36C25218B0014-004.pdf
PDF 8 MB Posted
- Attached to
- Replace Medium Voltage Circuits 2, 3, 5 550-16-102 Federal contract opportunity
- Solicitation number
- 36C25218B0014
About this file
36C25218B0014 550-16-102 Construction Drawings V2.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25218B0014-00005000.docx | DOCX document | |
| 36C25218B0014-00004000.docx | DOCX document | |
| 36C25218B0014-00004001.pdf | ||
| 36C25218B0014-00003000.docx | DOCX document | |
| 36C25218B0014-00002002.pdf | ||
| 36C25218B0014-00002001.pdf | ||
| 36C25218B0014-00002000.docx | DOCX document | |
| 36C25218B0014-00001000.docx | DOCX document | |
| 36C25218B0014-00001001.docx | DOCX document | |
| 36C25218B0014-00001002.pdf | ||
| 36C25218B0014-002.docx | DOCX document | |
| 36C25218B0014-001.docx | DOCX document | |
| 36C25218B0014-003.pdf | ||
| 36C25218B0014-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHADANSHOVIM1
Typewritten Text Deductive Bid Alternate #2 Not in Contract
VHADANSHOVIM1
Line
VHADANSHOVIM1
Typewritten Text Deductive Bid Alternate #3 Not in Contract
VHADANSHOVIM1
Line
VHADANSHOVIM1
Text Box Deductive Bid Alternate #4
VHADANSHOVIM1
Line
VHADANSHOVIM1
Text Box Deductive Bid Alternate #1
Line
Existing T/58A To Remain
VHADANSHOVIM1
Typewritten Text X
VHADANSHOVIM1
Typewritten Text Not In Contract
VHADANSHOVIM1
Polygon
VHADANSHOVIM1
Line
Line
Deductive Bid Alternate #2 Not in Contract
VHADANSHOVIM1
Typewritten Text Deductive Bid Alternate #3 Not in Contract
VHADANSHOVIM1
Typewritten Text Existing T/58A To Remain
VHADANSHOVIM1
Line
VHADANSHOVIM1
Typewritten Text
XX
VHADANSHOVIM1
Line
VHADANSHOVIM1
Line
VHADANSHOVIM1
Typewritten Text
372 FT
VHADANSHOVIM1
Typewritten Text
387 FT
VHADANSHOVIM1
Typewritten Text
292 FT
VHADANSHOVIM1
Typewritten Text
203 FT
VHADANSHOVIM1
Typewritten Text
250 FT
VHADANSHOVIM1
Typewritten Text
291 FT
VHADANSHOVIM1
Typewritten Text
250 FT
VHADANSHOVIM1
Typewritten Text
110 FT
VHADANSHOVIM1
Typewritten Text
70 FT
VHADANSHOVIM1
Typewritten Text Remove Cable from T/14 to T/13
VHADANSHOVIM1
Line
VHADANSHOVIM1
Line
VHADANSHOVIM1
Typewritten Text Deductive Bid Alternate #4
VHADANSHOVIM1
Line
VHADANSHOVIM1
Text Box Deductive Bid Alternate #1
| Danville_100%-Resubmittal |
| 0 - VA Danville Cover |
| 0 9 -Introduction-Letter_SIGNED |
| 0.1 - Danville TOC |
| 1. EXECUTIVE SUMMARY |
| 1.1. Introduction Letter |
| 1.2. Executive Summary |
| 2. GENERAL OVERVIEW |
| 2.1. Station Information |
| 2.2. Electrical Utility System Overview |
| 2.3. MV Distribution System Overview |
| 2.4. Calculation Methods |
| 2.5. Study Assumptions |
| 3. CONSTRUCTION NARRATIVES, PRE-PROPOSAL MEETING/SCOPE EVALUATION |
| 3.1. Narratives |
| 3.2. Pre-proposal Meeting/Scope Evaluation |
| 4. MV CIRCUIT 2, 3 AND 5 ARC FLASH ANALYSIS UPDATE |
| 4.1. Flash Hazard Analysis |
| 4.2. Hazard Risk Category Classification Table |
| 4.3. Arc Flash Evaluation Report |
| 5. MV CIRCUIT 2, 3 AND 5 PROTECTIVE DEVICE COORDINATION STUDY UPDATE |
| 5.1. Analysis and Recommendations |
| 5.2. TCC Descriptions, Comments, and Recommendations |
| 6. MANHOLE AND DUCT BANK INVESTIGATION AND ELECTRICAL MAPPING |
| 6.1. Manhole and Duct Bank Inspections for Circuits# 2, 3, & 5 |
| 6.2. Civil Survey, Electrical and Topographical Mapping |
| APPENDICES |
| A. VA UTILITY INFORMATION |
| B. CONSTRUCTION DOCUMENTS, SPECIFICATIONS, BOD CUTSHEETS, CONSTRUCTION COST ESTIMATE |
| C. SKM INPUT REPORT AND ONE LINE DIAGRAM MODEL |
| D. SOW/SCHEDULE/COMMENTS |
| E. EMT Manhole and Duct bank Inspections for Circuits# 2, 3, & 5 Report and Photos |
| 01_Divider |
| 1 Exec Summary |
| 02_Divider |
| 2 - General Overview |
| 2.1. Site Information |
| 2.2. Electrical Utility System Overview |
| 2.3. MV Distribution System Overview |
| 2.4. Calculation Methods |
| 2.5. Study Assumptions |
| 2.5.1. Transformers: |
| 2.5.2. Primary Underground Raceways: |
| 2.5.3. Distances / Routing |
| 03_Divider |
| 3 - Construction Narratives |
| 2. |
| 3. |
| 3.1. Narratives |
| Construction Specific Scope of Work: |
| 3.2. Pre-proposal meeting/Scope Evaluation/Review minutes: |
| 04_Divider |
| 4 - Arc Flash Analysis |
| 4.1. Arc Flash Hazard Analysis |
| 4.2. Hazard Risk Category Classification Table |
| A listing of minimum protective FR clothing and the evaluation criteria for each category is given within NFPA 70E. Note that the code tabulations represent a minimum requirement. The final survey assessment reports will include the specific tables us... |
| 4.3. Arc Flash Evaluation Report |
| The evaluation report for Arc Flash will include a listing of devices that may have settings altered in order to reduce the potential energy release and subsequent hazard to personnel. |
| HDR found no Arc Flash Hazard concerns in the Medium Voltage Systems. All Medium Voltage Equipment has incident energy less than 40 cal/cm2. See Appendix C-3 for complete Arc Flash Evaluation Report. |
| 05_Divider |
| 5 - Protective Device Coordination Study |
| 5.1 Analysis |
| 5.2 Descriptions, Comments, and Recommendation |
| 5.2 Protective Device Coordination |
| T102 |
| T102_ |
| T14 |
| T58 |
| 06_Divider |
| 6 Manhole and Duct Bank Investigation and Electrical Mapping |
| 6.1 Manhole and Duct Bank Inspection for Circuits # 2, 3 and 5 |
| 6.2 Civil Survey, Electrical and Topographical Mapping |
| HDR, through Civil sub-contractor, Weaver Consultants Group performed a site surveys (July 2016 and Feb. 2017) to do utility location services, electrical and topographical mapping within the scope of work and to obtain the field data required to vali... |
| 6.2DANVILLE ELECTRIC EXHIBIT 02-03-2017 |
| Sheets and Views |
| 4355-300-32-01 |
6.3DANVILLE TOPO EXHIBIT 07-28-16 DRAFT
| A |
| A_Divider |
| Memo Style |
| B-1 |
| B-1_Divider |
| Danville_11X17 |
| 6390G-001_(11x17) |
| 6390E-001_(11x17) |
| 6390ES-101_(11x17) |
| 6390ES-102_(11x17) |
| 6390E-401_(11x17) |
| 6390E-402_(11x17) |
| 6390E-501_(11x17) |
| 6390E-601_(11x17) |
| 6390E-602_(11x17) |
| 6390PS-101_(11x17) |
| Topographic Exhibit |
| As-Built Electric Exhibit |
| B-3 |
| B-3_Divider |
| Appendix B-3 |
| B-3_Divider |
| 1-XTEInterfaceServl |
| 2-EPR PVC 15kV 133 |
| 4-BR100003EN |
| 5 A-S&C PMH |
| 5 B-S&C PMH |
| 6-Prolec Products |
| 7-BEDN620130 |
| 8-BEDN620130_DRAWING |
| 9-HDR VA Danville IL |
| 10-HDR VA Switchgear BEDN620130 11.8.2016 |
| B-4 |
| B-4_Divider |
| Estimate-Rev2 |
| C |
| C. Divider |
| C-1_Input Report |
| C-2_ArcFlashEvalReport |
| C-3_SKMOverallOneLine |
| D |
| D-1_Divider |
| D-1a Statement of Work 550-16-102_R1 |
| D-1aa - VA Danville pre-proposal Meeting Minutes |
| D-1b1 550-16-102_NTP VA251-16-J-1084 |
| D-1b2 AE Design Schedule |
| D-2_Divider |
| D-2a1 550-16-102_Kick Off Meeting VA251-16-J-1084 |
| D-2a2 550-16-102_Design Kick Off Sign in Sheet |
| D-2b1Danville VA EMT call.txt - Notepad |
| D-3 Danville VA Comments and HDR Response |
| D-3_Divider |
| D-3a 6390-E1.MV.Master.Rev02 Model |
| D-3b 6390-Line.MV.Master.Rev04 Model |
| D-3c 35% schematic design review attendance log |
| D-3d 550-16-102_65% DD Review Comments |
| 8888 Keystone Crossing, Ste. 1100 |
| Item Comment |
| Basis of Design Narratives: |
| D-3e Response to 550-16-102_65% DD Review Comments 10.17.2016 |
| D-3f Response to 550-16-102_95% CD Submittal Comments |
| Sheet1 |
| D-3g Response to 550-16-102_Pre-100% CD Submittal Comments (1) |
| Sheet1 |
| D-3h HDR - VA Electrical Response Letter 02-03-2017 |
| D-3i HDR - VA Electrical Response Letter 04-21-2017 |
| E |
| E. Divider |
| ER - I16089 - Manholes |
| ER - I16089 |
| HDR ENGINEERING |
| ENGINEERING REPORT |
| UPROJECT SCOPE: |
| UANALYSIS AND RECOMMENDATIONS: |
| Not Rated - Various Manholes: |
| As can be seen in the manhole inspection data, the physical condition is good in the majority of the manholes unless otherwise stated. Water is the major problem in most manholes. The majority of the sump pumps have failed and prevent water removal.... |
| The information concerning the circuit routing should not be considered reliable, as the tags could have been placed in error during previous work. |
| URecommendation: |
| Water removal; sump pump replacements; and de-energizing circuits to verify circuit routing. |
| VA MAN-HOLE INSPECTION SHEET |
| Sheet1 |
| Section 4 |
| MH-6 |
| Manhole file 1 1 |
| MH 6 Bottom |
| MH 6 E High |
| MH 6 E |
| MH 6 Location |
| MH 6 N |
| MH 6 S High |
| MH 6 S |
| MH 6 W |
| MH 6 |
| MH-6A |
| Manhole file 1 2 |
| MH 6A Bottom |
| MH 6A E |
| MH 6A Location |
| MH 6A N |
| MH 6A S |
| MH 6A W |
| MH 6A |
| MH-7 |
| Manhole file 1 3 |
| MH 7 Bottom |
| MH 7 E |
| MH 7 Location |
| MH 7 N |
| MH 7 S |
| MH 7 W |
| MH 7 |
| MH-8 |
| Manhole file 1 4 |
| MH 8 Bottom |
| MH 8 E |
| MH 8 Location |
| MH 8 N |
| MH 8 NW |
| MH 8 S |
| MH 8 SW |
| MH 8 W |
| MH 8 |
| MH-24 |
| Manhole file 1 5 |
| MH 24 Bottom |
| MH 24 E |
| MH 24 Location |
| MH 24 N |
| MH 24 S |
| MH 24 W |
| MH 24 |
| MH-25 |
| Manhole file 1 6 |
| MH 25 Bottom |
| MH 25 E |
| MH 25 Location |
| MH 25 N |
| MH 25 NW |
| MH 25 S |
| MH 25 SE |
| MH 25 W |
| MH 25 |
| MH-26 |
| Manhole file 1 7 |
| MH 26 E |
| MH 26 Location |
| MH 26 N |
| MH 26 NE |
| MH 26 W |
| MH 26 |
| MH-27 |
| Manhole file 1 8 |
| MH 27 Bottom |
| MH 27 Location |
| MH 27 NE |
| MH 27 NW |
| MH 27 SE |
| MH 27 SSE |
| MH 27 SSW |
| MH 27 SW |
| MH 27 |
| MH-28 |
| Manhole file 1 9 |
| MH 28 Bottom |
| MH 28 E |
| MH 28 Location |
| MH 28 N |
| MH 28 S |
| MH 28 SE |
| MH 28 W |
| MH 28 |
| MH-30 |
| Manhole file 1 10 |
| MH 30 Bottom |
| MH 30 E |
| MH 30 Location |
| MH 30 N |
| MH 30 NW |
| MH 30 S |
| MH 30 W |
| MH 30 |
| MH-31 |
| Manhole file 1 11 |
| MH 31 Bottom |
| MH 31 E |
| MH 31 Location |
| MH 31 N |
| MH 31 NW |
| MH 31 S |
| MH 31 SE |
| MH 31 W |
| MH 31 |
| MH-33 |
| Manhole file 1 12 |
| MH 33 Bottom |
| MH 33 Location |
| MH 33 N |
| MH 33 NE |
| MH 33 S |
| MH 33 SE |
| MH 33 W |
| MH 33 |
| MH-33A |
| Manhole file 1 13 |
| MH 33A Bottom |
| MH 33A E |
| MH 33A Location |
| MH 33A N |
| MH 33A NE |
| MH 33A NW |
| MH 33A S |
| MH 33A SW |
| MH 33A |
| MH-34 |
| Manhole file 2 1 |
| MH 34 Location |
| MH 34 Shaft |
| MH 34 |
| MH-43 |
| Manhole file 2 2 |
| MH 43 Bottom |
| MH 43 E |
| MH 43 Location |
| MH 43 N |
| MH 43 NW |
| MH 43 S |
| MH 43 W |
| MH 43 |
| MH-44 |
| Manhole file 2 3 |
| MH 44 Bottom |
| MH 44 E |
| MH 44 Location |
| MH 44 N |
| MH 44 NW |
| MH 44 S |
| MH 44 W |
| MH 44 |
| MH-46 |
| Manhole file 2 4 |
| MH 46 Bottom |
| MH 46 E High |
| MH 46 E Low |
| MH 46 Location |
| MH 46 N |
| MH 46 NE Low |
| MH 46 S |
| MH 46 W |
| MH 46 |
| MH-47 |
| Manhole file 2 5 |
| MH 47 Bottom |
| MH 47 E |
| MH 47 Location |
| MH 47 N |
| MH 47 S |
| MH 47 W |
| MH 47 |
| MH-48 |
| Manhole file 2 6 |
| MH 48 Bottom |
| MH 48 E |
| MH 48 Location |
| MH 48 N |
| MH 48 S |
| MH 48 W |
| MH 48 |
| MH-49 |
| Manhole file 2 7 |
| MH 49 Bottom |
| MH 49 ENE |
| MH 49 Location 2 |
| MH 49 Location |
| MH 49 N |
| MH 49 NNE |
| MH 49 SSW |
| MH 49 SW |
| MH 49 W |
| MH 49 |
| MH-50 |
| MH-52 |
| Manhole file 2 9 |
| MH 52 Bottom |
| MH 52 E |
| MH 52 Location |
| MH 52 N |
| MH 52 NW |
| MH 52 S |
| MH 52 W |
| MH 52 |
| MH-52A |
| MH-52C |
| Manhole file 2 11 |
| MH 52C Bottom |
| MH 52C E |
| MH 52C Location |
| MH 52C N |
| MH 52C S |
| MH 52C W |
| MH 52C |
| MH-52D |
| Manhole file 2 12 |
| MH 52D Bottom |
| MH 52D E |
| MH 52D Location |
| MH 52D N |
| MH 52D S |
| MH 52D W |
| MH 52D |
| MH-52E |
| Manhole file 2 13 |
| MH 52E Bottom |
| MH 52E E |
| MH 52E Location |
| MH 52E N |
| MH 52E S |
| MH 52E W |
| MH 52E |
| MH-54 |
| Manhole file 2 14 |
| MH 54 Bottom |
| MH 54 E |
| MH 54 Location |
| MH 54 N |
| MH 54 S |
| MH 54 W |
| MH 54 |
| MH-55 |
| MH-56 |
| Manhole file 2 16 |
| MH 56 Bottom |
| MH 56 Location |
| MH 56 NE |
| MH 56 NW |
| MH 56 SE |
| MH 56 SW |
| MH 56 |
| 11X17_DanvilleCombined.pdf |
| 6390G-001 |
| 6390E-001 |
| 6390ES-101 |
| 6390ES-102 |
| 6390E-401 |
| 6390E-402 |
| 6390E-501 |
| 6390E-601 |
| 6390E-602 |
| 6390PS-101 |
| Topo Exhibit |
| Elec Exhibit |
File details come from the government source that posted it.