PWS - Facility Scrap Updated 11152026.docx

DOCX document 86 KB Posted

Attached to
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation number
36C25027Q0075_0001
Issued by

About this file

This is a Performance Work Statement (PWS) for facility scrap and recycling services at the Louis Stokes VA Medical Center and associated Community-Based Outpatient Clinics (CBOCs) in northeast Ohio. The contractor shall provide removal, recycling, and proper disposal of non-hazardous scrap materials including metals, plastics, wood, ceramics, and unserviceable equipment generated through daily operations. Services are structured as an indefinite-delivery, on-call/as-needed contract across five ordering periods from December 15, 2026, through December 14, 2031. The contractor must respond to pickup requests within 48 hours (excluding weekends and Federal Holidays) using a minimum 26-foot box truck or equivalent vehicle and must furnish all labor, equipment, transportation, and materials. Estimated pickups average approximately 15 per month across all sites, with volumes escalating by one pickup per month per site grouping during each successive ordering period (Main Facility: 13–17 monthly pickups; Offsite CBOCs/Other Facilities: 7–11 monthly pickups). Historical monthly scrap weights averaged approximately 22,444 pounds, ranging from 8,644 to 41,504 pounds.

The contractor must deliver recycling proceeds to the LSVAMC Agent Cashier within 14 calendar days of pickup or sale, whichever occurs first, matching reported material categories and weights with zero tolerance for non-submission. All monthly summary performance reports and annual reconciliation/certification reports must be submitted to the Contracting Officer, Contracting Officer's Representative, and GEMS Manager within specified timeframes. The contractor shall provide complete documentation including release forms at each pickup, recycling/disposal facility certifications, and proof of compliance with Ohio EPA and U.S. EPA guidelines. All costs including disposal, tipping, processing, and fuel are included in the per-pickup CLIN price with no separate reimbursement. Performance is measured against a Quality Assurance Surveillance Plan with an Acceptable Quality Level of 95% for most requirements and 100% for waste disposal compliance, documentation completeness, and proceeds delivery. The Government will conduct random monthly observations of collections and annual inspections of disposal/recycling facilities. Service Contract Labor Standards and wage determinations apply, and the contractor must comply with VA Handbook 6500.6 cybersecurity and privacy requirements, VA Directives 7707 and 1850.06 regarding environmental management, and applicable federal and state environmental regulations.

View the file

Other files

File Type Posted
36C25027Q0075 0001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25027Q0075

B.2 PERFORMANCE WORK STATEMENT

Updated: 11/15/2026 Contract Title: Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center and Supported Community Based Outpatient Clinics (CBOCs)

1. INTRODUCTION

This Performance Work Statement (PWS) establishes the performance requirements for the removal, recycling, and proper disposal of scrap materials generated by the Louis Stokes VA Medical Center (LSVAMC) and all associated offsite facilities. The contractor shall achieve timely, compliant, and efficient scrap removal outcomes that support safe operations, environmental stewardship, and regulatory compliance. Contractor performance will be measured against the standards identified in the Performance Requirements Summary (QASP table) and monitored in accordance with the Government's Quality Assurance Surveillance Plan (QASP).

2. BACKGROUND

The Louis Stokes VA Medical Center (541) generates thousands of pounds of scrap materials and unserviceable equipment each week. These materials must be removed and processed through authorized scrap and recycling contractors. Scrap may include metals, wood, plastics, ceramics, and equipment rendered unserviceable that cannot be disposed of in standard dunnage bins.

Due to limited storage space and unpredictable removal timelines, the VA requires a reliable scrap removal service capable of responding quickly and servicing multiple VA locations. The VA seeks to establish a contract structured as five (5) ordering periods, to ensure continuity of these services. Services under this contract shall be performed on an indefinite-delivery, on-call/as-needed basis; no recurring fixed schedule of pickups is guaranteed, and actual service events will be governed solely by demand and issued in accordance with Section 3.2.

3. SCOPE

The contractor shall achieve the removal, recycling, and disposal of scrap materials from LSVAMC and all associated offsite locations, including all labor, equipment, transportation, and materials necessary to accomplish this outcome. The contractor shall furnish its own vehicle(s), with a minimum size of a 26-foot box truck or similar vehicle, to report on-premises at each site, load scrap materials directly, and transport them off-site for recycling or disposal. The contractor may use two (2) smaller vehicles to service a single pickup, provided their combined cargo capacity meets or exceeds that of a 26-foot box truck and all material is removed within the 48-hour response requirement (see Section 3.5(g) and QASP Row 1). Vehicles shall arrive on a staggered schedule and shall not arrive at or occupy dock space simultaneously. Prior to dispatching multiple vehicles for any pickup, the contractor shall coordinate with the COR/Station POC so the Government can confirm that multiple vehicles are warranted for that pickup. Individual pickups generally do not exceed approximately 5,000 lbs., and no maximum individual-item weight or dimension is established; see Section 3.4 for historical monthly weight data. The Government will not provide or lease any dumpsters, roll-off containers, open-top boxes, or compactors. The contractor shall provide all containers and equipment required to perform the work. The Government estimates approximately 15 pickups per month across all listed sites, based on historical experience; the quantities identified in Section 3.3 are intentionally estimated above this historical level to account for anticipated growth and are the controlling figures for pricing and evaluation purposes. All disposal, tipping, processing, fuel, and other costs associated with performing a pickup — including disposal of non-recyclable materials — shall be included in the contractor's applicable per-pickup CLIN price and are not separately reimbursable by the Government. This is provided for planning purposes only and does not constitute a guaranteed minimum or maximum.

The Government reserves the right to add or remove any additional locations, Community Based Outpatient Clinics (CBOCs), or other facilities to the contract as they become available. Furthermore, the Government reserves the right to add, increase, or decrease the quantity, frequency, or scope of collections to allow for fluctuations in client demand that are otherwise unknown at the time of solicitation. The total contract value may increase up to 20% of the base award.

Required outcomes include:

· Scrap collection completed within required response times

· Freight and transportation of materials to authorized recycling/disposal facilities

· Recycling processing performed by authorized/licensed recyclers

· Proper disposal of non-recyclable materials in accordance with applicable regulations

· Return of recycling proceeds to the Government

3.1 SITE LIST AND ADDRESS REFERENCE TABLE

Type
Name
Address
Main Facility
Louis Stokes VA Medical Center – Warehouse Dock
10701 East Blvd, Cleveland, OH 44106
Internal Department
Environmental Management Services (EMS)
Main Facility
Internal Department
Engineering Service
Main Facility
Cemetery
Ohio Western Reserve National Cemetery
10175 Rawiga Rd., Seville, OH 44273
Warehouse
On Station Storage Warehouses
Main Facility
Warehouse
Offsite Warehouse Facilities
4346 Cranwood Pkwy, Warrensville Hts, OH 44122
CBOC
Kent VA Clinic
3838 Cascades Blvd., Kent, OH 44240
CBOC
Canton CBOC
733 Market Avenue South, Canton, OH 44702
CBOC
Lake County CBOC
35000 Kaiser Court, Willoughby, OH 44094
CBOC
Ravenna Outpatient Clinic (N. Chestnut St.)
6751 North Chestnut Street, Ravenna, OH 44266 — the time needed to decommission this site is not yet known; the contractor shall service both Ravenna sites during the transition and shall continue servicing this site until the station closes it, as confirmed by the COR/Logistics Department
CBOC
Warren Outpatient Clinic
1406 Todd N.W., Warren, OH 44485
CBOC
East Liverpool CBOC
15655 State Route 170, Calcutta, OH 43920
CBOC
Akron CBOC
55 West Waterloo Road, Akron, OH 44319
CBOC
Akron CBOC – Annex
95 West Waterloo Road, Akron, OH 44319 — separate pickup point, adjacent to main Akron CBOC; both locations require service
CBOC
Lorain CBOC
5255 N. Abbe Road, Sheffield Village, OH 44035
CBOC
Mansfield CBOC
1025 S Trimble Rd, Mansfield, OH 44906
CBOC
New Philadelphia CBOC
1260 Monroe Avenue, Suite 1A, New Philadelphia, OH 44663
CBOC
Sandusky CBOC
3416 Columbus Avenue S, Sandusky, OH 44870
CBOC
Wade Park Personal Health
Main Facility
CBOC
Youngstown CBOC
2031 Belmont Avenue, Youngstown, OH 44505
CBOC
Parma CBOC
8700 Brook Park Road, Parma, OH 44129
Communications/External Affairs
Ravenna (Loomis Parkway)
4100 Loomis Parkway, Ravenna, OH 44266 — new facility scheduled to open November 16, 2026; this and the Ravenna Outpatient Clinic (N. Chestnut St.) shall both be serviced during the transition period until the N. Chestnut St. site is confirmed deactivated
Communications/External Affairs
LXC (Learning Exchange Center)
Main Campus — located across from the Warehouse Dock, adjacent to the employee parking garage
Communications/External Affairs
EUL (Cleveland VA Midtown Hemodialysis 1st Flr. and CRRC 2nd Flr.)
7000 Euclid Ave., Cleveland, OH 44103
Communications/External Affairs
Park Center Plaza – Building 1
6100 Oak Tree Blvd., Independence, OH 44131 — separate pickup point; both Independence buildings require service
Communications/External Affairs
Park Center Plaza – Building 2
6150 Oak Tree Blvd., Independence, OH 44131 — separate pickup point; both Independence buildings require service
Housing/Logistics
On Station Housing – Logistics Service (Domiciliary/DOM)
Main Campus — attached to the employee parking garage
Manufacturing/Lab
Advanced Manufacturing (Cedar)
11000 Cedar Ave., Cleveland, OH 44106
Surgical Center
Outpatient Surgery Center – Surgical (W)
8901 Superior Ave., Cleveland, OH 44106
Vet Center
Vet Center East
24197 Broadway Ave., Oakwood Village, OH 44146
Vet Center
Vet Center West
4220 Cleveland Ave NW, Canton, OH 44702
Other (Prosthetics)
Health Aide of Ohio
6940 Engle Rd., Suite A, Cleveland, OH 44130
Other
Fisher House
10521 Lee Ave., Cleveland, OH 44106

3.2 ORDERING AUTHORITY — WHO MAY REQUEST A PICKUP

All pickups under this contract are on-call/as-needed. Pickups shall be initiated ONLY by, or with the express prior permission of, one of the following:

· The VA Northeast Ohio Healthcare System (VANEOHS) NX – Equipment Team

· The Logistics Department

· The Contracting Officer (CO) No other individual, service, department, or site (including individual CBOC or clinic staff) is authorized to request, schedule, or direct a pickup under this contract. If the contractor receives a pickup request from anyone other than the NX Equipment Team, Logistics Department, or the CO, the contractor shall decline the request and shall verify authorization with one of the above parties before dispatching a vehicle. The contractor shall not be entitled to payment for any pickup performed at the direction of an unauthorized requester, and performing such an unauthorized pickup may be treated as a performance and invoicing discrepancy under the QASP.

The CO will issue one (1) funded annual task order per ordering period and individual pickups are authorized under the funded order by the NX/Logistics/CO per PWS 3.2.

3.3 ESTIMATED PICKUP VOLUME

The following pickup volumes are Government estimates for planning purposes only, provided on an on-call/as-needed basis, and do not constitute a guaranteed minimum or maximum. Estimated monthly pickup volume shall escalate by one (1) pickup per month, per site grouping, with each new ordering period, as follows:

Site Grouping
Ordering Period 1
Ordering Period 2
Ordering Period 3
Ordering Period 4
Ordering Period 5
Main Facility (Section 3.1)
13/month
14/month
15/month
16/month
17/month
Offsite CBOCs and Other Facilities (Section 3.1)
7/month
8/month
9/month
10/month
11/month

Estimated Annual Pickup Totals (for planning/pricing purposes; derived from the monthly figures above):

Site Grouping
Ordering Period 1
Ordering Period 2
Ordering Period 3
Ordering Period 4
Ordering Period 5
Main Facility
156/year
168/year
180/year
192/year
204/year
Offsite CBOCs and Other Facilities
84/year
96/year
108/year
120/year
132/year
Combined Total
240/year
264/year
288/year
312/year
336/year

As a courtesy, the contractor should make every effort to remind the government POC once 80% usage of a particular clin's annual estimated quantity has been reached. The government will independently track usage against each clin as well. There shall be no services performed beyond a clin's annual estimated/not-to-exceed quantity without a contract modification.

3.4 HISTORICAL WEIGHT DATA (ESTIMATE ONLY)

The following represents the historical average monthly weight of scrap collected across all sites during the preceding 12-month period, provided for planning and pricing purposes only:

Month
Weight (lbs.)
October 2025
32,330
November 2025
41,504
December 2025
25,289
January 2026
8,644
February 2026
35,076
March 2026
18,538
April 2026
22,833
May 2026
12,572
June 2026
17,638
July 2026
24,304
August 2026
8,809
September 2026
21,789
FY 2026 Annual Total
269,326
Historical Monthly Average FY 2026
~22,444 lbs./month

Disclaimer: the historical weight data and monthly average provided above are estimates only, based on prior-year data, and are furnished for informational and planning purposes only. These figures do not constitute actual, guaranteed, minimum, or maximum weights to be collected under this contract. Actual scrap weights collected in any given month or ordering period may be higher or lower than the historical average shown, and the government makes no representation or warranty as to future volume. The contractor shall not rely on these figures as a basis for any claim, equitable adjustment, or dispute regarding actual volumes encountered during performance.

3.5 PICKUP CONDITIONS AND ACCESS

(a) Staging and interior retrieval. Material is generally staged in warehouse or dock areas. On occasion, pickups may require retrieval from non-staged locations, including offices, basements, mechanical rooms, other floors, or multiple interior locations within a facility. The contractor shall furnish the labor and equipment necessary for such retrieval.

(b) Site access. The Government is not aware of any height, weight, parking, or access restrictions at the sites listed in Section 3.1. The contractor is responsible for assessing site access conditions.

(c) No additional compensation. Interior retrieval, additional labor, or additional equipment needed to complete a pickup is included in the applicable per-pickup CLIN price. No separate special request, scope modification, or additional compensation will be authorized for such effort.

(d) Pickup weight. Individual pickups generally do not exceed approximately 5,000 lbs. No maximum individual-item weight or dimension is established.

(e) Pre-arrival information. Photographs of material will not be provided. Upon order placement, the contractor may ask the requester to identify what is being picked up, whether any heavy or oversized items are included, and estimated weights. The Government will respond on a reasonable-efforts basis.

(f) Material composition. Material composition varies by pickup, and the Government has no historical data on material mix.

(g) 48-hour response period. The 48-hour response period begins at the time of notification by an authorized requester and does not include weekends or Federal Holidays. If a pickup must occur on a weekend, the Government will coordinate with the contractor to allow ample time to arrange the pickup. Weekend pickups are uncommon.

4. DEFINITIONS

4.1 HOSPITAL SCRAP

Non-hazardous materials and unserviceable equipment generated through daily operations, maintenance, construction, and modernization activities.

Acceptable Scrap Materials

· Metals: steel, aluminum, copper, stainless steel, fixtures, carts, bed frames, piping

· Plastics: non-medical plastic components, broken bins, containers

· Wood: pallets, crating, damaged furniture

· Ceramics and Glass: broken tiles, fixtures, non-hazardous glass

· Unserviceable Equipment: items rendered unusable and designated for scrap

· Mixed Scrap: items containing ≤10% non-metal materials (rubber, insulation [non-asbestos], cork, concrete, etc.)

Prohibited Materials

· Hazardous materials

· Liquids or gases

· Enameled scrap

· Biomedical waste

· IT equipment requiring data sanitization

· Any material requiring special disposal under environmental regulations All items collected must be free of any liquids, refrigerants (e.g., Freon), and other prohibited materials identified above. Where an authorized pickup contains a prohibited item mixed with otherwise acceptable scrap, the contractor may decline to collect that specific item and leave it at the Government facility while completing collection of the remainder of the authorized pickup. Declining a prohibited item under this provision shall not be considered incomplete or deficient performance under the QASP, Row 1.

4.2 RATIONALE FOR PERFORMANCE REQUIREMENTS

Timely, compliant scrap removal is required to:

1. Maintain safe work environments — accumulated scrap creates fire hazards and blocks pathways.

2. Ensure regulatory compliance — with OSHA, Joint Commission standards, and federal/state environmental regulations.

3. Support operational efficiency — Engineering, Logistics, and EMS require clear staging areas.

4. Manage limited storage space — particularly at CBOCs with minimal capacity.

5. Promote environmental stewardship — recycling reduces landfill waste and supports VA sustainability goals.

6. Return proceeds to the VA — recyclable scrap generates funds returned to the VA Agent Cashier.

4.3 DEFINITION OF "PICKUP": For purposes of billing under the applicable CLIN/SLIN, one billable "pickup" is defined as one load, not one job or service event. Where servicing a single authorized request at one location requires multiple truckloads/trips (e.g., due to vehicle capacity), each truckload/trip constitutes a separate billable pickup. Notwithstanding the foregoing, the use of multiple vehicles to service a single authorized pickup request at a single location constitutes one (1) pickup for invoicing and CLIN purposes, regardless of the number of vehicles dispatched. The contractor shall not invoice multiple vehicles responding to the same pickup event as separate pickups under the applicable per-pickup CLIN.

5. APPLICABLE DIRECTIVES AND REFERENCES

The contractor shall perform all work in accordance with the following directives and regulations, as applicable and as may be updated or superseded during the period of performance:

· VHA Directive 7707, VHA Green Environmental Management System (GEMS) and Governing Environmental Policy Statement — va.gov/vhapublications, pub_ID=9234

· VHA Directive 1850.06, Waste Management Program — va.gov/vhapublications, pub_ID=9875

· VA Directive 0057, VA Environmental Management Program — va.gov/vapubs, Pub_ID=1404

· VA Financial Policy, Volume IV, Chapter 4 – Recycling Revenue — department.va.gov/financial-policy-documents

6. HOURS OF PERFORMANCE / FEDERAL HOLIDAYS

Scrap pickup services shall occur Monday–Friday during normal business hours, 8:00 AM–4:30 PM, excluding Federal Holidays. Pickups on weekends or outside these days and hours are uncommon and shall occur only by prior coordination with the COR/Station POC (see Section 3.5(g)). Federal Holidays shall be defined in accordance with the schedule published annually by the U.S. Office of Personnel Management (OPM) for the applicable calendar year(s) of performance. Federal Holidays currently observed are:

· New Year's Day

· Martin Luther King Jr.'s Birthday

· Washington's Birthday

· Memorial Day

· Juneteenth National Independence Day

· Independence Day

· Labor Day

· Columbus Day

· Veterans Day

· Thanksgiving Day

· Christmas Day Note: Exact dates shift each calendar year and shall be confirmed against the current OPM Federal Holiday schedule at time of performance, rather than fixed dates listed in this PWS.

7. REPORTING REQUIREMENTS AND AGENT CASHIER PROCEEDS

This section is the single, controlling reference for all reporting and proceeds-handling requirements under this contract. The QASP (Performance Requirements Summary) and Section 14 (Deliverables Summary) cross-reference this section rather than restating its requirements, to avoid inconsistency.

7.1 REPORT RECIPIENTS

All reports required under this section shall be submitted simultaneously to all three of the following:

· The Contracting Officer (CO)

· The Contracting Officer's Representative (COR)

· The GEMS Manager

7.2 REPORT FREQUENCY AND DUE DATES

Report
Frequency
Due Date
Monthly Summary Performance Report
Monthly
Within 5 calendar days of the end of the previous month
Annual Reconciliation and Certification Report
Annually (once per ordering period)
Within 30 calendar days of the expiration of each Ordering Period

7.3 REQUIRED CONTENT — MONTHLY SUMMARY PERFORMANCE REPORT

Each monthly report shall include, at minimum:

1. Date and time of each pickup

2. Location/site of each pickup

3. Driver Name/Vehicle ID

4. Gross Weight of materials collected at time of pickup

5. Materials collected, itemized by Category and Subtype per the Material Category Reporting Breakdown in Section 7.5

6. Current market value of each material subtype reported at the time of pickup. Current market value shall be established using the actual recycler/processor settlement rate on the date of drop-off/transaction. Final disposal/recycling site(s) for each material stream

7. Total recycling proceeds generated for the reporting month, itemized by material Category and Subtype

7.4 REQUIRED CONTENT — ANNUAL RECONCILIATION AND CERTIFICATION REPORT

The annual report shall consolidate and reconcile all monthly reports submitted during the ordering period, and shall confirm, itemized by material Category and Subtype (per Section 7.5):

1. Total tonnage/weight of scrap collected against the sum of all monthly reports for the period

2. Total recycling proceeds reported by the contractor against amounts actually received and recorded by the LSVAMC Agent Cashier (see Section 7.6)

3. Total number of pickups performed against the number invoiced for the period The COR shall independently validate the contractor's annual reconciliation against Agent Cashier deposit records and the monthly report history before accepting the report. The contractor's submission of the annual report is not, by itself, sufficient for acceptance — COR validation is required. This report is due regardless of whether the contract continues into a subsequent Ordering Period; the Annual Reconciliation and Certification Report for the final Ordering Period is required even if the contract is not extended or renewed.

7.5 MATERIAL CATEGORY REPORTING BREAKDOWN

All reports (monthly and annual) shall itemize collected materials according to the following categories and subtypes, including weight/tonnage and, where applicable, market value and proceeds attributable to each. Materials shall not be combined into a single figure across categories or subtypes, except for genuinely commingled "Mixed Scrap" as defined in Section 4.1.

Category
Subtypes to be Reported
Proceeds Expected?
Metal
Steel, Iron, Copper, Brass, Aluminum, Stainless Steel, Nickel, and any other metal type collected (each itemized individually)
Yes
Other Recyclables
Plastics, Cardboard, and any other non-metal recyclable material collected
Yes, where applicable
Non-Recyclables
Wood, Foam, and any other non-recyclable material collected and sent to disposal
No — tracked by weight/volume only, for waste-stream and GEMS diversion-rate reporting purposes consistent with VHA Directive 1850.06 and VHA Directive 7707 (Section 5)

7.6 AGENT CASHIER PROCEEDS — DELIVERY REQUIREMENTS (MANDATORY — NO EXCEPTIONS)

Recycling proceeds are a mandatory deliverable under this contract, not a discretionary or "as-available" item. The contractor shall deliver proceeds for every load of recyclable material collected under this contract, without exception, in accordance with VA Financial Policy, Volume IV, Chapter 4 (Section 5). Failure to submit proceeds — including silent non-submission, non-response, or claiming no recyclable value without required certification per Section 7.6(4) below — constitutes a material breach of this contract and shall be treated as a critical, not minor, performance failure under QASP Row 7 and the CDR process in QASP Section 4.

All recycling proceeds generated under this contract shall be delivered as follows:

1. Form and address of payment: Check, made payable and mailed to:

Louis Stokes VA Healthcare Center Attn: Agent Cashier / FCP 2516-0162 – Medical Facilities 10701 East Blvd. Cleveland, OH 44106

2. Timing: Proceeds shall be received by the Agent Cashier within 14 calendar days of the date recyclable items are picked up and/or sold/processed by the contractor, whichever occurs first. This is a hard deadline, not a target.

3. Matching requirement: Each proceeds payment shall correspond to, and be traceable against, the material Category/Subtype and weight figures reported in that month's Summary Performance Report (Section 7.3). A monthly report showing recyclable metal or other-recyclable tonnage collected, with no corresponding proceeds received by the Agent Cashier within the required timeframe, is a per se performance failure requiring no further COR investigation to substantiate — the absence of a matching payment is itself the deficiency.

4. Zero-proceeds certification: If, in any given month, the contractor collected only material categories that generate no proceeds (see Section 7.5, "Non-Recyclables"), the contractor shall affirmatively state this in that month's report and certify that no recyclable material with market value was collected. A contractor may not simply omit the proceeds line item; absence of a certification statement where proceeds are otherwise expected shall itself be treated as a reporting failure under QASP Row 2.

5. Market value volatility. The Government recognizes that market value for recyclable metals and other recyclable commodities fluctuates and may, at times, decline substantially or approach zero for reasons outside the contractor's control (e.g., regional or national commodity price swings, processor/recycler demand changes). This provision does not excuse or reduce the contractor's obligations under Sections 7.6(2) through (4); the contractor remains required to deliver any proceeds actually realized within the required timeframe, and to certify zero-proceeds months in accordance with Section 7.6(4).

Where a proceeds discrepancy identified under Section 7.6(3) coincides with a documented, verifiable decline in market value for the specific material category/subtype in question, the COR shall consider that market data — in addition to, not in place of, the contractor's own required certification and documentation — before determining whether the discrepancy reflects a performance failure or a legitimate market-driven reduction in proceeds. The contractor bears the burden of certifying zero or reduced proceeds under Section 7.6(4); citing market volatility after the fact does not substitute for that certification and does not, by itself, cure a missing or late certification. The COR retains sole discretion to determine, based on the totality of the record, whether a given month's proceeds figure is consistent with prevailing market conditions.

6. Documentation: Copies of recycling/disposal transaction documentation supporting each proceeds payment (e.g., recycler settlement sheets, scale tickets, sale receipts) shall be provided to Logistics Service 90 (W) and the COR within 1 week of disposal, per Section 14 (Deliverables Summary). The COR shall independently confirm receipt of funds with the Agent Cashier — the COR shall not rely solely on the contractor's self-reported figures.

7. Escalation for non-compliance: Given documented prior performance issues with proceeds non-submission under this requirement, the CO/COR shall treat any missed, late, or unsubstantiated proceeds delivery as grounds for immediate issuance of a Contract Discrepancy Report (CDR) under QASP Section 4, without a warning period, and shall consider such failures an aggravating factor in any past performance (CPARS) evaluation and in the decision to exercise future ordering periods.

8. No deduction of contractor costs. The contractor shall remit 100% of the actual proceeds received from the recycler/processor for each load of recyclable material, with no deduction for transportation, processing, handling, sorting, scale fees, or administrative costs incurred by the contractor. Such costs are compensated separately through the contractor's per-pickup CLIN price under Section 3.

7.7 RETENTION OF TITLE — SCRAP REMAINS VA PROPERTY UNTIL PAYMENT CLEARS

The materials collected under this contract are excess Government personal property for which VA has no further use, disposed of for scrap value under VA's local scrap-sale authority (VA Directive/Handbook 7348) and the recycling-revenue-retention provisions of 41 C.F.R. § 102-38.295 and VA Financial Policy, Volume IV, Chapter 4. Collection of this material by the contractor constitutes a conditional sale of Government property, not an unconditional transfer.

(1) Title retention. Title to each load of scrap material remains with the Department of Veterans Affairs until the Agent Cashier has received and confirmed clearance of the corresponding proceeds payment for that specific load, in accordance with Section 7.6. Physical removal, transport, processing, or possession of the material by the contractor prior to payment clearance does not transfer title. Title transfers to the contractor only upon confirmed clearance of payment for that load or shipment.

(2) Backup remedies where title cannot practically be enforced. The parties recognize that once scrap material has been processed, melted, commingled, or resold by the contractor to a third party, VA's title interest in the specific physical material may no longer be practically recoverable. Accordingly, independent of the title-retention right described above, the contractor's right to collect and dispose of scrap material under this contract is conditioned on timely delivery of proceeds under Section 7.6, and failure to deliver proceeds for any load — regardless of the condition, location, or disposition of the underlying material — constitutes a material breach and unjust enrichment of the contractor at the Government's expense. In such event, and in addition to any remedy arising from the title-retention right in 7.7(1), the Government reserves all remedies available under this contract, including the CDR process in QASP Section 4, and applicable law, including:

(a) Recovery of the fair market value of the unremitted proceeds, calculated using prevailing scrap/recyclable material rates at the time of pickup or sale, whichever is documented;

(b) Withholding of amounts otherwise due to the contractor under this or any other VA contract, to the extent permitted by law and regulation, as an offset against unremitted proceeds; and

(c) Treatment of the failure as a material breach supporting termination for default, in addition to the CDR and CPARS consequences described in Section 7.6(7).

8. SECURITY REQUIREMENTS

· Contractor personnel shall report to the warehouse or Ohio Western Reserve National Cemetery upon arrival and present valid identification.

· No logical (IT) system access is required or authorized under this contract.

· The 6500.6 requirements incorporated in this PWS (VA Handbook 6500.6 (October 2, 2026), Section 8, Sections 1, 2, 3, 5, 9, 10 and 13, and Appendix D) apply to contractor personnel for physical access, for any VA information the contractor may encounter incidentally, and for the handling of equipment and media. Their inclusion does not authorize logical (IT) access to VA systems.

· Physical access shall be supervised by VA personnel at all times.

· Scrap and recycled material may include equipment or media that contains or may contain VA information (for example, computers, copiers, printers, phones, and removable or fixed storage). The contractor shall not access, copy, retain, resell, or disclose any data found on such items, shall treat any VA information encountered as VA property subject to Sections 1 and 2 of the incorporated 6500.6 language, and shall immediately notify the COR/Station POC if data-bearing equipment appears not to have been sanitized by VA. Sanitization of VA media remains a VA responsibility prior to turnover.

9. GOVERNMENT-FURNISHED EQUIPMENT/INFORMATION (GFE/GFI)

Pallet jacks and flatbed carts will be made available for contractor use in locations where such equipment is normally used and housed (typically warehouse areas). The Government generally attempts to stage items in such areas, though this may not always be the case depending on the pickup location. The Government will not provide tow motors or forklifts. The contractor shall furnish all other equipment necessary to perform the required services**, including any liftgate or similar equipment needed to load items at locations without pallet jack/flatbed cart availability**. VA personnel may stage items using VA-owned equipment as needed prior to contractor pickup. For planning purposes, the contractor may ask the authorized requester (NX Equipment Team, Logistics Department, or CO) what types of items are expected to constitute the majority of the materials for a specific on-call pickup, to assist the contractor in determining appropriate equipment for that pickup. The Government will provide this information to the extent reasonably known at the time of the request, but this does not constitute a binding representation of actual pickup contents and does not relieve the contractor of its obligation to be prepared for variation in material type consistent with Section 3.

10. RISK CONTROL

· Contractor shall designate a supervisor authorized to communicate with VA warehouse personnel.

· No contact with patients is permitted.

· Contractor personnel shall comply with all site safety protocols and furnish appropriate PPE for their own staff.

· The contractor shall provide all training necessary to perform the work described in this contract. Training shall not hamper the quantity, quality, or timeliness of work required under the contract.

11. PLACE OF PERFORMANCE

All work shall occur at the Louis Stokes VA Medical Center and all sites identified in Section 3.1. The contractor shall provide transportation for travel to and from each identified site as needed to perform the requirements of this contract.

12. PERIOD OF PERFORMANCE (ORDERING PERIODS)

This contract shall be structured as five (5) ordering periods.

All services shall be ordered/performed on an indefinite-delivery, on-call/as-needed basis in accordance with Sections 3.2 and 3.3 throughout each ordering period.

Ordering Period
Dates
Ordering Period 1
12/15/2026 – 12/14/2027
Ordering Period 2
12/15/2027 – 12/14/2028
Ordering Period 3
12/15/2028 – 12/14/2029
Ordering Period 4
12/15/2029 – 12/14/2030
Ordering Period 5
12/15/2030 – 12/14/2031

13. COMMUNICATION AND ORDERING PLAN

Given the on-call/as-needed nature of this contract (see Sections 2 and 3.2), no formal phase-in transition is required, as there is no standing equipment, fixed recurring schedule, or incumbent asset handoff associated with this requirement. Instead, the contractor shall submit a Communication and Ordering Plan as part of its quote response, describing the contractor's proposed process for:

· Receiving and confirming pickup requests from the VANEOHS NX Equipment Team, Logistics Department, or the CO (per Section 3.2)

· Designated points of contact and after-hours/emergency contact procedures, if applicable

· Method(s) of communication (phone, email, or other system) the contractor will use to receive and confirm requests

· Internal dispatch procedure ensuring the 48-hour response requirement in QASP Row 1 can be consistently met The Communication and Ordering Plan shall be validated and finalized in coordination with the COR within 10 business days after contract award.

14. DELIVERABLES SUMMARY

Deliverable
Frequency
Due To
Release documentation per pickup
Per pickup
VA site personnel (at time of pickup)
Recycling proceeds
Within 14 days of pickup/sale (see Section 7.6)
Agent Cashier, per Section 7.6 remittance address
Recycling/disposal documentation
Within 1 week of disposal
Logistics Service 90 (W)
Shipment log (date, time, quantities, and type of material shipped)
Maintained continuously
Available to COR upon request
Monthly Summary Performance Report
See Section 7.2
CO, COR, and GEMS Manager (see Section 7.1)
Annual Reconciliation and Certification Report
See Section 7.2
CO, COR, and GEMS Manager (see Section 7.1)
Quality Control Program plan
Once, prior to contract start; resubmit on revision
COR / Contracting Officer
Communication and Ordering Plan
Submitted with quote response; validated within 10 business days after award
Contracting Officer/COR
Limitations on Subcontracting Reporting (D5. Appendix E)
Within 30 calendar days after the start of each new ordering period (Ordering Periods 2–5). Each report shall document LoS compliance for the immediately preceding ordering period.
Contracting Officer

15. SERVICE CONTRACT LABOR STANDARDS / WAGE DETERMINATION

Service Contract Labor Standards apply to this contract. Applicable Wage Determinations can be found at www.SAM.gov. Please refer to Section D: Wage Determinations.

VA Handbook 6500.6

VA Handbook 6500.6, Acquisition Cybersecurity (October 2, 2026), Section 8 — VA Cybersecurity and Privacy Language for Inclusion in Acquisitions (Sections 1, 2, 3, 5, 9, 10 and 13; supersedes the Notice 24-12 text of 6500.6 Appendix C)

6500.6 Appendix D — Contractor Rules of Behavior

(VA Handbook 6500.6, March 12, 2010) Applicability. The Contract Security Checklist for this requirement calls for Appendix C Sections 1, 2, 3, 5, 9, 10 and 13 and Appendix D. VA Handbook 6500.6 was reissued October 2, 2026 and now carries this language in Section 8 (lettered a through m). Using the checklist numbering, the sections below are 1 (General), 2 (VA Information Custodial), 3 (Access to VA Information and VA Information Systems), 5 (Security Incident Investigation), 9 (Product Integrity, Authenticity, Provenance, Anti-Counterfeit and Anti-Tampering), 10 (Viruses, Firmware and Malware) and 13 (Specialized Devices/Systems), reproduced without alteration other than the section numbers. These section numbers are separate from PWS Section 8 and PWS Appendices A and B. Appendix D is retained as previously incorporated. In Appendix D, references to the "COTR" mean the COR designated under this contract. Where a Handbook provision refers to logical access, systems, or software and no such access is authorized (see PWS Section 8), the provision applies only if and to the extent the contractor is later granted such access in writing by the CO.

1. GENERAL

(1) Contractors, Contractor personnel, Sub-Contractor and Sub-Contractor personnel (hereinafter referred to as “Contractor”) will be subject to the same Federal laws, regulations, standards, VA directives and handbooks as VA personnel regarding information and information system security and privacy.

(2) VA Cybersecurity and Privacy language included in the solicitation or contract applies to the Contractor and all Contractor affiliates and agents.

(3) All information systems, applications, and services operating on behalf of or within VA must meet or exceed all applicable federal cybersecurity and risk management minimum standards. At a minimum, systems shall implement and maintain compliance with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-37, Risk Management Framework for Information Systems and Organization: A System Life Cycle Approach for Security and Privacy, Federal Information Security Modernization Act of 2014 (FISMA) requirements, and all applicable federal laws, and Office of Management and Budget (OMB) mandates. Contractual terms, implementation approaches, or operational constraints shall not supersede or circumvent these federal minimum security and compliance requirements. Authority established under this handbook is limited to technical, and enterprise architecture matters; interpretation or adjudication of non-technical policy or programmatic content remains the responsibility of the appropriate business or governing policy offices.

2. VA INFORMATION CUSTODIAL

(1) The Contractor must provide unlimited rights to data / intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is Federal Acquisition Regulation (FAR) 52.227-14, Rights in Data – General.

(a) The Contractor must provide all custom-developed code and technical components developed in the performance of this contract (e.g., documentation; data models; schemas; metadata; architecture designs; configuration scripts; and artifacts required to develop, build, test, and deploy the code for or on behalf of VA) for storage in a VA- designated repository for custom-developed code in a format that allows VA to access, use, modify, distribute, and reuse it in accordance with the Source Code Harmonization and Reuse in Information Technology Act of 2024 (SHARE IT Act).

(b) The Contractor must provide any support and assistance deemed necessary for VA to comply with the SHARE IT Act (e.g., furnishing data for reporting and following federal and VA standards for custom code development).

(2) Information made available to the Contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the contract, service agreement, SOW, PWS, and / or PD. The Contractor shall not use VA information in any other manner without prior written approval from a VA CO. The Contractor shall disclose to the CO all Data to be collected, stored, and accessed and will only collect, store, and access the minimum Data necessary to perform its services. The Contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal laws, regulations, or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and / or policies. The primary clause used to define Government and Contractor data rights is FAR 52.227-14.

(3) The Contractor shall not make copies of VA information unless necessary to perform the requirements of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program, and VA Office of Information Security (OIS) Knowledge Service.

(4) VA information will not be co-mingled with any other data on the Contractor’s information systems or media storage systems. The Contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization. Exceptions to this paragraph will be granted only with the approval of the VA Program Office communicated to the Contractor by the VA CO.

(5) Except for uses and disclosures of VA information specifically authorized by this contract, the Contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The Contractor shall refer all requests for, or inquiries about, VA information and information systems to the VA CO.

(6) Notwithstanding the provision above, the Contractor shall not release VA records protected by Title 38 United States Code (U.S.C.) § 5705, Confidentiality of medical quality- assurance records, and / or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the Contractor is in receipt of a court order or other form of request for the above-mentioned information, the Contractor shall immediately refer that court order or request to the VA CO.

(7) If a VHA contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with Veterans Health Administration (VHA) Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contractor.

(8) Information made available to the Contractor by VA for the performance or administration of this contract, or information developed by the Contractor in performance or administration of the contract, will be protected and secured in accordance with VA Directive 6500, VA Directive 6510, VA Identity, Credential, and Access Management, and VA Handbook 6510, VA Identity, Credential and Access Management.

(9) The Contractor shall store VA sensitive information in an encrypted form, using VA-approved encryption tools which are Federal Information Processing Standards (FIPS)-validated in accordance with requirements on the OIS Knowledge Service. The Contractor shall verify the integrity of transmitted security and privacy attributes. The Contractor shall provide the capability to check the integrity of VA information while it resides in the external system.

(10) The Contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with NIST SP 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations. The cryptographic module used must be FIPS-validated in accordance with requirements on the OIS Knowledge Service.

(11) The Contractor’s firewall security shall meet or exceed VA’s minimum requirements.

(12) The Contractor shall retain all data storage media which have been used to create, collect, process, store, or disseminate any VA data, information, or agency record in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.

(13) The Contractor shall not store or maintain VA sensitive information, including on any form of removable or transportable media, without CO’s prior written approval.

(14) The Contractor, in accordance with Federal and VA policy, shall maintain backup of Data containing VA sensitive information, image repositories, and provisioned environments. The backup storage infrastructure shall be located in physically protected, limited-access facilities within the United States and governed by the cybersecurity Controls set forth herein.

(15) The Contractor shall provide its plan for the disposition of all VA data in its possession, including destruction and return, in accordance with VA Directive 6500 and requirements specified on the VA OIS Knowledge Service, prior to termination or completion of this contract.

(16) The Contractor shall return to VA all data storage media which have been used to create, collect, process, store, or disseminate any VA data, information, or agency record which cannot be sanitized or destroyed as required by Section 2(15) of this contract. Such media include, but are not limited to, printed or handwritten hardcopies (containing text or images), magnetic tapes, magnetic discs, optical discs, solid state devices, or any other removable digital or analog data storage media.

(17) Media shall be returned using VA-approved methods for secure data transfer. If the media contain VA sensitive information, that information must be encrypted by a VA-approved FIPS-validated encryption tool in accordance with requirements on the OIS Knowledge Service. If the Contractor chooses to ship the media, and the media contain no VA sensitive information, such shipment shall be performed in accordance with VA Directive 6340, Enterprise Mail Management. If any of the media to be shipped contain VA Sensitive Information, the shipment shall be performed in accordance with VA Directive 6609, Mailing of Sensitive Personal Information.

(18) The Contractor shall self-certify that the data disposition requirements in Section 2(12)-(15) of this contract have been satisfied, and shall send this self-certification to the VA Program Office and the VA CO within 30 business days of the completion or termination of this contract.

(19) At the end of any contracted lease, loan, or trade-in of equipment, VA shall not return any electronic storage media included in or with equipment if that media has been used to create, collect, process, store, or disseminate VA data, information, or agency record. Any exception to this stipulation will be granted only with the written approval of the VA CO.

(20) VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of Contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements in accordance with Title 38 U.S.C. § 5722(b)(1). This includes, but is not limited to, periodic assessments of the risk and magnitude of harm that could result from the unauthorized access, use, disclosure, disruption, modification, or destruction of information and information systems that support the operations and assets of VA. The Contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to Contractors associated with the contract) to VA, VA's Office Inspector General (OIG), and / or the Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.

3. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

(1) All Contractors shall comply with conditions specified in the Veterans Affairs Acquisition Regulation (VAAR) 852.204-71(d), and Contractor operations are required to be in U.S. All Contractors working with VA information must be permanently located within a jurisdiction subject to the law of the U.S. to the maximum extent practicable. The Contractor shall also ensure to restrict the geographic location of information processing and data storage to facilities located within the legal jurisdictional boundary of the U.S. If services are proposed to be performed abroad, the Contractor must state where all non-U.S. services are provided and obtain the CO’s prior written approval where required by law.

(2) The Contractor shall deliver to VA a detailed risk mitigation plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the Contracting Officer (CO) in writing prior to access being granted.

(3) The Contractor shall ensure that all Contractors assigned to work on the contract undergo the same security investigations and obtain the same levels of clearance as VA employees who have been granted access to VA information at the same level of sensitivity. The level and process of background security investigations for Contractors shall be in accordance with VA Directive 0710, Personnel Vetting Program, and VA Handbook 0710, Personnel Vetting Program.

(4) The Contractor shall request logical (electronic) or physical access to VA information and VA information systems only to the extent that the requested information is needed to perform…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .