This pre-solicitation notice announces a forthcoming solicitation for construction services. The project involves renovating approximately 8,500 square feet of space on the second floor of Building 23 at the Tomah VA Medical Center in Tomah, Wisconsin. Work includes preventing water intrusion, addressing lead paint and mold, and upgrading administrative areas without disturbing asbestos-containing materials. The performance period is 180 calendar days from notice to proceed. The North American Industry Classification System code is 236220 and the estimated price range is $500,000 to $1,000,000. The solicitation will be set aside for service-disabled veteran-owned small businesses. The solicitation, specifications and drawings will be posted on October 28, 2019 to FedBizOpps.gov. An optional pre-bid site visit is tentatively scheduled for the week of November 4, 2019. Interested vendors should monitor the site for award details and any amendments.
36C25220B0007 S02 36C25220B0007 Att3 DWGS COMBINED 676-19-108 UPGRADE B23 2nd FL 2019.10.01.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25220B0007-0003000.docx | DOCX document | |
| 36C25220B0007-0003001.pdf | ||
| 36C25220B0007-0002000.docx | DOCX document | |
| 36C25220B0007-0001000.docx | DOCX document | |
| 36C25220B0007-0001003.pdf | ||
| 36C25220B0007-0001002.pdf | ||
| 36C25220B0007-0001001.pdf | ||
| 36C25220B0007-007.pdf | ||
| 36C25220B0007-006.pdf | ||
| 36C25220B0007-009.pdf | ||
| 36C25220B0007-010.pdf | ||
| 36C25220B0007-005.pdf | ||
| 36C25220B0007-008.pdf | ||
| 36C25220B0007-004.pdf | ||
| 36C25220B0007-003.pdf | ||
| 36C25220B0007-002.docx | DOCX document | |
| 36C25220B0007-008.pdf | ||
| 36C25220B0007-010.pdf | ||
| 36C25220B0007-002.docx | DOCX document | |
| 36C25220B0007-007.pdf | ||
| 36C25220B0007-006.pdf | ||
| 36C25220B0007-009.pdf | ||
| 36C25220B0007-003.pdf | ||
| 36C25220B0007-004.pdf | ||
| 36C25220B0007-001.docx | DOCX document | |
| 36C25220B0007-001.docx | DOCX document | |
| 36C25220B0007-000.docx | DOCX document | |
| 36C25220B0007-000.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING
ENCLOSED
WALK
BENCH
MARK
PARKING
P A
R K
I N
G
4 t h
ST
RE
ET
PARKING
E N
C L O
S E
D
WALK
PARKING
ENCLOSED
WALK
MINIATURE
GOLF
E STREET
PARKING
PARKING
ST
RE
ET
3 r d
T
C
STREET
PARKING
D
STREET
P A
R K
I N
G
E
STREET
T
T
PARKING
3 r d
ST
RE
ET
F
STREET
S T
R E
E T
T s t
2 n d
ST
RE
ET
P A
R K
I N
G
PARKING
BASEBALL AND SOCCER FIELD
PATH
E STREET
4T H
S
TR
EE
T
5T H
S
TR
EE
T
TENNIS
COURT
ENGINEERING
CORPORATION
YARD
LP FUEL
STORAGE
SCRAP
STORAGE
WANDERING
GREENHOUSE
FUEL
PUMP
FLAGPOLE
PATIO
EAST VETERANS STREET
GAZEBO
WALK
PARK
VETERANS
GOLF COURSE
402AWAREHOUSE
OUTPATIENT
PARKING
ENTRANCEADMINISTRATION
OUTPATIENT ADMISSION
VETERANS ASSISTANCE CENTER
VOLUNTARY SERVICE
MENTAL HEALTH
NURSING HOME
CARE UNIT
NURSING HOME
CARE UNIT
KITCHEN
DINING
ADMINISTRATION
CANTEEN SERVICES
CHAPEL
NURSING HOME
CARE UNIT
GYM
ELECTRICAL
SUBSTATION
BOILER
PLANT
LAUNDRY
DISTRIBUTION
FIRE STATION
MAINTENANCE SHOPS
EAST VETERANS STREET
PARKING
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
PROJECT TEAM
CAMPUS MAP
IN THE CASE OF CONFLICTS OR
DISCREPANCIES WITHIN OR AMONG THE
CONTRACT DRAWINGS, THE BETTER
QUALITY, MORE STRINGENT
REQUIREMENTS OR GREATER QUANTITY
OF WORK, AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
LOCATION MAP
LA CROSSE
MILWAUKEEMADISON
SUPERIOR
ASHLAND
APPLETON
GREEN BAY
PROJECT
LOCATION
TOMAH
BUILDING NO. 23
VA COR
CONTACT: JAMES CONN
ADDRESS: 500 EAST VETERANS ST B23
TOMAH, WI 54660
PHONE: 608-372-7751
VA ACOR
CONTACT: DAVID MARTIN
ADDRESS: 500 EAST VETERANS ST B23
PHONE:
TOMAH, WI 54660
608-372-3197 EXT 61841
COVER SHEET
DEPARTMENT OF
VETERANS AFFAIRS
UPGRADE B23 SECOND FLOOR
VA MEDICAL CENTER
TOMAH, WISCONSIN
BUILDING NO. NAMING LEGEND
VA DESIGNATED BUILDING NO.
G1
SHEET INDEX
LEGEND
SHEET DESCRIPTION NUMBER
G-1
COVER SHEET
G-2
ABBREVIATIONS
G-3
ICRA BARRIER
G-4
BID DEDUCTS
AD-1 ARCHITECTURAL DEMOLITION
A-1
NEW WALLS AND DOORS
A-2 SUMMARY OF WORK
A-3 FLOOR FINISHES
A-4
CEILING PLAN
WALL SCHEDULE OF FINISHES
T-1
FIRST FLOOR ROOM NUMBERS
E-1
SECOND FLOOR ROOM NUMBERS
ELECTRICAL DEMOLITION
E-2 ELECTRICAL NEW
ELECTRICAL CEILING FIXTURESE-3
IT IT COVER SHEET
IT-1 IT DEMOLITION
IT-2 IT NEW CONSTRUCTION
AP VA WIRELESS LOCATIONS
P-1 PLUMBING NEW
FD FIRE SUPRESSION
INTERIOR SIGNAGE
(Section/Elevation)
Plastic Laminate
Metal (Elevation)
Red Granite
Ceramic Tile
Resilient Flooring or
Gypsum Board
Acoustical Tile
Plaster
Room Number
Vertical Elevation
Column Grid Number
Centerline, Projection
Ext. Elevation Line
(cloud around revision)
Partition Type
Window Type
Key Note
B
Revision
A
A6
Drain - Open Tile
Storm Sewer
Sanitary Sewer
Fuel Line - Oil
Gas Main
Power Line
Telephone
Water Main
Through Member
Interrupted Blocking
Glass (Elevation)
Insulation, Rigid
Insulation, Batt
Finish Wood
Wood Framing
Wood Framing
Clay Tile or Rubble
Plywood
Steel
Sand, Mortar, Stone
Concrete Masonry Unit
Concrete (Elev.)
Concrete (Section)
Gravel
Earth
Expansion
Exposed
Electric Water Cooler
Equipment
Electrical Panelboard
Enclosure
Emergency
Elevation
Electrical
Elevation
Expansion Joint
EXT.
EXP.
EXPO.
EXST.
E.W.C.
EQPT.
EQ.
Exterior
Existing
Equal
E.P.
ENCL.
EMER.
ELEV.
ELEC.
EL.
E.J.
EA. Each
+121.42
+121.42
121.42
100.00
INTERIOR ELEVATIONS
BUILDING SECTION
Elevation No.
Sheet No.
Sheet No.
Section No.
A6
A5
SECTION
Section No.
Sheet No.
Sheet No.
Detail No.
A7
A7
DETAIL REFERENCE
True North
Project North
North Arrow
TN
N
N
Construction to be Removed
Hidden, Future or Existing
Property or Boundary Lines
Existing Tree to be Removed
Existing Tree to Remain
Power Poles
Street Lights
Fire Hydrant
Catch Basin
Manhole
Test Boring
Benchmark
Existing Spot Elevation
Required Spot Elevation
Bldg. Elevation - 1st Floor
Site Elevation - 1st Floor
Finished Contour
Existing Contour
WT.
Outside Diameter (Dim.)
Not in Contract
Opposite
Opening
Office
On Center
Obscure
Overall
OPP.
OPNG.
OFF.
O.D.
O.C.
OBS.
O.A.
Not to Scale
Nominal
Number
North
Mullion
N.T.S.
NOM.
NO. or #
N.I.C.
N.
MUL.
WSCT.
WP.
W/O
WD.
W.C.
W/
W.
VEST.
VERT.
UR.
U.O.N.
UNF.
T.O.F.
Weight
Unless Otherwise Noted
Wainscot
Waterproof
Water Closet
Without
Wood
With
West
Vestibule
Unfinished
Top of Footing
Vertical
Urinal
Dry Standpipe
Door Opening
Dispensor
Dimension
Diameter
Drinking Fountain
Department
E.
DWG.
D.S.P.
DWR.
DR.
D.O.
DN
East
Drawing
Drawer
Door
Down
DISP.
DIM.
DIA.
DTL.
D.F.
DEPT.
DBL.
Detail
Double
Countersunk
Corridor
Continuous
Construction
Connection
Concrete
Concrete Masonry Unit
Caulking
Corner Guard
CONSTR.
CTR.
CNTR.
CTSK.
CORR.
CONT.
CONN.
Center
Counter
CONC.
COL.
C.M.U.
CLR.
CLO.
CLKG.
CLG.
C.G.
Column
Clear
Closet
Ceiling
Control Joint
Cast Iron
Ceramic
Catch Basin
Blocking
Bituminous
Above Finish Floor
C.J.
C.I.
CER.
CEM.
C.B.
CAB.
BOT.
Cement
Cabinet
Bottom
BITUM.
BM.
BLKG.
BLK.
BLDG.
B.D.
A.F.F.
Beam
Block
Building
Board
Asbestos
Architectural
Approximate
Aluminum
Aggregate
Adjustable
Area Drain
Acoustical
Pound or Number
Diameter or Round
Centerline
APPROX.
ASPH.
ASB.
ARCH.
AL.
AGGR.
ADJ.
A.D.
Asphalt
ACOUS.
O
At
Angle
T. & G.
Masonry Opening
Medicine Cabinet
Mounted
Miscellaneous
Mirror
Minimum
Manhole
Manufacturer
Metal
MTD.
M.O.
MISC.
MIR.
MIN.
MH.
MFR.
MET.
Membrane
Mechanical
Maximum
Light
Locker
Lavatory
MEMB.
MECH.
M.C.
MAX.
LT.
LKR.
LAV.
TYP.
T.W.
T.V.
T.P.D.
T.P.
THK.
TER.
TEL.
T.C.
T.B.
TRD.
SYM.
SUSP.
STRL.
Inside Diameter (Dim.)
Laminate
Laboratory
Kitchen
Joint
Janitor
LAM.
LAB.
KIT.
JT.
JAN.
Interior
Insulation
Height
Hour
Horizontal
INT.
INSUL.
I.D.
HGT.
HR.
HORIZ.
STOR.
STL.
STD.
STA.
S.SK.
S.ST.
SQ.
SPEC.
S.N.D.
SIM.
SHT.
SHR.
SH.
SECT.
S.D.
Toilet Paper Dispenser
Top of Wall
Television
Top of Pavement
Tongue and Groove
Terrazzo
Typical
Thick
Telephone
Top of Curb
Towel Bar
Symmetrical
Suspended
Structural
Tread
Sanitary Napkin Dispenser
Standard
Service Sink
Stainless Steel
Specification
Storage
Steel
Station
Square
Soap Dispenser
Similar
Sheet
Shower
Shelf
Section
SCHED.
REINF.
P.T.D/R
PLYWD.
P. LAM.
Hollow Metal
Hardware
Hardwood
Hollow Core
Hose Bib
Gypsum
Grade
H.M.
HDWE.
HDWD.
H.C.
H.B.
GYP.
GR.
Ground
Glass
Grab Bar
Galvanized
Gauge
Future
Furring
GND.
GL.
G.B.
GALV.
G.A.
FUT.
FURR.
S.C.D.
S.C.
S.
R.W.L.
RWD.
R.O.
RM.
RESIL.
REQ.
RGTR.
REFR.
REF.
R.D.
Face of Studs
Face of Concrete
Fire Hose Cabinet
Fire Extinguisher Cabinet
Fire Extinguisher
Footing
Foot or Feet
Full Size
Fireproof
Fluorescent
Flashing
FTG.
FT.
F.S.
FPRF.
F.O.S.
F.O.C.
FLUOR.
FLASH.
Floor
Finish
Foundation
Floor Drain
Flat Bar
FL.
FIN.
F.H.C.
F.E.C.
F.E.
FDN.
F.D.
F.B.
RAD.
R.
Q.T.
P.T.R.
PTN.
P.T.D.
PT.
PR.
PLAS.
PL.
Seat Cover Dispensor
Schedule
Solid Core
Rain Water Leader
Redwood
Rough Opening
South
Resilient
Required
Reinforced
Register
Refrigerator
Reference
Roof Drain
Room
Paper Towel Receptacle
Dispenser & Receptacle
Combination Paper Towel
Paper Towel Dispenser
Quarry Tile
Partition
Radius
Riser
Plywood
Plastic Laminate
Point
Pair
Plaster
Plate
& And PRCST.Fire AlarmF.A. Precast
HandicapH.C.P.
ICRA BARRIER
Construction Fence
Asphalt
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ABBREVIATIONS
G2
AutoCAD SHX Text
DT
AutoCAD SHX Text
STS
AutoCAD SHX Text
SS
AutoCAD SHX Text O
AutoCAD SHX Text G
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
MATERIAL SYMBOLS
AutoCAD SHX Text
6" ELM
AutoCAD SHX Text
8" OAK
AutoCAD SHX Text M.H.
AutoCAD SHX Text T.B.#1
AutoCAD SHX Text
EL. 100
AutoCAD SHX Text B.M.
AutoCAD SHX Text
SITE LEGEND
AutoCAD SHX Text
DRAWING SYMBOLS
AutoCAD SHX Text C.B.
AutoCAD SHX Text
AutoCAD SHX Text
ABBREVIATIONS
INFECTION CONTROL RISK ASSESSMENT
(ICRA) BY PROJECT AREA USE
ALL FLOORS
CONSTRUCTION TYPE - D
PATIENT RISK GROUP - HIGH RISK
CONTROL PROCEDURE CLASS - I, II, III & IV
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ICRA BARRIER
G3
AutoCAD SHX Text
LEGEND / NOTES
AutoCAD SHX Text
1. THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT THE INTENT OF INFECTION CONTROL ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHICH HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING CLASS II, III, OR IV OPERATIONS. 2. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR 3. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C (SEE AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION "INFECTION CONTROL") AND THEREON, PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT. 4. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 4 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS. SEE DETAILS 1/GI107 AND 2/GI107 5. REFER TO SPECIFICATIONS SECTION 010110 AND THIS DRAWING REFER TO SPECIFICATIONS SECTION 010110 AND THIS DRAWING FOR TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION DETAIL. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION ACCESS DOORS AND PROXIMITY CARD READERS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. 6. HVAC CONTRACTOR SHALL ADJUST THE VARIABLE FREQUENCY HVAC CONTRACTOR SHALL ADJUST THE VARIABLE FREQUENCY DRIVES IF REQUIRED. THIS VFD ADJUSTMENT IS NECESSARY PRIOR TO STARTING ANY CONSTRUCTION OR DEMOLITION OPERATIONS TO ENSURE PROPER INFECTION CONTROL MEASURES. ADJUST VFD FOR BALANCING SUPPLY TO MEET INFECTION CONTROL MEASURES AS INDICATED HEREAFTER. 7. PROVIDE BALANCING DAMPERS IN THE MAIN SUPPLY AND PROVIDE BALANCING DAMPERS IN THE MAIN SUPPLY AND EXHAUST DUCT WORK SERVING THESE AREAS. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY 8. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE TRIATEK ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF. INSTALL NEW YELLOW CONSTRUCTION DOOR. NOTE THAT ONLY (3) THREE SETS OF YELLOW CONSTRUCTION DOORS WITH RECOGNITION SOURCE HARDWARE SHOULD BE NEEDED DEPENDING ON VA RESIDENT ENGINEER APPROVED CONSTRUCTION MEANS AND METHODS PHASING CONSTRUCTION OPERATIONS. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AT ALL TIMES. 9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA. 10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER. 11. FOR UPPER FLOOR CONSTRUCTION COORDINATE WITH VA FOR UPPER FLOOR CONSTRUCTION COORDINATE WITH VA RESIDENT ENGINEER FOR REQUIREMENT TO PROVIDE ENCLOSED CHUTE AND ENCLOSED DUMPSTER FOR CONSTRUCTION DEBRIS HANDLING. ENCLOSE AREA WITH CYCLONE FENCE AND LOCKED GATE. PROVIDE TO VA SUBMITTAL FOR APPROVAL OF CHUTE DESIGN, CONSTRUCTION, AND ANCHORING TO BUILDING. RESTORE BUILDING, GROUNDS, AND ALL AFFECTED AREAS TO LIKE NEW CONDITION AFTER COMPLETION OF CHUTE-REQUIRED OPERATIONS. 12. ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF ALL CONSTRUCTION DEBRIS, WASTE, AND TRANSPORTATION OF DEMOLITION ITEMS SHALL BE CONVEYED IN A COVERED DUMPSTER CONTAINER SUCH THAT NO DEBRIS/ITEMS ARE VISIBLE. ALL CONTAINERS SHALL BE TRANSPORTED DOWN THE ELEVATORS (A DESIGNATED ELEVATOR WILL NOT BE PROVIDED FOR TRANSPORTATION.) A MINIMUM OF ONE RUNOFF MAT ON THE INSIDE AND MINIMUM OF TWO RUNOFF MATS ON THE OUTSIDE SHALL BE PROVIDED FOR THE CONSTRUCTION ACCESS DOORS. COORDINATE MOVEMENT OF ALL CONSTRUCTION DEBRIS, WASTE AND TRANSPORTATION OF DEMOLITION ITEMS WITH VA.
AutoCAD SHX Text
INFECTION CONTROL GENERAL NOTES
AutoCAD SHX Text %%uOCCUPIED SIDE OF BARRIER
AutoCAD SHX Text
%%U"CONSTRUCTION" SIDE OF BARRIER
AutoCAD SHX Text
EXISTING CEILING
AutoCAD SHX Text
CONTINUOUS DUCT TAPE SEAL EACH SIDE
AutoCAD SHX Text
CONTINUOUS DUCT TAPE SEAL EACH SIDE
AutoCAD SHX Text
EXISTING FINISHED FLOOR
AutoCAD SHX Text CLOSE OPEN DUCTS W/ (2) LAYERS 6 MIL POLYETHYLENE BARRIER. SEAL EDGES W/ CONT DUCT TAPE
EXTEND ONE LAYER 6 MIL POLY (SHOWN DASHED) THROUGH ACT TO ROOF OR SLAB ABOVE
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
BID DEDUCTS
G4
BID DEDUCTS
Bid Alternate:
A) Bid Alternate 1:
i) Remove all interior work for "Section B" from bid
B) Bid Alternate 2:
i) Remove all work and materials for split unit air conditioner system to include new electrical service.
C) Bid Alternate 3:
i) Remove all interior work for "Section B" from bid
ii) Remove all work and materials for split unit air conditioner systems to include new electrical service.
A
B
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
NEW RECESS-MOUNTED TELEPHONE CABINET TC-2
AutoCAD SHX Text
FURR OUT BACK SIDE OF WALL WITH 2X FRAMING
AutoCAD SHX Text
& PROVIDE 1/2" GYP BOARD WITH FINISH TO
AutoCAD SHX Text
MATCH EXISTING SURFACE
AutoCAD SHX Text
SECOND FLOOR PLAN BUILDING 23
AutoCAD SHX Text 1/8"=1'0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 236A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
233A
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ARCHITECTURAL
DEMOLITION
AD-1
1. REMOVE PAINT FROM THE TOP 12-FEET ON EXTERIOR OF
BUILDING, TUCK-POINT, AND REPAINT.
2. WATERPROOF PARAPET WALL AND COVER WITH WHITE
FLASHING.
3. REMOVE WALL
4. DEMOLISH BULKHEAD.
5. DEMOLISH STEPS.
6. STRIP STAIRWAY FLOORING FINISH.
7. DEMOLISH DOOR AND FRAME.
8. DEMOLISH PLASTER ON EXTERIOR WALLS IN THIS REGION.
KEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 236A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DEMO PASS THROUGH WINDOW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ARCHITECTURAL
WALL PLAN
A-1
KEYNOTES:
1. NEW WALLS TO BE 4.75" TOTAL THICKNESS. USE BATT
INSULATION FOR SOUND DEADENING.
2. FILLED WALLS TO MATCH EXISTING THICKNESS.
3. NEW DOORWAYS TO BE MADE TO ACCEPT 36" DOOR.
4. CONSTRUCT CODE COMPLIANT STEPS AND ADD FINISHES.
5. PREPARE AND ADD FINISHES TO STAIRWAY.
6. WHITE FLASHING OVER THE PARAPET WALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILL IN
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ARCHITECTURAL
SUMMARY PLAN
A-2
KEYNOTES:
A - Asbestos abatement (See report of locations)
B - Lead Paint Abatement (any dust creation from painted areas)
C - Ceiling tile and grid remove and replace with 2 x 2 tegular style frame and panels
D - Reuse Door Hardware
E - Install new Public Address speaker grid as indicated in drawings
F - New LVT flooring - see schedule of finishes specification
G - Install new Noise generator grid as indicated in drawings
H - New hydronic heat register covers (painted) and clean and straighten fins.
K - Remove carpet and pad to linoleum level, install
" Wood subflooring, and leveling compound to accommodate new LVT flooring.
L - Install new 2 x 2 LED type troffer lighting - See drawings for locations
M - Split Unit A/C cooled rooms
NS - New Code Compliant steps with vinyl finish
O - Window Air Conditioning dedicated unit outlet
P - Prepare, texture, prime and paint 2 coats of latex
PW - Plywood (Fire rated) new install
S - Sprinkler head move to meet NFPA code requirements
T - Stair tread remove and replace
W- - Remove wall
W+ - New wall, with new electrical and computer connections where specified.
X - Remove plaster on exterior wall (lead paint), clean tuck point, construct new gypsum wall, run electric/computer connections, prepare, prime, texture, and paint.
Y - Remove exterior lead-based paint, tuck point, repaint latex upper 12 feet of wall.
Z - Waterproof and cap roof parapet wall with white prefinished galvanized steel flashing
C E F K P
H D L M
C E F K P
H D M L
W+
C F K P H
D L M
C F K P H
D L O
C E
F G
K P
L
W+
W-
F P D L T S
C F K P H
D L M
C F K P H
D L M
N S
C F K P
H D L M
C F K P
H D L M
S
C E F
K P L
W-
C E F
K P
L W
C F K P
H D L M
C F K P H
D L M W+
C F K P
H D L M
S
C F K P D
L W- W+
C F K P H
D L O W+
C F K P D
L O H W+
C F K P
H D L O
C F K
P L
W-
A C E F K P
H D L M W+
C E F K P H
D L M W+
C F K P
H L D M
W+
W
E
G
C F K P H
D L M
C F K P H
D L M
C F K P H
D L M W+
W
(PW)
P F
L S
M
C F K P H D
L O W- W+
C F K P H
D L O
B C F K P H D L
O W- W+
C E F K P L W
C F K P H
D L O W
NS
C F K P H
D L O W- S
C F K P H
D L O S
W-
W-
F P D L T S
C F K P H
D L O W-
W+ S
C F K P H D
L O W-
C F K P H D
L O W- W+ S
C E F K P
H D L O
W_ S
C E
F G
K P
L
W+
F P D L T S
X
Y & Z
Y & Z
X
G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
223A
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
FINISHES
A-3
TILE
LVT
SCALE:1/8" = 1'
AutoCAD SHX Text
DN
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
MATERIAL SYMBOLS
AutoCAD SHX Text
B23 2ND FLOOR FLOORING PLAN
202A
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
CEILING GRID
A-4
MEN'S BATHROOM
WOMEN'S BATHROOM
WOMEN'S BATHROOM
ITH
O
U S
E
K E
E P
I N
G
SCALE:1/8" = 1'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text
B23 2ND CEILING PLAN
DN
3-0
3-6
3-0
2-8 3-0
3-0 3-0
2-6
2-0
3-0 3-6
2-0
3-6
3-6
2-8
2-8
3-6
3-0
3-0
3-6
3-0
3-0
2-4
3-6
3-6
3-0
2-8
2-8
2-8
3-0
2-10
3-0
3-0
C141
C140
C139
C138
C140A
3-6
3-0
3-6
3-0
3-63-6
3-0
3-0
C112
12301
12305
12307
12311
12306
12304
12330
12300
12332
12328
12323
12331
12313
12312
12314
12314A
12315
12316
12319 12318
12318A
12322
12325
12326
12327
12333
12335A
12339
12335
12341
12343
12349
12347
12348
12346
12344
12324
12334
12336
12338
12340
3-6
C142
FIRST FLOOR
BLDG. 23
12309
102301
102318
102320
102348
102350
102352
102354 102358
102360
102305
102319
102321
102307
102308
102311
102310S
102310
102312
102315
102314
102325
102335
102337
102339
102323
102341
102353
102355
102357
102357S
102362
102333
102379
102380
102371
102372
102365
102364
102367
102365
102364
102320
EX 101
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
EX - 201
VISTA - 202301 202322 202324 202326
202348
202350
202352 202354 202358
202362 202353202305 202321 202323
202315 202314
202313 202312
202310
202308 202307
202331
202335
202337
202339
202341
202325
202351
202355 202357
202379 202380
202371 202372
202367
202365 202364
AutoCAD SHX Text
DN
AutoCAD SHX Text N
AutoCAD SHX Text
DN
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ELECTRICAL
DEMOLITION
E-1
REMOVE AND REPLACE ALL LIGHT FIXTURES WITH NEW LED FIXTURES.
REMOVE AND REPLACE ALL ELECTRICAL SWITCHES
KEY NOTES
S
S
S S
S
S
S
S
S
SS
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S S
S
S
S
S
S
S
S
REMOVE AND REPLACE ALL ELECTRICAL RECEPTACLES
REMOVE AND REPLACE ALL ELECTRICAL SWITCHES
S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS
JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
ELECTRICAL
NEW
E-2
KEY NOTES
S
S
S
SS
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
INSTALL NEW OUTLET FOR OVERHEAD PROJECTOR @ APPROX. 9'
INSTALL NEW OUTLET ON WALL
INSTALL NEW EXHAUST FANS (RESTROOMS)
S
S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
202A
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
E-3
MEN'S BATHROOM
WOMEN'S BATHROOM
WOMEN'S BATHROOM
ITH
O
U S
E
K E
E P
I N
G
SCALE:1/8" = 1'
P
N
NOTES:
- 2' X 2' LED LIGHT
- PUBLIC ADDRESS SPEAKER
- WHITE NOISE DEVICE
P
P
P
P
P
P
N
N
N
N
PPP
P
P
P P
P
CEILING FIXTURES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text
B23 2ND Ceiling Fixtures
EL01
IT COVER SHEET
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
Project Title
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
TYPICAL
WALLFIELD
VELCRO STRAP TO SECURE
CABLES TO LADDER
CABLE RUNWAY
CAT. 6 CABLES
BUSHING
VERTICAL RISER
Notes:
1. CABLE TO BE SECURED APPROXIMATELY EVERY 24" TO VERTICAL CABLE RUNWAY
2. MOUNT PER MANUFACTURER'S INSTRUCTION. APPROXIMATELY 1" OFF WALL
T568B
WIRING PAIR COLORS - EIA/TIA 568B
PAIR
ID PIN
BRAND MARKED CODE
WHITE/BLUE5T1
BLUE/WHITE4R1
WHITE/ORANGE1T2
ORANGE/WHITE2R2
WHITE/GREEN3T3
GREEN/WHITE6R3
WHITE/BROWN7T4
BROWN/WHITE8R4
1 2 3 4 5 6 7 8
2 41
1 2 3 4 5 6 7 8
3PAIR #
T568B
8 7 6 5 4 3 2 1
T568B
CAT.6A DATA JACK IN-CEILING
BRACKET
Notes:
1. USED IN A PLENUM APPLICATION
DROP WIRE/ROD
CEILING BRACKET CLIP
XXXX
PLENUM CAT.6A STRANDED PATCH CORD
TO NETWORK DEVICE
PLENUM RATED CAT.6A SOLID
CABLEPLENUM
SURFACE BOX
PLENUM CAT.6A STRANDED PATCH CORD
TO NETWORK DEVICE
WIRLESS ACCESS POINT - MOUNTED
BELOW CEILING
HARD OR DROP CEILING
1A-122
CAT 6
DATA JACK RECESSED
W
Notes:
1. MOUNTED 46" TO CENTER LINE OF BRACKET, ABOVE FINISHED FLOOR
COMPUTER LABEL
SINGLE GANG
FACEPLATE
STAINLESS STEEL FINISH
MOUNTING LUGLOW VOLTAGE
MOUNTING
BRACKET
1" CONDUIT TO ACCESSIBLE CEILING SPACE
ONE (1) CAT.6 CABLE TERMINATED
IN APPLICABLE MER.
1A-122, 1A-123
CAT 6
Notes:
1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.
2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS.
3. TWO DATA JACKS ARE DEPICTED ABOVE. 4-PORT FACEPLATE
MINIMUM. FILL UN-USED PORTS WITH BLANKS.
4. REFER TO DIVISION 27 05 53 FOR LABELING REQUIREMENTS.
COMPUTER
GENERATED LABEL
6 - PORT
FACEPLATE
1" CONDUIT TO ACCESSIBLE CEILING SPACE
COUNT (2) CAT.6 CABLES TERMINATED
IN APPLICABLE MER.
CAT 6
XXXX COMPUTER
GENERATED LABEL
Notes:
1. CONTRACTOR TO PROVIDE BLANK COVERPLATE AT LOCATION
WHERE JACKS ARE NOT INSTALLED.
2. COVERPLATE TO MATCH COLOR OF RECEPTACLE COVERPLATE.
SINGLEGANG
BLANK COVERPLATE
FOR REFERENCE
1" CONDUIT STUBBED INTO
NEAREST ACCESSIBLE
CEILING CAVITY
INSTALL PULL STRING IN CONDUIT
AND BUSHINGS AT BOTH ENDS
4" SQUARE BOX WITH
SINGLE GANG TRIM RING
Notes:
1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.
2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS.
3. ONE NETWORK OUTLET IS DEPICTED ABOVE. 4-PORT FACEPLATE
MINIMUM. FILL UN-USED PORTS WITH BLANKS.
4. REFER TO DIVISION 27 05 53 FOR LABELING REQUIREMENTS.
COMPUTER
GENERATED LABEL
1" CONDUIT TO ACCESSIBLE CEILING SPACE
COUNT (1) CAT.6 CABLES TERMINATED
IN APPLICABLE MER
COMPUTER
GENERATED LABEL
1A-122, 1A-123
Notes:
1. MOUNTED 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.
2. REFER TO LABELING DETAIL FOR LABELING SPECIFICATIONS.
3. INSTALL QUANTITY OF NETWORK OUTLETS AS SHOWN. "X"=QTY, 4-PORT FACEPLATE
MINIMUM. FILL UN-USED PORTS WITH BLANKS.
4. REFER TO DIVISION 27 05 53 FOR LABELING REQUIREMENTS.
COMPUTER
GENERATED LABEL
1" CONDUIT TO ACCESSIBLE CEILING SPACE
COUNT (X) CAT.6 CABLES (AS SHOWN)
TERMINATED IN APPLICABLE MER
COMPUTER
GENERATED LABEL
"X""X"
BLANK
MATRIX NOTES
LOCATIONS OF TECHNOLOGY ROUGH-INS SHALL BE INDICATED BY THE INFORMATION OUTLET SYMBOLS.1.
INCLUDE BACKBOXES AND CONDUIT REQUIRED FOR THE TECHNOLOGY SYSTEM INSTALLATION.2.
INCLUDES ALL CONDUCTORS , GROUND BARS, AND TERMINATIONS FOR THE COMPLETE BONDING SYSTEM REQUIRED BY THE SPECIFICATIONS.3.
SIZE APPROPRIATELY FOR 40% FILL RATIO'S4.
SIZE PER SPECIFICATION - DIVISION 265.
HILTI SLEEVES CP653 OR EQUIVALENT - PER ROOM6.
7. INTEGRATE OF FIRE, INTERCOM AND IDS WITH THE P2000 SHALL BE HARDWIRED OR BE APPROVED THROUGH THE VA (IT) 6500 COMMITTEE IF INTEGRATED THROUGH THE NETWORK
CAT 6 CAT 6
BLANK
1A-122, 1A-123
CAT 6
6 - PORT
FACEPLATE
CAT 6
XXXX
BLANK
CAT 6 CAT 6
BLANK
CAT 6
6 - PORT
FACEPLATE
CAT 6
XXXX
BLANK
CAT 6 CAT 6
BLANK
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
568B WIRING CONFIGURATION
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
VERTICAL RUNWAY DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
WIRELESS OUTLET / ACCESS POINT DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
TYPICAL TELECOM BOX/CONDUIT ROUGH-IN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
STANDARD TELECOM OUTLET
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
WALL MOUNTED VOICE OUTLET
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
VARIABLE TELECOM OUTLET
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text E6.1
AutoCAD SHX Text
DATA ONLY TELECOM OUTLET
NTS
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
IT-1
KEY NOTES
EXISTING IT EQUIPMENT CABINET
EXISTING IT EQUIPMENT TO BE REMOVED
INFORMATION
TECHNOLOGY
DEMO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
IT-2
IT SERVICE CABINET LOCATION
IT NEW SERVICE DROP LOCATION
INFORMATION
TECHNOLOGY
NEW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
208 209 210
214 215
D N
D N
D N
223A
WORK NEEDED
CABLE PULLS 12
BRACKET INSTALLS 12
2702i AP (VA WIRELESS)
VA GUEST WIRELESS
IT Closet location
REFERENCE
B
A A A
A
A
A
A
A
A A
A
GENERAL NOTES
ALL FIRE WALLS MUST BE MAINTAINED AFTER WORK IS COMPLETED
NO CABLES SHALL BE PLUGGED INTO NETWORK SWITCHES UNLESS APPROVED BY IT
STAFF.
CABLING SHOULD BE RUN FROM IT CLOSETS TO LOCATIONS SPECIFIED ON DRAWINGS
ONLY ONE CEILING TILE MAY BE REMOVED PER 50 SQ. FT. UNLESS ADVANCED
INFECTION CONTROL PROTOCOL IS UTILIZED.
END CABLE WITH MAINTENANCE LOOP AND INSTALL BRACKETS ON OR NEAR STICKERS
ON CEILING USING MAPS AS REFERENCE.
EL01
AP LOCATIONS B-23 2ND FLOOR
A
A
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
KEY NOTE
1. ROUTE ALL CABLES TO ROOM 210
REINSTALL EXISTING AP'S IN CURRENT LOCATION, DRAWING IS USED AS REFERENCE
FOR NEW CABLE PULLS SITE VERIFY ALL LENGTHS AND LOCATIONS.
BB
B
B
B
B B
B
AutoCAD SHX Text %%UB-23 2nd FLOOR
SCALE : 3/16" = 1'-0"
NEW
PLUMBING
CHASE
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10 /01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
PLUMBING FIXTURES
P1
MEN'S BATHROOM
WOMEN'S
BATHROOM
IT
H O
U S
E
K E
E P
I N
G
WOMEN'S
BATHROOM
NOTES:
TOILETS TO BE FLOOR MOUNTED
URINALS TO BE WALL MOUNTED
PRIVACY PANELS TO BE FLOOR MOUNTED AT TOILETS AND WALL
MOUNTED AT URINALS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
223A
Approved: Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of
Construction and Facilities
Management
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F o n e e i g h t h i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h o n e f o o t t h r e e i n c h e s o n e f o o t
FULLY SPRINKLED
FOR CONSTRUCTION 01 OCT, 2019
UPGRADE B23 2ND FLOOR
VAS JC/DM10/01/2019
676-19-108
VA MEDICAL CENTER TOMAH, WI
No. Revisions Date
FD
EXISTING FIRE SUPPRESSION SPRINKLERS TO REMAIN
EXISTING FIRE SUPPRESSION SPRINKLERS TO BE RELOCATED
EXISTING FIRE SUPPRESSION SPRINKLERS TO BE REMOVED
FIRE SPRINKLER
DEMO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%USECOND FLOOR%%U
AutoCAD SHX Text
BLDG. 23
AutoCAD SHX Text N
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 223A
AutoCAD SHX Text 233A
| Binder2 |
| Binder1.pdf |
| 676-19-108.pdf |
| Sheets and Views |
| 676-19-108-G-1 |
| 676-19-108-G-2 |
| 676-19-108-G-3 |
| 676-19-108-G-4 |
| 676-19-108-AD-1 |
| 676-19-108-A-1 |
| 676-19-108-A-2 |
| 676-19-108-A-3 |
| 676-19-108-L-1 |
| 676-19-108-A-4 |
| 676-19-108-P-1 |
| 676-19-108-1 |
| Sheets and Views |
| 676-19-108 ID FIN-G-1 |
| 676-19-108 ID FIN-G-2 |
| 676-19-108 ID FIN-G-3 |
| 676-19-108 ID FIN-G-4 |
| 676-19-108 ID FIN-AD-1 |
| 676-19-108 ID FIN-A-1 |
| 676-19-108 ID FIN-A-2 |
| 676-19-108 ID FIN-A-3 |
| 676-19-108 ID FIN-A-4 |
| 676-19-108 ID FIN-LVT Direction |
| 676-19-108 ID FIN-2ND Floor Room # |
| 676-19-108 ID FIN-Fire Demo |
| 676-19-108 ID FIN-FP-1 |
| 676-19-108 ID FIN-ELECT DEMO |
| 676-19-108 ID FIN-E-1 |
| 676-19-108 ID FIN-IT DEMO |
| 676-19-108 ID FIN-IT -1 |
| 676-19-108.pdf |
| Sheets and Views |
| 676-19-108-G-1 |
| 676-19-108-G-2 |
| 676-19-108-G-3 |
| 676-19-108-G-4 |
| 676-19-108-AD-1 |
| 676-19-108-A-1 |
| 676-19-108-A-2 |
| 676-19-108-A-3 |
| 676-19-108-L-1 |
| 676-19-108-A-4 |
| 676-19-108-P-1 |
| Paint Colors and Locations |
| B23 1st Floor Room Numbers |
| Sheets and Views |
| Room # |
| 676-19-108 ID FIN-Room # |
| Sheets and Views |
| Room # |
vatomah-991l-1-arc
| 676-19-108 ID FIN3 |
| Sheets and Views |
| 676-19-108 ID FIN-Fire Demo |
| 676-19-108 IT DETAIL.pdf |
| Sheets and Views |
| 676-19-108 IT elec-IT Cover |
| 676-19-108 IT elec.pdf |
| Sheets and Views |
| 676-19-108 IT elec-23-2 AP |
File details come from the government source that posted it. Updated .