36C25219B0040-0003000.docx

DOCX document 3 MB Posted

Attached to
Project 556-17-007 - Replace Chiller #5 Federal contract opportunity
Solicitation number
36C25219B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219B0040 0003 36C25219B0040 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to Project 556-17-007 - Replace Chiller #5, newest first.
File Type Posted
36C25219C0204-000.docx DOCX document
36C25219B0040-0003001.pdf PDF
36C25219B0040-0002001.pdf PDF
36C25219B0040-0002000.docx DOCX document
36C25219B0040-0001000.docx DOCX document
36C25219B0040-018.pdf PDF
36C25219B0040-020.pdf PDF
36C25219B0040-017.pdf PDF
36C25219B0040-016.docx DOCX document
36C25219B0040-019.pdf PDF
36C25219B0040-000.docx DOCX document
36C25219B0040-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 36C25219B0040

Project: 556-17-007 Replace Chiller #5

RESPONSES TO REQUEST FOR INFORMATION (RFI)

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-29-2019 556-19-2-6979-0009 556-17-007 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road Building 1 North Chicago

Il

60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Road Building 1 North Chicago

IL

60064 To all Offerors/Bidders

36C25219B0040 07-01-2019

X X X

556-3690169-6979-754200-3220 23NR7MA09

X Project 556-17-007: Replace Chiller #5

The purpose of this amendment is to publish RFI's received in reference to solicitation 36C25219B0040.

Jason Hardy Contracting Officer

1. QUESTION: Who should we contact if we would like to make a return visit to the site location?

ANSWER: At this time, no additional site visits will be authorized.

2. QUESTION: Can we get a list of the pre-bid attendees?

ANSWER: The pre-bid attendees list was posted to FBO on July 8, 2019.

3. QUESTION: Are there any proprietary control contractor for this project? If so, please provide contact information.

ANSWER: The subcontractor for the project should be Automated Logic Corp.

4. QUESTION: Are we ok with supplying a 7-31-19 expired document bid bond?

ANSWER: The Bid Bond form has been updated and the expiration date is 08/31/2019. This form can be accessed at https://www.gsa.gov/forms-library/bid-bond.

5. QUESTION: Drawing No. S-501 section 1: #spec dwg/sect.1 s-501; What is the specification for the required coating of the concrete infill. The drawing states to obtain information from owner.

ANSWER: The infill coating shall match the existing coating. Bidder to contact the Chicago Cooling Tower for the type of existing coating on the cooling tower.

6. QUESTION: Are there any shutdown constraints per the contract requirements?

ANSWER: This depends on what time of year. In winter the chiller plant can be isolated and drained the system briefly.

7. QUESTION: Bid Specification Section 01 00 00 state items i, ii, iii under 1.3 statement of bid item(s) the solicitation shows one lump sum proposal. Please clarify which is to be followed?

ANSWER: The contractor shall propose one lump sum on the provided Bid Schedule which covers Items I, II, III in the specification. A price breakdown is not necessary.

8. QUESTION: Bid Specification Section 01 35 26: Is the contractor to designate one SSHO and one Superintendent for the project, or can the person share both responsibilities?

ANSWER: No, one SSHO and one CP (Superintendent are required per the Bid Specification.

9. QUESTION: Bid Specification Section 01 91 00: Who is responsible for contracting the third party commissioning agent? the va or gc

ANSWER: As stated on the Bid Specification the VA will engage the CxA under a separate contract.

10. QUESTION: mechanical: There is a control point for refrigerant leak detection. Is there a new refrigerant leak detection system called for or are we to utilize existing?

ANSWER: Use the existing system.

Use the existing refrigerant leak detection system.

11. QUESTION: 23 09 23: Is the ddc contractor to be contracted by the gc directly?

ANSWER: The GC need to contract a DDC subcontractor directly.

12. QUESTION: Will water balancing be required in the scope for the new chiller, the new chilled water pump and the new condenser water pump?

ANSWER: Yes, flow meter for chilled water needs to be verified and circuit setters for pumps need to be set up by the balancer.

13. QUESTION: New valves are being installed just off the main piping for the chilled water and condenser water. Will the chilled water and condenser water mains be completely drained down during the Chiller 5 replacement project?

ANSWER: Yes, but it depends on what time of the year. In winter the plant can be isolated and drained briefly.

14. QUESTION: The RFP states "Rework the existing cooling tower to accommodate flow requirements of the new chiller and verify that the new flow adequately covers the cooling tower fill." The existing chiller condenser flow is 3,000 gpm and the new chiller condenser flow is 3,037 gpm. Please verify if any alternations are required as the flow change is minimal.

ANSWER: No, but contractor need to work with Chicago Cooling Tower to verify tower piping and nozzle configuration work with the new chiller.

15. QUESTION: Drawing No. M-101 "Keynote 16" discusses interconnecting piping and a gearbox for the adjacent cooling towers. Please provide a sketch or elevation view to help clarify the overall scope requirements.

ANSWER: The valve handle is a custom fabrication to be provided by the contractor as described in note 16. We have included a photograph of the existing valve the VA would like to duplicate. Also attached is a catalog depicting right angle gear operators that could be provided to attach to the valve.

16. QUESTION: Drawing No. M-301, Section 3, Keynote 8 states "Condenser water piping to oil cooler.” The specified chiller has a magnetic centrifugal drive. Is this piping required?

ANSWER: Installation of the chiller and associated piping should be done according to the vendor’s installation instruction.

See attached document: S05_Dyntorque CAM Brochure (in reference to RFI question 15).

image1.jpeg