36C25219B0003-0013000.docx
DOCX document 19 KB Posted
- Attached to
- 537-18-136A OR AHU5 Follow-Up
- Solicitation number
- 36C25219B0003
About this file
36C25219B0003 0013 36C25219B0003 0013.docx
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-19-2019 537-18-136A 36C252 Department of Veterans Affairs
GLAC-NORTH CHICAGO IL
3001 Green Bay Road Building 1, Room 329 North Chicago
IL
60064-3048 36C252 Department of Veterans Affairs
GLAC-NORTH CHICAGO IL
3001 Green Bay Road Building 1, Room 329 North Chicago
IL
60064-3048 To all Offerors/Bidders
36C25219B0003 02-19-2019
X X X
February 21, 2019 1:00 PM CST X
PROJECT 537-18-136A AHU 5 FOLLOW-ON
This amendment is issued to publish RFIs and Answers. Please see the following page.
The closing date and time has been extended to February 21, 2019 at 1:00 pm CST.
All other terms and conditions remain in full force and effect.
Under Period of Performance the top caption states "Option 2" period of performance. What is Option 1?
There is no option 1. Remove the word “Option 2 “in the Table Please advise whether TAB work is to occur at the end of ALL construction, or if TAB is to occur at the end of each phase of construction. Please also confirm that all TAB work is to occur during the day, not at night, with the COR present.
The TAB work is to occur at the end of each phase of construction. All TAB work is to occur during the day or night time, with the VA COR present.
The Period of Performance Chart Indicates (7) separate mobilizations for completion of work. When comparing this PoP chart with item 15 of Part 3 of the AMD 12 SOW, the narrative states that after the "9-day construction work", the balancing work shall be done "during the day" with the COR present. However, per the PoP as a guide, each of the (7) week tasks are to be turned over complete. This contradicts the statement "Test and Balance activities are to be conducted AFTER the completion of the (9) calendar days work." This would mean that ORs are to be turned over without Test and Balance work being completed and BAS functional testing.
Please see the above response.
The boxes and equipment are located outside of the ORs – since these are in shared space do we need to be completed cleaned up after each night shift or will those areas be partitioned off from the rest of the OR space during the down time?
The terminal unit and equipment are located in the corridor next to the OR but other work requires the contractor to be inside the perspective OR. The areas outside the OR require a partition. Area inside the OR can proceed using precautions as noted in the SOW as that perspective “OR” will be taken out of service.
"Option 2 Period of Performance Chart" Section 4.3 states "Friday-Sunday OR Bypass, Sunday afternoon Terminal Cleaning all OR's, Sunday night Reactivation for Monday am re-use". Then the OR's are listed by weeks. Contractor interprets that OR 1 & 2 will be gained on a Friday (After Operations Conclude) with work able to proceed on nights in OR's 1 & 2 Friday, Saturday, Sunday, Monday through to Sunday at noon. Contractor also interprets that OR3 & OR5 will overlap with occupancy of OR 1 & 2. Please confirm that work can occur in specific OR spaces during the weekday at night as outlined in the schedule, as well as work on the weekend.
Work for each of the mobilization will be from Friday evening after the last surgery case to Sunday noon when the work area is turned for terminal cleaning. OR is reactivated Monday for reuse.
Please confirm that the 20x12 Exhaust Ductwork called out for replacement is part of this solicitation and replacement has not been corrected under an emergency contract.
The 20X12 ductwork is part of this solicitation.