36C25218B0230-00001002.pdf
PDF 15 KB Posted
- Attached to
- 695-15-116: Replace 3 Boilers Building 112, Milwaukee Federal contract opportunity
- Solicitation number
- 36C25218B0230
About this file
36C25218B0230 00001 S06 - A00001 Amended Specifications Table of Contents.pdf
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Milwaukee VAMC – Amendment 001
695-15-116 Replace (3) Boilers Building 112 07-01-15
Contract No. VA69D-15-J-1908 Station Project No. 695-15-116 Bancroft-AE Project No. 14-101-06 00 01 10-1 02/21/2018
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 10 Table of Contents 07-15 00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-17 01 01 10 SN Special Notes with Risk Baseline Attach ment 12-17 01 32 16.15 Project Schedules (Small Projects) – De sign/Bid/Build with FM Inspection List Attachment 01-18
01 33 23 Shop Drawings, Product Data, and Samples 03-18 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 29 Testing Laboratory Services 06-15 01 74 19 Construction Waste Management 03-18 01 91 00 General Commissioning Requirements 06-13
DIVISION 02 – EXISTING CONDITIONS
02 82 11 Traditional Asbestos Abatement 09-15 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.21 Asbestos Roofing Abatement 09-15
DIVISION 03 – CONCRETE (NOT USED)
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 02-16 04 20 00 Unit Masonry 02-15
DIVISION 05 – METALS
05 50 00 Metal Fabrications 07-14
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES (NOT USE D)
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 Roof and Deck Insulation 02-16 07 92 00 Joint Sealants 10-17 07 84 00 Firestopping 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 33 00 Coiling Doors and Grilles 02-16
07-01-15
Contract No. VA69D-15-J-1908 Station Project No. 695-15-116 Bancroft-AE Project No. 14-101-06 00 01 10-2 02/21/2018
08 71 00 Door Hardware 02-15
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 04-15 09 91 00 Painting 09-15
DIVISION 10 – SPECIALTIES (NOT USED)
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
12 31 00 Manufactured Metal Casework 05-15
DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION (NOT USED)
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-15 22 67 19.16 Reverse-Osmosis Water Equipment 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and S team
Generation 02-15
23 05 11 Common Work Results for HVAC 02-15 23 05 12 General Motor Requirements for HVAC and St eam
Generation Equipment 02-15
23 05 51 Noise and Vibration Control for Boiler Pla nt 02-15 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 08 11 Demonstrations and Tests for Boiler Plant 02-15 23 09 11 Instrumentation and Control for Boiler Pla nt 02-15 23 09 23 Direct-Digital Control System for HVAC 09- 11 23 10 00 Facility Fuel Systems 02-15 23 21 11 Boiler Plant Piping Systems 02-15 23 50 11 Boiler Plant Mechanical Equipment 08-17 23 51 00 Breechings, Chimneys, and Stacks 08-17 23 52 33 Water-Tube Boilers 02-15
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 07-15 26 05 19 Low-Voltage Electrical Power Conductors an d Cables 01-17
07-01-15
Contract No. VA69D-15-J-1908 Station Project No. 695-15-116 Bancroft-AE Project No. 14-101-06 00 01 10-3 02/21/2018
26 05 26 Grounding and Bonding for Electrical Syste ms 01-17 26 05 33 Raceway and Boxes for Electrical Systems 0 5-14 26 05 73 Overcurrent Protective Device Coordination Study 12-15 26 08 00 Commissioning of Electrical Systems 11-16 26 22 00 Low-Voltage Transformers 12-15 26 24 16 Panelboards 05-14 26 27 26 Wiring Devices 01-16 26 29 11 Motor Controllers 08-14 26 36 23 Automatic Transfer Switches 12-12 26 51 00 Interior Lighting 08-14
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installati ons 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 13 Conductors and Cables for Electronic Safet y and
Security 09-11
DIVISION 31 – EARTHWORK (NOT USED)
DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – Electrical Power Generation (NOT USED )
APPENDIX
Attachment A Sample Construction Waste Management P lan Attachment B Limited Asbestos Inspection Report 10- 15 Attachment C Fire Stop Hilti Attachment D Fire Stop Selection Chart Attachment E Lighting Efficiency Rules
File details come from the government source that posted it.