text 4"V
AutoCAD SHX Text 4"V
AutoCAD SHX Text
NC
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
3"PC
AutoCAD SHX Text
4"CTPS
AutoCAD SHX Text
CTP
AutoCAD SHX Text
AutoCAD SHX Text
CTP
AutoCAD SHX Text
AutoCAD SHX Text
CRT
AutoCAD SHX Text
AutoCAD SHX Text SET NEW CONDENSATE TANK IN PLACE OF DEMOLISHED CONDENSATE TANK. CONNECT NEW PIPING TO NEW CONDENSATE TANK. SET NEW CONDENSATE TRANSFER PUMPS CTP-1 AND CTP-2 IN PLACE OF DEMOLISHED PUMPS CTP-1 AND CTP-2. SEE DETAIL FOR PUMP PIPING AND ACCESSORIES. PROVIDE 3"CTPD PIPING FROM CTP-1 AND CTP-2 TO DEAERATOR TANK CONNECTION, 3"CTPD BYPASS AND 4"CTPD TO CTP-1 AND CTP-2. PROVIDE 4"V FROM CONDENSATE TANK THROUGH ROOF, SEE DETAIL FOR 4"V THROUGH ROOF AND TERMINATION ON ROOF. PROVIDE 2"D AND 2-4"OFL PIPES FROM CONDENSATE TANK TO EXISTING OVERFLOW PIPING. REMOVE CAP AT 2" DRAIN AND CONNECT TO EXIST DRAIN PIPE. PROVIDE 1"CTPD RECIRC PIPE FROM CTP-1 AND CTP-2 TO CONNECTION AT NEW CONDENSATE TANK. PROVIDE 4"CTPD FROM NEW CONDENSATE TANK TO CTP-1 AND CTP-2 INLET PIPE. PROVIDE NEW 4" FWPS HEADER FOR PUMPS INLET, 4" FWPS HEADER FOR BOILER FEED, 1-1/2" RECIRC HEADER, ALL TEES, AND SHUT-OFF VALVES FOR NEW FWP-1, FWP-2 AND FWP-3. PROVIDE NEW HEADER SUPPLY TO BOILERS THROUGH FLOW METER. PROVIDE TEE AND VALVE IN FWPS PUMP INLET HEADER FOR 4" DEAERATOR TANK BOILER FEED-WATER CONNECTION. CUT-IN EXISTING 4" FWPS PIPE WITH NEW 4" FWPS PIPE. PROVIDE TEE AND VALVE IN FWPS PUMP INLET HEADER FOR 4"FWPS BY-PASS CONNECTION FROM CTP-1 AND CTP-2. CUT-IN EXISTING 3"CTPD BY-PASS AND CONNECT TO NEW VALVE. PROVIDE 4"FWPD FROM NEW FLOW METER TO EXISTING 3"FWPD, INCLUDING 2-4" SHUT-OFF VALVES AT 2-3"FWPD CUT-IN TO EXISTING FWPD PIPES TO BOILERS DE-ENERGIZE EXISTING FWP-1. CLOSE ALL FWP-1 VALVES. PROVIDE NEW BFP-1. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-1 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-1 WHEN NEW BFP-1 IS OPERATIONAL. REMOVE TUBE CLEANING PIPING COMPLETELY. DE-ENERGIZE EXISTING FWP-2. CLOSE ALL FWP-2 VALVES. PROVIDE NEW BFP-2. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-2 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-2 WHEN NEW BFP-2 IS OPERATIONAL. DE-ENERGIZE EXISTING FWP-3. CLOSE ALL FWP-3 VALVES. PROVIDE NEW BFP-3. SEE PUMP DETAIL 5 ON DWG M503 FOR ADDITIONAL INFORMATION. PROVIDE VFD AND WIRE BFP-3 TO NEW PANEL DP-1. COMPLETELY REMOVE EXISTING FWP-3 WHEN NEW BFP-3 IS OPERATIONAL. REMOVE EXISTING 3"FWPS AND FWPD PIPING HEADERS, VALVES AND SUPPORTS. PROVIDE 1-1/2" FWPD RECIRC TO EXISTING FWPD RECIRC AT EXISTING DEAERATOR TANK, CLOSE EXISTING 1-1/2" CTPD RECIRC VALVE FROM DEMOLISHED FW PUMPS AND REMOVE EXISTING 1-1/2" RECIRC CTPD PIPING.
AutoCAD SHX Text
PHASE 1 - PART 2:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NC
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
4"FWPS
AutoCAD SHX Text 4"
AutoCAD SHX Text
BFP
AutoCAD SHX Text
AutoCAD SHX Text
BFP
AutoCAD SHX Text
AutoCAD SHX Text
BFP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3"FWPD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .