36C25218B0014-004.pdf

PDF 8 MB Posted

Attached to
Replace Medium Voltage Circuits 2, 3, 5 550-16-102 Federal contract opportunity
Solicitation number
36C25218B0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25218B0014 550-16-102 Construction Drawings V2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Medium Voltage Circuits 2, 3, 5 550-16-102, newest first.
File Type Posted
36C25218B0014-00005000.docx DOCX document
36C25218B0014-00004000.docx DOCX document
36C25218B0014-00004001.pdf PDF
36C25218B0014-00003000.docx DOCX document
36C25218B0014-00002002.pdf PDF
36C25218B0014-00002001.pdf PDF
36C25218B0014-00002000.docx DOCX document
36C25218B0014-00001000.docx DOCX document
36C25218B0014-00001001.docx DOCX document
36C25218B0014-00001002.pdf PDF
36C25218B0014-002.docx DOCX document
36C25218B0014-001.docx DOCX document
36C25218B0014-003.pdf PDF
36C25218B0014-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHADANSHOVIM1

Typewritten Text Deductive Bid Alternate #2 Not in Contract

VHADANSHOVIM1

Line

VHADANSHOVIM1

Typewritten Text Deductive Bid Alternate #3 Not in Contract

VHADANSHOVIM1

Line

VHADANSHOVIM1

Text Box Deductive Bid Alternate #4

VHADANSHOVIM1

Line

VHADANSHOVIM1

Text Box Deductive Bid Alternate #1

Line

Existing T/58A To Remain

VHADANSHOVIM1

Typewritten Text X

VHADANSHOVIM1

Typewritten Text Not In Contract

VHADANSHOVIM1

Polygon

VHADANSHOVIM1

Line

Line

Deductive Bid Alternate #2 Not in Contract

VHADANSHOVIM1

Typewritten Text Deductive Bid Alternate #3 Not in Contract

VHADANSHOVIM1

Typewritten Text Existing T/58A To Remain

VHADANSHOVIM1

Line

VHADANSHOVIM1

Typewritten Text

XX

VHADANSHOVIM1

Line

VHADANSHOVIM1

Line

VHADANSHOVIM1

Typewritten Text

372 FT

VHADANSHOVIM1

Typewritten Text

387 FT

VHADANSHOVIM1

Typewritten Text

292 FT

VHADANSHOVIM1

Typewritten Text

203 FT

VHADANSHOVIM1

Typewritten Text

250 FT

VHADANSHOVIM1

Typewritten Text

291 FT

VHADANSHOVIM1

Typewritten Text

250 FT

VHADANSHOVIM1

Typewritten Text

110 FT

VHADANSHOVIM1

Typewritten Text

70 FT

VHADANSHOVIM1

Typewritten Text Remove Cable from T/14 to T/13

VHADANSHOVIM1

Line

VHADANSHOVIM1

Line

VHADANSHOVIM1

Typewritten Text Deductive Bid Alternate #4

VHADANSHOVIM1

Line

VHADANSHOVIM1

Text Box Deductive Bid Alternate #1

Danville_100%-Resubmittal
0 - VA Danville Cover
0 9 -Introduction-Letter_SIGNED
0.1 - Danville TOC
1. EXECUTIVE SUMMARY
1.1. Introduction Letter
1.2. Executive Summary
2. GENERAL OVERVIEW
2.1. Station Information
2.2. Electrical Utility System Overview
2.3. MV Distribution System Overview
2.4. Calculation Methods
2.5. Study Assumptions
3. CONSTRUCTION NARRATIVES, PRE-PROPOSAL MEETING/SCOPE EVALUATION
3.1. Narratives
3.2. Pre-proposal Meeting/Scope Evaluation
4. MV CIRCUIT 2, 3 AND 5 ARC FLASH ANALYSIS UPDATE
4.1. Flash Hazard Analysis
4.2. Hazard Risk Category Classification Table
4.3. Arc Flash Evaluation Report
5. MV CIRCUIT 2, 3 AND 5 PROTECTIVE DEVICE COORDINATION STUDY UPDATE
5.1. Analysis and Recommendations
5.2. TCC Descriptions, Comments, and Recommendations
6. MANHOLE AND DUCT BANK INVESTIGATION AND ELECTRICAL MAPPING
6.1. Manhole and Duct Bank Inspections for Circuits# 2, 3, & 5
6.2. Civil Survey, Electrical and Topographical Mapping
APPENDICES
A. VA UTILITY INFORMATION
B. CONSTRUCTION DOCUMENTS, SPECIFICATIONS, BOD CUTSHEETS, CONSTRUCTION COST ESTIMATE
C. SKM INPUT REPORT AND ONE LINE DIAGRAM MODEL
D. SOW/SCHEDULE/COMMENTS
E. EMT Manhole and Duct bank Inspections for Circuits# 2, 3, & 5 Report and Photos
01_Divider
1 Exec Summary
02_Divider
2 - General Overview
2.1. Site Information
2.2. Electrical Utility System Overview
2.3. MV Distribution System Overview
2.4. Calculation Methods
2.5. Study Assumptions
2.5.1. Transformers:
2.5.2. Primary Underground Raceways:
2.5.3. Distances / Routing
03_Divider
3 - Construction Narratives
2.
3.
3.1. Narratives
Construction Specific Scope of Work:
3.2. Pre-proposal meeting/Scope Evaluation/Review minutes:
04_Divider
4 - Arc Flash Analysis
4.1. Arc Flash Hazard Analysis
4.2. Hazard Risk Category Classification Table
A listing of minimum protective FR clothing and the evaluation criteria for each category is given within NFPA 70E. Note that the code tabulations represent a minimum requirement. The final survey assessment reports will include the specific tables us...
4.3. Arc Flash Evaluation Report
The evaluation report for Arc Flash will include a listing of devices that may have settings altered in order to reduce the potential energy release and subsequent hazard to personnel.
HDR found no Arc Flash Hazard concerns in the Medium Voltage Systems. All Medium Voltage Equipment has incident energy less than 40 cal/cm2. See Appendix C-3 for complete Arc Flash Evaluation Report.
05_Divider
5 - Protective Device Coordination Study
5.1 Analysis
5.2 Descriptions, Comments, and Recommendation
5.2 Protective Device Coordination
T102
T102_
T14
T58
06_Divider
6 Manhole and Duct Bank Investigation and Electrical Mapping
6.1 Manhole and Duct Bank Inspection for Circuits # 2, 3 and 5
6.2 Civil Survey, Electrical and Topographical Mapping
HDR, through Civil sub-contractor, Weaver Consultants Group performed a site surveys (July 2016 and Feb. 2017) to do utility location services, electrical and topographical mapping within the scope of work and to obtain the field data required to vali...
6.2DANVILLE ELECTRIC EXHIBIT 02-03-2017
Sheets and Views
4355-300-32-01

6.3DANVILLE TOPO EXHIBIT 07-28-16 DRAFT

A
A_Divider
Memo Style
B-1
B-1_Divider
Danville_11X17
6390G-001_(11x17)
6390E-001_(11x17)
6390ES-101_(11x17)
6390ES-102_(11x17)
6390E-401_(11x17)
6390E-402_(11x17)
6390E-501_(11x17)
6390E-601_(11x17)
6390E-602_(11x17)
6390PS-101_(11x17)
Topographic Exhibit
As-Built Electric Exhibit
B-3
B-3_Divider
Appendix B-3
B-3_Divider
1-XTEInterfaceServl
2-EPR PVC 15kV 133
4-BR100003EN
5 A-S&C PMH
5 B-S&C PMH
6-Prolec Products
7-BEDN620130
8-BEDN620130_DRAWING
9-HDR VA Danville IL
10-HDR VA Switchgear BEDN620130 11.8.2016
B-4
B-4_Divider
Estimate-Rev2
C
C. Divider
C-1_Input Report
C-2_ArcFlashEvalReport
C-3_SKMOverallOneLine
D
D-1_Divider
D-1a Statement of Work 550-16-102_R1
D-1aa - VA Danville pre-proposal Meeting Minutes
D-1b1 550-16-102_NTP VA251-16-J-1084
D-1b2 AE Design Schedule
D-2_Divider
D-2a1 550-16-102_Kick Off Meeting VA251-16-J-1084
D-2a2 550-16-102_Design Kick Off Sign in Sheet
D-2b1Danville VA EMT call.txt - Notepad
D-3 Danville VA Comments and HDR Response
D-3_Divider
D-3a 6390-E1.MV.Master.Rev02 Model
D-3b 6390-Line.MV.Master.Rev04 Model
D-3c 35% schematic design review attendance log
D-3d 550-16-102_65% DD Review Comments
8888 Keystone Crossing, Ste. 1100
Item Comment
Basis of Design Narratives:
D-3e Response to 550-16-102_65% DD Review Comments 10.17.2016
D-3f Response to 550-16-102_95% CD Submittal Comments
Sheet1
D-3g Response to 550-16-102_Pre-100% CD Submittal Comments (1)
Sheet1
D-3h HDR - VA Electrical Response Letter 02-03-2017
D-3i HDR - VA Electrical Response Letter 04-21-2017
E
E. Divider
ER - I16089 - Manholes
ER - I16089
HDR ENGINEERING
ENGINEERING REPORT
UPROJECT SCOPE:
UANALYSIS AND RECOMMENDATIONS:
Not Rated - Various Manholes:
As can be seen in the manhole inspection data, the physical condition is good in the majority of the manholes unless otherwise stated. Water is the major problem in most manholes. The majority of the sump pumps have failed and prevent water removal....
The information concerning the circuit routing should not be considered reliable, as the tags could have been placed in error during previous work.
URecommendation:
Water removal; sump pump replacements; and de-energizing circuits to verify circuit routing.
VA MAN-HOLE INSPECTION SHEET
Sheet1
Section 4
MH-6
Manhole file 1 1
MH 6 Bottom
MH 6 E High
MH 6 E
MH 6 Location
MH 6 N
MH 6 S High
MH 6 S
MH 6 W
MH 6
MH-6A
Manhole file 1 2
MH 6A Bottom
MH 6A E
MH 6A Location
MH 6A N
MH 6A S
MH 6A W
MH 6A
MH-7
Manhole file 1 3
MH 7 Bottom
MH 7 E
MH 7 Location
MH 7 N
MH 7 S
MH 7 W
MH 7
MH-8
Manhole file 1 4
MH 8 Bottom
MH 8 E
MH 8 Location
MH 8 N
MH 8 NW
MH 8 S
MH 8 SW
MH 8 W
MH 8
MH-24
Manhole file 1 5
MH 24 Bottom
MH 24 E
MH 24 Location
MH 24 N
MH 24 S
MH 24 W
MH 24
MH-25
Manhole file 1 6
MH 25 Bottom
MH 25 E
MH 25 Location
MH 25 N
MH 25 NW
MH 25 S
MH 25 SE
MH 25 W
MH 25
MH-26
Manhole file 1 7
MH 26 E
MH 26 Location
MH 26 N
MH 26 NE
MH 26 W
MH 26
MH-27
Manhole file 1 8
MH 27 Bottom
MH 27 Location
MH 27 NE
MH 27 NW
MH 27 SE
MH 27 SSE
MH 27 SSW
MH 27 SW
MH 27
MH-28
Manhole file 1 9
MH 28 Bottom
MH 28 E
MH 28 Location
MH 28 N
MH 28 S
MH 28 SE
MH 28 W
MH 28
MH-30
Manhole file 1 10
MH 30 Bottom
MH 30 E
MH 30 Location
MH 30 N
MH 30 NW
MH 30 S
MH 30 W
MH 30
MH-31
Manhole file 1 11
MH 31 Bottom
MH 31 E
MH 31 Location
MH 31 N
MH 31 NW
MH 31 S
MH 31 SE
MH 31 W
MH 31
MH-33
Manhole file 1 12
MH 33 Bottom
MH 33 Location
MH 33 N
MH 33 NE
MH 33 S
MH 33 SE
MH 33 W
MH 33
MH-33A
Manhole file 1 13
MH 33A Bottom
MH 33A E
MH 33A Location
MH 33A N
MH 33A NE
MH 33A NW
MH 33A S
MH 33A SW
MH 33A
MH-34
Manhole file 2 1
MH 34 Location
MH 34 Shaft
MH 34
MH-43
Manhole file 2 2
MH 43 Bottom
MH 43 E
MH 43 Location
MH 43 N
MH 43 NW
MH 43 S
MH 43 W
MH 43
MH-44
Manhole file 2 3
MH 44 Bottom
MH 44 E
MH 44 Location
MH 44 N
MH 44 NW
MH 44 S
MH 44 W
MH 44
MH-46
Manhole file 2 4
MH 46 Bottom
MH 46 E High
MH 46 E Low
MH 46 Location
MH 46 N
MH 46 NE Low
MH 46 S
MH 46 W
MH 46
MH-47
Manhole file 2 5
MH 47 Bottom
MH 47 E
MH 47 Location
MH 47 N
MH 47 S
MH 47 W
MH 47
MH-48
Manhole file 2 6
MH 48 Bottom
MH 48 E
MH 48 Location
MH 48 N
MH 48 S
MH 48 W
MH 48
MH-49
Manhole file 2 7
MH 49 Bottom
MH 49 ENE
MH 49 Location 2
MH 49 Location
MH 49 N
MH 49 NNE
MH 49 SSW
MH 49 SW
MH 49 W
MH 49
MH-50
MH-52
Manhole file 2 9
MH 52 Bottom
MH 52 E
MH 52 Location
MH 52 N
MH 52 NW
MH 52 S
MH 52 W
MH 52
MH-52A
MH-52C
Manhole file 2 11
MH 52C Bottom
MH 52C E
MH 52C Location
MH 52C N
MH 52C S
MH 52C W
MH 52C
MH-52D
Manhole file 2 12
MH 52D Bottom
MH 52D E
MH 52D Location
MH 52D N
MH 52D S
MH 52D W
MH 52D
MH-52E
Manhole file 2 13
MH 52E Bottom
MH 52E E
MH 52E Location
MH 52E N
MH 52E S
MH 52E W
MH 52E
MH-54
Manhole file 2 14
MH 54 Bottom
MH 54 E
MH 54 Location
MH 54 N
MH 54 S
MH 54 W
MH 54
MH-55
MH-56
Manhole file 2 16
MH 56 Bottom
MH 56 Location
MH 56 NE
MH 56 NW
MH 56 SE
MH 56 SW
MH 56
11X17_DanvilleCombined.pdf
6390G-001
6390E-001
6390ES-101
6390ES-102
6390E-401
6390E-402
6390E-501
6390E-601
6390E-602
6390PS-101
Topo Exhibit
Elec Exhibit