695-15-116: Replace 3 Boilers Building 112, Milwaukee Federal contract opportunity
Solicitation number
36C25218B0230
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25218B0230 00002 S06 - A00002 - Amended Specification Section 02 82 11.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 695-15-116: Replace 3 Boilers Building 112, Milwaukee, newest first.
File Type Posted
36C25218C0142-000.docx DOCX document
36C25218B0230-00006000.docx DOCX document
36C25218B0230-00005000.docx DOCX document
36C25218B0230-00005002.pdf PDF
36C25218B0230-00005001.pdf PDF
36C25218B0230-00004001.pdf PDF
36C25218B0230-00004002.pdf PDF
36C25218B0230-00004000.docx DOCX document
36C25218B0230-00003001.pdf PDF
36C25218B0230-00003000.docx DOCX document
36C25218B0230-00002005.pdf PDF
36C25218B0230-00002006.pdf PDF
36C25218B0230-00002004.pdf PDF
36C25218B0230-00002008.pdf PDF
36C25218B0230-00002007.pdf PDF
36C25218B0230-00002000.docx DOCX document
36C25218B0230-00002009.pdf PDF
36C25218B0230-00002003.pdf PDF
36C25218B0230-00002001.pdf PDF
36C25218B0230-00002010.pdf PDF
36C25218B0230-00001002.pdf PDF
36C25218B0230-00001003.pdf PDF
36C25218B0230-00001005.pdf PDF
36C25218B0230-00001004.pdf PDF
36C25218B0230-00001001.pdf PDF
36C25218B0230-00001000.docx DOCX document
36C25218B0230-011.pdf PDF
36C25218B0230-001.docx DOCX document
36C25218B0230-017.pdf PDF
36C25218B0230-002.pdf PDF
36C25218B0230-007.pdf PDF
36C25218B0230-015.pdf PDF
36C25218B0230-005.pdf PDF
36C25218B0230-004.pdf PDF
36C25218B0230-014.pdf PDF
36C25218B0230-013.pdf PDF
36C25218B0230-006.pdf PDF
36C25218B0230-018.pdf PDF
36C25218B0230-003.pdf PDF
36C25218B0230-008.pdf PDF
36C25218B0230-016.pdf PDF
36C25218B0230-009.pdf PDF
36C25218B0230-012.pdf PDF
36C25218B0230-019.pdf PDF
36C25218B0230-010.pdf PDF
36C25218B0230-000.docx DOCX document
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clement J. Zablocki VA Medical Center

Milwaukee, Wisconsin 53295

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-i 10/13/2015

SECTION 02 82 11

TRADITIONAL ASBESTOS ABATEMENT

TABLE OF CONTENTS

PART 1 - GENERAL

1.1 SUMMARY OF THE WORK

1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS

1.1.2 EXTENT OF WORK

1.1.3 RELATED WORK

1.1.4 TASKS

1.1.5 CONTRACTORS USE OF PREMISES

1.2 VARIATIONS IN QUANTITY

1.3 STOP ASBESTOS REMOVAL

1.4 DEFINITIONS

1.4.1 GENERAL

1.4.2 GLOSSARY

1.4.3 REFERENCED STANDARDS ORGANIZATIONS

1.5 APPLICABLE CODES AND REGULATIONS

1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS

1.5.2 ASBESTOS ABATEMENT CONTRACTOR RESPONSIBILITY

1.5.3 FEDERAL REQUIREMENTS

1.5.4 STATE REQUIREMENTS

1.5.5 STANDARDS

1.5.6 EPA GUIDANCE DOCUMENTS

1.5.7 NOTICES

1.5.8 PERMITS/LICENSES

1.5.9 POSTING AND FILING OF REGULATIONS

1.5.10 VA RESPONSIBILITIES

1.5.11 SITE SECURITY

1.5.12 EMERGENCY ACTION PLAN AND ARRANGEMENTS

1.5.13 PRE-CONSTRUCTION MEETING

1.6 PROJECT COORDINATION

1.6.1 PERSONNEL

1.7 RESPIRATORY PROTECTION

1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM

1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR

VHAMIWOsgooM Text Box Amendment #2

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-ii 10/13/2015

1.7.3 SELECTION AND USE OF RESPIRATORS

1.7.4 MINIMUM RESPIRATORY PROTECTION

1.7.5 MEDICAL WRITTEN OPINION

1.7.6 RESPIRATOR FIT TEST

1.7.7 RESPIRATOR FIT CHECK

1.7.8 MAINTENANCE AND CARE OF RESPIRATORS

1.7.9 SUPPLIED AIR SYSTEMS

1.8 WORKER PROTECTION

1.8.1 TRAINING OF ABATEMENT PERSONNEL

1.8.2 MEDICAL EXAMINATIONS

1.8.3 PERSONAL PROTECTIVE EQUIPMENT

1.8.4 REGULATED AREA ENTRY PROCEDURE

1.8.5 DECONTAMINATION PROCEDURE – PAPR & APR

1.8.6 REGULATED AREA REQUIREMENTS

1.9 DECONTAMINATION FACILITIES

1.9.1 DESCRIPTION

1.9.2 GENERAL REQUIREMENTS

1.9.3 TEMPORARY FACILITIES TO THE PDF and W/EDF

1.9.4 PERSONNEL DECONTAMINATION FACILITY (PDF)

1.9.5 WASTE/EQUIPMENT DECONTAMINATION FACILITY (W/EDF)

1.9.6 WASTE/EQUIPMENT DECONTAMINATION PROCEDURES

PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT

2.1 MATERIALS AND EQUIPMENT

2.1.1 GENERAL REQUIREMENTS

2.1.2 NEGATIVE PRESSURE FILTRATION SYSTEM

2.1.3 DESIGN AND LAYOUT

2.1.4 NEGATIVE AIR MACHINES (HEPA UNITS)

2.1.5 PRESSURE DIFFERENTIAL

2.1.6 MONITORING

2.1.7 AUXILIARY GENERATOR

2.1.8 SUPPLEMENTAL MAKE-UP AIR INLETS

2.1.9 TESTING THE SYSTEM

2.1.10 DEMONSTRATION OF THE NEGATIVE AIR PRESSURE SYSTEM

2.1.11 USE OF SYSTEM DURING ABATEMENT OPERATIONS

2.1.12 DISMANTLING THE SYSTEM

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-iii 10/13/2015

2.1.13 AREAS OUTSIDE CONTAINMENT AREA

2.2 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA

2.2.1 GENERAL

2.2.2 PREPARATION PRIOR TO SEALING THE REGULATED AREA

2.2.3 CONTROLLING ACCESS TO THE REGULATED AREA

2.2.4 CRITICAL BARRIERS

2.2.5 PRIMARY BARRIERS

2.2.6 SECONDARY BARRIERS

2.2.7 EXTENSION OF THE REGULATED AREA

2.2.8 FIRESTOPPING

2.3 MONITORING, INSPECTION AND TESTING

2.3.1 GENERAL

2.3.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT

2.3.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH

2.4 STANDARD OPERATING PROCEDURES

2.5 SUBMITTALS

2.5.1 PRE-START MEETING SUBMITTALS

2.5.2 SUBMITTALS DURING ABATEMENT

2.5.3 SUBMITTALS AT COMPLETION OF ABATEMENT

2.6 ENCAPSULANTS

2.6.1 TYPES OF ENCAPSULANTS

2.6.2 PERFORMANCE REQUIREMENTS

2.6.3 CERTIFICATES OF COMPLIANCE

PART 3 - EXECUTION

3.1 PRE-ABATEMENT ACTIVITIES

3.1.1 PRE-ABATEMENT MEETING

3.1.2 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS

3.1.3 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS

3.2 REGULATED AREA PREPARATIONS

3.3 CONTAINMENT BARRIERS AND COVERINGS FOR THE REGULATED AREA GENERAL

3.4 REMOVAL OF ACM

3.4.1 WETTING ACM

3.4.2 SECONDARY BARRIER AND WALKWAYS

3.4.3 WET REMOVAL OF ACM

3.4.5 DISCOVERED MATERIALS

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-iv 10/13/2015

3.5 LOCKDOWN ENCAPSULATION

3.5.1 GENERAL

3.5.2 DELIVERY AND STORAGE

3.5.3 WORKER PROTECTION

3.5.4 ENCAPSULATION OF SCRATCH COAT PLASTER OR PIPING

3.5.5 SEALING EXPOSED EDGES

3.6 DISPOSAL OF ACM WASTE MATERIALS

3.6.1 GENERAL

3.6.2 PROCEDURES

3.7 PROJECT DECONTAMINATION

3.7.1 GENERAL

3.7.2 REGULATED AREA CLEARANCE

3.7.3 WORK DESCRIPTION

3.7.4 PRE-DECONTAMINATION CONDITIONS

3.7.5 FIRST CLEANING

3.7.6 PRE-CLEARANCE INSPECTION AND TESTING

3.7.7 LOCKDOWN ENCAPSULATION OF ABATED SURFACES

3.8 FINAL VISUAL INSPECTION AND AIR CLEARANCE TESTING

3.8.1 GENERAL

3.8.2 FINAL VISUAL INSPECTION

3.8.3 FINAL AIR CLEARANCE TESTING

3.8.4 FINAL AIR CLEARANCE PROCEDURES

3.8.5 CLEARANCE SAMPLING USING PCM – LESS THAN 260LF/160SF

3.8.6 CLEARANCE SAMPLING USING TEM – EQUAL TO OR MORE THAN 260LF/160SF

3.8.7 LABORATORY TESTING OF PCM CLEARANCE SAMPLES

3.8.8 LABORATORY TESTING OF TEM SAMPLES

3.8.9 AUTHORIZATION TO REMOVE ABATEMENT CONTAINMENT

3.9 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE

3.9.1 COMPLETION OF ABATEMENT WORK

3.9.2 CERTIFICATE OF COMPLETION BY CONTRACTOR

3.9.3 WORK SHIFTS

3.9.4 RE-INSULATION

3.9.5 REPLACEMENT OF DIELECTRIC UNIONS

ATTACHMENT #1

ATTACHMENT #2

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-v 10/13/2015

ATTACHMENT #3

ATTACHMENT #4

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-1 10/13/2015

PART 1 - GENERAL

1.1 SUMMARY OF THE WORK

1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS

Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement

Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos

Abatement Contractor.

1.1.2 EXTENT OF WORK

A. Below is a brief description of the estimated quantities of asbestos containing materials to be abated. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.

B. Removal, clean-up and disposal of asbestos containing materials (ACM) and asbestos/waste contaminated elements in an appropriate regulated area for the following approximate quantities:

( 40 ) fittings ≤ 150 mm (≤ 6") in diameter (TF5-1 AND TF5-2)

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-2 10/13/2015

( 115 ) linear meters (375 feet) of ≤ 150 mm (≤ 6") diameter pipe insulation (TM5-1 and TM5-2)

( 160 ) fittings > 150 mm (>6") in diameter (TF10-1, TF10-2, TF10-3, AND TF10-4)

( 260 ) linear meters (850 feet) of >150 mm (>6") diameter pipe insulation (TM10-1 and TM10-2)

( 3 ) steam boilers (MB)

( 70 ) flange gasket – water/steam plumbing system (MGT-1)

( 13 ) square meters (130 square feet) of built-up roof around boiler exhaust stacks and at the sites of vent stacks installation (MRBU)

( 6 ) square meters (60 square feet) of roof flashing around boiler exhaust stacks (MRF-1)

Material codes provided in parenthesis above are defined in Reference

Section 028211-A, “Limited Asbestos Inspection Report: Building 112

Boiler Replacement, VA Project #695-15-116, VA Medical Center, Building

111, 5000 W. National Avenue, Milwaukee, Wisconsin”, prepared by The

Sigma Group, Inc. See Table 4 in 028211-A for specific information regarding the locations of the materials listed above.

1.1.3 RELATED WORK

A. Section 07 84 00, FIRESTOPPING.

B. Division 09, FINISHES

C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

D. Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION.

1.1.4 TASKS

The work tasks are summarized briefly as follows:

A. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and standard operating procedures for asbestos abatement work.

B. Abatement activities including removal, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.

C. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.

1.1.5 CONTRACTORS USE OF PREMISES

A. The Contractor and Contractor's personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-3 10/13/2015 work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local regulations and requirements.

B. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved pre-abatement work plan. Asbestos abatement drawings of partially occupied buildings will show the limits of regulated areas;

the placement of decontamination facilities; the temporary location of bagged waste ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings:

Reference Section 028211-A, the asbestos inspection report, “Limited

Asbestos Inspection Report: Building 112 Boiler Replacement, VA Project

#695-15-116, VA Medical Center, Building 111, 5000 W. National Avenue, Milwaukee, Wisconsin”, prepared by The Sigma Group, Inc, dated October

01, 2015.

1.2 VARIATIONS IN QUANTITY

The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the buildings. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered materials and those prices shall be used for additional work required under the contractor.

Additionally, it may be later determined that materials designated as

Assumed to Contain (ATC) do not contain greater than one percent asbestos. As such, the contractor shall provide unit pricing for all materials designated as POS and ATC. Materials designated as ATC which are later determined to contain less than one percent asbestos may be removed from the contract at the discretion of the owner. The dollar amount deducted from the contract will be determined by multiplying the quantity of ATC materials determined to be non-ACM by the unit costs.

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-4 10/13/2015

1.3 STOP ASBESTOS REMOVAL

If the Contracting Officer; their field representative; or the VPIH/CIH presents a written Stop Asbestos Removal Order, the

Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered air flow and adequately wet any exposed ACM. The

Contractor shall not resume any asbestos removal activity until authorized to do so by the VA. A stop asbestos removal order may be issued at any time the VA determines abatement conditions/activities are not within specification requirements. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA.

Standby time and costs for corrective actions will be borne by the

Contractor, including the industrial hygienist's time. The occurrence of any of the following events shall be reported immediately by the

Contractor’s competent person in writing to the VA representative and shall require the Contractor to immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities:

A. =/> 0.01 f/cc outside a regulated area or >0.05 f/cc inside a regulated area;

B. breach/break in regulated area barrier(s);

C. less than –0.02” WCG pressure in the regulated area;

D. serious injury/death at the site;

E. fire/safety emergency at the site;

F. respiratory protection system failure;

G. power failure or loss of wetting agent; or

H. any visible emissions observed outside the regulated area.

1.4 DEFINITIONS

1.4.1 GENERAL

Definitions and explanations here are neither complete nor exclusive of all terms used in the contract documents, but are general for the work to the extent they are not stated more explicitly in another element of the contract documents. Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated therein.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-5 10/13/2015

1.4.2 GLOSSARY

Abatement - Procedures to control fiber release from asbestos-containing materials, typically during removal. Includes removal, encapsulation, enclosure, demolition and renovation activities related to asbestos.

ACE - Asbestos contaminated elements.

ACM - Asbestos-containing material.

Aerosol - Solid or liquid particulate suspended in air.

Adequately wet - Sufficiently mixed or penetrated with liquid to prevent the release of particulates. If visible emissions are observed coming from the ACM, then that material has not been adequately wetted.

Aggressive method - Removal or disturbance of building material by sanding, abrading, grinding, or other method that breaks, crumbles, or disintegrates intact ACM.

Aggressive sampling - EPA AHERA defined clearance sampling method using air moving equipment such as fans and leaf blowers to aggressively disturb and maintain in the air residual fibers after abatement.

AHERA - Asbestos Hazard Emergency Response Act. Asbestos regulations for schools issued in 1987.

Aircell - Pipe or duct insulation made of corrugated cardboard which contains asbestos.

Air monitoring - The process of measuring the fiber content of a known volume of air collected over a specified period of time. The NIOSH 7400

Method, Issue 2 is used to determine the fiber levels in air.

Air sample filter - The filter used to collect fibers which are then counted. The filter is made of mixed cellulose ester membrane for PCM

(Phase Contrast Microscopy) and polycarbonate for TEM (Transmission

Electron Microscopy)

Amended water - Water to which a surfactant (wetting agent) has been added to increase the penetrating ability of the liquid.

Asbestos - Includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that have been chemically treated or altered. Asbestos also includes PACM, as defined below.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-6 10/13/2015

Asbestos-containing material (ACM) - Any material containing more than one percent of asbestos.

Asbestos contaminated elements (ACE) - Building elements such as ceilings, walls, lights, or ductwork that are contaminated with asbestos.

Asbestos-containing waste material - Asbestos-containing material or asbestos contaminated objects requiring disposal.

Asbestos waste decontamination facility - A system consisting of drum/bag washing facilities and a temporary storage area for cleaned containers of asbestos waste. Used as the exit for waste and equipment leaving the regulated area. In an emergency, it may be used to evacuate personnel.

Authorized person - Any person authorized by the VA, the Contractor, or government agency and required by work duties to be present in regulated areas.

Authorized visitor - Any person approved by the VA; the contractor; or any government agency having jurisdiction over the regulated area.

Barrier - Any surface the isolates the regulated area and inhibits fiber migration from the regulated area.

Containment Barrier - An airtight barrier consisting of walls, floors, and/or ceilings of sealed plastic sheeting which surrounds and seals the outer perimeter of the regulated area.

Critical Barrier - The barrier responsible for isolating the regulated area from adjacent spaces, typically constructed of plastic sheeting secured in place at openings such as doors, windows, or any other opening into the regulated area.

Primary Barrier - Barriers placed over critical barriers and exposed directly to abatement work.

Secondary Barrier - Any additional sheeting used to isolate and provide protection from debris during abatement work.

Breathing zone - The hemisphere forward of the shoulders with a radius of about 150 - 225 mm (6 - 9 inches) from the worker's nose.

Bridging encapsulant - An encapsulant that forms a layer on the surface of the ACM.

Building/facility owner - The legal entity, including a lessee, which exercises control over management and recordkeeping functions relating to a building and/or facility in which asbestos activities take place.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-7 10/13/2015

Bulk testing - The collection and analysis of suspect asbestos containing materials.

Certified Industrial Hygienist (CIH) - One certified in practice of industrial hygiene by the American Board of Industrial Hygiene. An industrial hygienist Certified in Comprehensive Practice by the

American Board of Industrial Hygiene.

Class I asbestos work - Activities involving the removal of Thermal

System Insulation (TSI) and surfacing ACM and Presumed Asbestos

Containing Material (PACM).

Class II asbestos work - Activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.

Clean room/Changing room - An uncontaminated room having facilities for the storage of employee's street clothing and uncontaminated materials and equipment.

Clearance sample - The final air sample taken after all asbestos work has been done and visually inspected. Performed by the VA's industrial hygiene consultant (VPIH/CIH).

Closely resemble - The major workplace conditions which have contributed to the levels of historic asbestos exposure, are no more protective than conditions of the current workplace.

Competent person - In addition to the definition in 29 CFR 1926.32(f), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR 1926.32(f); in addition, for

Class I and II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR 763) for supervisor.

Contractor's Professional Industrial Hygienist (CPIH) - The asbestos abatement contractor's industrial hygienist. The industrial hygienist must meet the qualification requirements of the PIH.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-8 10/13/2015

Count - Refers to the fiber count or the average number of fibers greater than five microns in length per cubic centimeter of air.

Decontamination area/unit - An enclosed area adjacent to and connected to the regulated area and consisting of an equipment room, shower room, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.

Demolition - The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.

Disposal bag - Typically 6 mil thick siftproof, dustproof, leak-tight container used to package and transport asbestos waste from regulated areas to the approved landfill. Each bag/container must be labeled/marked in accordance with EPA, OSHA and DOT requirements.

Disturbance - Activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM or

PACM, no greater than the amount that can be contained in one standard sized glove bag or waste bag in order to access a building component.

In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or disposal bag which shall not exceed 60 inches in length or width.

Drum - A rigid, impermeable container made of cardboard fiber, plastic, or metal which can be sealed in order to be siftproof, dustproof, and leak-tight.

Employee exposure - The exposure to airborne asbestos that would occur if the employee were not wearing respiratory protection equipment.

Encapsulant - A material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents the release of fibers.

Encapsulation - Treating ACM with an encapsulant.

Enclosure - The construction of an air tight, impermeable, permanent barrier around ACM to control the release of asbestos fibers from the material and also eliminate access to the material.

Equipment room - A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-9 10/13/2015

Fiber - A particulate form of asbestos, 5 microns or longer, with a length to width ratio of at least 3 to 1.

Fibers per cubic centimeter (f/cc) - Abbreviation for fibers per cubic centimeter, used to describe the level of asbestos fibers in air.

Filter - Media used in respirators, vacuums, or other machines to remove particulate from air.

Firestopping - Material used to close the open parts of a structure in order to prevent a fire from spreading.

Friable asbestos containing material - Any material containing more than 1 percent asbestos as determined using the method specified in appendix A, Subpart F, 40 CFR 763, section 1, Polarized Light

Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Glovebag - Not more than a 60 x 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which materials and tools may be handled.

High efficiency particulate air (HEPA) filter - A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 microns or greater in diameter.

HEPA vacuum - Vacuum collection equipment equipped with a HEPA filter system capable of collecting and retaining asbestos fibers.

Homogeneous area - An area of surfacing, thermal system insulation or miscellaneous ACM that is uniform in color, texture and date of application.

HVAC - Heating, Ventilation and Air Conditioning

Industrial hygienist - A professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards. Meets definition requirements of the

American Industrial Hygiene Association (AIHA).

Industrial hygienist technician - A person working under the direction of an IH or CIH who has special training, experience, certifications and licenses required for the industrial hygiene work assigned.

Intact - The ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-10 10/13/2015

Lockdown - Applying encapsulant, after a final visual inspection, on all abated surfaces at the conclusion of ACM removal prior to removal of critical barriers.

National Emission Standards for Hazardous Air Pollutants (NESHAP's) -

EPA's rule to control emissions of asbestos to the environment.

Negative initial exposure assessment - A demonstration by the employer which complies with the criteria in 29 CFR 1926.1101 (f)(2)(iii), that employee exposure during an operation is expected to be consistently below the PEL's.

Negative pressure - Air pressure which is lower than the surrounding area, created by exhausting air from a sealed regulated area through

HEPA equipped filtration units. OSHA requires maintaining -0.02" water column gauge inside the negative pressure enclosure.

Negative pressure respirator - A respirator in which the air pressure inside the facepiece is negative during inhalation relative to the air outside the respirator.

Non-friable ACM - Material that contains more than 1 percent asbestos but cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Organic vapor cartridge - The type of cartridge used on air purifying respirators for organic vapor exposures.

Outside air - The air outside buildings and structures, including, but not limited to, the air under a bridge or in an open ferry dock.

Owner/operator - Any person who owns, leases, operates, controls, or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls, or supervises the demolition or renovation operation, or both.

Penetrating encapsulant - Encapsulant that is absorbed into the ACM matrix without leaving a surface layer.

Personal sampling/monitoring - Representative air samples obtained in the breathing zone of the person using a cassette and battery operated pump to determine asbestos exposure.

Permissible exposure limit (PEL) - The level of exposure OSHA allows for an 8 hour time weighted average. For asbestos fibers, the PEL is

0.1 fibers per cc.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-11 10/13/2015

Polarized light microscopy (PLM) - Light microscopy using dispersion staining techniques and refractive indices to identify and quantify the type(s) of asbestos present in a bulk sample.

Polyethylene sheeting - Strong plastic barrier material 4 to 6 mils thick, semi-transparent, sometimes flame retardant in compliance with

NFPA 241.

Positive/negative fit check - A method of verifying the fit of a respirator by closing off the filters and breathing in or closing off the exhalation valve and breathing out while detecting leakage of the respirator.

Presumed ACM (PACM) - Thermal system insulation, surfacing, and flooring material installed in buildings prior to 1981. If the building owner has actual knowledge, or should have known through the exercise of due diligence that other materials are ACM, they too must be treated as PACM. The designation of PACM may be rebutted pursuant to 29 CFR

1926.1101 (k)(5).

Professional IH - An IH who meets the definition requirements of AIHA;

meets the definition requirements of OSHA as a "Competent Person" at 29

CFR 1926.1101 (b); has completed two specialized EPA approved courses on management and supervision of asbestos abatement projects; has formal training in respiratory protection and waste disposal; and has a minimum of four projects of similar complexity with this project of which at least three projects serving as the supervisory IH.

Project designer - A person who has successfully completed the training requirements for an asbestos abatement project designer as required by

40 CFR 763 Appendix C, Part I; (B)(5).

Protection factor - A value assigned by OSHA/NIOSH to indicate the assigned protection a respirator should provide if worn properly. The number indicates the reduction of exposure level from outside to inside the respirator.

Qualitative fit test (QLFT) - A fit test using a challenge material that can be sensed by the wearer if leakage in the respirator occurs.

Quantitative fit test (QNFT) - A fit test using a challenge material which is quantified outside and inside the respirator thus allowing the determination of the actual fit factor.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-12 10/13/2015

Regulated area - An area established by the employer to demarcate where

Class I, II, III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work may accumulate; and a work area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed the PEL.

Regulated ACM (RACM) - Friable ACM; Category I nonfriable ACM that has become friable; Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading or; Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of the demolition or renovation operation.

Removal - All operations where ACM, PACM and/or RACM is taken out or stripped from structures or substrates, including demolition operations.

Renovation - Altering a facility or one or more facility components in any way, including the stripping or removal of asbestos from a facility component which does not involve demolition activity.

Repair - Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of

ACM or PACM attached to structures or substrates.

Shower room - The portion of the PDF where personnel shower before leaving the regulated area. Also used for bag/drum decontamination in the EDF.

Standard operating procedures (SOP's) - Asbestos work procedures required to be submitted by the contractor before work begins.

Supplied air respirator (SAR) - A respirator that utilizes an air supply separate from the air in the regulated area.

Surfacing ACM - A material containing more than 1 percent asbestos that is sprayed, troweled on or otherwise applied to surfaces for acoustical, fireproofing and other purposes.

Surfactant - A chemical added to water to decrease water's surface tension thus making it more penetrating into ACM.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-13 10/13/2015

Thermal system ACM - A material containing more than 1 percent asbestos applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.

Transmission electron microscopy (TEM) - A microscopy method that can identify and count asbestos fibers.

VA Industrial Hygienist (VPIH) - Department of Veterans Affairs

Professional Industrial Hygienist.

VA Certified Industrial Hygienist (VPCIH) – Department of Veterans

Affairs Professional Certified Industrial Hygienist.

VA Representative - The VA official responsible for on-going project work.

Visible emissions - Any emissions, which are visually detectable without the aid of instruments, coming from ACM/PACM/RACM or ACM waste material.

Waste/Equipment decontamination facility (W/EDF) – The area in which equipment is decontaminated before removal from the regulated area.

Waste generator - Any owner or operator whose act or process produces asbestos-containing waste material.

Waste shipment record - The shipping document, required to be originated and signed by the waste generator, used to track and substantiate the disposition of asbestos-containing waste material.

Wet cleaning - The process of thoroughly eliminating, by wet methods, any asbestos contamination from surfaces or objects.

1.4.3 REFERENCED STANDARDS ORGANIZATIONS

The following acronyms or abbreviations as referenced in contract/specification documents are defined to mean the associated names. Names and addresses may be subject to change.

A. VA Department of Veterans Affairs

810 Vermont Avenue, NW

Washington, DC 20420

B. AIHA American Industrial Hygiene Association

2700 Prosperity Avenue, Suite 250

Fairfax, VA 22031

703-849-8888

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-14 10/13/2015

C. ANSI American National Standards Institute

1430 Broadway

New York, NY 10018

212-354-3300

D. ASTM American Society for Testing and Materials

1916 Race St.

Philadelphia, PA 19103

215-299-5400

E. CFR Code of Federal Regulations

Government Printing Office

Washington, DC 20420

F. CGA Compressed Gas Association

1235 Jefferson Davis Highway

Arlington, VA 22202

703-979-0900

G. CS Commercial Standard of the National Institute of Standards and

Technology (NIST)

U. S. Department of Commerce

Government Printing Office

Washington, DC 20420

H. EPA Environmental Protection Agency

401 M St., SW

Washington, DC 20460

202-382-3949

I. MIL-STD Military Standards/Standardization Division

Office of the Assistant Secretary of Defense

Washington, DC 20420

J. MSHA Mine Safety and Health Administration

Respiratory Protection Division

Ballston Tower #3

Department of Labor

Arlington, VA 22203

703-235-1452

K. NIST National Institute for Standards and Technology

U. S. Department of Commerce

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-15 10/13/2015

Gaithersburg, MD 20234

301-921-1000

L. NEC National Electrical Code (by NFPA)

M. NEMA National Electrical Manufacturer's Association

2101 L Street, N.W.

Washington, DC 20037

N. NFPA National Fire Protection Association

1 Batterymarch Park

P.O. Box 9101

Quincy, MA 02269-9101

800-344-3555

O. NIOSH National Institutes for Occupational Safety and Health

4676 Columbia Parkway

Cincinnati, OH 45226

513-533-8236

P. OSHA Occupational Safety and Health Administration

U.S. Department of Labor

Government Printing Office

Washington, DC 20402

Q. UL Underwriters Laboratory

333 Pfingsten Rd.

Northbrook, IL 60062

312-272-8800

R. USA United States Army

Army Chemical Corps

Department of Defense

Washington, DC 20420

1.5 APPLICABLE CODES AND REGULATIONS

1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS

A. All work under this contract shall be done in strict accordance with all applicable Federal, State, and local regulations, standards and codes governing asbestos abatement, and any other trade work done in conjunction with the abatement. All applicable codes, regulations and standards are adopted into this specification and will have the same force and effect as this specification.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-16 10/13/2015

B. The most recent edition of any relevant regulation, standard, document or code shall be in effect. Where conflict among the requirements or with these specifications exists, the most stringent requirement(s) shall be utilized.

C. Copies of all standards, regulations, codes and other applicable documents, including this specification and those listed in Section 1.5 shall be available at the worksite in the clean change area of the worker decontamination system.

1.5.2 ASBESTOS ABATEMENT CONTRACTOR RESPONSIBILITY

The Asbestos Abatement Contractor (Contractor) shall assume full responsibility and liability for compliance with all applicable

Federal, State and Local regulations related to any and all aspects of the abatement project. The Contractor is responsible for providing and maintaining training, accreditations, medical exams, medical records, personal protective equipment as required by applicable Federal, State and Local regulations. The Contractor shall hold the VA and VPIH/CIH consultants harmless for any Contractor’s failure to comply with any applicable work, packaging, transporting, disposal, safety, health, or environmental requirement on the part of himself, his employees, or his subcontractors. The Contractor will incur all costs of the CPIH, including all sampling/analytical costs to assure compliance with

OSHA/EPA/State requirements related to failure to comply with the regulations applicable to the work.

1.5.3 FEDERAL REQUIREMENTS

Federal requirements which govern of asbestos abatement include, but are not limited to, the following regulations.

A. Occupational Safety and Health Administration (OSHA)

1. Title 29 CFR 1926.1101 - Construction Standard for Asbestos

2. Title 29 CFR 1910.132 - Personal Protective Equipment

3. Title 29 CFR 1910.134 - Respiratory Protection

4. Title 29 CFR 1926 - Construction Industry Standards

5. Title 29 CFR 1910.20 - Access to Employee Exposure and Medical

Records

6. Title 29 CFR 1910.1200 - Hazard Communication

7. Title 29 CFR 1910.151 - Medical and First Aid

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-17 10/13/2015

B. Environmental Protection Agency (EPA)

1. 40 CFR 61 Subpart A and M (Revised Subpart B) - National Emission

Standard for Hazardous Air Pollutants - Asbestos.

2. 40 CFR 763.80 - Asbestos Hazard Emergency Response Act (AHERA)

C. Department of Transportation (DOT)

Title 49 CFR 100 - 185 - Transportation

1.5.4 STATE REQUIREMENTS

State requirements that apply to the asbestos abatement work, disposal, clearance, etc., include, but are not limited to, the following:

A. Wisconsin Administrative Code NR 445

B. Wisconsin Administrative Code NR 447

C. Wisconsin State Statues 285.11, 285.13, 285.17 and 285.27

D. Wisconsin Department of Health Services DHS 159

1.5.5 LOCAL REQUIREMENTS (NOT USED)1.5.6 STANDARDS

A. Standards which govern asbestos abatement activities include, but are not limited to, the following:

1. American National Standards Institute (ANSI) Z9.2-2012 -

Fundamentals Governing the Design and Operation of Local Exhaust

Ventilation Systems

2. ANSI Z88.2-2015 - Practices for Respiratory Protection.

3. Underwriters Laboratories (UL) 586-90 - UL Standard for Safety of

HEPA Filter Units, 7th Edition.

B. Standards which govern encapsulation work include, but are not limited to the following:

1. American Society for Testing and Materials (ASTM)

C. Standards which govern the fire and safety concerns in abatement work include, but are not limited to, the following:

1. National Fire Protection Association (NFPA) 241 - Standard for

Safeguarding Construction, Alteration, and Demolition Operations.

2. NFPA 701 - Standard Methods for Fire Tests for Flame Resistant

Textiles and Film.

3. NFPA 101 - Life Safety Code http://nxt.legis.state.wi.us/nxt/gateway.dll?f=xhitlist$xhitlist_x=Advanced$xhitlist_vpc=first$xhitlist_xsl=querylink.xsl$xhitlist_sel=title;path;content-type;home-title$xhitlist_d=%7bstats%7d$xhitlist_q=%5bfield%20folio-destination-name:'285.11'%5d$xhitlist_md=target-id=0-0-0-231323 http://nxt.legis.state.wi.us/nxt/gateway.dll?f=xhitlist$xhitlist_x=Advanced$xhitlist_vpc=first$xhitlist_xsl=querylink.xsl$xhitlist_sel=title;path;content-type;home-title$xhitlist_d=%7bstats%7d$xhitlist_q=%5bfield%20folio-destination-name:'285.13'%5d$xhitlist_md=target-id=0-0-0-231325 http://nxt.legis.state.wi.us/nxt/gateway.dll?f=xhitlist$xhitlist_x=Advanced$xhitlist_vpc=first$xhitlist_xsl=querylink.xsl$xhitlist_sel=title;path;content-type;home-title$xhitlist_d=%7bstats%7d$xhitlist_q=%5bfield%20folio-destination-name:'285.17'%5d$xhitlist_md=target-id=0-0-0-231331 http://nxt.legis.state.wi.us/nxt/gateway.dll?f=xhitlist$xhitlist_x=Advanced$xhitlist_vpc=first$xhitlist_xsl=querylink.xsl$xhitlist_sel=title;path;content-type;home-title$xhitlist_d=%7bstats%7d$xhitlist_q=%5bfield%20folio-destination-name:'285.27'%5d$xhitlist_md=target-id=0-0-0-231339 VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-18 10/13/2015

1.5.7 EPA GUIDANCE DOCUMENTS

A. EPA guidance documents which discuss asbestos abatement work activities are listed below. These documents are made part of this section by reference. EPA publications can be ordered from (800) 424-9065.

B. Guidance for Controlling ACM in Buildings (Purple Book) EPA 560/5-85-

C. Asbestos Waste Management Guidance EPA 530-SW-85-007

D. A Guide to Respiratory Protection for the Asbestos Abatement Industry

EPA-560-OPTS-86-001

E. Guide to Managing Asbestos in Place (Green Book) TS 799 20T July 1990

1.5.8 NOTICES

A. State and Local agencies: Send written notification as required by state and local regulations including the local fire department prior to beginning any work on ACM as follows:

B. Copies of notifications shall be submitted to the VA for the facility's records in the same time frame notification is given to EPA, State, and

Local authorities.

1.5.9 PERMITS/LICENSES

A. The contractor shall apply for and have all required permits and licenses to perform asbestos abatement work as required by Federal, State, and Local regulations.

1.5.10 POSTING AND FILING OF REGULATIONS

A. Maintain two (2) copies of applicable federal, state, and local regulations. Post one copy of each in the clean room at the regulated area where workers will have daily access to the regulations and keep another copy in the Contractor's office.

1.5.11 VA RESPONSIBILITIES

Prior to commencement of work:

A. Notify occupants adjacent to regulated areas of project dates and requirements for relocation, if needed. Arrangements must be made prior to starting work for relocation of desks, files, equipment and personal possessions to avoid unauthorized access into the regulated area. Note:

Notification of adjacent personnel is required by OSHA in 29 CFR

1926.1101 (k) to prevent unnecessary or unauthorized access to the regulated area.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-19 10/13/2015

B. Submit to the Contractor results of background air sampling; including location of samples, person who collected the samples, equipment utilized and method of analysis. During abatement, submit to the

Contractor, results of bulk material analysis and air sampling data collected during the course of the abatement. This information shall not release the Contractor from any responsibility for OSHA compliance.

1.5.12 SITE SECURITY

A. Regulated area access is to be restricted only to authorized, trained/accredited and protected personnel. These may include the

Contractor's employees, employees of Subcontractors, VA employees and representatives, State and local inspectors, and any other designated individuals. A list of authorized personnel shall be established prior to commencing the project and be posted in the clean room of the decontamination unit.

B. Entry into the regulated area by unauthorized individuals shall be reported immediately to the Competent Person by anyone observing the entry. The Competent Person shall immediately notify the VA.

C. A log book shall be maintained in the clean room of the decontamination unit. Anyone who enters the regulated area must record their name, affiliation, time in, and time out for each entry.

D. Access to the regulated area shall be through a single decontamination unit. All other access (doors, windows, hallways, etc.) shall be sealed or locked to prevent entry to or exit from the regulated area. The only exceptions for this requirement are the waste/equipment load-out area which shall be sealed except during the removal of containerized asbestos waste from the regulated area, and emergency exits. Emergency exits shall not be locked from the inside, however, they shall be sealed with poly sheeting and taped until needed.

E. The Contractor's Competent Person shall control site security during abatement operations in order to isolate work in progress and protect adjacent personnel. A 24 hour security system shall be provided at the entrance to the regulated area to assure that all entrants are logged in/out and that only authorized personnel are allowed entrance.

F. The Contractor will have the VA's assistance in notifying adjacent personnel of the presence, location and quantity of ACM in the

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-20 10/13/2015 regulated area and enforcement of restricted access by the VA's employees.

G. The regulated area shall be locked during non-working hours and secured by VA security/police guards.

1.5.13 EMERGENCY ACTION PLAN AND ARRANGEMENTS

A. An Emergency Action Plan shall be developed by prior to commencing abatement activities and shall be agreed to by the Contractor and the

VA. The Plan shall meet the requirements of 29 CFR 1910.38 (a);(b).

B. Emergency procedures shall be in written form and prominently posted in the clean room and equipment room of the decontamination unit.

Everyone, prior to entering the regulated area, must read and sign these procedures to acknowledge understanding of the regulated area layout, location of emergency exits and emergency procedures.

C. Emergency planning shall include written notification of police, fire, and emergency medical personnel of planned abatement activities; work schedule; layout of regulated area; and access to the regulated area, particularly barriers that may affect response capabilities.

D. Emergency planning shall include consideration of fire, explosion, hazardous atmospheres, electrical hazards, slips/trips and falls, confined spaces, and heat stress illness. Written procedures for response to emergency situations shall be developed and employee training in procedures shall be provided.

E. Employees shall be trained in regulated area/site evacuation procedures in the event of workplace emergencies.

1. For non-life-threatening situations - employees injured or otherwise incapacitated shall decontaminate following normal procedures with assistance from fellow workers, if necessary, before exiting the regulated area to obtain proper medical treatment.

2. For life-threatening injury or illness, worker decontamination shall take least priority after measures to stabilize the injured worker, remove them from the regulated area, and secure proper medical treatment.

F. Telephone numbers of any/all emergency response personnel shall be prominently posted in the clean room, along with the location of the nearest telephone.

VHAMIWOsgooM

Replace (3) Boilers Building 112

Bancroft Architects + Engineers

09-01-15

Contract No. VA69D-15-J-1908

Station Project No. 695-15-116

Bancroft-AE Project No. 14-101-06 02 82 11-21 10/13/2015

G. The Contractor shall provide verification of first aid/CPR training for personnel responsible for providing first aid/CPR. OSHA requires medical assistance within 3-4 minutes of a life-threatening injury/illness. Bloodborne Pathogen training shall also be verified for those personnel required to provide first aid/CPR.

H. The Emergency Action Plan shall provide for a Contingency Plan in the event that an incident occurs that may require the modification of the standard operating procedures during abatement. Such incidents include, but are not limited to, fire; accident; power failure; negative pressure failure; and supplied air system failure. The Contractor shall detail procedures to be followed in the event of an incident assuring that asbestos abatement work is stopped and wetting is continued until correction of the problem.

1.5.14 PRE-CONSTRUCTION MEETING

Prior to commencing the work, the Contractor shall meet with the VA

Certified Industrial Hygienist (VPCIH) to present and review, as appropriate, the items following this paragraph. The Contractor's

Competent Person(s) who will be on-site shall participate in the pre-start meeting.

This is the start of the file's text. The full file is on GovTribe.