This is an Amendment to Solicitation/Modification of Contract (SF 30) for solicitation 36C25027Q0075, issued by the Department of Veterans Affairs Network Contracting Office in Kettering, Ohio, effective November 15, 2026. The amendment revises the Performance Work Statement (PWS) for facility scrap and recycling services at the Louis Stokes VA Medical Center and related VA Northeast Ohio Healthcare System locations, and provides government responses to 43 industry questions submitted during the presolicitation phase.

The revised PWS clarifies that the Ravenna facility will relocate from 6751 North Chestnut Street to 4100 Loomis Parkway, Ravenna, OH 44266, opening November 16, 2026, with both sites serviced during transition until decommissioning is complete. The contractor must provide all containers, equipment, and a 26-foot box truck (or two smaller vehicles with equivalent capacity requiring per-pickup COR coordination) for on-call pickups across multiple VA facilities including the main medical center, Warrensville Heights warehouse, Ohio Western Reserve National Cemetery, and community-based outpatient clinics in Kent and Canton. The government does not provide containers, dumpsters, or standing equipment. Acceptable materials are limited to scrap metal and recyclables excluding electronics, IT assets, hazardous materials, and items requiring data sanitization. Estimated pickups are 240, 264, 288, 312, and 336 for Ordering Periods 1-5 respectively, with approximately 15 monthly pickups based on historical data averaging 22,444 pounds per month. The contractor receives firm fixed-price compensation per pickup and must remit 100% of recycling proceeds to the Government's Agent Cashier within 14 calendar days, along with monthly performance reports and settlement documentation. All proceeds remain government property until payment clears. Site access requires only valid identification with no PIV badging or background checks required. Past performance evaluation considers only the prime contractor, not subcontractors. The prior contract 36C25026P0027 held by E Scrap Solutions had an awarded value of $240,000 for a one-year period.

View the file

Other files

File Type Posted
PWS - Facility Scrap Updated 11152026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

11-15-2026

541-27-1-0355-0004

36C250 Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd Suite 210 Kettering OH 45409-1337

36C250 Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd Suite 210 Kettering OH 45409-1337 To all Offerors/Bidders

36C25027Q0075 10-29-2026

X x The Purpose of this solicitation amendment is to answer questions from industry and to update the Performance Work Statement (PWS).

Please see continuation Pages for Q/A and update(s) to the Performance Work Statement.

Josh Kovar Contracting Officer

Revisions to the Performance Work Statement (PWS) The PWS dated 10/28/2026 is revised as follows. A revised PWS is attached to this amendment, and the revised version supersedes the prior version.

1. PWS Section 3.1 (Ravenna facility). Replace "4100 Loomis Ave., Ravenna, OH" with "4100 Loomis Parkway, Ravenna, OH 44266." Replace "October/November 2026" with "November 16, 2026" for the facility opening. The new facility is scheduled to open on that date.

2. PWS Section 3.1 (Ravenna transition). The new Ravenna facility is scheduled to open on November 16, 2026. The time needed to decommission the 6751 North Chestnut Street site is not yet known. The contractor shall service both Ravenna sites during the transition and shall continue servicing the North Chestnut Street site until the station closes it, as confirmed by the COR/Logistics Department.

3. PWS Section 3 (containers). Replace the sentence "No Government-leased or standing dumpster/roll-off container will be provided or maintained by the contractor" with "The Government will not provide or lease any dumpsters, roll-off containers, open-top boxes, or compactors. The contractor shall provide all containers and equipment required to perform the work."

4. Appendix B. Update the Ravenna entry to the 4100 Loomis Parkway address if it appears there.

Questions and Government Responses Question 1: May the offeror submit past performance references from a proposed small business subcontractor who will perform the majority of the work, and will that record be considered in the evaluation?

Government Response: No. Past performance submitted shall be that of the prime offeror (the entity submitting the quote) only. Past performance of subcontractors, parent companies, affiliates, or predecessor entities will not be considered in the evaluation, regardless of whether the subcontractor is proposed to perform work under this contract. References and PPQs that describe work performed by an entity other than the offeror will not be evaluated. An offeror with no past performance of similar size and scope, or with none that can be verified, will receive a Neutral rating (see Section E.13), which will be neither favorable nor unfavorable.

Question 2: Complete site list. SOW §3.1 lists the Louis Stokes VAMC, the Warrensville Heights warehouse, Ohio Western Reserve National Cemetery, and CBOCs "including" Kent and Canton. Please provide the complete list of locations (with addresses) expected to generate pickup orders in Ordering Period 1.

Government Response: The complete list of locations, with addresses, is included in PWS Section 3.1. All of the locations listed there are places of potential pickups. Some locations are expected to change during future periods of performance. Any updates to the addresses for those locations will be made by bilateral modification.

Question 3: Ravenna location status. The SAM notice references a site at 6751 North Chestnut Street, Ravenna, OH "planned for deactivation." Is that site in scope for this contract, and if so, until what date?

Government Response: Yes. The site at 6751 North Chestnut Street, Ravenna, OH is in scope. The new Ravenna facility at 4100 Loomis Parkway, Ravenna, OH 44266 is scheduled to open on 11/16/2026 and is also in scope (see PWS Section 3.1). The time needed to decommission the North Chestnut Street site is not yet known, and no end date has been set. Services at that site may be required until all items have been removed, so there may be an overlap period during which both Ravenna sites are serviced. The contractor shall continue servicing the North Chestnut Street site until the station closes the location, as confirmed by the COR/Logistics Department.

Question 4: Past Performance Questionnaire (PPQ). Must completed PPQs be submitted with the quote, and how many references are requested? For a quoter with no prior federal contracts, are commercial references acceptable on the PPQ form?

Government Response: (1) Yes. Either completed PPQs or client references are required at the time of quote submission.

(2) Exactly three (3) are requested, whether the offeror submits PPQs or client references, covering similarly sized and relevant contracts or requirements performed within the past four years.

(3) Yes. A quoter with no prior federal contracts may submit commercial references using the Client References method. Provide exactly three (3) client references, and include: entity or organization name; dates of service; description and short narrative of services rendered; POC and contact information (name, phone number, extension, and email address); approximate dollar value of contract/requirement; contract number, if a Federal contract.

Question 5: Evaluation quantities. The Cost Schedule states evaluation quantities are set above historical levels and control pricing. Please confirm the estimated pickup quantities per period used for evaluation, and whether award evaluation is based on extended totals computed from those quantities.

Government Response: The estimated pickup quantities in PWS Section 3.3 and the Price/Cost Schedule control pricing and evaluation. They are 240, 264, 288, 312, and 336 pickups for Ordering Periods 1 through 5, respectively. Yes. Award evaluation is based on the Total Contract Value, which is the extended total of the unit prices multiplied by these quantities, summed across all CLINs and SLINs for all ordering periods (see Section E.13).

Question 6: Proceeds remittance mechanics. Settlement sheets/scale tickets are due within 1 week of each disposal — please confirm (a) the clock starts on the date of sale/disposal, (b) the remittance method and payee (e.g., payment to the Agent Cashier), and (c) whether a standard settlement-sheet format is provided or contractor-generated.

Government Response: (a) Yes. Settlement sheets, scale tickets, and sale receipts are due to Logistics Service 90 (W) and the COR within one (1) week of disposal (PWS Sections 7.6(6) and 14). Separately, proceeds are due within fourteen (14) calendar days of pickup or sale/processing, whichever occurs first (PWS Section 7.6(2)).

(b) Proceeds shall be remitted by check payable to the Agent Cashier, at the address stated in PWS Section 7.6(1).

(c) The Government does not provide a standard format for settlement sheets, scale tickets, or pick tickets. These documents are contractor-generated. Each individual pick ticket (pickup instance) shall show, at minimum, the date, driver, materials picked up, and estimated weight. The Monthly Summary Performance Report shall contain, at minimum, the information required by PWS Section 7.3, including the date and time and location of each pickup, driver name/vehicle ID, gross weight, materials collected itemized by category and subtype per Section 7.5, current market value of each subtype, final disposal/recycling site(s), and total proceeds for the month itemized by category and subtype.

Question 7: Site access for contractor personnel. Are there badging, background-check, or escort requirements for contractor/subcontractor personnel performing pickups at the VAMC, CBOCs, and the National Cemetery, and what is the typical lead time to obtain access approval?

Government Response: No PIV badging is required. Background checks are not required. VA personnel will be present to monitor the pickup of materials. Contractor personnel shall report to the warehouse or cemetery and present valid identification (see PWS Section 8). Because no badging or background check is required, an access approval lead time is not required.

Question 8: Communication and Ordering Plan. Is there a required format or page limit for the Communication and Ordering Plan, and how is it weighted relative to price under the FAR 12.203 comparative evaluation?

Government Response: There is no required format or page limit for the Communication and Ordering Plan. The Government requests that quoters be clear and concise in their responses and avoid self-promotion. The plan shall address the content required by PWS Section 13. The Government is using a comparative evaluation under FAR 12.203, in which there are no weightings. Each quote is compared against the other quotes received.

Question 9: Two-vehicle equivalence. The PWS allows two smaller vehicles whose combined capacity equals a 26-ft box truck, with staggered arrival and prior COR coordination. Must that coordination be arranged per pickup order, or can a standing arrangement be approved at contract start?

Government Response: Coordination shall be arranged per pickup. A standing or global approval will not be granted at contract start. The contractor shall coordinate with the COR/Station POC prior to dispatching multiple vehicles for any pickup (see PWS Section 3).

Question 10: Could you share the expected volumes and material types, the pickup frequency, and whether a site visit is planned before the November 23 deadline?

Government Response: Volumes: The estimated number of pickups is 240, 264, 288, 312, and 336 for Ordering Periods 1 through 5, respectively (PWS Section 3.3). Historical weights by month are provided in PWS Section 3.4.

Material types: Material types are listed in PWS Section 4.1. The Government does not have historical data on the mix of materials (PWS Section 3.5(f)).

Frequency: Pickups are on-call, with no fixed schedule (PWS Sections 2 and 3.2). The Government estimates approximately 15 pickups per month across all listed sites, based on historical experience; the quantities in PWS Section 3.3 are intentionally estimated above this historical level (PWS Section 3).

Site visit: No site visit will be scheduled. Prospective quoters may view the exterior of the warehouse dock at their own convenience after checking in with Police Services. Any visits must occur between 8:00 AM and 4:30 PM.

Question 11: We are reviewing the requirement allowing two smaller vehicles with equivalent cargo capacity. Could you confirm whether offers must cover every listed site or whether geographic portions are permitted, and direct us to the SAM registration, insurance/permit, bonding, and subcontracting requirements applicable to this RFQ? Please also advise whether our stated fleet configuration can be proposed, subject to documented capacity and the loading requirements?

Government Response: Site coverage: Quotes shall cover all sites listed in PWS Section 3.1. Geographic portions are not permitted. Quoters shall price every CLIN in the Price/Cost Schedule.

SAM registration: See FAR 52.204-7 (Section E.3) and FAR 52.204-13 (Section C.1).

Insurance: See Section C.10 and FAR 52.228-5. A certificate of insurance for the prime and any subcontractors is due with the quote (Section E.2).

Permits: Disposal of materials shall comply with Ohio EPA and U.S. EPA requirements (QASP Row 3).

Bonding: No bonding is required.

Subcontracting: See FAR 52.219-14, Appendices D, E, and F, and the Limitations on Subcontracting worksheet due with the quote (Section E.2).

Fleet configuration: PWS Section 3 requires a 26-foot box truck or similar, or two smaller vehicles whose combined capacity equals a 26-foot box truck. The Government will evaluate a proposed fleet configuration only as submitted in the quote. Any two-vehicle configuration requires COR/Station POC coordination prior to dispatching multiple vehicles for each pickup (see response to Question 9), and all loading requirements in the PWS apply.

Question 12: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

Government Response: This is not a brand new requirement. These services were previously performed by E Scrap Solutions under contract 36C25026P0027. See response to Question 13.

Question 13: If not brand new, could you please provide the current / previous contract number?

Government Response: The current/previous contract number for this service is 36C25026P0027, with an awarded value of $240,000.00. That prior contract was for a shortened period of performance of 1 year.

Question 14: Equipment Ownership: Will the VA provide the specific recycling containers, open-top roll-off boxes, or compactors required on-site, or is the contractor expected to furnish and maintain all physical assets?

Government Response: The Government is not providing any dumpsters, open-top boxes, compactors, or similar containers. The Government will provide pallet jacks and flatbed carts in accordance with PWS Section 9 if the location on record has these items. The contractor shall provide all other equipment in accordance with PWS Section 3.

Question 15: Tonnage and Frequency: Can the government provide historical manifest data, estimated monthly tonnages, or a minimum/maximum pull schedule for the scrap metal and recycling streams to help ensure accurate line-item pricing?

Government Response: Historical monthly weights for FY2026 are provided in PWS Section 3.4. The estimated number of pickups for each ordering period is provided in PWS Section 3.3 and the Price/Cost Schedule. The Government does not have historical data on the mix of materials (PWS Section 3.5(f)). Pickups are on-call, so there is no minimum or maximum pull schedule (PWS Sections 2 and 3.2).

Question 16: Drop-and-Hook Capability: Does the facility support a drop-and-hook arrangement where the contractor leaves an empty trailer/roll-off box on-site and pulls the loaded asset, or are scheduled live-loads required?

Government Response: No. Drop-and-hook is not supported. Pickups are on-call. The contractor receives the order and performs the work.

Question 17: Scrap Rebate Structure: How should commodity revenue or rebates for high-value scrap metal be factored into the Price-Cost_Schedule spreadsheet? Should it be calculated as a direct credit against pull fees, or handled as a separate accounting line?

Government Response: All proceeds are provided back to the Government (PWS Section 7.6). The contractor will be paid per pickup at a firm fixed price. Proceeds shall not be factored into the Price/Cost Schedule, and there shall be no credits against any CLIN for proceeds.

Question 18: Weight Discrepancies: Could the government clarify the policy regarding scale discrepancies or tonnage variations ("drift") between the origin facility scale and the destination recycling/disposal facility scale?

Government Response: Proceeds are based on the weight shown on the recycler's/processor's scale ticket (PWS Section 7.6). The weight on the pick ticket is an estimate only. The contractor is paid a firm fixed price per pickup, so variations in weight do not change the contractor's payment.

Question 19: Site visit: Under Solicitation 36C25026Q1050 (Amendment 0001, Question 17), the Government permitted prospective offerors to view the exterior of the warehouse dock at their own convenience after checking in with Police Services. Does this same arrangement apply to Solicitation 36C25027Q0075, or will the Government schedule a site visit prior to the quote due date?

Government Response: Yes. Prospective quoters may view the exterior of the warehouse dock at their own convenience after checking in with Police Services. Any visits must occur between 8:00 AM and 4:30 PM. The Government will not schedule a site visit prior to the quote due date. See response to Question 10.

Question 20: Vehicle size: Section 3 requires a minimum 26-foot box truck. Given that individual pickups generally do not exceed approximately 5,000 lbs. (Section 3.5(d)), will the Government accept a 24-foot dock-height box truck with liftgate as the primary vehicle, provided all material is removed in a single load within the 48-hour response period?

Government Response: No. PWS Section 3 requires a 26-foot box truck or similar, or two smaller vehicles whose combined capacity equals a 26-foot box truck, with COR/Station POC coordination prior to dispatching multiple vehicles for each pickup. The requirement is based on the size and bulk of the items to be removed, such as bulky equipment and large furniture, and not only on weight. If a single 24-foot truck is not sufficient, the contractor may send two 24-foot trucks as the two-vehicle option in PWS Section 3, with COR/Station POC coordination prior to dispatch for each pickup. Multiple vehicles dispatched together to the same pickup constitute one pickup (PWS Section 4.3). The Government will not pay for additional pickups that result from the contractor using a vehicle smaller than the PWS Section 3 requirement. PWS Section 3 is otherwise unchanged.

Question 21: Section 1 requires a minimum 26-foot box truck. Given that individual pickups generally do not exceed approximately 5,000 lbs. (Section 3.5(d)), will the Government accept a 24-foot dock-height box truck with liftgate as the primary vehicle, provided all material is removed in a single load within the 48-hour response period?

Government Response: See response to Question 20.

Question 22: If a 24-foot box truck is not acceptable as the primary vehicle, may the contractor use a 26-foot box truck only for pickups where the requester indicates the load will exceed the capacity of a 24-foot truck?

Government Response: No. The vehicle requirements of PWS Section 3 apply to every pickup. Pickups vary in size and bulk, and the Government does not determine in advance which pickups will exceed a smaller truck's capacity. If a 24-foot truck is not sufficient, the contractor may send two 24-foot trucks with COR/Station POC coordination prior to dispatch for each pickup, and they are billed as one pickup. See response to Question 20.

Question 23: When two smaller vehicles are used for a single pickup, is COR/Station POC confirmation required before every such pickup, or may standing approval be granted for recurring locations?

Government Response: Yes. COR/Station POC confirmation is required before every such pickup. Standing approval will not be granted for recurring locations. See response to Question 9.

Question 24: My understanding is that this RFQ is not intended to cover electronics recycling or the disposition of IT assets. Can you please confirm?

Government Response: Confirmed. This requirement does not include electronics recycling or the disposition of IT assets. IT equipment requiring data sanitization is a prohibited material under PWS Section 4.1. The acceptable scrap materials are listed in PWS Section 4.1. Equipment that VA has designated as scrap and that does not require data sanitization may be collected as Unserviceable Equipment in accordance with PWS Section 4.1. If data-bearing equipment appears not to have been sanitized, the contractor shall notify the COR/Station POC in accordance with PWS Section 8.

Question 25: How many containers are required, what sizes, and where on the grounds will each one sit?

Government Response: No containers are required or provided by the Government. This is an on-call pickup service, and there are no standing containers on site. The Government is not providing any dumpsters, open-top boxes, compactors, or similar containers. The contractor shall provide all equipment in accordance with PWS Section 3. See response to Question 14.

Question 26: What pickup frequency is expected for each container, and what has the recent pickup count per month looked like?

Government Response: There are no standing containers, so there is no pickup frequency per container. Pickups are on-call, with no fixed schedule (PWS Sections 2 and 3.2). The Government estimates approximately 15 pickups per month across all listed sites, based on historical experience (PWS Section 3).

Question 27: What material streams are included in this contract, and what is the estimated tonnage per month based on recent service? Are appliances with Freon, electronics, or any regulated items part of the stream?

Government Response: The acceptable materials are listed in PWS Section 4.1. The Government does not have historical data on the mix of materials (PWS Section 3.5(f)). Historical weights are provided in pounds in PWS Section 3.4, with a FY2026 monthly average of approximately 22,444 lbs. Items must be free of liquids and refrigerants (e.g., Freon). Hazardous materials and materials requiring special disposal under environmental regulations are prohibited (PWS Section 4.1). For electronics, see response to Question 24.

Question 28: How is scrap value handled under this contract? Does the VA expect a credit or payment back for the value of the scrap collected, or does the contractor keep the scrap value as part of its pricing?

Government Response: All proceeds are provided back to the Government (PWS Section 7.6). The contractor will be paid per pickup at a firm fixed price. There shall be no credits against any CLIN for proceeds. See response to Question 17.

Question 29: Can you share the price paid on the most recent contract for this same service, and the name of the company that held it?

Government Response: The previous contract was 36C25026P0027, held by E Scrap Solutions, with an awarded value of $240,000.00 for a shortened period of performance of 1 year. See responses to Questions 12 and 13.

Question 30: Are there site access or background requirements for drivers entering the medical center grounds?

Government Response: See response to Question 7.

Question 31: Billable pickups — Section 4.3 Section 4.3 states that each truckload/trip is a separate billable pickup, but also states that multiple vehicles responding to the same pickup event constitute only one pickup. How should we distinguish between two full-size truckloads required for one request and two smaller vehicles providing the capacity of one 26-foot truck? What authorization is required for additional billable loads?

Government Response: Under PWS Section 4.3, each truckload or trip is a separate billable pickup. Multiple vehicles dispatched together to the same pickup event, after COR/Station POC coordination under PWS Section 3, constitute one pickup regardless of the number of vehicles. The Government rarely schedules more than one pickup in a day because of loading and unloading time. If a request requires two loads, the loads are normally completed on separate days, and each truckload is paid as a separate pickup. All pickups, including additional loads, shall be authorized through the NX Section in accordance with PWS Section 3.2. The Government will not pay for additional pickups that result from the contractor using a vehicle smaller than the PWS Section 3 requirement.

Question 32: Dismantling and specialized equipment — Sections 3 and 3.5 Will equipment be disconnected and ready for removal, or must the contractor perform dismantling, cutting, utility disconnection, stair carries, or specialized rigging? With no maximum individual-item weight or dimensions established, will the Government establish limits or a separate pricing mechanism for removals requiring cranes or specialized equipment?

Government Response: Equipment will be disconnected by the Government and ready for removal before pickup. The contractor does not perform utility disconnection. The contractor shall furnish the labor and equipment necessary for retrieval (PWS Section 3.5(a)). Interior retrieval, additional labor, and additional equipment are included in the per-pickup CLIN price, and no separate compensation will be authorized (PWS Section 3.5(c)). The Government is not establishing a maximum individual-item weight or dimension and is not establishing a separate pricing mechanism for removals requiring cranes or specialized equipment (PWS Section 3.5(d)). Upon order placement, the contractor may ask the requester to identify heavy or oversized items and estimated weights (PWS Section 3.5(e)).

Question 33: Historical pickup data — Sections 3.3–3.4 Please provide available pickup counts and load weights by location or pricing distance band for the preceding 12 months, including any loads exceeding 5,000 pounds. This information would help establish the distribution of travel, labor, and equipment requirements beyond the aggregate monthly weights provided.

Government Response: The Government has no additional historical data beyond that provided in PWS Sections 3.3 and 3.4. Individual pickups generally do not exceed approximately 5,000 lbs. (PWS Section 3.5(d)).

Question 34: Interior retrieval and site visits — Section 3.5 Please provide available information on the frequency of interior retrieval, typical crew size and loading time, and locations requiring stairs or lacking freight-elevator access. Will a pre-quote site visit be available for representative locations?

Government Response: Material is generally staged in warehouse or dock areas. On occasion, pickups may require retrieval from non-staged locations (PWS Section 3.5(a)). The Government is not aware of any height, weight, parking, or access restrictions at the listed sites, and the contractor is responsible for assessing site access conditions (PWS Section 3.5(b)). The Government has no further data on frequency, crew size, or loading time. For site visits, see response to Question 10.

Question 35: Multiple locations on one route — Sections 3.1 and 4.3 If separately authorized pickups at multiple facilities are combined into one truckload, is each location separately billable under its applicable distance-band price? Please also clarify billing for separate pickup points on the main campus and adjacent facilities, such as the Akron clinic and annex.

Government Response: Separately authorized pickups at multiple facilities may be combined into one truckload if all of the material can be safely loaded into the truck. Each separately authorized pickup is billed under the CLIN for its own location's distance band, even when the pickups share a truck. All pickup points within one campus or location, on a single authorization, are one pickup.

Question 36: Weight documentation — Sections 7.3–7.5 Section 7.3 requires gross weight at the time of pickup. Will certified recycler scale tickets obtained after collection satisfy this requirement, or must materials be weighed onsite? If multiple authorized pickups share a load, what allocation method is acceptable for reporting weight and proceeds by location and material subtype?

Government Response: Yes. The scale ticket from the recycler or disposal site satisfies the weight reporting requirement of PWS Section 7.3. On-site weighing is not required. Where multiple authorized pickups share a load, the contractor shall use a documented allocation method to report weight and proceeds by location and material subtype. The contractor shall submit the method to the COR for approval before using it.

Question 37: Recycler deductions and zero-value materials — Section 7.6 If a recycler deducts processing or contamination charges before issuing settlement, must the contractor remit the gross commodity value before those deductions or the actual net settlement received? What documentation is required when recyclable material has zero or negative market value, including months containing both revenue-producing and zero-value loads?

Government Response: The contractor shall remit 100% of the actual proceeds received from the recycler/processor for each load of recyclable material (PWS Section 7.6(8)). Processing or contamination charges deducted by the recycler before it issues settlement are taken out of the proceeds, so the contractor remits the net settlement actually received. The contractor shall not deduct its own transportation, processing, handling, sorting, scale fees, or administrative costs, which are compensated through the per-pickup CLIN price. The settlement sheet or scale ticket for each load shall show the recycler's deductions (PWS Section 7.6(6)). If a load has zero or negative market value, no proceeds are due for that load. Any charge the recycler or disposal facility assesses to the contractor for that load is the contractor's cost and is included in the per-pickup CLIN price (PWS Section 3). The contractor shall not offset that charge against proceeds from other loads. If the contractor collects only material that generates no proceeds in a month, the monthly report shall say so and certify that no recyclable material with market value was collected (PWS Section 7.6(4)).

Question 38: Processing and title transfer — Section 7.7 Please confirm whether the contractor may deliver materials for immediate processing, commingling, or resale before the Government’s proceeds payment clears. When does title transfer for non-recyclable or zero-proceeds loads for which no payment will be issued?

Government Response: Title to each load of recyclable material remains with VA until the Agent Cashier confirms clearance of the corresponding proceeds payment, and processing or possession by the contractor does not transfer title (PWS Section 7.7(1)). The PWS recognizes that material may be processed, commingled, or resold, but the contractor's right to collect and dispose of scrap is conditioned on timely delivery of proceeds under Section 7.6 (PWS Section 7.7(2)). For non-recyclable or zero-proceeds loads for which no payment will be issued, title transfers to the contractor when the contractor delivers the load to the recycler or disposal facility.

Question 39: Unsuccessful trips and cancellations — Sections 3.2 and 3.5 If the contractor arrives for an authorized pickup and access is unavailable, materials are not released, or all materials are prohibited, is the trip billable? What cancellation notice applies, and how is the 48-hour completion requirement adjusted for Government-caused delays?

Government Response: A billable pickup is one load (PWS Section 4.3). The PWS does not provide for payment of a trip on which no material is collected. If access is unavailable or materials are not released, the contractor shall notify the NX Section immediately, and the Government will coordinate a revised pickup time. There is no cancellation notice period. Where an authorized pickup contains a prohibited item, the contractor may decline that item and complete collection of the remainder (PWS Section 4.1). The 48-hour response period begins at notification by an authorized requester and does not include weekends or Federal Holidays (PWS Section 3.5(g)). If a Government delay occurs, the contractor shall work with the NX Section to complete the pickup as quickly as possible and as close to the 48-hour window as possible.

Question 40: Added locations and changes in scope — Section 3 For facilities added after award, will existing distance-band rates apply automatically? Will additions beyond the current service geography, or changes requiring materially different equipment or labor, be subject to a negotiated contract modification before performance?

Government Response: The Government reserves the right to add or remove locations, CBOCs, or other facilities, and to add, increase, or decrease the quantity, frequency, or scope of collections. Total contract value may increase up to 20% of the base award (PWS Section 3). Address updates will be made by bilateral modification (see response to Question 2). Facilities added by the Government will be automatically placed into the appropriate distance band, and the existing distance-band CLIN prices apply. The Government does not anticipate that added facilities will require materially different equipment or labor. Changes in scope will be handled by contract modification as required by the contract.

Question 41: Subcontracting worksheet — Appendix D Please clarify how the worksheet should classify recyclers that purchase scrap, disposal facilities charging tipping fees, and subcontracted hauling companies. Which payments must be included in the subcontracting calculation, and what similarly situated entity standard applies to this small-business set-aside?

Government Response: Limitations on subcontracting are measured by dollar value, not by hours, tasks, or workload share (Appendix D). Under FAR 52.219-14, a subcontractor is similarly situated only if it shares the prime's SBA program status and is small under the assigned NAICS code. Second-tier subcontractors and subcontractors under a different NAICS are not similarly situated. Disposal, tipping, and processing costs are included in the per-pickup CLIN price (PWS Section 3). Quoters shall complete Appendix D as issued and in accordance with FAR 52.219-14.

Question 42: Could you share the current or most recent contract number and price for this requirement, or the number of pickups actually billed in FY2026?

Government Response: The current/previous contract number for this service is 36C25026P0027, with an awarded value of $240,000.00 for a shortened period of performance of 1 year. See responses to Questions 12 and 13. The Government has no additional historical data beyond that provided in PWS Sections 3.3 and 3.4.

Question 43: Is it acceptable for the licensed recycler to issue the proceeds check directly to the Agent Cashier, with the settlement sheet tied to each load and copied in our monthly report?

Government Response: No. All proceeds shall be remitted by the Prime contractor. A recycler, subcontractor, or other third party shall not issue the proceeds check directly to the Agent Cashier. The Prime contractor shall deliver the proceeds check to the Agent Cashier within 14 calendar days, in accordance with PWS Section 7.6(1) and (2). The Prime contractor is also responsible for submitting the monthly report and the settlement sheets, scale tickets, and sale receipts in accordance with PWS Sections 7.3, 7.6(6), and 14. See response to Question 6.

All other terms and conditions of the solicitation remain unchanged.

Offerors must acknowledge receipt of this amendment in accordance with the solicitation instructions.

See attached document: PWS - Facility Scrap Updated 11152026.

The Purpose of this solicitation amendment is to answer questions from industry and provide an updated Performance Work Statement (PWS).