- 695-15-116: Replace 3 Boilers Building 112, Milwaukee Federal contract opportunity
- Solicitation number
- 36C25218B0230
About this file
36C25218B0230 00002 S06 - A00002 - Amended Specification Section 23 05 12.pdf
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clement J. Zablocki VA Medical Center
Milwaukee, Wisconsin 53295
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-1 10/13/2015
SECTION 23 05 12
GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies the furnishing, installation and connection of motors for HVAC and steam generation equipment.
1.2 RELATED WORK:
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and SAMPLES.
B. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM
GENERATION.
C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
D Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.
E. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
F. Section 26 24 19, MOTOR-CONTROL CENTERS.
G. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS.
1.3 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and SAMPLES, and Section 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS.
B. Shop Drawings:
1. Provide documentation to demonstrate compliance with drawings and specifications.
2. Include electrical ratings, efficiency, bearing data, power factor, frame size, dimensions, mounting details, materials, horsepower, voltage, phase, speed (RPM), enclosure, starting characteristics, torque characteristics, code letter, full load and locked rotor current, service factor, and lubrication method.
C. Manuals:
1. Submit simultaneously with the shop drawings, companion copies of complete installation, maintenance and operating manuals, including technical data sheets and application data.
D. Certification: Two weeks prior to final inspection, unless otherwise noted, submit four copies of the following certification to the COR:
VHAMIWOsgooM Text Box Amendment #2
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-2 10/13/2015
1. Certification that the motors have been applied, installed, adjusted, lubricated, and tested according to manufacturer published recommendations.
E. Completed System Readiness Checklists provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS.
1.4 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Electrical Manufacturers Association (NEMA):
MG 1-2006 Rev. 1 2009 ..Motors and Generators
MG 2–2001 Rev. 1 2007...Safety Standard for Construction and Guide for
Selection, Installation and Use of Electric
Motors and Generators
C. National Fire Protection Association (NFPA):
70-2008.................National Electrical Code (NEC)
D. Institute of Electrical and Electronics Engineers (IEEE):
112-04..................Standard Test Procedure for Polyphase Induction
Motors and Generators
E. American Society of Heating, Refrigerating and Air-Conditioning
Engineers (ASHRAE):
90.1-2007...............Energy Standard for Buildings Except Low-Rise
Residential Buildings
PART 2 - PRODUCTS
2.1 MOTORS:
A. For alternating current, fractional and integral horsepower motors, NEMA Publications MG 1 and MG 2 shall apply.
B. All material and equipment furnished and installation methods shall conform to the requirements of Section 26 29 11, LOW-VOLTAGE MOTOR
STARTERS. Provide all electrical wiring, conduit, and devices necessary for the proper connection, protection and operation of the systems.
VHAMIWOsgooM
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-3 10/13/2015
Provide premium efficiency type motors as scheduled. Unless otherwise specified for a particular application, use electric motors with the following requirements.
C. Single-phase Motors: Motors for centrifugal fans and pumps may be split phase or permanent split capacitor (PSC) type. Provide capacitor-start type for hard starting applications.
D. Poly-phase Motors: NEMA Design B, Squirrel cage, induction type.
1. Two Speed Motors: Each two-speed motor shall have two separate windings. Provide a time- delay (20 seconds minimum) relay for switching from high to low speed.
E. Voltage ratings shall be as follows:
1. Single phase:
a. Motors connected to 120-volt systems: 115 volts.
2. Three phase:
a. Motors connected to 208-volt systems: 200 volts.
b. Motors, less than 100 HP, 480 volt systems: 208-230/460 volts, dual connection.
F. Number of phases shall be as follows:
1. Motors, less than 1/2 HP: Single phase.
2. Motors, 1/2 HP and larger: 3 phase.
3. Exceptions:
a. Hermetically sealed motors.
b. Motors for equipment assemblies, less than one HP, may be single phase provided the manufacturer of the proposed assemblies cannot supply the assemblies with three phase motors.
G. Motors shall be designed for operating the connected loads continuously in a 104°F environment, where the motors are installed, without exceeding the NEMA standard temperature rises for the motor insulation.
If the motors exceed 104°F, the motors shall be rated for the actual ambient temperatures.
H. Motor designs, as indicated by the NEMA code letters, shall be coordinated with the connected loads to assure adequate starting and running torque.
VHAMIWOsgooM
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-4 10/13/2015
I. Motor Enclosures:
1. Shall be the NEMA types as specified and/or shown on the drawings.
2. Where the types of motor enclosures are not shown on the drawings, they shall be the NEMA types, which are most suitable for the environmental conditions where the motors are being installed.
Enclosure requirements for certain conditions are as follows:
a. Motors located outdoors, indoors in wet or high humidity locations, or in unfiltered airstreams shall be totally enclosed type.
b. Where motors are located in an NEC 511 classified area, provide
TEFC explosion proof motor enclosures.
c. Where motors are located in a corrosive environment, provide TEFC enclosures with corrosion resistant finish.
3. Enclosures shall be primed and finish coated at the factory with manufacturer's prime coat and standard finish.
J. Special Requirements:
1. Where motor power requirements of equipment furnished deviate from power shown on plans, provide electrical service designed under the requirements of NFPA 70 without additional time or cost to the
Government.
2. Assemblies of motors, starters, controls and interlocks on factory assembled and wired devices shall be in accordance with the requirements of this specification.
3. Wire and cable materials specified in the electrical division of the specifications shall be modified as follows:
a. Wiring material located where temperatures can exceed 160 degrees
F shall be stranded copper with Teflon FEP insulation with jacket. This includes wiring on the boilers.
b. Other wiring at boilers and to control panels shall be NFPA 70 designation THWN.
c. Provide shielded conductors or wiring in separate conduits for all instrumentation and control systems where recommended by manufacturer of equipment.
VHAMIWOsgooM
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-5 10/13/2015
4. Select motor sizes so that the motors do not operate into the service factor at maximum required loads on the driven equipment.
Motors on pumps shall be sized for non-overloading at all points on the pump performance curves.
5. Motors utilized with variable frequency drives shall be rated
“inverter-duty” per NEMA Standard, MG1, Part 31.4.4.2. Provide motor shaft grounding apparatus that will protect bearings from damage from stray currents.
K. Additional requirements for specific motors, as indicated in the other sections listed in Article 1.2, shall also apply.
L. Energy-Efficient Motors (Motor Efficiencies): All permanently wired polyphase motors of 1 HP or more shall meet the minimum full-load efficiencies as indicated in the following table. Motors of 746 Watts or more with open drip-proof or totally enclosed fan-cooled enclosures shall be NEMA premium efficiency type, unless otherwise indicated.
Motors provided as an integral part of motor driven equipment are excluded from this requirement if a minimum seasonal or overall efficiency requirement is indicated for that equipment by the provisions of another section. Motors not specified as “premium efficiency” shall comply with the Energy Policy Act of 2005 (EPACT).
Minimum Premium Efficiencies
Open Drip-Proof
Minimum Premium Efficiencies
Totally Enclosed Fan-Cooled
Rating
HP
RPM
RPM
RPM
Rating
HP
RPM
RPM
RPM
1 82.5% 85.5% 77.0% 1 82.5% 85.5% 77.0%
1.5 86.5% 86.5% 84.0% 1.5 87.5% 86.5% 84.0%
2 87.5% 86.5% 85.5% 2 88.5% 86.5% 85.5%
3 88.5% 89.5% 85.5% 3 89.5% 89.5% 86.5%
5 89.5% 89.5% 86.5% 5 89.5% 89.5% 88.5%
7.5 90.2% 91.0% 88.5% 7.5 91.0% 91.7% 89.5%
10 91.7% 91.7% 89.5% 10 91.0% 91.7% 90.2%
15 91.7% 93.0% 90.2% 15 91.7% 92.4% 91.0%
VHAMIWOsgooM
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-6 10/13/2015
20 92.4% 93.0% 91.0% 20 91.7% 93.0% 91.0%
25 93.0% 93.6% 91.7% 25 93.0% 93.6% 91.7%
30 93.6% 94.1% 91.7% 30 93.0% 93.6% 91.7%
40 94.1% 94.1% 92.4% 40 94.1% 94.1% 92.4%
50 94.1% 94.5% 93.0% 50 94.1% 94.5% 93.0%
60 94.5% 95.0% 93.6% 60 94.5% 95.0% 93.6%
75 94.5% 95.0% 93.6% 75 94.5% 95.4% 93.6%
100 95.0% 95.4% 93.6% 100 95.0% 95.4% 94.1%
125 95.0% 95.4% 94.1% 125 95.0% 95.4% 95.0%
150 95.4% 95.8% 94.1% 150 95.8% 95.8% 95.0%
200 95.4% 95.8% 95.0% 200 95.8% 96.2% 95.4%
M. Minimum Power Factor at Full Load and Rated Voltage: 90 percent at 1200
RPM, 1800 RPM and 3600 RPM.
PART 3 - EXECUTION
3.1 INSTALLATION:
A. Install motors in accordance with manufacturer’s recommendations, the
NEC, NEMA, as shown on the drawings and/or as required by other sections of these specifications.
3.2 FIELD TESTS
A. Perform an electric insulation resistance Test using a megohmmeter on all motors after installation, before start-up. All shall test free from grounds.
B. Perform Load test in accordance with ANSI/IEEE 112, Test Method B, to determine freedom from electrical or mechanical defects and compliance with performance data.
C. Insulation Resistance: Not less than one-half meg-ohm between stator conductors and frame, to be determined at the time of final inspection.
D. All test data shall be complied into a report form for each motor and provided to the contracting officer or their representative.
3.3 STARTUP AND TESTING
A. The Commissioning Agent will observe startup and contractor testing of all equipment. Coordinate the startup and contractor testing schedules
VHAMIWOsgooM
Replace (3) Boilers Building 112
Bancroft Architects + Engineers
02-01-15
Contract No. VA69D-15-J-1908
Station Project No. 695-15-116
Bancroft-AE Project No. 14-101-06 23 05 12-7 10/13/2015 with COR and Commissioning Agent. Provide a minimum of 7 days prior notice.
3.4 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS for all inspection, start up, and contractor testing required above and required by the
System Readiness Checklist provided by the Commissioning Agent.
B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 –
COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.
3.5 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA personnel in operation and maintenance of units.
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.