36C25219B0058-004.pdf

PDF 5 MB Posted

Attached to
Replace B58-4 FCUs/Hot/Chilled Piping 550-18-102
Solicitation number
36C25219B0058
Issued by

About this file

36C25219B0058 550-18-102 Drawings - 9july2019.pdf

View the file

Other files

File Type Posted
36C25219C0224-000.docx DOCX document
36C25219B0058-0002003.pdf PDF
36C25219B0058-0002000.docx DOCX document
36C25219B0058-0002002.pdf PDF
36C25219B0058-0002001.pdf PDF
36C25219B0058-0001000.docx DOCX document
36C25219B0058-003.pdf PDF
36C25219B0058-002.pdf PDF
36C25219B0058-001.docx DOCX document
36C25219B0058-000.docx DOCX document
36C25219B0058-000.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 58

E. MAIN STREET

Palm er D r.

B lue S tar H w y

Danville National Cemetery

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

PROJECT SITE MAPPROJECT LOCATION MAP

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:09 AM

58-G-001

COVER SHEET

1900 E Main St, Danville, IL 61832

DGC, ES

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

REPLACE F58-4 FCUS AND HOT/CHILLED

WATER PIPING

1900 E Main St, Danville, IL 61832

VA PROJECT #: 550-18-102

NORTH

TRUE

NORTH

TRUE

SHEET LIST

SHEET

NUMBER SHEET NAME DWG OF DWG

GENERAL

58-G-001 COVER SHEET 1 3

58-G-002 GENERAL SYMBOLS, ABBREVIATIONS AND NOTES 2 3

58-G-003 TYPICAL ICRA DETAILS AND NOTES 3 3

ARCHITECTURAL

58-A-001 THIRD FLOOR PLAN (REFERENCE ONLY) 1 8

58-A-002 THIRD FLOOR PLAN (REFERENCE ONLY) 2 8

58-AD111 THIRD FLOOR REFLECTED CEILING DEMOLITON PLAN 3 8

58-AD112 THIRD FLOOR REFLECTED CEILING DEMOLITION PLAN 4 8

58-A-101 FOURTH FLOOR PLAN 5 8

58-A-102 FOURTH FLOOR PLAN 6 8

58-A-111 THIRD FLOOR REFLECTED CEILING PLAN 7 8

58-A-112 THIRD FLOOR REFLECTED CEILING PLAN 8 8

MECHANICAL

58-M-001 MECHANICAL GENERAL INFORMATION 1 7

58-MD101 THIRD FLOOR MECHANICAL DEMOLITION PLAN 2 7

58-MD102 FOURTH FLOOR MECHANICAL DEMOLITION PLAN 3 7

58-M-101 THIRD FLOOR MECHANICAL PIPING PLAN 4 7

58-M-102 FOURTH FLOOR HVAC PLAN 5 7

58-M-501 MECHANICAL DETAILS 6 7

58-M-601 MECHANICAL SCHEDULES 7 7

ELECTRICAL

58-E-001 ELECTRICAL GENERAL NOTES, LEGENDS, AND ABBREVIATIONS 1 6

58-ED101 THIRD FLOOR LIGHTING DEMOLITION PLAN 2 6

58-ED102 FOURTH FLOOR ELECTRICAL DEMOLITION PLAN 3 6

58-EL101 THIRD FLOOR LIGHTING PLAN 4 6

58-EP101 FOURTH FLOOR POWER PLAN 5 6

58-E-601 ELECTRICAL SCHEDULES AND LIGHTING DETAILS 6 6

DocuSign Envelope ID: 94BD6672-7352-4EAD-AA87-0512B57C546C

6/12/2019

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

IDPH ILLINOIS DEPARTMENT OF

PUBLIC HEALTH

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

GENERAL NOTES

1. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

2. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS

REQUIRED FOR COMPLETION OF THE WORK.

3. COORDINATE THE WORK OF TRADES PRIOR TO THE START OF CONSTRUCTION.

4. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK FOR EACH PHASE.

5. NOTIFY THE COR OF DISCREPANCIES IN THE DRAWINGS AND SPECS PRIOR TO THE START OF WORK.

6. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED

FACE OF EXISTING WALL SURFACE.

7. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

8. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES AND PUBLISHED STANDARDS.

9. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

10. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

11. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE

CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION.

12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

13. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE

RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

DEMOLITION NOTES

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT

GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE

SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS INDICATED AND CLEAR AREA OF DEBRIS

PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

3. EQUIPMENT REMOVED SHALL BE LEGALLY DISPOSED OFF MEDICAL CENTER

GROUNDS.

4. COORDINATE WITH VA COR FOR DEMOLITION SCHEDULE AND SCHEDULE OF

WASTE REMOVAL.

5. NOTIFY COR OF DEMOLITION REQUIRED AND NOT INDICATED FOR

INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND

INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION

REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND

THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE

PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE

DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE

SCOPE OF THE PROJECT.

9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND

DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF

SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.

DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT

INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE

CONTRACTING OFFICER (COR).

10. COORDINATE WITH VA COR FOR CONSTRUCTION ACCESS ROUTE AND

LOCATIONS OF DUMPSTER AREA. COORDINATE WITH COR FOR SCHEDULE OF

USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR USE OF

FREIGHT ELEVATOR.

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

DEMOLITION KEYNOTE WINDOW TYPE

WALL TYPE

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

W1

P

-1

SITE NOTES

1. WORKING SPACE AND SPACE AVAILABLE FOR STORING MATERIALS SHALL

BE AS DETERMINED BY THE COR

2. KEEP ROADS CLEAR OF CONSTRUCTION MATERIAL, DEBRIS, STANDING

CONSTRUCTION EQUIPMENT AND VEHICLES AT ALL TIMES. DO NOT STORE

MATERIALS AND EQUIPMENT IN OTHER THAN ASSIGNED AREAS.

3. SCHEDULE DELIVERY OF MATERIALS AND EQUIPMENT TO IMMEDIATE

CONSTRUCTION WORKING AREAS IN QUANTITIES SUFFICIENT FOR NOT

MORE THAN TWO WORK DAYS. PROVIDE UNOBSTRUCTED ACCESS TO

MEDICAL CENTER AREAS REQUIRED TO REMAIN IN OPERATION.

4. COORDINATE WITH COR FOR REMOVAL OF EXISTING FURNISHINGS AND

EQUIPMENT TO PERMIT WORK TO PROCEED.

5. COORDINATE THE WORK FOR THIS CONTRACT WITH OTHER

CONSTRUCTION OPERATIONS AS DIRECTED BY COR. THIS INCLUDES THE

SCHEDULING OF TRAFFIC AND THE USE OF ROADWAYS.

6. UTILITIES SERVICES: MAINTAIN EXISTING UTILITY SERVICES FOR MEDICAL

CENTER AT ALL TIMES. PROVIDE TEMPORARY FACILITIES, LABOR,

MATERIALS, EQUIPMENT, CONNECTIONS, AND UTILITIES TO ASSURE

UNINTERRUPTED SERVICES AS REQUIRED BY THE DRAWINGS AND

SPECIFICATIONS. WHERE NECESSARY TO CUT EXISTING WATER, STEAM,

GASES, SEWER OR AIR PIPES, OR CONDUITS, WIRES, CABLES, ETC. OF

UTILITY SERVICES OR OF FIRE PROTECTION SYSTEMS AND

COMMUNICATIONS SYSTEMS (INCLUDING TELEPHONE), THEY SHALL BE

CUT AND CAPPED AT SUITABLE PLACES WHERE SHOWN; OR, IN ABSENCE

OF SUCH INDICATION, WHERE DIRECTED BY COR.

7. OBTAIN ASBESTOS ABATEMENT PLANS FROM VA COR PRIOR TO START OF

WORK. COMPLETE WORK FOR ASBESTOS ABATEMENT PRIOR TO THE

START OF CONSTRUCTION OR DEMOLITION. REFER TO SPECIFICATIONS

FOR REQUIREMENTS FOR ASBESTOS ABATEMENT.

8. COORDINATE PROJECT PHASING WITH COR.

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:09 AM

58-G-002

GENERAL SYMBOLS,

ABBREVIATIONS AND NOTES

1900 E Main St, Danville, IL 61832

DGC, ES

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

ABBREVIATIONS

GENERAL SYMBOL LEGEND

SURGERY

ROOM

SURGERY

ROOM

OFFICE

PCC

EXAM

CORR.

C3-11

TLT.

346A

TLT.

347A

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

A B

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

REPLACE F58-4 FCUS AND HOT/CHILLED WATER PIPING

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E

IG

H T

HEPA NEGATIVE AIR UNIT

EXISTING WALL

EXISITNG CEILING

FLEX DUCT

A. TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION.

B. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT

PRIOR APPROVAL OF THE COR AND THE

MEDICAL CENTER.

C. USING A HEPA VACUUM, CLEAN INSIDE THE

BARRIER AND VACUUM CEILING TILE PRIOR TO

REPLACEMENT. ANY CEILING ACCESS PANELS

OPENED FOR INVESTIGATION BEYOND

SEALED AREAS SHALL BE SEALED

IMMEDIATELY WHEN UNATTENDED.

D. AT COMPLETION, REMOVE CONSTRUCTION

BARRIERS AND CEILING PROTECTION

CAREFULLY, OUTSIDE OF NORMAL WORK

HOURS. VACUUM AND CLEAN ALL SURFACES

FREE OF DUST AFTER THE REMOVAL.

E. ASBESTOS ABATEMENT WILL BE REQUIRED

AS PART OF THIS PROJECT. REFER TO

EXISTING ACM SURVEY BY VA FOR EXTENTS

AND SCOPE OF ASBESTOS REMOVAL.

58-G-003

A .F

.F

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

SHEET NOTES:

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:10 AM

58-G-003

TYPICAL ICRA DETAILS AND NOTES

1900 E Main St, Danville, IL 61832

DGC, ES

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

Scale: 3/4" = 1'-0"

ICRA WALL TYPES

Scale: No Scale

ILSM SIGNAGE

Scale: No Scale

MOBILE CONTAINMENT CART

01 PROVIDE A MINIUM 6'-0" X 4'-0" WALK OFF

MATT INSIDE OF THE WORK AREA. CHANGE

WHEN NECESSARY TO MAINTAIN

CLEANLINESS.

02 PROVIDE STICKY MATS, CHANGED AT END

OF SHIFT OR MORE IN NECESSARY TO

MAINTAIN CLEANLINESS.

03 POST I.C.R.A. I.L.S.M. FIRE INSPECTION TAGS

VISIBLE TO THE PUBLIC. REFER TO SHEET

G-003 DETAIL 3 FOR DETAILS.

04 CONSTRUCTION SIGN: INFORMATION

DESIGNATING THE SPECIFIC DEPARTMENT

OF VETERNS AFFAIRS PROJECT UNDER

CONSTRUCTION AS WELL AS THE NAE OF

THE GENERAL CONTRACTOR AND OTHER

PROJECT SPECIFIC CONSULTANTS. REFER

TO SHEET G-003 DETAIL 5 FOR MORE

INFORMATION.

05 SUSPENDED PLASTIC ZIPPER WALL CURTAIN

BARRIER.

06 FIRE EXTINGUISHER ON PORTABLE FLOOR

BRACKET.

07 HEPA FILTRATION IS REQUIRED WHERE THE

EXHAUST DUST MAY RE-ENTER THE

BREATHING ZONE. CONTRACTOR SHALL

VERIFY THAT CONSTRUCTION EXHAUST TO

EXTERIOR IS NOT REINTRODUCED TO THE

MEDICAL CENTER THROUGH INTAKE VENTS,

OR BUILDING OPENINGS.

Scale: 1/8" = 1'-0"

TYPICAL CONSTRUCTION LAYOUT

Scale: 1/4" = 1'-0"

TYPICAL INTERIOR

ELEVATION

Scale: No Scale

ISLM TEMPORARY BARRIER TAG

FHC

E P

UCR

1 / 2

9.1 10 11.1 11.9 13 13.8 14.9 16.1 17.2 18.1 19 20 21 22

G

H

G.7

J

K

L

M

N

10.8 12.2

10.7 12.3 20.7

M.8

14.2 15.6 16.6 17.814 15 16 17 18

TLT

337A

EXAM

RM

MED

OFFICE

COMM.

CHUTE

CORR.

C3-2

PHYS.

OFFICE

LINEN

RM

SOCIAL

WORKERS

OFFICE

CHIEF

PULM.

MITS &

RTS

CORR.

C3-1

CORR.

C3-3

SOIL

HOLD

PUBLIC

TLT

STAFF

TLT

333D

CORR.

C3-4

PHYS.

OFFICE

333C

STAFF

LOUNGE

333B

WARD

CLERK

333A

TLT

332A

PATIENT

RM

TLT

331A

CARDIO

EXAM

RM

WAITING/KITCHENETTE

TLT

330B

EXAM

RM

330C

WORK

AREA

330A

EXAM

RM

330D

SUPERV.

OFFICE

EQUIP.

STORAGE

SUPERV.

OFFICE

330F

E.C.

CORR.

C3-5

CARDIO

NP

OFFICE

EXAM

RM

330E

WAIT/

COMFORT

PULM.

RECPT.

PFT

CORR.

C3-8

CPAP

BC/EEG

PANTRY

P.L.

STORAGE

321A

OFFICE

MED.

GAS

STORAGE

PAT'NT

TLT

EXAM

CORR.

C3-6

OFFICE

OFFICE

RESIDENT

WORK

RESIDENT

WORK

CORR.

C3-7

EXAM

EXAM

EXAM

STAIR #1

STAIR #2

EQUIP

ALCOVE

A -0

A -0

A -0

A -0

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:03 AM

58-A-001

THIRD FLOOR PLAN (REFERENCE

ONLY)

1900 E Main St, Danville, IL 61832

DGC, EGS

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

Scale: 1/8" = 1'-0"

THIRD FLOOR PLAN (REFERENCE ONLY)

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

FF 2 3 4 4.8 5.8 6.9 8.1 9.1

H

G.7

J

K

L

M

N

2.3

5 6 7 8

5.1 6.4 7.4

8.8

M.8

A -0

A -0

A -0

A -0

LPN

OFFICE

ORTHO

RM

ANTE

351A ORTHO

TELEH.

RM

WORK

TLT

352A

TLT

350A

TLT

349A

CORR.

C3-12

STOR.

CORR.

C3-10

SURG.

TELEH.

RM

CORR.

C3-11

OFFICE

PCC

EXAM

SURGERY

RM

SURGERY

RM

TLT

346A

TLT

347A

EXAM

RM

TLT

344A

TLT

343A

WAITING

RM

E.C.

CORR.

C3-9

EXAM

RM

E.C.

EXAM

RM

NOURISH.

OFFICE

TLT

341A

EXAM

RM

NURSE

STATION

EXAM

RM

TLT

339A

TLT

337A

JAN. CL.

EXAM

RM

CORR.

C3-9

MED

OFFICE

58-G-003

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:03 AM

58-A-002

THIRD FLOOR PLAN (REFERENCE

ONLY)

1900 E Main St, Danville, IL 61832

DGC

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

Scale: 1/8" = 1'-0"

THIRD FLOOR PLAN (REFERENCE ONLY)

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

E P

STAIR #1

STAIR #2

10 11.1

11.9 13 13.8 14.9 16.1 17.2 18.1 19 20 21 22

G

H

G.7

J

K

L

M

N

10.8 12.2

10.7 12.3 20.7

M.8

14.2 15.6 16.6 17.814 15 16 17 18

COMM.

CHUTE

CORR.

C3-2

PHYS.

OFFICE

LINEN

RM

SOCIAL

WORKERS

OFFICE

CHIEF

PULM.

MITS &

RTS

CORR.

C3-1

CORR.

C3-3

SOIL

HOLD

PUBLIC

TLT

STAFF

TLT

333D

CORR.

C3-4

PHYS.

OFFICE

333C

STAFF

LOUNGE

333B

WARD

CLERK

333A TLT

332A

PATIENT

RM

TLT

331A

CARDIO

EXAM

RM

WAITING/KITCHENETTE

TLT

330B

EXAM

RM

330C

WORK

AREA

330A

EXAM

RM

330D

SUPERV.

OFFICE

EQUIP.

STORAGE

SUPERV.

OFFICE

330F

E.C.

CORR.

C3-5

CARDIO

NP

OFFICE

EXAM

RM

330E

WAIT/

COMFORT

PULM.

RECPT.

PFT

CORR.

C3-8

CPAP

BC/EEG

PANTRY

P.L.

STORAGE

321A

OFFICE

MED.

GAS

STORAGE

PAT'NT

TLT

EXAM

CORR.

C3-6

OFFICE

OFFICE

RESIDENT

WORK

RESIDENT

WORK

CORR.

C3-7

EXAM

EXAM

EXAM

04 04

8' - 6"

GWB

7' - 11"

ACT

8' - 0"

ACT

9' - 6"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 5"

GYP

7' - 11"

ACT

7' - 11"

ACT

7' - 1"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 1"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 1"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

8' - 5"

ACT

7' - 11"

ACT

7' - 11"

ACT

8' - 5"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

8' - 3"

ACT

7' - 11"

ACT

9' - 0"

ACT

8' - 11"

ACT

8' - 11"

ACT 8' - 6"

ACT

7' - 1"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

9' - 0"

ACT

8' - 0"

ACT

9' - 6"

ACT

9' - 6"

ACT

9' - 5"

ACT

9' - 5"

ACT

9' - 6"

ACT

9' - 6"

ACT

9' - 6"

ACT

9' - 8"

ACT

9' - 7"

ACT

9' - 7"

ACT

9' - 7"

ACT

9' - 6"

ACT

7' - 11"

ACT

7' - 11"

ACT

7' - 11"

ACT

8' - 6"

GWB

7' - 11"

ACT

SD

REMOVE AND REPLACE

PORTION OF ACOUSTIC CEILING

AS REQUIRED TO FACILITATE

MECHANICAL WORK ABOVE

CEILING.

TEMPORARY SUPPORT CEILING

MOUTNED DEVICES UNTIL

CEILING IS RE-INSTALLED.

REMOVE EXISTING GYPSUM

BOARD CEILING AND SUPPORT

FRAMING. REMOVE EXISTING

CEILING MOUNTED DEVICES.

PROVIDE NEW SUSPENDED

ACOUSTICAL CEILING.

- SEE MECHANCIAL AND

ELECTRICAL DRAWINGS FOR

NEW CEILING MOUNTED

DEVICES.

03 EXISTING PATIENT LIFT AND SUPPORT

FRAMING TO REMAIN.

04 REMOVE EXISTING SUSPENDED

ACOUSTIC CEILING WINDOW POCKET.

CONSTRUCT NEW WINDOW POCKET.

- SEE DETAIL 2/A-112

EXISTING WINDOW POCKET TO REMAIN.

CONSTRUCT NEW BULKHEAD. REFINISH

WINDOW POCKET.

- SEE DETAIL 2/A-112, SIM

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:08 AM

58-AD111

THIRD FLOOR REFLECTED CEILING

DEMOLITON PLAN

1900 E Main St, Danville, IL 61832

DGC

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

Scale: 1/8" = 1'-0"

THIRD FLOOR REFLECTED CEILING DEMOLITION PLAN 0 4 8 16

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

STAIR #1

STAIR #3

FF 2 3 4 4.8 5.8 6.9 8.1 9.1

H

G.7

J

K

L

M

N

2.3

5 6 7 8 95.1 6.4 7.4 8.8

M.8

LPN

OFFICE

ORTHO

RM

ANTE

351A

ORTHO

TELEH.

RM

WORK

TLT

352A

TLT

350A

TLT

349A

CORR.

C3-12

STOR.

CORR.

C3-10

SURG.

TELEH.

RM

CORR.

C3-11OFFICE

PCC

EXAM

SURGERY

RM

SURGERY

RM

TLT

346A

TLT

347A

EXAM

RM

TLT

344A

TLT

343A

WAITING

RM

E.C.

CORR.

C3-9

EXAM

RM

E.C.

EXAM

RM

NOURISH.

OFFICE

TLT

341A

EXAM

RM

NURSE

STATION

EXAM

RM

TLT

339A

TLT

337A

JAN. CL.

EXAM

RM

CORR.

C3-9

MED

OFFICE

A D

A -1

A D

A -1

05 05

REMOVE AND REPLACE

PORTION OF ACOUSTIC CEILING

AS REQUIRED TO FACILITATE

MECHANICAL WORK ABOVE

CEILING.

TEMPORARY SUPPORT CEILING

MOUTNED DEVICES UNTIL

CEILING IS RE-INSTALLED.

REMOVE EXISTING GYPSUM

BOARD CEILING AND SUPPORT

FRAMING. REMOVE EXISTING

CEILING MOUNTED DEVICES.

PROVIDE NEW SUSPENDED

ACOUSTICAL CEILING.

- SEE MECHANCIAL AND

ELECTRICAL DRAWINGS FOR

NEW CEILING MOUNTED

DEVICES.

03 EXISTING PATIENT LIFT AND SUPPORT

FRAMING TO REMAIN.

04 REMOVE EXISTING SUSPENDED

ACOUSTIC CEILING WINDOW POCKET.

CONSTRUCT NEW WINDOW POCKET.

- SEE DETAIL 2/A-112

EXISTING WINDOW POCKET TO REMAIN.

CONSTRUCT NEW BULKHEAD. REFINISH

WINDOW POCKET.

- SEE DETAIL 2/A-112, SIM

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:08 AM

58-AD112

THIRD FLOOR REFLECTED CEILING

DEMOLITION PLAN

1900 E Main St, Danville, IL 61832

DGC

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

Scale: 1/8" = 1'-0"

THIRD FLOOR REFLECTED CEILING DEMOLITION PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

10 11.1 11.9 13 13.8 14.9 16.1 17.2 18.1 19 20 21 22

G

H

G.7

J

K

L

M

N

10.8 12.2

1210.7 12.3

20.7

M.8

14.2 15.6 16.6 17.814 15 16 17 18

3 BED

CORR.

C4-1

STAIR #1

TIP

CHUTE

CORR.

C4-2

OPTHALMOLOGY

EXAM

OPTHALMOLOGY

TESTING

RM

PT.

WAITING

TLT

437A

3 BED

TREATMENT

RM

OFFICE

CA1

TLT

406A

X-RAY

STORAGE

SOILED

UTILITY

ENDO

HOLDING

ENDOSCOPY

(TB)

EQUIP.

433A

STRG

OFFICE

LOUNGE

ENDOSCOPY

EQUIP.

432A

STORAGE

432B

E.C.

TLT

STAIR #2

NURSE

STATION

RESTROOM

CLEAN

UTIL

TLT

428A

MED. RM

430A

NURSE

SUPERVISOR

430B

OFFICE

PHYSICIAN

EXAM

EXAM

CORR.

C4-3

CORR.

C4-4 EXAM

WAITING

RM

PHYSICIANS

OFFICE

CYSTO

CLINIC

NURSE

423P.A.

(MOLLY)

CORR.

C4-5RESTROOM

STRG

NURSING

MOTHERS

RESTROOM

STRG

A -0

A -0

A -0

A -0

REMOVE EXISTING FCU AND REPLACE

WITH NEW UNIT. PATCH AND REPAIR

FLOOR AND WALL FINISHES.

REMOVE EXISTING RADIATOR. PATCH

AND REPAIR FLOOR AND WALL

FINISHES.

- SEE DETAIL 2/A-102 FOR DETAIL OF

NEW LOUVER.

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

SHEET NOTES:

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:04 AM

58-A-101

FOURTH FLOOR PLAN

1900 E Main St, Danville, IL 61832

DGC, ES

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

Scale: 1/8" = 1'-0"

FOURTH FLOOR PLAN

LEGEND

0 4 8 16

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A. ROOMS 404, 417 AND 419 WHERE

EXISTING FAN COIL UNITS WERE

REMOVED, A NEW UNIT IS NOT NEEDED

AND, WALL AND FLOOR PATCHING IS

REQUIRED.

FF 2 3 4 4.8 5.8 6.9 8.1 9.1

H

G.7

J

K

L

M

N

2.3 5 6 7 8 95.1 6.4 7.4 8.8

M.8

O.D.

SLEEPING

RM

2 BED

OFFICE

CORR.

C4-7

MED.

SUPPLY

STOR.

HSK

MED.

SUPPLY

STOR.

3 BED

4 BED

3 BED

OFFICE

TLT

447A

CLEAN

UTIL.

TLT

STORAGE

444A

RESTROOM

CORR.

C4-6

457A

E.C.

MED. RM

442B

NURSES

STATION

SHOWER

TREATMENT

RM

3 BED

2 BED

3 BED

SOILED

UTILITY

LINEN

RM

462 464

A -0

A -0

A -0

A -0

REMOVE EXISTING FCU AND REPLACE

WITH NEW UNIT. PATCH AND REPAIR

FLOOR AND WALL FINISHES.

REMOVE EXISTING RADIATOR. PATCH

AND REPAIR FLOOR AND WALL

FINISHES.

- SEE DETAIL 2/A-102 FOR DETAIL OF

NEW LOUVER.

SILICONE SEALANT AT

PERIMETER OF COVER

PLATE (CONT.)

STAINLESS STEEL MASONRY

FASTENERS AT EACH COVER

OF PLATE - MIN. 1" EMBED.

NEW ALUMINUM LOUVER - SEE

MECHANICAL DRAWINGS

LOUVER TO BE PREFINISHED W/

KYNAR COATING. COLOR TO

MATCH EXISTING LOUVERS.

EXISTING BRICK VENEER

TO REMAIN

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:05 AM

58-A-102

FOURTH FLOOR PLAN

1900 E Main St, Danville, IL 61832

DGC

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

Scale: 1/8" = 1'-0"

FOURTH FLOOR PLAN

LEGEND

Scale: 3" = 1'-0"

DETAIL AT EXTERIOR LOUVER

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

E P

339A

STAIR #1

STAIR #2

E

E E E

E E E E E E

E

E

E

E

E

EEE

E

E

E

E

E

E

E E

E

REFLECTED CEILING PLAN

LEGEND

DENOTES GWB

SOFFIT/CEILING

CEILING HEIGHT

DESIGNATION

(WHEN HEIGHT

VARIES FROM

TYPICAL)

WIRELESS

COMMUNICATION

EQ. A EQ. A

E Q

B

E Q

B

EXIT SIGN (SHADED

AREA INDICATES

DIRECTION OF

EGRESS)

MECHANICAL SUPPLY

MECHANICAL RETURN

DOWN LIGHT

FIXTURE

1' - 0"

MATL

OUTLET

FIRE ALARM

STROBE

FAA

FIRE ALARM

ENUNCIATOR

F

FIRE ALARM PULL

STATION

FIRE ALARM

STROBE LIGHT

SD

H

HEAT DETECTOR

SMOKE DETECTOR

FIRE ALARM / HORN /

STROBE LIGHT -

CEILING MOUNTED

SPRINKLER HEAD

2'x4' LAY-IN

FIXTURE

EXHAUST GRILL

PATIENT LIFT

SUPPORT LEGS

WHERE OCCURS

ACCESS DOOR

CURTAIN TRACK

NEW PORTION OF ACOUSTIC

CEILING AS REQUIRED TO

FACILITATE MECHANICAL WORK

ABOVE CEILING.

TEMPORARY SUPPORT CEILING

MOUNTED DEVICES UNTIL

CEILING IS RE-INSTALLED.

02 EXISTING PATIENT LIFT AND SUPPORT

FRAMING.

03 NEW WINDOW POCKET

- SEE DETAIL 2/A-112.

9.1 10 11.1 11.9 13 13.8 14.9 16.1 17.2 18.1 19 20 21 22

G

H

G.7

J

K

L

M

N

9 11

10.8 12.2

10.7 12.3 20.7

M.8

14.2 15.6 16.6 17.814 15 16 17 18

A -1

A -1

A -1

A -1

TLT

337A

JAN. CL.

EXAM

RM

CORR.

C3-9

MED

OFFICE

COMM.

CHUTE

CORR.

C3-2

PHYS.

OFFICE

LINEN

RM

SOCIAL

WORKERS

OFFICE

CORR.

C3-1

CORR.

C3-3

SOIL

HOLD

PUBLIC

TLT

STAFF

TLT

333D

CORR.

C3-4

PHYS.

OFFICE

333C

STAFF

LOUNGE

333B

WARD

CLERK

333A

TLT

332A

PATIENT

RM

TLT

331A

CARDIO

EXAM

RM

WAITING/KITCHENETTE

TLT

330B

EXAM

RM

330C

WORK

AREA

330A

EXAM

RM

330D

SUPERV.

OFFICE

EQUIP.

STORAGE

SUPERV.

OFFICE

330F

E.C.

CORR.

C3-5

CARDIO

NP

OFFICE

EXAM

RM

330E

WAIT/

COMFORT

PULM.

RECPT.

PFT

CORR.

C3-8

CPAP

BC/EEG

PANTRY

P.L.

STORAGE

321A

OFFICE

MED.

GAS

STORAGE

PAT'NT

TLT

EXAM

CORR.

C3-6

OFFICE

OFFICE

RESIDENT

WORK

RESIDENT

WORK

CORR.

C3-7

EXAM

EXAM

EXAM

JAN. CL.

CORR.

C3-9

03 03

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:06 AM

58-A-111

THIRD FLOOR REFLECTED CEILING

PLAN

1900 E Main St, Danville, IL 61832

DGC, EGS

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

KEYNOTES

Scale: 1/8" = 1'-0"

THIRD FLOOR REFLECTED CEILING PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

MED.

OfficeSTAIR #3

Exam

ROOM

E

E

E

E

E

E

E

E E

E E E E E

EE

E

EXISTING

EXTERIOR WALL

TO REMAIN

3 5/8" METAL STUDS

ATTACHED TO EXISTING

STRUCTURE

5/8" GYPSUM

WALL BOARD

SEE REFLECTED

CEILING PLAN

CORNER BEAD

FV

1'-6"

REFLECTED CEILING PLAN

LEGEND

DENOTES GWB

SOFFIT/CEILING

CEILING HEIGHT

DESIGNATION

(WHEN HEIGHT

VARIES FROM

TYPICAL)

WIRELESS

COMMUNICATION

EQ. A EQ. A

E Q

B

E Q

B

EXIT SIGN (SHADED

AREA INDICATES

DIRECTION OF

EGRESS)

MECHANICAL SUPPLY

MECHANICAL RETURN

DOWN LIGHT

FIXTURE

1' - 0"

MATL

OUTLET

FIRE ALARM

STROBE

FAA

FIRE ALARM

ENUNCIATOR

F

FIRE ALARM PULL

STATION

FIRE ALARM

STROBE LIGHT

SD

H

HEAT DETECTOR

SMOKE DETECTOR

FIRE ALARM / HORN /

STROBE LIGHT -

CEILING MOUNTED

SPRINKLER HEAD

2'x4' LAY-IN

FIXTURE

EXHAUST GRILL

PATIENT LIFT

SUPPORT LEGS

WHERE OCCURS

ACCESS DOOR

CURTAIN TRACK

NEW PORTION OF ACOUSTIC

CEILING AS REQUIRED TO

FACILITATE MECHANICAL WORK

ABOVE CEILING.

TEMPORARY SUPPORT CEILING

MOUNTED DEVICES UNTIL

CEILING IS RE-INSTALLED.

02 EXISTING PATIENT LIFT AND SUPPORT

FRAMING.

03 NEW WINDOW POCKET

- SEE DETAIL 2/A-112.

FF 2 3 4 4.8 5.8 6.9 8.1 9.1

H

G.7

J

K

L

M

N

2.3

5 6 7 8 95.1 6.4 7.4 8.8

M.8

A -1

A -1

A -1

A -1

TLT

337A

JAN. CL.

CORR.

C3-9

LPN

OFFICE

ORTHO

RM

ANTE

351A

ORTHO

TELEH.

RM

WORK

TLT

352A

TLT

350A

TLT

349A

CORR.

C3-12

STOR.

CORR.

C3-10

SURG.

TELEH.

RM

CORR.

C3-11

OFFICE

PCC

EXAM

SURGERY

RM

SURGERY

ROOM

347 TLT

346A

TLT

347A

EXAM

RM

TLT

344A

TLT

343A

WAITING

RM

E.C.

CORR.

C3-9

EXAM

RM

E.C.

EXAM

RM

NOURISH.

OFFICE

TLT

341A

EXAM

RM

NURSE

STATION

EXAM

RM

TLT

339A

JAN. CL.

CORR.

C3-9

1 1 1

01 01

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\esanborn\Documents\Revit\A_BUILDING 58 - REPLACE FCU - 18-152_esanborn.rvt

6/12/2019 11:04:07 AM

58-A-112

THIRD FLOOR REFLECTED CEILING

PLAN

1900 E Main St, Danville, IL 61832

DGC

LW

JUNE 11, 2019

REPLACE F58-4 FCUS AND

HOT/CHILLED WATER PIPING

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 4 8 16

NORTH

PLAN

Scale: 1 1/2" = 1'-0"

TYPICAL POCKET WINDOW DETAIL

KEYNOTES

Scale: 1/8" = 1'-0"

THIRD FLOOR REFLECTED CEILING PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERGE

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

BDR BASE BOARD RADIATOR

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BIW BACKWARD INCLINED WHEEL (FAN)

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CO CLEAN OUT

COP COEFFICIENT OF PERFORMANCE

CU CONDENSING UNIT

CW COLD WATER (POTABLE)

D CONDENSATE DRAIN

dB DECIBELS Db DRY-BULB TEMPERATURE

DEG DEGREE

DIA DIAMETER

DP DEW POINT TEMPERATURE

DN DOWN

EA EXHASUT AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FARENHEIT

FCU FAN COIL UNIT

FM FLOW METER

FPM FEET PER MINUTE

FT FEET

FT-LB FOOT-POUND

GA GAUGE

GAL GALLONS

GPM GALLONS PER MINUTE

H HUMIDIFER

HAC HOUSEKEEPING AID CLOSET

HC HEATING COIL

HD HEAD

HHW HEATING HOT WATER

HWC HEATING HOT WATER COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HP HORSEPOWER

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

INWG INCHES WAATER GAUGE

IN-LB INCH-POUND

kW KILOWATT kWh KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LH LATENT HEAT

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MBH 1000 BTUH

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MTD MEAN TEMPERATURE DIFFERENCE

NA NOT APPLICABLE

NC NOISE CRITERIA

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

P PUMP

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SEN SENSIBLE HEAT

SF SUPPLY FAN

SI SQUARE INCHES

SP STATIC PRESSURE

SQ FT SQUARE FOOT (FEET)

TD TEMPERATURE DIFFERENCE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

UV UNIT VENTILATOR

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED

BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

W WATTS

Wb WET-BULB (TEMPERATURE)

MECHANICAL ABBREVIATIONS

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE

REQUIRED.

6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH

COR.

23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS

ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

25. INSTALL PIPING FREE OF SAGS AND BENDS.

26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS

GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

MECHANICAL GENERAL NOTES

YR YEAR

T

CO2 CARBON DIOXIDE

THERMOSTAT

SUPPLY DIFFUSER

RETURN DIFFUSER/GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

EG-88 2000 DIFFUSER TAG | DIFFUSER CFM

LINEAR SLOT DIFFUSER

BALANCING DAMPER

(RECTANGULAR)

BALANCING DAMPER

(ROUND)

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

SIDE MOUNTED GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

MECHANICAL LEGEND

LPS

LPR

CHS

CHR

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OUTLET

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MOTORIZED CONTROL VALVE

STEAM TRAP

D CONDENSATE DRAIN LINE

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

CONNECT TO EXISTING PIPE

LIMITS OF DEMOLITION

INLINE CENTRIFUGAL PUMP

TANGENTIAL AIR SEPARATOR

EXPANSION TANK

WALL-MOUNTED INDOOR

SPLIT-SYSTEM

SPLIT-SYSTEM CONDENSING UNIT

UTILITY SET EXHAUST FAN

STEAM PRESSURE

REDUCING STATION

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

TERMINAL UNIT

CHECK VALVE

HEATING HOT WATER RETURN

PIPING

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

FULLY SPRINKLERED

C:\Users\jterpsta\Documents\M_BUILDING 58 - REPLACE FCU - 18-152_jterpstra.rvt

6/27/2019 2:39:47 PM

58-M-001

MECHANICAL GENERAL

INFORMATION

1900 E Main St, Danville, IL 61832

JT

RCM

JUNE 11, 2019

Replace B58-4 FCUS & Hot/Chilled Water Piping

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

DocuSign Envelope ID: 4CA5BF0B-E86B-4A6C-9D1E-6C734CCECDAD

6/28/2019

CARDIO

ORTHO

ROOM

SOIL

HOLD

SURGERY

ROOM

ORTHO TELEH.

ROOM

SURG. TELEH.

ROOM

SURGERY

ROOM

EXAM

ROOM

TLT

349A

TLT

350A

OFFICE

PCC

TLT

352A

TLT

344A

TLT

337A

TLT

341A

TLT

343A

TLT

339A

TLT

332A

STAFF

TLT

333D

PAT'NT

TLT

WAITING

ROOM

EXAM

ROOM

LPN

OFFICE

CPAP

RESIDENT

WORK

OFFICE

EXAM

OFFICE

OFFICE

EXAM

PANTRY

ANTE

351A

EXAM

WORK

CORR.

C3-12

CORR.

C3-11

STOR.

TLT.

346A

TLT.

347A

NOURSH.

Office

357CLEAN

SUPPLY/UTIL.

EXAM

ROOM

SOCIAL WORKERS

OFFICE

MED.

OFFICE

PHYS.

OFFICE

CHIEF

PULM., MITs &RTs

E.C.

E.C.

EXAM

ROOM

PHYS.

OFFICE

333C

JAN. CL.

WARD

CLERK

333A

EQUIP.

STOR.

STAFF

LOUNGE

333B

WAITING/

KITCHENETTE

E.C.

NP OFFICE

CORR.

C3-9

CORR.

C3-7

CORR.

C3-8

CORR.

C3-5

CORR.

C3-1

SUPERV.

OFFICE

MECH. RM

TLT.

330B

WAIT/

COMFORT

PULM.

RECPT.

MED GAS

STOR.

EXAM

BC/EEG

Office

STAIR #1

PFT

CHART

EQUIP

ALCOVE CHART IP

HOLDPUBLIC

TLT

CORR.

C3-2

TLT

331A

COMM.

CHUTE

STAIR #2STAIR #3

CORR.

C3-10

CORR.

C3-3

P.L.

STOR.

321A

CORR.

C3-6

EQUIP

ALCOVE

NURSE

STATION

LINEN

ROOM

EXAM

ROOM

2-PATIENT

ROOM

CARDIO EXAM

ROOM

RESIDENT

WORK

WORK

AREA

330A

EXAM

Room 330C

EXAM

ROOM

330D

EXAM

ROOM

330E

STORAGE

ROOM

330F

CORR.

C3-4

FHC

FHC

E P

FHC

UCR

1 / 2

3RD FLOOR CONTINUED

1"

D

5" D

D

3/4" D3/4" D3/4" D

D

3/4" D

3/4" D

5" CHR

2" D2" D2" D2" D

1" D

2" D 2" D2" D

D

1"

D

D

D

D

C H R

222120.7201918.117.216.114.913.81312.312.211.911.110.810.7109.18.16.95.84.8432.32FF

F

G

H

G.7

J

K

L

M

M.8

N

17.8

16.6

15.6

14.2

8.8

7.4

6.4

5.1

01 01 01 01

03 03

03 03

03 03

030303030303

030303

0303030303030303

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

SHEET NOTES:

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\jterpsta\Documents\M_BUILDING 58 - REPLACE FCU - 18-152_jterpstra.rvt

6/27/2019 2:40:08 PM

58-MD101

THIRD FLOOR MECHANICAL

DEMOLITION PLAN

1900 E Main St, Danville, IL 61832

JT

RCM

JUNE 11, 2019

Replace B58-4 FCUS & Hot/Chilled Water Piping

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 84 16

NORTH

TRUE

01 REMOVE SUPPLY, RETURN AND DRAIN

PIPING AND ASSOCIATED HANGERS AND

SUPPORTS SERVING FAN COIL UNITS ON

FOURTH FLOOR ABOVE.

02 EXISTING SUPPLY AND RETURN RISER TO

REMAIN.

03 REMOVE SUPPLY, RETURN, AND DRAIN

PIPING UP TO CONNECTION AT FAN COIL

UNIT ON FLOOR ABOVE.

04 EXISTING 4" SUPPLY COPPER PIPING TO

REMAIN.

05 REMOVE EXISTING DIFFUSER IN CEILING

AND RETAIN FOR INSTALLATION IN NEW

CEILING GRID. SEE 58-M-101.

06 REMOVE STEAM AND CONDENSATE PIPING

UP TO RADIATOR AND CAP AT MAINS.

Scale: 3/32" = 1'-0"

THIRD FLOOR HVAC DEMOLITION PLAN

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

PHYSICIAN EXAM

EXAM

BATHROOM

STORAGE

C4-4

EXAM

WAITING ROOM

PHYSICIAN'S

CYSTO CLINIC

P.A. (MOLLY)

C4-5

BATHROOM

STORAGE

NURSING MOTHERS

CLEAN UTIL.

RESTROOM

428A

MED. ROOM

430A

NURSE

430B

NURSE'S STATION

STAIR 2

RESTROOM

E.C.

EQUIPMENT

432A

STORAGE

432B

RSTRM

LOUNGE

SUPERVISOR

OFFICE

SOILED

X-RAY

408RESTROOM

406A

TREATMENT

ENDOSCOPY (TB)

ENDOSCOPY

OFFICE

OFFICE

STORAGE UTILITY

EQUIPMENT

433A

3 BED

436437438

RESTROOM

437A

3 BED

STAIR 1

TIP

CHUTE

OPTHALMOLOGY EXAM

C4-1

2 BED

3 BED

NURSE'S

MED. ROOM

442B

E.C.

STORAGE

444A

RESTROOM

C4-6

RESTROOM

SHOWER

458 TREATMENT ROOM

SOILED

LINEN

STATION

UTILITY

ROOM

STAIR 3

CLEAN UTIL.

RESTROOM

447A

3 BED

4 BED

3 BED

OFFICE

2 BED

HSK.

C4-7

STRG

O.D. SLEEPING

OFFICE

OPTHALMOLOGY

TESTING ROOM

CA1

PT. WAITING

NURSE

ENDO

ROOM

ROOM

HOLDING

OFFICE

MED.

SUPPLY

STORG.

MED

SUPPLY

STORG.

C4-3

C4-2

457A T

222120191310432FF

H

J

K

L

M

N

1817161514

98765

01 01

01 02

01 0101 01 01 01 01 01

01 01 01

01 01 01 01 01 01 01

010101

030301 03

03030303

3/4" D

3/4" CHS

3/4" CHR

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

SHEET NOTES:

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\jterpsta\Documents\M_BUILDING 58 - REPLACE FCU - 18-152_jterpstra.rvt

6/27/2019 2:40:09 PM

58-MD102

FOURTH FLOOR MECHANICAL

DEMOLITION PLAN

1900 E Main St, Danville, IL 61832

JT

RCM

JUNE 11, 2019

Replace B58-4 FCUS & Hot/Chilled Water Piping

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

0 84 16

NORTH

TRUE

Scale: 3/32" = 1'-0"

FOURTH FLOOR HVAC DEMOLITION PLAN

01 REMOVE FAN COIL UNIT CONTROLS,

SUPPLY, RETURN, AND DRAIN PIPING DOWN

THROUGH FLOOR. REMOVE MATERIAL

BLOCKING EXISTING WALL LOUVER AND

MAKE READY FOR INSTALLATION OF NEW

UNIT AT THIS LOCATION.

02 EXISTING TO REMAIN.

03 EXISTING RADIATOR AND ALL ASSOCIATED

CONTROLS AND PIPING DOWN THROUGH

FLOOR TO REMAIN.

04 REMOVE FAN COIL UNIT ABOVE CEILING,

INCLUDING ASSOCIATED DUCT, PIPING,

GRILLES, AND CONTROLS. REMOVE

SUPPLY, RETURN, AND DRAIN PIPING BACK

TO MAIN AND CAP

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

CARDIO

ORTHO

ROOM

SOIL

HOLD

SURGERY

ROOM

ORTHO TELEH.

ROOM

SURG. TELEH.

ROOM

SURGERY

ROOM

EXAM

ROOM

TLT

349A

TLT

350A

OFFICE

PCC

TLT

352A

TLT

344A

TLT

337A

TLT

341A

TLT

343A

TLT

339A

TLT

332A

STAFF

TLT

333D

PAT'NT

TLT

WAITING

ROOM

EXAM

ROOM

LPN

OFFICE

CPAP

RESIDENT

WORK

OFFICE

EXAM

OFFICE

OFFICE

EXAM

PANTRY

ANTE

351A

EXAM

WORK

CORR.

C3-12

CORR.

C3-11

STOR.

TLT.

346A

TLT.

347A

NOURSH.

Office

357CLEAN

SUPPLY/UTIL.

EXAM

ROOM

SOCIAL WORKERS

OFFICE

MED.

OFFICE

PHYS.

OFFICE

CHIEF

PULM., MITs &RTs

E.C.

E.C.

EXAM

ROOM

PHYS.

OFFICE

333C

JAN. CL.

WARD

CLERK

333A

EQUIP.

STOR.

STAFF

LOUNGE

333B

WAITING/

KITCHENETTE

E.C.

NP OFFICE

CORR.

C3-9

CORR.

C3-7

CORR.

C3-8

CORR.

C3-5

CORR.

C3-1

SUPERV.

OFFICE

MECH. RM

TLT.

330B

WAIT/

COMFORT

PULM.

RECPT.

MED GAS

STOR.

EXAM

BC/EEG

Office

STAIR #1

PFT

CHART

EQUIP

ALCOVE CHART IP

HOLDPUBLIC

TLT

CORR.

C3-2

TLT

331A

COMM.

CHUTE

STAIR #2STAIR #3

CORR.

C3-10

CORR.

C3-3

P.L.

STOR.

321A

CORR.

C3-6

EQUIP

ALCOVE

NURSE

STATION

LINEN

ROOM

EXAM

ROOM

2-PATIENT

ROOM

CARDIO EXAM

ROOM

RESIDENT

WORK

WORK

AREA

330A

EXAM

Room 330C

EXAM

ROOM

330D

EXAM

ROOM

330E

STORAGE

ROOM

330F

CORR.

C3-4

FHC

FHC

E P

FHC

UCR

1 / 2

3RD FLOOR CONTINUED

1 1/2" CHS

222120191310432FF

F

G

H

G.7

J

K

L

M

N

1817161514

98765

CO

0.60° 0 .6

.6

0.60°

010101

01 01 01 01 01 01 01 01 01 01

01 01 01 01 01 01 01

1 1/2" D

1 1/2" D

3/4" D

2 1/2" CHR

1 1/2" CHS

1 1/2" CHS

2 1/2" CHR

3" CHR

3/4" CHS

3/4" CHR

3/4" D

4" CHR

1" CHS

4" CHR

C H

R

/4

D

1" CHS

3/4" CHR

3" CHS

3/4" D 2" CHR

3" CHS

2 1/2" CHR

1" D

2 1/2" CHR

2" CHS

1 1/2" CHR

3" CHS

3" CHS

2" CHR

3/4" CHS

3/4" CHR

1 1/2" CHR

1 1/2" CHS

3/4" CHR

3/4" CHS

3/4" D 3/4" D

3/4" D

3/4" D

2 1/2" CHR

1 1/2" CHS

1" D

3" CHR

1 1/2" CHS

3/4" D

3" CHR

1 1/2" CHS

3/4" D

3" CHR

1 1/2" CHS

3" CHR

1 1/2" CHS1 1/2" CHS

1" D

1" CHS

4" CHR

3/4" D

1" CHS

1" D

4" CHS

1" CHR

1" D

4" CHS

1" CHR

1" D

4" CHS

1 1/2" CHR

1 1/2" D

4" CHS

1 1/2" CHR

1 1/2" D

4" CHS

1 1/2" CHR

1 1/2" D

1 1/2" CHR

3/4" D

3" CHS

2" CHR

2" CHR

3" CHS

3/4" D

3" CHS

2" CHR

1" D

2" CHR

2 1/2" CHS 2 1/2" CHR

2 1/2" CHS 2 1/2" CHS

2 1/2" CHR

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

2 1/2" CHR

2" CHS

3" CHS

2" CHR

1" D

2" CHR

3" CHS

CO

1" D 1" D

2 1/2" CHS

2 1/2" CHR

3/4" D 2 1/2" CHR

2" CHS

1 1/2" D

2" CHS

2 1/2" CHR

1" D

1" D

2 1/2" CHR

2" CHS

3/4" D

2 1/2" CHR

2" CHS

2" CHS

1 1/2" CHS

2 1/2" CHR

3/4" D

1" D

CO

3" CHS

1" D

1" D

1" D 1" D

1" D

3/4" D

1 1/2" D

1" D

1" D

1 1/2" D

3" CHR

03 03

3/4" D

CO

# SHEET KEY NOTES:

DWG OF

DRAWN BY:

CHECKED BY:

ISSUE DATE:

DATE

File Path:

Plot Date:

REV # REVISION DESCRIPTION

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Suite 120 Cary, NC 27511 www.acg-pa.com

919-858-7420

VA PROJECT NO.

© COPYRIGHT Apogee Consulting Group, P.A.

DRAWING NO.:

CONSULTANTS: Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ACG Project NO.:

LOCATION:

PROJECT TITLE:

APPROVED:

DRAWING TITLE: BUILDING NO.

SHEET NOTES:

FULLY SPRINKLERED

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

C:\Users\jterpsta\Documents\M_BUILDING 58 - REPLACE FCU - 18-152_jterpstra.rvt

6/27/2019 2:39:56 PM

58-M-101

THIRD FLOOR MECHANICAL PIPING

PLAN

1900 E Main St, Danville, IL 61832

JT

RCM

JUNE 11, 2019

Replace B58-4 FCUS & Hot/Chilled Water Piping

550-18-102

18-152

FINAL CONSTRUCTION DOCUMENTS

Scale: 3/32" = 1'-0"

THIRD FLOOR MECHANICAL PIPING PLAN 0 84 16

NORTH

TRUE

01 3/4" SUPPLY, 3/4" RETURN, AND 3/4" DRAIN UP

THROUGH EXISTING OPENINGS AND

CONNECT TO UNIT ABOVE. COORDINATE

HAND OF NEW UNIT WITH EXISTING PIPING

LOCATION.

02 EXISTING SUPPLY AND RETURN WATER

RISERS TO REMAIN.

03 VALVE AND CAP 3/4" SUPPLY, 3/4" RETURN,

AND CAP 3/4" DRAIN FOR FUTURE

CONNECTION.

04 INSULATED DRAIN PIPING DOWN ALONG

WALL AND TERMINATE ABOVE MOP BASIN.

PROVIDE WHITE PVC COVER OVER PIPE

INSULATION WHERE EXPOSED IN ROOM 338.

05 3/4" INSULATED DRAIN ABOVE CEILING

THROUGH WALL INTO…

This is the start of the file's text. The full file is on GovTribe.