Replace Medium Voltage Circuits 2, 3, 5 550-16-102 Federal contract opportunity
Solicitation number
36C25218B0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25218B0014 00004 36C25218B0014 00004.docx

View the file

Other files for this federal contract opportunity

Other files attached to Replace Medium Voltage Circuits 2, 3, 5 550-16-102, newest first.
File Type Posted
36C25218B0014-00005000.docx DOCX document
36C25218B0014-00004001.pdf PDF
36C25218B0014-00003000.docx DOCX document
36C25218B0014-00002000.docx DOCX document
36C25218B0014-00002002.pdf PDF
36C25218B0014-00002001.pdf PDF
36C25218B0014-00001002.pdf PDF
36C25218B0014-00001000.docx DOCX document
36C25218B0014-00001001.docx DOCX document
36C25218B0014-004.pdf PDF
36C25218B0014-002.docx DOCX document
36C25218B0014-001.docx DOCX document
36C25218B0014-003.pdf PDF
36C25218B0014-000.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 01-16-2018 550-18-1-6915-0001 550-16-102 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago

IL

60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago

IL

60064 To all Offerors/Bidders

36C25218B0014 12-11-2017

X X X X SOLICITATION 36C25218B0014; Amendment 00004 550-16-102 Replace Medium Voltage Circuits 2,3,5 at VA Illiana Health Care System, Danville, IL

The purpose of Amendment 00004 to solicitation 36C25218B0014 is as follows:

1. Remove and replace current drawings with attached revised 550-16-102 Construction Drawings V4 Full Size:

Drawings ES-101, ES-102, E401, E-401, and PS-101 have been revised to correct the scales.

2. Government responses to RFI questions.

Claude Humphrey Contracting Officer

PCOE16L2-3303

AMENDMENT 00004 CONTINUATION PAGE

Project Number: 550-16-102 Solicitation Number: 36C25218B0014 Description: Replace Medium Voltage Circuits 2,3,5

The following RFI questions have been submitted regarding this solicitation, representing all questions submitted to the Contracting Officer prior to the deadline established in Solicitation No 36C25218B0014. Bidders are instructed to submit their bids in response to the solicitation “as-is”, taking into consideration all Amendments issued to date. Any remaining issues will be addressed with the successful bidder. Questions and responses are provided for bidder’s information and use.

RFI QUESTIONS/ANSWERS:

1. You can use either XLP or EPR cable. XLP is cheaper but harder to work with. The EPR cable is a stock item an easy to get but the XLP cable is a make only cable. Which do you prefer?

RESPONSE: The Government prefers 15kV (MV-105, 1/C, 133% Rated EPR Insulation, PVC Jacket, Semi-Conducting Insulation, Copper Tape Shield.)

2. The drawings ask for the new air switches to be the 4 compartment style and for them to be the same as the existing switches. Some of the existing switches are shown as S&C PMH switches which are live front switches. The specs ask for dead front switches. Also the single line shows that each switch has 2 ways with switches and the other 2 ways are not shown as switched ways or fused ways except for one switch that shows one way having 200E fuses. There is a huge price difference in the different styles. The most common switch is the style PME-9 Switch which has 2 -600Amp switch ways and 2-200Amp fused ways. Which option would you prefer?

RESPONSE: The Government prefers PME-9 Switch which has 2 -600Amp switch ways and 2-200Amp fused ways is preferred.

3. On sheet E-601 Deductive Bid Alternate #2 & #3 are labeled Not in Contract. Does this mean the work is still to be included in the Base Bid or is the work not in the contract?

RESPONSE: This work is not in the contract and is not to be included in the base bid.

4. The specs call for a SSHO and QC. Can the Superintendent preform these duties?

RESPONSE: Yes, the Superintendent can perform SSHO and QC duties if they are qualified.

5. Does the VA have a preference on the type of insulation for the cable? EPR or XLP the specs call for either.

RESPONSE: Same as RFI Question 1. The Government prefers 15kV (MV-105, 1/C, 133% Rated EPR Insulation, PVC Jacket, Semi-Conducting Insulation, Copper Tape Shield.)

6. The specs call for dead front switches, the prints call for the same as the existing switches. The existing are S&C PMS live front switches. Which switches are required?

RESPONSE: Switches required shall be like PME-9 Switch which has 2 -600Amp switch ways and 2-200Amp fused ways.

7. Fault indicators are called for in the Transformers in the specs. Switches are to have provisions for vault indicators. Are we to provide Fault Indicators in the switches also?

RESPONSE: No, fault indicators are not required for the switches.

8. I have been reviewing ADD#2 full size drawings & they seem to be off in scale.

In Particular the length of run from MH27A & MH27B comes up about 60' on drawings ES-102 & E401 when using the scale as shown. By using the chart for existing runs it appears the length of run would be approx 320' by comparison. Please review & advise if this needs to be forwarded for another addendum RFI?

RESPONSE: Drawings ES-101, ES-102, E401, E-401, and PS-101 have been revised to correct the scales. See revised full sized drawings uploaded with Amendment 00004 on 01/16/2018. The corrected sheets have been dated 1-10-2018.

9. In Spec Section 26 05 11 – 10 1.14 States there will be PCB Equipment to be removed. On Sheet ES-102 General Note “F” states Contractor to dispose of Equipment Identified as PCB Contaminated. I cannot locate any equipment on the prints identifying them as PCB Contaminated. What Equipment is PCB Contaminated?

RESPONSE: None of the equipment on the drawings contain PCBs nor is PCB contaminated.

See attached document: 550-16-102 Construction Drawings V4_Full_Size_PDF.