36C25219B0040-020.pdf

PDF 313 KB Posted

Attached to
Project 556-17-007 - Replace Chiller #5 Federal contract opportunity
Solicitation number
36C25219B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219B0040 P03_Justification and Approval (FINAL).pdf

View the file

Other files for this federal contract opportunity

Other files attached to Project 556-17-007 - Replace Chiller #5, newest first.
File Type Posted
36C25219C0204-000.docx DOCX document
36C25219B0040-0003001.pdf PDF
36C25219B0040-0003000.docx DOCX document
36C25219B0040-0002001.pdf PDF
36C25219B0040-0002000.docx DOCX document
36C25219B0040-0001000.docx DOCX document
36C25219B0040-017.pdf PDF
36C25219B0040-016.docx DOCX document
36C25219B0040-019.pdf PDF
36C25219B0040-018.pdf PDF
36C25219B0040-000.docx DOCX document
36C25219B0040-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFOC SOP Revision 08 Original Date: 03/22/11 Revision 08 Date: 04/18/2018

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (> SAT)

Acquisition Plan Action ID: 36C252‐19‐AP‐1436

1. Contracting Activity:

Department of Veterans Affairs Captain James A. Lovell Federal Health Care Center Network Contract Office 12 Great Lakes Acquisition Center 3001 Green Bay Rd, Bldg. 1, Rm 300 North Chicago, IL 60064

2237# 556‐19‐2‐6979‐0009

2. Nature and/or Description of the Action Being Processed:

Project 556‐17‐007: Replace Chiller #5 at Building 188 requires the acquisition of a new chiller on a brand name basis. The existing No. 5 1000‐Ton York centrifugal chiller was installed in 1989 and needs to be replaced by a new 1000‐Ton water‐cooled centrifugal magnetic drive chiller. The contract will be award as a fixed‐firm price contract.

3. Description of Supplies/Services Required to Meet the Agency’s Needs:

The Captain James A. Lovell Federal Health Care Center (FHCC) has a requirement for removal of an existing 1000 ton chiller # 5 and replacing with a new 1000 ton centrifugal chiller. Contractor shall provide new chilled water and condenser water pumps to complete the system with VFD's to replace the existing pumps. Rework the existing cooling tower to accommodate flow requirements of the new chiller and verify that the new flow adequately covers the cooling tower fill. The new chiller and pump VFD's shall be connected to the existing front‐end control system in accordance with the drawings and specifications. Captain James A. Lovell ‐ FHCC has named the York 1000‐Ton water‐cooled centrifugal magnetic drive chiller (Model # HYP1278XHC30B‐46A) as a required Sole

Source item to complete this requirement. The FHCC currently has in‐place a service contract for all

York Model chillers currently in operational use throughout the Federal Health Care Center.

Contractor will be required to purchase and install this specific Sole Source item.

4. Statutory Authority Permitting Other than Full and Open Competition:

In accordance with 41 USC §3304(a)(1) as implemented by FAR 6.302‐1:

( X ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per FAR 6.302‐1;

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority):

Original Date: 03/22/11 Revision 08 Date: 04/18/2018

FAR 6.302‐1 allows a Contracting Officer to make a sole source designation when the supplies or services required are available from only one responsible source, and no other type of supplies or services will satisfy agency requirements. York chillers are used throughout Capt. James A. Lovell FHCC and no other manufacturer can provide a compatible alternative of the item needed.

Accordingly, York Corporation is the only firm capable of providing the supplies and services described in Section III above without the Veteran’s Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable:

There were no other vendors considered, as it is in the best interest of the Government to acquire this item as a sole source.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable:

A construction estimate was developed by the architect‐engineer and the Government accepts it as the Government IGE. The Government will perform price analysis and pricing will be evaluated against the Government IGE and the bids received in response to the solicitation to determine that the proposed price is fair and reasonable and reflects reasonable value.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted:

No market research was conducted for this sole source procurement because of the rationale described in Item #9 below.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition:

Utilizing a different manufacturer would require a new service contract, the purchasing of parts and or compatible components, the loss of in‐house expertise / knowledge from familiarity and history with current equipment and components, and increased cost associated with re‐training maintenance technicians on newly installed equipment. Other technical elements to be considered in which this brand name product offers:

‐ Integrated Variable Feed Drive (VFD) ‐ Magnetic Drive Chiller (Magnetic – Bearing)

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition:

None

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required:

None

Original Date: 03/22/11 Revision 08 Date: 04/18/2018

12. Requirements Certification:

I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Craig Marriner Date Engineering Supervisor Captain James A. Lovell Federal Health Care Center

13. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer: I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Jason Hardy Date Contracting Officer

NCO 12

b. One Level Above the Contracting Officer (Required over SAT but not exceeding $700K):

I certify the justification meets requirements for other than full and open competition.

Ricky Bond Date Division Chief

NCO12

2019-05-24T14:27:34-0500
CRAIG E MARRINER 237161
2019-05-24T14:43:32-0500
JASON W. HARDY 265188
2019-05-24T15:43:58-0500
Ricky Bond 321819