- 695-15-116: Replace 3 Boilers Building 112, Milwaukee Federal contract opportunity
- Solicitation number
- 36C25218B0230
About this file
36C25218B0230 00001 S06 - A00001 Amended List of Drawing Sheets.pdf
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specifi cation form a part of the contract.
DRAWING INDEX
DRAWING
NUMBER
PAGE
NUMBER
DRAWING TITLE
GENERAL
G-0 1 1 COVER
G-002 2 3D VIEWS
G-003 3 INFECTION CONTROL PLANS
G-004 4 CONSTRUCTION PHASING PLANS
HAZARDOUS MATERIAL
ASD-100 5 WEST BOILER ROOM ASBESTOS REMOVAL FIGURE
ASD-101 6 WEST BOILER ROOM MEZZANINE ASBESTOS REMOVAL FIGURE
STRUCTURAL
S-001 7 STRUCTURAL GENERAL NOTES
S-101
LOWER LEVEL CATWALK RAILING CONSTRUCTION PLAN +
ELEVATIONS
S-102 9 EXISTING HIGH ROOF FRAMING PLAN
ARCHITECTURAL
AD-101 10 EXISTING BACEMENT + FIRST FLOOR – DEMOLITION PLAN
AD-102 11 EXISTING SECOND FLOOR – DEMOLITION PLAN
AD-103
EXISTING THIRD FLOOR - LOWER CATWALK DEMOLITION
PLAN
AD-104
EXISTING THIRD FLOOR - UPPER CATWALK DEMOLITION
PLAN
AD-201 14 BOILER ROOM DEMOLITION ELEVATION
AD-301 15 BUILDING DEMOLITION SECTION – LOOKING NORTH
AD-302 16 BUILDING DEMOLITION SECTION – LOOKING WEST
AD-321 17 KITCHEN AREA SECTION
AD-401 18 RAILING DEMOLITION
A-101 19 EXISTING FIRST FLOOR – CONSTRUCTION PLAN
A-102 20 EXISTING SECOND FLOOR – CONSTRUCTION PLAN
A-103 21 EXISTING LOWER CATWALK – CONSTRUCTION PLAN
A-104 22 UPPER AND LOWER ROOF PLAN
A-201 23 EXISTING EAST BUILDING CONSTRUCTION ELEVATION
A-301 24 BUILDING SECTION – LOOKING NORTH
A-302 25 BUILDING SECTION – LOOKING WEST
Station Project No. 695-15-116 00 01 15-1 10/13/2015
695-15-116 Replace (3) Boilers Building 112 01/17/2018
Amendment 001 - February 21, 2018
A-321 26 KITCHEN AREA SECTION
A-401
ELEVATIONS
A-402
ELEVATIONS
A-501 29 ARCHITECTURAL DETAILS
A-502 30 ARCHITECTURAL DETAILS
A-601 31 DOOR SCHEDULE
INTERIORS
I - 101 32 INTERIOR FINISHING PLANS
MECHANICAL
M-001 33 MECHANICAL NOTES, ABBREVIATIONS AND SYMBOLS
MD-101
WEST BOILER ROOM – MECHANICAL DEMOLITION FLOOR
PLAN
MD-102 35 WEST BOILER ROOM – MECHANICAL DEMOLITION PLAN
MD-103 36 EAST BOILER ROOM – MECHANICAL DEMOLITION PLAN
MD-104
UPPER WEST BOILER ROOM – MECHANICAL DEMOLITION
MD-105
UPPER EAST BOILER ROOM – MECHANICAL DEMOLITION
MD-106 39 GRADE LEVEL GAS PIPING DEMOLITION PLAN
MD-107
BASMENT LEVEL AND STEAM HEADER MECHANICAL
DEMOLITION DRAWING
M-101 41 WEST BOILER ROOM – MECHANICAL CONSTRUCTION PLAN
M-102 42 WEST BOILER ROOM – MECHANICAL CONSTRUCTION PLAN
M-103
BOILER ROOM – COMPRESSED AIR AND CHEMICAL FEED
PIPING PLAN
M-104 44 EAST BOILER ROOM – MECHANICAL CONSTRUCTION PLAN
M-105 45 PARTIAL FIRST FLOOR – MECHANICAL CONSTRUCTION PLAN
M-106
WEST BOILER ROOM – MECHANICAL CONSTRUCTION
MEZZANINE PPLAN
M-107
EAST BOILER ROOM – SECOND LEVEL MECHANICAL
CONSTRUCTION PLAN
M-108
EAST BOILER ROOM – MEZZANINE LEVEL MECHANICAL
CONSTRUCTION PLAN
M-109
STEAM HEADER AND BASEMENT MECHANICAL CONSTRUCTION
DRAWING
M-110 50 REVERSE OSMOSIS SYSTEM PIPING DIAGRAM
M-500 51 EXISTING FIELD CONDITION PHOTOS
M-501 52 EXISTING FIELD CONDITION PHOTOS
M-502 53 MECHANICAL DETAILS
M-503 54 MECHANICAL DETAILS
M-504 55 MECHANICAL DETAILS
00 01 15-2 10/13/2015
695-15-116 Replace (3) Boilers Building 112 01/17/2018
Amendment 001 - February 21, 2018
VHAMIWMobleM Strikethrough
M-505 56 BOILER SECTIONS AND DETAILS
M-506 57 DA AND SURGE TANK DETAIL
M-600 58 STEAM PIPING SCHEMATIC
M-601 59 STEAM SYSTEM PIPING SCHEMATIC
M-602 60 STEAM SYSTEM PIPING SCHEMATIC
M-603 61 STEAM SYSTEM PIPING SCHEMATIC
M-700 62 MECHANICAL EQUPIMENT SCHEDULES
TC-100 63 STEAM BOILER PROCESS AND INSTRUMENTATION DIAGRAM
TC-101
STEAM BOILER PROCESS AND INSTRUMENTATION BILL OF
MATERIAL
TC-102
EXISTING NORTH DEAERATOR PROCESS AND
INSTRUMENTATION DIAGRAM
TC-103
SOUTH DEAERATOR PROCESS AND INSTRUMENTATION
DIAGRAM AND BOM
TC-104
EXISTING NORTH SURGE TANK PROCESS AND
INSTRUMENTATION AND BOM
TC-105
SOUTH SURGE TANK PROCESS AND INSTRUMENTATION
DIAGRAM AND BOM
TC-106 69 REMOTE BOP PANEL LAYOUT AND BOM
TC-107 70 BOILER CONTROL PANEL LAYOUT
TC-108 71 BOILER CONTROL PANEL BOM (TYPICAL FOR 3 BOILERS)
ELECTRICAL
E-001 72 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-002 73 ELECTRICAL NOTES AND TABLES
ED-100 74 BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN
ED-101 75 FIRST FLOOR + ROOF – ELECTRICAL DEMOLITION PLAN
ED-102 76 PARTIAL FLOOR PLANS – ELECTRICAL DEMOLITION PLAN
ED-500 77 ELECTRICAL ONELINE POWER DIAGRAM - DEMOLITION
ED-501 78 ELECTRICAL ONELINE POWER DIAGRAM - DEMOLITION
E-100 79 BASEMENT LEVEL ELCTRICAL FLOOR PLAN
E-101 80 FIRST FLOOR – ELECTRICAL POWER PLAN
E-102
2ND FLOOR + LOWER LEVEL CATWALK – ELECTRICAL
LIGHTING AND POWER PLAN
E-103
EXISTING ROOF – ELECTRICAL LIGHTNING PROTECTION
PLAN
E-500 83 ELECTRICAL ONELINE POWER DIAGRAM
E-501 84 ELECTRICAL ONELINE POWER DIAGRAM
E-600 85 ELECTRICAL MOTOR WIRING + PANEL SCHEDULES
TD-101 86 FIRST FLOOR – COMMUNICATION DEMOLITION PLAN
T-101 87 FIRST FLOOR – COMMUNICATION PLAN
00 01 15-3 10/13/2015
695-15-116 Replace (3) Boilers Building 112 01/17/2018
Amendment 001 - February 21, 2018