About this file

36C25220B0009 0004 S06 - RFI Reponses 537-20-137.pdf

View the file

Other files

File Type Posted
36C25220B0009-0005000.docx DOCX document
36C25220B0009-0005002.pdf PDF
36C25220B0009-0005001.pdf PDF
36C25220B0009-0004002.pdf PDF
36C25220B0009-0004003.pdf PDF
36C25220B0009-0004000.docx DOCX document
36C25220B0009-0004004.pdf PDF
36C25220B0009-0003000.docx DOCX document
36C25220B0009-0002001.pdf PDF
36C25220B0009-0002000.docx DOCX document
36C25220B0009-0001005.pdf PDF
36C25220B0009-0001004.pdf PDF
36C25220B0009-0001003.docx DOCX document
36C25220B0009-002.pdf PDF
36C25220B0009-003.pdf PDF
36C25220B0009-001.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUESTS FOR INFORMATION

PROJECT NUMBER: 537-20-137

PROJECT: Steam Repairs DATE: 01/06/2020

SOLICITATION: 36C252-20-B-0009

RESPONSES TO REQUESTS FOR INFORMATION (RFI) MATRIX

RFI # RFI REFERENCE Response

It appears in areas the pipes are to be insulated there are evidence of leaking. Before we insulate what is the plan to repair any leaks not in this scope?

PAGE 1 OF 8 ON

SOW

See SOW Part 5

2 Task B added 5” bypass valve to be replaced? Task B See SOW Part 3, Task B

Building 30 south penthouse heat exchangers to be re insulated it is apparent there has been leaks on systems.

Before we insulate lines, leaks to be repaired? By who?

Task A See SOW Part 5

Can we get a linear footage and pipe size to figure insulation?

Any images to view?

Building 11A Crawlspace

Task was removed

(2) valves appear to be leaking near pump. Until it’s uncovered don’t know exactly where leak is coming from.

Who is responsible for investigation and repairs before insulation is applied?

Building 11A task 6&7

See SOW Part 5

PER PART THREE TASK A THROUGH D- CONFIRM PIPING

QUANTITIES. WE ARE CONCERNED WHERE WE START AND

STOP INSULATION AS WE DON'T KNOW THE FULL LENGTH OF

PIPE OR THE EXPECTIONS FOR INSULATION TO STOP. MAYBE

THE FACILITY HAS A ONE LINE SKETCH FOR EACH VALVE

LOCATION AND WHERE THEY WANT THE CONTRACTOR TO

TERMINATE INSULATION.

PAGE 1 OF 8 ON

SOW

See SOW Part 3

PLEASE CONFIRM THAT THERE ARE NO HVAC CONTROLS, 23

09 23, FOR THIS PROJECT.

PAGE 2 OF 8 ON

SOW

Specification 23 09 23 was not provided with this solicitation

PLEASE CONFIRM THAT THE VA WILL CORRECT THE GLYCOL

LEAKS PRIOR TO PLACING NEW INSULATION ON LINES PRIOR

TO OUR NEW INSULATION. IF NOT, WILL GLYCOL LEAK

CORRECTIONS BE A PART OF THIS PROJECT'S SCOPE.

PAGE 2 OF 8 ON

SOW

See SOW Part 5

PLEASE PROVIDE ENVIRONMENTAL TESTS FOR ASBESTOS

AND LEAD BASED PAINT ON THE PIPING? IF THERE IS NONE,

PLEASE CONFIRM THAT THERE IS NO ASBESTOS IN FITTINGS,

INSULATION OR MASTIC.

PAGE 2 OF 8 ON

SOW

Asbestos report attached

WHAT ARE THE SHUTDOWN REQUIREMENTS FOR THIS SCOPE

OF WORK? DO SHUTDOWNS NEEDS TO BE ON OVERTIME? IF

WE REMOVE AND REPLACE THE VALVES, IS THERE ANY

SYSTEMS TO BE PUT ON BYPASS?

PAGE 2 OF 8 ON

SOW

Shutdown hours per SOW Part 6, Item 4

PLEASE CONFIRM INFECTION CONTROL REQUIREMENTS PER

AREA. WHAT TYPE OF ROOMS WILL WE BE WORKING IN? ARE

THEY OCCUPIED?

PAGE 1 OF 8 ON

SOW

CLASS II

12 WHAT ARE THE CLOSEST ACCESS POINTS PER AREA?

PAGE 1 OF 8 ON

SOW

All deliveries at Polk Street Dock

THERE ARE WELDING REQUIREMENTS FOR THIS TYPE OF

WORK. WILL THIS WORK NEED TO BE ON OFF HOURS? WILL

THE WELDS NEED TO BE INSPECTED?

PAGE 2 OF 8 ON

SOW

Shutdown hours per SOW Part 6, Item 4

FOR AREAS REQUIRED FOR SHUTDOWN, IS TEMPORARY HEAT

REQUIRED BY THE PRIME CONTRACTOR?

PAGE 2 OF 8 ON

SOW

No

15 There are no job specific specifications to the project. See SOW Part 5

What are the various insulation types and thickness for each system to be insulated?

See SOW Part 5, Item 2

Is there on-site storage for tools and materials within the mechanical spaces?

See SOW Part 6, Item 5

VA indicated that crawlspace was confined space. What are confined space requirements?

Crawlspace task was removed

Can insulation work be done during normal working hours or nights and weekends?

See SOW Part 6, Item 2

Please provide the linear footage, the diameter of pipes, heat exchanger sizes, and fittings at each location for the accurate proposal, so all the bidders can bid the same scope.

SOW Part 3 See SOW Part 3

There were 4 heat exchangers in the room. We were told that only 2 of the heat exchangers need to reinsulate. Please confirm and provide linear footage, pipe size, heat exchanger size, and fittings to figure insulation.

Building 11A task

There is only 2 functional heat exchangers in this room. The third heat exchanger is abandoned in place and not part of the scope. See SOW Part 3.

Please provide an asbestos survey report for all the locations and scope involved in this project.

Asbestos report attached

We were told to remove Task E from the scope of work during the walkthrough. Please confirm.

Task E was removed

File details come from the government source that posted it. Updated .