36C25218B1092-003.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25218B1092
About this file
36C25218B1092 P01 - Specs, Updated - 6.4.18.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25219C0035-000.docx | DOCX document | |
| 36C25218B1092-A00003000.docx | DOCX document | |
| 36C25218B1092-A00003001.pdf | ||
| 36C25218B1092-A00003002.pdf | ||
| 36C25218B1092-A00002000.docx | DOCX document | |
| 36C25218B1092-A00001000.docx | DOCX document | |
| 36C25218B1092-005.pdf | ||
| 36C25218B1092-006.pdf | ||
| 36C25218B1092-004.pdf | ||
| 36C25218B1092-002.docx | DOCX document | |
| 36C25218B1092-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-01-17
Expanded Community Living 00 01 10-1
Center (CLC)
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 10 Table of Contents 01-17
00 01 15 List of Drawing Sheets 07-15
00 31 32 Geotechnical Data 06-14
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-15
01 32 16.15 Project Schedules 02-15
01 33 23 Shop Drawings, Product Data, and Samples 02-17
01 35 26 Safety Requirements 02-17
01 42 19 Reference Standards 05-16
01 45 00 Quality Control 01-18
01 45 29 Testing Laboratory Services 06-16
01 57 19 Temporary Environmental Controls 01-11
01 74 19 Construction Waste Management 09-13
01 91 00 General Commissioning Requirements 10-15
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
03 45 00 Precast Architectural Concrete 10-15
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 02-16
04 05 16 Masonry Grouting 02-16
04 20 00 Unit Masonry 02-16
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16
05 36 00 Composite Metal Decking 10-15
05 50 00 Metal Fabrications 07-14
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-15
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 52 Modified Bituminous Sheet Waterproofing 08-16
07 21 13 Thermal Insulation 02-16
07 21 29 Spray-Applied Insulation
07 22 00 Roof and Deck Insulation 02-16
Expanded Community Living 00 01 10-2
07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16
07 40 00 Roofing and Siding Panels 10-15
07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16
07 60 00 Flashing and Sheet Metal 07-14
07 71 00 Roof Specialties 10-15
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-15
07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 41 13 Aluminum-Framed Entrances and Storefronts 08-16
08 43 10 Interior Glass Partition and Entry System
08 44 13 Glazed Aluminum Curtain Walls 03-17
08 56 53 Blast Resistant Windows 02-16
08 71 00 Door Hardware 01-16
08 71 13.11 Low Energy Power Assist Door Operators 08-16
08 80 00 Glazing 10-15
08 87 00 Glazing Surface Film
08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 04-15
09 22 16 Non-Structural Metal Framing 05-16
09 29 00 Gypsum Board 11-14
09 30 13 Ceramic/Porcelain Tiling 10-15
09 51 00 Acoustical Ceilings 12-16
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 02-16
09 65 19 Resilient Tile Flooring 12-15
09 68 00 Carpeting 10-15
09 75 00 Interior Stone Veneer
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 11 13 Markerboards 10-15
10 14 00 Signage 10-15
10 21 23 Cubicle Curtain Tracks 05-15
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 31 00 Manufactured Fireplaces
10 44 13 Fire Extinguisher Cabinets 08-14
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 01-17
Expanded Community Living 00 01 10-3
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 09-15
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-15
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
22 05 12 General Motor Requirements for Plumbing Equipment 09-15
22 05 19 Meters and Gages for Plumbing Piping 09-15
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 05 33 Gutter Melt System 09-15
22 07 11 Plumbing Insulation 09-15
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 13 23 Sanitary Waste Interceptors 09-15
22 13 29 Sanitary Sewerage Pumps 09-15
22 14 00 Facility Storm Drainage 09-15
22 14 29 Sump Pumps 09-15
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 01 30 HVAC Air Duct Cleaning
23 05 11 Common Work Results for HVAC 02-15
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-15
23 05 14 Variable Frequency Drives
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15
23 07 11 HVAC Insulation 02-15
23 08 00 Commissioning of HVAC Systems 11-16
23 09 15 DDC Input/Output Summary Table
23 09 23 Direct-Digital Control System for HVAC 09-11
23 09 93 Sequence of Operation for HVAC Controls
23 21 13 Hydronic Piping 09-12
23 21 23 Hydronic Pumps 02-15
23 22 13 Steam and Condensate Heating Piping 02-15
23 22 23 Steam Condensate Pumps 02-15
23 25 00 HVAC Water Treatment 02-15
23 31 00 HVAC Ducts and Casings 03-13
23 34 00 HVAC Fans 02-15
Expanded Community Living 00 01 10-4
23 36 00 Air Terminal Units 02-15
23 37 00 Air Outlets and Inlets 02-15
23 40 00 HVAC Air Cleaning Devices 02-12
23 72 00 Air-to-Air Energy Recovery Equipment 05-11
23 73 00 Indoor Central-Station Air-Handling Units 04-11
23 82 00 Convection Heating and Cooling Units 04-11
23 82 16 Air Coils 04-11
DIVISION 26 – ELECTRICAL
26 05 02 Electrical Demolition for Remodeling
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13
26 05 26 Grounding and Bonding for Electrical Systems 12-12
26 05 29 Hangers and Supports for Electrical Piping & Equipment
26 05 33 Raceway and Boxes for Electrical Systems 05-14
26 05 41 Underground Electrical Construction 12-12
26 05 73 Overcurrent Protective Device Coordination Study 12-15
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 05-14
26 24 16 Panelboards 05-14
26 27 26 Wiring Devices 01-16
26 29 11 Motor Controllers 08-14
26 29 21 Enclosed Switches and Circuit Breakers 12-12
26 41 00 Facility Lightning Protection 01-17
26 43 13 Surge Protective Devices 12-12
26 51 00 Interior Lighting 08-14
26 56 00 Exterior Lighting 05-14
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 06-15
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
27 11 00 Telecommunications Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
27 52 23 Nurse Call and Code Blue Systems 10-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11
28 05 13 Conductors and Cables for Electronic Safety and
Security
09-11
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
Expanded Community Living 00 01 10-5
DIVISION 31 – EARTHWORK
31 20 11 Earthwork
31 23 23.33 Flowable Fill
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 17 23 Pavement Markings 08-16
32 32 24 Segmental Unit Retaining Walls
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 01-14
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 10-11
DIVISION 34 – TRANSPORTATION
34 71 13 Vehicle Barriers 08-16
07-01-15
Expanded Community Living 00 01 15 - 1
Center (CLC)
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
1 G001 COVER SHEET
2 G002 CODE MATRIX AND CODE COMPLIANCE
3 G011 ABBREVIATIONS, MATERIALS, SYMBOLS & GENERAL NOTES
4 G012 TYPICAL MOUNTING HEIGHTS
5 G101 BASEMENT LIFE SAFETY PLAN
6 G102 FIRST FLOOR LIFE SAFETY PLAN
CIVIL
7 CJ-100 NOTE SHEET
8 CS-200 EXISTING SITE PLAN
9 CD-300 SITE DEMOLITION PLAN
10 CG-400 SITE LAYOUT AND GRADING PLAN
11 CU-500 SITE UTILITY PLAN
12 CJ-600 DETAILS
13 CJ-700 DETAILS
14 CJ-800 DETAILS
ARCHITECTURAL
15 A001 1ST FLOOR PLAN - PHASING
16 AD101 BASEMENT FLOOR DEMO PLAN ZONE 2
17 AD102 1ST FLOOR DEMO PLAN ZONE 2
18 A011 BASEMENT OVERALL FLOOR PLAN
19 A012 1ST FLOOR OVERALL PLAN
20 A101 BASEMENT FLOOR PLAN ZONE 1
21 A102 1ST FLOOR PLAN ZONE 1
22 A103 1ST FLOOR PLAN ZONE 2
23 A104 ROOF PLAN - ZONE 1
24 AR101 BASEMENT RCP ZONE 1
Expanded Community Living 00 01 15 - 2
Center (CLC)
25 AR102 1ST FLOOR RCP ZONE 1
26 AR103 1ST FLOOR RCP ZONE 2
27 AC101 1ST FLOOR RCP COORDINATION ZONE 1
28 A201 EXTERIOR ELEVATIONS
29 A301 BUILDING SECTIONS
30 A401 WALL SECTIONS
31 A402 WALL SECTIONS
32 A403 WALL SECTIONS
33 A404 ENLARGED PLANS AND INTERIOR ELEVATIONS
34 A405 ENLARGED PLANS AND INTERIOR ELEVATIONS
35 A406 ENLARGED PLANS AND INTERIOR ELEVATIONS
36 A407 ENLARGED PLANS AND INTERIOR ELEVATIONS
37 A408 ENLARGED PLANS AND INTERIOR ELEVATIONS
38 A409 ENLARGED PLANS AND INTERIOR ELEVATIONS
39 A410 ENLARGED PLANS AND INTERIOR ELEVATIONS
40 A411 ENLARGED PLANS AND INTERIOR ELEVATIONS
41 A412 ENLARGED PLANS AND INTERIOR ELEVATIONS
42 A413 ENLARGED PLANS AND INTERIOR ELEVATIONS
43 A414 ENLARGED PLANS AND INTERIOR ELEVATIONS
44 A501 EXTERIOR SECTION DETAILS
45 A502 EXTERIOR PLAN DETAILS
46 A503 INTERIOR DETAILS
47 A601 PARTITION TYPES & DETAILS
48 A602 DOOR AND EQUIPMENT SCHEDULES
49 A603 WINDOW DETAILS
50 A701 CASEWORK SECTIONS
INTERIOR
51 I001 INTERIOR SCHEDULES
52 I101 1ST FLOOR PLAN ZONE 1 - FLOOR PATTERN
53 I102 1ST FLOOR PLAN ZONE 2 - FLOOR PATTERN
54 IW101 1ST FLOOR PLAN ZONE 1 - WALL PATTERN
55 IW102 1ST FLOOR PLAN ZONE 2 - WALL PATTERN
Expanded Community Living 00 01 15 - 3
Center (CLC)
STRUCTURAL
56 SE-001 STRUCTURAL NOTES
57 SB-100 FOUNDATION PLAN - ZONE 1
58 SB-800 FOUNDATION DETAILS
59 SB-801 FOUNDATION DETAILS
60 SF-200 GROUND FLOOR FRAMING PLAN - ZONE 1
61 SF-201 ROOF AND CLERESTORY FRAMING PLAN - ZONE 1
62 SF-810 FRAMING DETAILS
63 SF-811 FRAMING DETAILS
FIRE PROTECTION
64 FD-101 BASEMENT AND FIRST FLOOR ZONE 2 DEMOLITION PLAN
65 F-001 BASEMENT FLOOR ZONE 1 NEW WORK PLAN, ZONE 2 NEW WORK
PLAN
66 F-101 FIRST FLOOR ZONE 1 NEW WORK PLAN
67 F-102 FIRST FLOOR ZONE 2 NEW WORK PLAN
PLUMBING
68 PD-101 BASEMENT AND FIRST FLOOR ZONE 2 DEMOLITION PLAN
69 PG-001 BASEMENT FLOOR ZONE 1 AND 2 MED GAS PIPING PLAN
70 PG-101 FIRST FLOOR ZONE 1 MED GAS PIPING PLAN
71 PG-102 FIRST FLOOR ZONE 2 MED GAS PIPING PLAN
72 PK-500 SCHEDULES AND DETAILS
73 PL-001 BASEMENT FLOOR ZONE 1 SANITARY PLAN
74 PL-002 BASEMENT FLOOR ZONE 1 STORM AND DRAIN TILE PLAN
75 PL-101 FIRST FLOOR ZONE 1 SANITARY PIPING PLAN
76 PL-102 FIRST FLOOR ZONE 2 SANITARY PIPING PLAN
77 PL-103 FIRST FLOOR ZONE 1 STORM PIPING PLAN
78 PL-201 ROOF ZONE 1 SANITARY AND STORM PIPING PLAN
79 PP-002 BASEMENT FLOOR ZONE 2 WATER PIPING PLAN
80 PP-101 FIRST FLOOR ZONE 1 WATER PIPING PLAN
81 PP-102 FIRST FLOOR ZONE 2 WATER PIPING PLAN
82 PW-600 WATER PIPING ISOMETRIC
83 PW-601 SANITARY AND STORM ISOMETRIC
84 PW-602 MED GAS ISOMETRICS
Expanded Community Living 00 01 15 - 4
Center (CLC)
HVAC
85 MD100 BASEMENT AND FIRST FLOOR PLAN - ZONE 2
86 MP001 BASEMENT FLOOR PIPING PLAN - ZONE 1
87 MP002 BASEMENT FLOOR PLAN - ZONE 2
88 MP101 FIRST FLOOR PIPING PLAN - ZONE 1
89 MH001 BASEMENT FLOOR DUCTWORK PLAN - ZONE 1
90 MH100 FIRST FLOOR DUCTWORK PLAN - ZONE 1
91 MH101 FIRST FLOOR PLAN - ZONE 2
92 MH200 ROOF PLAN - ZONE 1
93 MH300 LARGE SCALE PLAN
94 MK500 DETAILS
95 MK501 DETAILS
96 MK502 DETAILS
97 MK503 DETAILS
98 MK504 DETAILS
99 MJ600 SCHEDULES
100 MJ601 SCHEDULES
101 MJ602 SCHEDULES
ELECTRICAL
106 ES011 ELECTRICAL SITE PLANS
107 ED100 BASEMENT DEMOLITION PLAN - ZONE 2
108 ED101 FIRST FLOOR DEMOLITION PLAN - ZONE 2
109 EL100 BASEMENT LIGHTING PLAN - ZONE 1
110 EL101 FIRST FLOOR LIGHTING PLAN - ZONE 1
111 EL102 FIRST FLOOR LIGHTING PLAN - ZONE 2
112 EP100 SUB-BASEMENT AND BASEMENT POWER PLAN - ZONE 1
113 EP101 BASEMENT POWER PLAN - ZONE 2
114 EP102 FIRST FLOOR POWER PLAN - ZONE 1
115 EP103 FIRST FLOOR POWER PLAN - ZONE 2
116 EP104 ROOF POWER/LIGHTNING PROTECTION PLAN - ZONE 1
117 ET100 BASEMENT TELEPHONE/PAGING/DATA PLAN - ZONE 1
118 ET101 BASEMENT TELEPHONE/PAGING/DAT PLAN - ZONE 2
119 ET102 FIRST FLOOR TELEPHONE/PAGING/DATA PLAN - ZONE 1
120 ET103 FIRST FLOOR TELEPHONE/PAGING/DATA PLAN - ZONE 2
121 ET104 PARTIAL 2ND, 3RD 4TH AND 5TH FLOOR
TELEPHONE/PAGING/DATA PLAN
Expanded Community Living 00 01 15 - 5
Center (CLC)
122 EY100 BASEMENT NURSE CALL/SECURITY/CLOCK PLAN - ZONE 1
123 EY101 FIRST FLOOR NURSE/SECURITY/CLOCK PLAN - ZONE 1
124 EY102 FIRST FLOOR NURSE/SECURITY/CLOCK PLAN - ZONE 2
125 EY103 FIFTH FLOOR NURSE CALL/SECURITY/CLOCK PLAN
126 FA100 BASEMENT FIRE ALARM PLAN - ZONE 1
127 FA101 BASEMENT FIRE ALARM PLAN - ZONE 2
128 FA102 FIRST FLOOR FIRE ALARM PLAN - ZONE 1
129 FA103 FIRST FLOOR FIRE ALARM PLAN - ZONE 2
130 EJ500 ELECTRICAL SCHEDULES
131 EJ501 ELECTRICAL SCHEDULES
132 EJ502 ELECTRICAL SCHEDULES
133 EK600 ELECTRICAL DETAILS
134 EK601 ELECTRICAL DETAILS
135 EK602 ELECTRICAL DETAILS
---END---
06-27-14
Expanded Community Living 00 31 32 - 1
SECTION 00 31 32
GEOTECHNICAL DATA
1. GENERAL
A. REQUIREMENTS INCLUDE
1. Contractor:
a. Verify data and existing conditions.
b. At Contractor's option, perform additional subsurface investigation at own expense.
c. Contractor shall furnish ALL labor, materials, equipment and services necessary or incidental to the completion of all work of this section, as shown on the drawings, herein specified, or otherwise required.
B. RELATED REQUIREMENTS
1. Specified Elsewhere:
a. 01 45 29 – Testing Laboratory Services
2. By Others: Architect/Engineer has caused borings to be made at the site by Coleman Engineering Company, 635 Circle Drive, Iron
Mountain, MI. Contact: Chris J. Rasmussen, PE, ph: 906-774-3440.
a. Soil boring location diagram and log are included within the evaluation immediately following this Section.
b. Soil boring data is included for information only. VA and the
Architect/Engineer do not guarantee the accuracy or validity of the data, nor do they assume any responsibility for the
Contractor's interpretation of the data.
C. SOIL BORING DATA
1. Exploration Findings Report:
a. A report of the exploration findings is identified as “Report of Geotechnical Investigation for Proposed Expanded Community
Living Center” and is included in the Project Manual immediately following this Section.
2. Quality Assurance:
a. The soils engineer warrants that the findings, recommendations, specifications, or professional advice contained herein have been promulgated after being prepared in accordance with generally accepted professional engineering practice in the fields of foundation engineering, soil mechanics and engineering geology. No other warranties are implied or expressed.
06-27-14
Expanded Community Living 00 31 32 - 2
b. The Contractor may examine the logs, boring logs and other subsurface data which may be issued or otherwise made available by the Architect. The Contractor must interpret such data according to his own judgment and acknowledge that he is not relying upon the same as totally describing the subsurface conditions which may be found to exist. The Contractor assumes all risks contingent upon the nature of the subsurface conditions actually encountered by him in performing the work covered by the Contract, even though such actual conditions may result in the Contractor performing more or less work than he originally anticipated. In bidding, the Contractor may use soil borings, additional information from soil consultants, or he may make additional borings which he may deem necessary for accurate bidding. Approved Change Orders to the contract will be considered for existing soil conditions which require over excavation (and new structural fill) to remove unstable subsurface “fill” materials below areas of new building foundations and floor slabs; at locations which are not reasonably discernible from the contract documents, site visitation, and subsurface exploration report. In no case will extra amounts over and above the Contract be allowed for removing or adding top soil and organic matter or for making additional borings.
--END---
REPORT OF GEOTECHNICAL INVESTIGATION
FOR
PROPOSED EXPANDED COMMUNITY LIVING CENTER
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MICHIGAN
NOVEMBER, 2016
CEC PROJECT #GD-16283
Coleman Engineering
Civil Engineering ● Environmental Engineering
Geotechnical Engineering ● Land Surveying ● Test Drilling Construction Quality Control ● Materials Laboratory Testing
REPORT OF GEOTECHNICAL INVESTIGATION
FOR
PROPOSED EXPANDED COMMUNITY LIVING CENTER
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MICHIGAN
NOVEMBER, 2016
CEC PROJECT #GD-16283
Prepared By:
COLEMAN ENGINEERING COMPANY
635 Circle Drive Iron Mountain, Michigan 49801
TABLE OF CONTENTS
PAGE #
I. INTRODUCTION
II. FIELD PROCEDURES
III. LABORATORY PROCEDURES
IV. SITE CONDITIONS
V. ANALYSIS AND RECOMMENDATIONS
Site Preparation and Grading
Foundations
Floor Slabs
Below Grade Walls
Underground Utility Construction
Exterior Concrete Flatwork
Inspection and Testing
Construction Considerations
VI. LIMITATIONS OF SUBSURFACE EXPLORATION
APPENDICES
A. LOCATION DRAWINGS
- Project Location Map
- Soil Boring Location Map
B. CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
(UNIFIED SOIL CLASSIFICATION SYSTEM)
C. SOIL EXPLORATION-GENERAL NOTES AND LEGEND
D. BORING LOGS
Coleman Engineering Company 1 Report of Geotechnical Investigation Proposed Expanded Community Center Living Center Iron Mountain, Michigan November, 2016
I. INTRODUCTION
The Oscar G. Johnson VA Medical Center is proposing to expand the Community Living Center (CLC) at the northeast corner of the existing facility located in Iron Mountain, Michigan. The project, as described, will have a footprint of approximately 10,000 square feet. The CLC will be a single story slab on grade structure with partial basement. The basement is limited to mechanical rooms and pipe tunnels. We assume wall loads will not exceed about 5 kips per linear foot with column loads not exceeding about 100 kips.
The purpose of this report is to document the results of the field investigation and to provide recommendations/guidance for soil bearing capacity, settlement mitigation, groundwater management, earthwork quality assurance/quality control (QA/QC) and other geotechnical considerations.
II. FIELD PROCEDURES
The site of the proposed building was evaluated with three (3) soil borings designated as Borings B-1 through B-3. This report also considered Soil Boring B-2-04, completed during a previous investigation for the Nursing Home Care Unit expansion (CEC Report Number 04164).
Boring B-2-04 is located at the southernmost corner of the newly proposed CLC expansion. Borings were advanced with a Diedrich D-50 all-terrain mounted drill unit present on-site on November 14, 2016 and a CME 55 Truck mounted drill unit present on site May 24, 2004. Drilling was performed using 3 ¼ inch and 4 ½ inch hollow shaft augers (HSA).
The HSA act as a continuously-advancing steel casing that prevents the borehole walls from collapsing in above the depths to be tested/sampled. Sampling tools are lowered inside the augers for testing into undisturbed soils ahead of the tip of the augers.
Drilling and field sampling were performed in accordance with ASTM D-1586, "Penetration Test and Split Barrel Sampling of Soils" with a 2-inch O.D. split spoon. Thirty-seven (37) such samples were obtained.
A field log was prepared for each boring during exploration which contained the work method, standard penetration test (SPT) data, samples recovered and the indication of the presence of various soil types/conditions. The field logs were submitted to Coleman Engineering Company’s (CEC’s) Iron Mountain laboratory along with the soil samples for evaluation of the subsurface information and preparation of the final boring logs.
Coleman Engineering Company 2 Report of Geotechnical Investigation
Iron Mountain, Michigan November, 2016
The boring locations and elevations were selected and established in the field by CEC. The project/boring location drawings are presented in Appendix A.
III. LABORATORY PROCEDURES
All soil samples collected were visually classified in accordance with ASTM D-2488, “Description and Identification of Soils” (Visual-Manual Procedure). Because of the relative uniformity and density of the subsurface conditions encountered and extensive past experience with local subsurface conditions, additional laboratory testing was deemed unnecessary.
The final logs contain both factual and interpretive information. It should be emphasized that the recommendations are based only on the final boring logs. On the final logs, horizontal lines designating the interface between differing materials encountered represent approximate boundaries.
The transition between soil strata is typically gradual.
IV. SITE CONDITIONS
Topographically the site slopes down to the northwest with elevations at Borings SB-1, SB-2 and SB-3 ranging from +1141.0 to +1144.7.
Surficially, Borings SB-1 and SB-2 disclosed 8 to 9 inches of topsoil. Boring SB-3 drilled within the limits of the existing parking lot disclose a pavement section of 3 inches of Hot Mix Asphalt (HMA) over 5 inches of aggregate base. Borings SB-2 and SB-3 disclosed up to 7 feet of fill or possible fill.
Fill was described as possible fill is the soil was not readily identifiable as fill or native soil. Native soils disclosed in the soil borings consisted of loose to dense poorly graded sand (SP), silty sand (SM) and sandy gravel (GP-GM). The sand contained varying amounts of gravel with cobbles and boulders being noted while drilling.
Groundwater was not observed in the borings. Groundwater levels may fluctuate several feet seasonally, owing to rainfall, snowmelt, surface runoff, and other factors.
V. ANALYSIS AND RECOMMENDATIONS
Our analysis and recommendations related to the geotechnical aspects of the proposed project include:
Coleman Engineering Company 3 Report of Geotechnical Investigation
Iron Mountain, Michigan November, 2016
Site Preparation and Grading
We recommend that the topsoil, uncontrolled fill and deleterious materials be stripped/excavated from within the building footprint, appurtenances, pavements, and sidewalks. We anticipate that the sidewalls of excavations to depths greater than 4 feet below surrounding grades will cave to 1 vertical to 1.5 horizontal or flatter. Excavation should anticipate sufficient cutback of excavation slopes to accommodate the foundation and below grade wall construction. Excavation spoil, heavy equipment and any type of vibrating machinery should not be permitted within a lateral distance from the top of the excavation to 0.5 times the depth of the excavation. Excavation safety is the excavation contractor's responsibility.
The native subgrade exposed after stripping is recommended to be compacted to a minimum of ninety percent (90%) of modified Proctor maximum dry density prior to commencing any site grading and filling operations.
The on-site soil classified as SP, SP-SM or GP-GM is suitable for reuse as general site grading and fill. A qualified geotechnical consultant should be consulted to identify appropriate on-site soil.
Placement of native site soil should accommodate removing oversize cobbles and boulders to limit the maximum rock size of about 4 inches. Fill shall be placed in lifts not exceeding about 12 inches in loose thickness compacted to a minimum of ninety-five percent (95%) of modified Proctor (ASTM D-1557) maximum dry density.
Engineered fill is recommended to supplement any volume of soil brought to the site to supplement fill quantities. Engineered fill should consist of sand and/or gravel with less than about 10 percent by weight of fines passing the No. 200 sieve with a maximum rock size of about 4 inches. A soil meeting Michigan Department of Transportation (MDOT) Class II or IIA would be acceptable for use as engineered fill. Engineered fill should be placed in lifts not exceeding about 12 inches in loose thickness compacted as recommended above.
Site soils classified as silty sand (SM) contain appreciable amounts of silt which may become sensitive to high moisture making compaction difficult. Precautions to protect stockpiled soils from periods of wet weather and/or drying overly moist soils may become necessary to effectively place and compact soils for general site fill.
The silty sand (SM) is highly sensitive to rubber tire construction traffic and may become unstable during periods of wet weather. If this is the case, we recommend eliminating all rubber tire traffic from the surface of exposed subgrade. Construction traffic should be limited to low ground contact pressure tracked equipment.
Coleman Engineering Company 4 Report of Geotechnical Investigation
Iron Mountain, Michigan November, 2016
Foundations
We recommend that the proposed building be supported on conventional spread footings founded on compacted native soil or engineered fill. Footings so supported can be proportioned for a net allowable soil bearing pressure of up to 3,000 psf. The net allowable soil bearing pressure refers to that pressure in excess of the final overburden pressure. The recommended net allowable bearing pressure can be increased by one-third for short-term transient type live loadings. For the recommended design soil bearing pressure, we estimate a total settlement of less than 1-inch for column footings and for a 25-foot span of continuous wall footing. Differential settlement is expected to approach fifty to seventy-five percent (50% -75%) of the total settlement for similarly sized and loaded footings.
In the event that unstable soils are encountered at foundation depth, it may be necessary to sub-cut these soils 1 to 3 feet (depth to be determined by field observation) and replaced with engineered fill as previously defined or open graded stone (MDOT 6A or similar) completely enveloped in geotextile (Mirafi 140N or similar) in order to provide a stable work surface.
All perimeter footings should extend to a minimum depth of 42 inches or below frost depth, as defined by local building codes/practice. All isolated exterior footings should extend to a minimum depth of 60 inches or below frost depth, as defined by local building codes/practice. Interior footings in heated areas can be located immediately below the floor slab. All column footings should have a minimum width of 30 inches; all continuous wall footings should have a minimum width of 16 inches. An adequate thickness of insulation on the inside face of all footing/foundation walls exposed to cold weather frost penetration through the outside wall face is recommended.
Floor Slabs
Earth supported interior floors are recommended to be constructed on compacted native soils or engineered fill. It is further recommended that a minimum of 6 inches of base course be located immediately beneath the floor slab. The base course should consist of 6 inches of coarse aggregate base (MDOT 22A or similar). The base course should be separated from the base of the slab by means of an appropriate vapor barrier (Visqueen or similar). If the structure cannot accommodate curling or shrinkage of the floor, industry standards often recommend burying the vapor barrier beneath a layer of free draining sand. However, we would caution that this practice risks trapping water between the slab and vapor barrier. We recommend contacting the floor coverings manufacturer regarding the placement and type of vapor barrier. Earth-supported floor slabs should be designed for the loads to be imposed upon the space. If required, earth supported floor slabs can be designed using a modulus of subgrade reaction of 225 pounds per cubic inch.
Coleman Engineering Company 5 Report of Geotechnical Investigation
Iron Mountain, Michigan
Below Grade Walls
We recommend that the below grade walls be designed to resist lateral earth pressures. For the engineered fill specified below, we recommend using an equivalent at-rest pressure of 50 pounds per square foot per foot (psf/ft) of depth accompanied by appropriate drainage as described below.
The earth pressures will be resisted by the floor slab by passive pressure against the sides of the footings and friction between the bottoms of the footing subgrade. It is our opinion that an allowable equivalent passive fluid pressure of 300 psf/ft and allowable friction coefficient of 0.4 can be used to calculate resisting forces. These values include a factor of safety of about one and one-half.
Backfill within 5 lateral feet of the back of the wall should consist of engineered fill as previously defined. The backfill should be compacted to a minimum of ninety percent (90%) of modified Proctor maximum dry density. Care should be taken not to damage the wall during compaction.
Relatively light manually-propelled compactors should be used within 5 feet of the walls.
Compactors used beyond 5 feet should be limited in weight to 3,000 pounds.
A minimum 4-inch diameter perforated flexible drainage pipe (ADS green stripe or similar) should be located behind, parallel to, and at the base of the below grade wall foundations. The pipe should be embedded in open graded aggregate (MDOT 6A or similar) completely enveloped with filter fabric (Mirafi® 140N or similar) to prevent migration of fine soil particles into the open graded material. The pipe should be routed to an appropriate gravity drain or a sump and pump. External loads on below grade walls have not been taken into account in our recommendations. Surcharge loads imposed by vehicle parking, construction equipment and material storage should be considered during structural design.
Underground Utility Construction
The borings indicate that generally firm subgrades will likely be encountered at invert elevations. In the event that unstable soils are encountered, it may be necessary to sub-cut these soils 1 to 3 feet (depth to be determined by field observation) and replace them with engineered fill in order to provide a stable work surface.
Below structures and pavements all trench backfill should be compacted to a minimum of ninety-five percent (95%) of modified Proctor maximum dry density. Trench backfill in green areas should be compacted to a minimum of ninety percent (90%) of modified proctor dry density. Trench backfill should be placed in lifts not exceeding about 12 inches in loose thickness. Excavated soils are
Coleman Engineering Company 6 Report of Geotechnical Investigation
Iron Mountain, Michigan November, 2016 recommended for trench backfill above the pipe bedding material if they are at or can be brought, with reasonable effort, to the moisture content optimum for compaction as defined by the modified Proctor test (ASTM D-1557). If this is not the case, we recommend that all excavations be backfilled with a soil recommended by a geotechnical engineer familiar with site subsurface conditions. Backfill to at least 12 inches above the pipe crown (pipe bedding) should consist of engineered fill.
Chunks of frozen soil, organics, rock particles larger than about 4 inches and other deleterious materials should not be permitted in trench backfill material. All utility pipes that could be negatively impacted by freezing should be located below frost depth. Frost depth in road areas is expected to be greater than in off-road areas. Trench spoil, heavy equipment and any type of vibrating machinery should not be permitted within a lateral distance from the top of the trench/excavation equal to 0.5 times the depth of the trench/excavation.
Caving of trench sidewalls and soils at the site should be expected to occur at any depth and without warning. All utility trenches should be cut back or braced as required to provide safe trench working conditions. Trench safety is the responsibility of the utility contractor.
Exterior Concrete Flatwork
We recommend that exterior concrete flatwork be supported on a minimum of 12 inches of engineered backfill over a firm subgrade compacted to a minimum of ninety-five percent (95%) of modified Proctor (ASTM D-1557) maximum dry density.
Exterior concrete should be pitched to drain away from the building. Any concrete flatwork that abuts entrances should either be supported on frost depth foundations or sufficiently depressed to prevent any frost heave from negatively impacting door openings.
Inspection and Testing
A qualified testing laboratory should be retained throughout the course of earthwork operations for testing and documentation of compliance with the recommendations of this report and related project specifications.
Coleman Engineering Company 7 Report of Geotechnical Investigation
Iron Mountain, Michigan
As a guide, the following compaction testing schedule is recommended:
Area or Material To Be Tested
Recommended Minimum Testing Frequency
Native Subgrades 1 test per 2,500 sq. ft.
Building Area Fill 1 test per 2,500 sq. ft. per lift
Parking Area Fill 1 test per 5,000 sq. ft. per lift
Column Footings 1-4 tests per footing depending on footing size
Wall Footings 1 test per 25 lineal feet
Utility Trenches 1 test per 50 lineal feet per lift
Construction Considerations
We anticipate that the sidewalls of excavations to depths greater than 4 feet below surrounding grades will cave to 1 vertical to 1.5 horizontal or flatter. Excavation spoil, heavy equipment and any type of vibrating machinery should not be permitted within a lateral distance from the top of the excavation to 0.5 times the depth of the excavation. Excavation safety is the excavation contractor's responsibility.
During construction, adequate provision should be made for proper drainage, so as to prevent erosion and possible damage to this site and adjacent property. Temporary cut slopes during construction should not exceed about 2:1. Post-construction finished slopes should not exceed about 3:1.
The on-site silty sand is highly moisture sensitive. If these soils become saturated, they will require discing and drying to achieve the required moisture for compaction. Care should be exercised during construction to grade site fill to drain in the event of prolonged wet weather and to prevent water from saturating moisture sensitive soils. In addition, if the soils are in a dry condition, they will require moisture conditioning to achieve the specified compaction.
The soils at this site may become unstable under construction traffic wheel loads during periods of wet weather. Should this become the case, the unstable areas should be undercut as necessary and replaced with engineered fill to create a stable working surface for both construction traffic and staging areas.
In the event construction takes place during freezing conditions, precautions should be taken to prevent frost from penetrating below exposed foundations. Exposed subgrade should be free of frost prior to placement of fill. Engineered fill containing ice chunks or frozen soil should not be incorporated in an engineered fill.
APPENDIX A
LOCATION DRAWINGS
Project Location Map Soil Boring Location Map
FO
FO
T T
T
T T T
11451144
MULCH AREA
MULCH AREA
CONC.
CONC.
CONC.
SW
Y = 376367.822 X = 25975764.240
PARKING LOT
(ASPHALT)
SAN SAN SANE
E
E
E
W
W
W
WWW
SB-1
B-2-04
SB-2
SB-3
OSCAR G. JOHNSON V.A. MEDICAL CENTER
SOIL BORING LOCATION MAP
BERNERS-SCHOBER ASSOCIATES
W E
S
N
( IN FEET )
GRAPHIC SCALE
IRON MOUNTAIN, MI
EXPANDED COMMUNITY LIVING CENTER
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE • IRON MOUNTAIN , MI 49801 • PHONE: 906-774-3440
200 EAST AYER STREET • IRONWOOD , MI • P HONE: 906-932-5048
EXPANDED COMMUNITY LIVING CENTER
APPENDIX B
CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
(UNIFIED SOIL CLASSIFICATION SYSTEM)
COLEMAN ENGINEERING COMPANY
635 Circle Drive
Iron Mountain, Michigan 49801
CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
ASTM Designation: D-2487 – 83
(Based on Unified Soil Classification System)
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group Group NameB Symbol
Coarse-Grained Soils More than 50 % retained on No. 200 sieve
Gravels More than 50 % of coarse fraction retained on No. 4 sieve
Clean Gravels Less than 5 % finesC
Cu > 4 and 1 < Cc < 3 E GW Well-graded gravel F
Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Gravels with Fines more than 12 % finesC
Fines classify as ML or MH GM Silty gravelF.G.H.
Fines classify as CL or CH GC Clayey gravelF.G.H.
Sands 50 % or more of coarse fraction passes No. 4 sieve
Clean Sands Less than 5 % finesD
Cu > 6 and 1 < Cc < 3E SW Well-graded sand
Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sand l
Sands with Fines More than 12 % finesD
Fines classify as ML or MH SM Silty sandG.H.J.
Fines classify as CL or CH SC Clayey sandG.H.I.
Fine-Grained Soils 50 % or more passes the No. 200 sieve
Silts and Clays Liquid limit less than 50 inorganic Pl > 7 and plots on or above “A” lineJ CL Lean clayK.L.M.
Pl < 4 or plots below “A” lineJ ML SiltK.L.M.
organic Liquid limit – oven dried < 0.75 OL Organic clayK.L.M.N.
Liquid limit – not dried Organic siltK.L.M.O.
Silts and Clays Liquid limit 50 or more inorganic Pl plots on or above “A” line CH Fat clayK.L.M.
Pl plots below “A” line MH Elastic siltK.L.M.
organic Liquid limit – oven dried < 0.75 OH Organic clayK.L.M.P.
Liquid limit – not dried Organic siltK.L.M.Q.
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve.
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12 % fines require dual symbols:
GW-GM well-graded gravel with silt GW-GC well-graded gravel with clay GP-GM poorly graded gravel with silt GP-GC poorly graded gravel with clay D Sands with 5 to 12 % fines require dual symbols:
SW-SM well-graded sand with silt SW-SC well-graded sand with clay SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay
E Cu = D60/D10 (D30)2 L If soil contains > 30 % plus No. 200, predominantly sand, add “sandy” to group name.
M If soil contains > 30 % plus No. 200, predominately gravel, add “gravelly” to group name.
N Pl > 4 and plots on or above “A” line.
O Pl < 4 or plots below “A” line.
P Pl plots on or above “A” line.
Q Pl plots below “A” line.
D10 x D60 F If soils contains > 15 % sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains > 15 % gravel, add “with gravel” to group name.
J If Atterberg limits plot in hatched area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29 % plus No. 200, add “with sand” or “with gravel”, whichever is predominant.
APPENDIX C
SOIL EXPLORATION-GENERAL NOTES AND LEGEND
APPENDIX D
BORING LOGS
0.9
1.0
1.5
1.3
1.3
0.8
2-4-9
3-4-16
7-9-9
19-17-10
11-17-25
11-20-27
(13)
(20)
(18)
(27)
(42)
(47)
TOPSOIL
0.7' (SM) SILTY SAND, brown, fine to coarse, gravelly, moist, medium dense
...grayish brown, dense
(Alluvial) +/-18.0' (SP) POORLY GRADED SAND, light brown, fine to coarse, trace silt, trace gravel, moist, medium dense
4-1/4" Hollow Stem Auger 0.0' to 30.0' 2" SPT Sampling 140# wt., 30" drop Auto Hammer
Driller's note: Cobbles and/or boulders 8.0' to 8.5'
Driller's note: Hard drilling from 12.0' to 15.0'
Driller's note: Hard drilling from 17.0' to 18.0'
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-1
HOLE CLOSURE:
CLIENT:
Proposed building corner #610, boring on staked location
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1141.45 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1141.4
1136.4
1131.4
1126.4
1121.4
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-1
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E R
Oscar G. Johnson V.A. Medical Center - Expanded Community Living Center
1.4
1-5-7
7-9-8
3-6-7
(12)
(17)
(13)
(SP) POORLY GRADED SAND, light brown, fine to coarse, trace silt, trace gravel, moist, medium dense
...fine to medium
(Alluvial) 31.5'
End of Boring
Driller's note: Pushed 3" spoon at 25.0' to 26.5' for recovery. No recovery with 2" split spoon.
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-1
HOLE CLOSURE:
CLIENT:
Proposed building corner #610, boring on staked location
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1141.45 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1121.4
1116.4
1111.4
1106.4
1101.4
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-1
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
0.7
1.1
0.7
0.8
0.8
0.8
2-2-3
5-7-9
3-3-4
4-5-7
8-10-11
5-5-7
(5)
(16)
(7)
(12)
(21)
(12)
TOPSOIL
0.7' (FILL) SILTY SAND, dark brown, fine to coarse, gravelly, trace topsoil, moist
...trace pieces of partially decomposed wood
...some lumps of topsoil +/-7.0'
(SP) POORLY GRADED SAND, brown, fine to coarse, gravelly, trace silt, moist, medium dense
(Alluvial) +/-9.5' (GP-GM) SANDY GRAVEL, brown, fine to coarse, angular to subangular, some silt, moist, medium dense
(Alluvial) +/-18.0' (SP) POORLY GRADED SAND, light brown, fine to medium, trace silt, moist, loose
4-1/4" Hollow Stem Auger 0.0' to 30.0' 2" SPT Sampling 140# wt., 30" drop Auto Hammer
Driller's note: Cobbles and/or boulders 2.0' to 4.0'
Driller's note: Cobbles and/or boulders 7.0' to 8.0'
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-2
HOLE CLOSURE:
CLIENT:
15' S of boring stake, proposed building #609
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1141.02 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1141.0
1136.0
1131.0
1126.0
1121.0
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-2
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
1.5
1.5
2-3-6
5-9-11
3-5-7
(9)
(20)
(12)
(SP) POORLY GRADED SAND, light brown, fine to medium, trace silt, moist, loose
(Alluvial) 31.5'
End of Boring
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-2
HOLE CLOSURE:
CLIENT:
15' S of boring stake, proposed building #609
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1141.02 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1121.0
1116.0
1111.0
1106.0
1101.0
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-2
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
1.1
1.1
1.3
0.8
1.0
5-6-9
8-13-12
8-11-15
6-15-16
3-7-9
6-13-18
(15)
(25)
(26)
(31)
(16)
(31)
ASPHALT
0.25'
BASE COURSE
0.67'
(POSSIBLE FILL) SILTY SAND, brown, fine to coarse, with gravel, moist
+/-4.5' (SM) GRAVELLY SILTY SAND, brown, fine to coarse, with gravel, moist, dense
...with gravel
...gravelly, medium dense
...dense
4-1/4" Hollow Stem Auger 0.0' to 30.0' 2" SPT Sampling 140# wt., 30" drop Auto Hammer
Driller's note: Cobbles and/or boulders 2.0' to 4.5'
Driller's note: Cobbles and/or boulders 6.5' to 7.0'
Driller's note: Cobbles and/or boulders 9.0' to 10.0'
Driller's note: Cobbles and/or boulders 14.5' to 15.0'
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-3
HOLE CLOSURE:
CLIENT:
On edge of asphalt as marked
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1144.74 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1144.7
1139.7
1134.7
1129.7
1124.7
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-3
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
0.7
1.5
10-19-25
4-4-5
3-4-6
(44)
(9)
(10)
(SP) POORLY GRADED SAND, light brown, fine to medium, trace silt, moist, loose
(Alluvial) +/-23.0' (SP) POORLY GRADED SAND, light brown, fine to medium, trace silt, moist, loose
(Alluvial) 31.5'
End of Boring
DRILLING METHOD:
D. Edlebeck hours
(tsf)
31.5BORING DEPTH:
JOB NO.:
SB-3
HOLE CLOSURE:
CLIENT:
On edge of asphalt as marked
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
16283.GPJ
BORING NO.:
+4
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/21/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Soil Cuttings
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1144.74 +/-ELEV.:
11/14/16 11/14/16 qa qu
BORING LOCATION:
1124.7
1119.7
1114.7
1109.7
1104.7
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
SB-3
R. Ochs / M. Gotham
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
4-1/4" Hollow Stem Auger
M O
IS
T
U R
E
-200
Berners-Schober Associates
L E
G E
N D
-3SS-3" Split Spoon
Diedrich D-50 ATV
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
0.2
1.3
1.5
1.5
1.2
1.2
1.0
1.2
50+ - -
20 15 10
25 22 17
18 10 5
8 8 9
8 12 9
10 12 14
27 25 16
(25)
(39)
(15)
(17)
(21)
(26)
Topsoil 0.8'
(SP-SM) SAND, brown, fine to coarse, some silt, some fine gravel, moist, medium dense to dense
6.5' ±
(SM) SILTY SAND, brown, fine to medium, trace of fine gravel, irregular small inclusion of black organic matter, wet, medium dense
9.0' ±
(SP-SM) SAND, brown, fine to coarse, some silt, with fine gravel, moist, medium dense
3-1/4" HSA
2" SPT Sampling 40 # weight, 30" Drop
Driller's Note:
Cobbles and/or boulders from 1.0' to 2.0' and 8.0' to 9.0'
DRILLING METHOD:
W. Rice hours
(tsf)
31.0BORING DEPTH:
JOB NO.:
B-2-04
HOLE CLOSURE:
CLIENT:
Refer to Boring Location Drawing
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
04164.GPJ
BORING NO.:
+4
N/A
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/15/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Backfilled with Natural Material
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1145.33 +/-ELEV.:
5/24/04 5/24/04 qa qu
BORING LOCATION:
1145.3
1140.3
1135.3
1130.3
1125.3
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
B-2-04
K. Frome / C. Chiaverotti
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
3-1/4" HSA
M O
IS
T
U R
E
-200
Hammel, Green and Abrahamson, Inc.
N/A
N/AN/A
L E
G E
N D
-3SS-3" Split Spoon
CME 55 Truck Rig
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
V.A. Medical Center - Nursing Home Care Unit, Iron Mountain, MI
1.5
1.2
15 13 12
3 8 12
(41)
(25)
(20)
...dense
23.0' ±
(SP) SAND, brown, fine to medium, moist, medium dense
31.0'
End of Boring
DRILLING METHOD:
W. Rice hours
(tsf)
31.0BORING DEPTH:
JOB NO.:
B-2-04
HOLE CLOSURE:
CLIENT:
Refer to Boring Location Drawing
-3ST-3" Shelby Tube
(tsf) -4
-2ST-2" Shelby Tube
BORING NO.:
COMMENTS
04164.GPJ
BORING NO.:
+4
N/A
W A
T E
R T
A B
L E
OF
DRILL CREW:
11/15/16
-2SS-2" Split Spoon
RIG TYPE:
DATE COMPLETED:
-AS-Auger Sample while drilling
Backfilled with Natural Material
-PS-Piston Tube
D E
P T
H
F T
R E
C O
V E
R Y
SOIL DESCRIPTION
1145.33 +/-ELEV.:
5/24/04 5/24/04 qa qu
BORING LOCATION:
1125.3
1120.3
1115.3
1110.3
1105.3
B L
O W
S /6
N
TEST RESULTS
S P
T V
A L
U E
S
E L
E V
(F
T after
-RC-Rock-Core
SAMPLE
REVIEWED BY:
B-2-04
K. Frome / C. Chiaverotti
DATE STARTED:
Telephone: (906)-774-3440 Fax: (906)-774-7776
COLEMAN ENGINEERING COMPANY
635 CIRCLE DRIVE
IRON MOUNTAIN, MICHIGAN 49801
TLL
PL
C O
N T
E N
T
DATE:
PROJECT:
3-1/4" HSA
M O
IS
T
U R
E
-200
Hammel, Green and Abrahamson, Inc.
N/A
N/AN/A
L E
G E
N D
-3SS-3" Split Spoon
CME 55 Truck Rig
(tsf)
-BS-Bag Sample after drilling
-GS-Grab Sample
N U
M B
E
V.A. Medical Center - Nursing Home Care Unit, Iron Mountain, MI
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish all labor, superintendence, materials, tools, equipment, transportation, licenses, certifications, insurance, temporary protection, and other items designated under the provisions of this contract: Expand CLC - Project 585-335 at the Oscar G.
Johnson VA Medical Center, Iron Mountain, MI. The project includes an addition of 11,000 square feet to the northwest corner of the existing CLC, renovation of approximately 3,900 square feet of existing space on the first…