This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office, Columbus, Ohio, providing answers to contractor questions regarding solicitation 36C25027Q0016 for window cleaning services. The amendment, effective October 20, 2026, clarifies scope, scheduling, personnel requirements, equipment staging, and evaluation criteria for window washing services at the Marion, Indiana and Fort Wayne, Indiana VA campuses. The contract involves semiannual and annual cleaning cycles, with the base period starting December 1, 2026.

Key clarifications include: scope is exterior windows only; all buildings are to be cleaned twice yearly (spring and fall, regardless of specific months listed); Building 124 at Marion requires semiannual cleaning; Fort Wayne Building 7 (under construction with estimated July 2027 completion) pricing begins in Option Year 1; aerial lifts are permitted for multi-story buildings with no existing anchor points; contractor equipment must be OSHA and NFPA certified with trained operators; site visits for Marion (November 2) and Fort Wayne (November 4) at 10:00 AM Eastern time allow subcontractor or teaming partner attendance if registered by October 30; personnel vetting (Tier 1 investigation and PIV/ID badging) begins with the first cleaning cycle; award will be made to the lowest-priced, technically acceptable offeror; and any contract changes will be handled via modification. The amendment addresses 26 specific contractor questions covering window counts, building inclusions, scheduling conflicts, equipment access, personnel requirements, and compliance standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER

IS ISSUED

PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT

ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office , appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11-10-2026 610-27-1-6091-0006 N/A 36C250 Department of Veterans Affairs Network Contracting Office 10 2780 Airport Drive Suite 340 Columbus OH 43219-2292 Timothy L. Garrity timothy.garrity@va.gov 36C250 Department of Veterans Affairs Network Contracting Office 10 2780 Airport Drive Suite 340 Columbus OH 43219-2292 To all Offerors/Bidders

36C25027Q0016 10-20-2026

X X X X The purpose of this amendment is to provide answers to contractor questions.

All other terms and conditions remain unchanged and in full effect.

Shelton Beasley Contracting Officer

Solicitation 36C25027Q0016 – Window Washing – Questions and Answers

1. Interior vs. exterior scope (Section D.1, Primary Task – General; Marion and Fort Wayne Campus Specific Tasks). The general task covers cleaning "both interior and exterior," but the campus-specific tasks say to clean "the exterior" of the listed windows. Is any interior glass cleaning required? If so, which buildings and windows?

Answer: Exterior only.

2. Covered windows and A/C units (Attachment 1, notes for Bldgs. 1–5, 16, 17, and others). Are the windows "covered by grates/wood" to be cleaned, and are they included in the window counts? For windows with "air conditioning units covering half the window," should the contractor clean only the exposed glass, or will the A/C units be removed by the Government?

Answer: No covers, grates, or AC units will be removed unless specifically needed. Contractor is to clean all covered or grated windows as best as possible.

3. Marion outer buildings timing (Section D.1, Marion Campus Specific Tasks; Attachment 2). The SOW requires annual cleaning of the outer buildings "in March of each year," but the general task requires spring work "between the months of April and May." Which window governs?

Answer: March, April, May does not matter. 2 cleanings a year one in the spring and the 2nd in the fall.

4. Building 124 (Section D.1; Attachments 1 and 2). Building 124 appears on both the semiannual (Attachment 1) and annual (Attachment 2) lists, but only in Attachment 1's counts. Should Building 124 be priced under CLIN xx01 (semiannual) only?

Answer: Twice a year. All the buildings should be done twice a year.

5. Fort Wayne building list (Section D.1, Fort Wayne Campus Specific Tasks; Attachment 3). The SOW lists "TT6," and Attachment 3 lists "T6." Please confirm these are the same building.

Answer: Same building. There is no TT6 in Fort Wayne.

6. Building 7 (Attachment 3; CLINs 0003 and 1003–4003). Building 7 is shown as under construction, "Est. completion 07/2027," and is priced from Option Year 1. Is the count of 54 windows (23 first floor, 31 second floor, plus two multi-floor storefront systems) final? How will a change in completion date or window count be handled?

Answer: Any change to the contract will be made via contract modification.

7. Evaluation method (page 3, "Quote Evaluation Criteria," vs. Section E.2, Addendum to 52.212-2, "Basis for Award"). Page 3 describes a "comparative evaluation," while E.2 states "Price alone is the sole evaluation factor." Please confirm that award will be made to the lowest-priced, responsible, technically acceptable offeror per E.2.

Answer: The phrase “price alone in the sole evaluation factor”, is a misprint. The award will be given to the lowest-priced, technically acceptable offeror.

8. Base-year first cycle and personnel vetting (Section B.2, CLIN 0001–0003 POP 12-01-2026; Section C.7, VAAR 852.204-72; Section D.1, Personnel Qualifications). Every contractor employee needs a Tier 1 investigation, PIV/ID badging, and IDs submitted one week before start, and the base period starts Dec 1, 2026. Is the fall cycle in December 2026 required, or will the first base-year cycle be the spring (April–May 2027) cycle?

Answer: The cycle begins when they do their first cleaning. If the first cleaning is done in the spring, then the spring/Fall is the first cycle. If they do their first cleaning in the fall, then the fall/spring becomes the cycle.

9. Lift staging and access (Section D.1, Equipment Note, Scheduling, Interference to Normal Functions). Fort Wayne roofs have no anchor points, so aerial lifts will be needed for multi-story buildings such as Building 1. May lifts be staged on lawns, sidewalks, and parking areas next to buildings? Are there weight limits, patient-area restrictions, or required protection (e.g., turf mats)?

Answer: Contractor is responsible for all damage done to structures and grounds caused by any equipment used by contractor or contractor employees. Any equipment can be staged with prior approval and planning before, during, and after cleanings.

10. Site-visit representative (Section E.1, Addendum to 52.212-1, "Site Visit"). May a subcontractor or teaming partner attend the Marion (Nov 2) and/or Fort Wayne (Nov 4) site visit as StrictlyHunter LLC's representative, if registered by the Oct 30 deadline?

Answer: Yes

11. Lift rental and the limitations on subcontracting (Section C.8, VAAR 852.219-75(a)(1)(i); Attachment A). For the 50% services limit, is rented aerial-lift equipment (with no operator, run by the prime's own employees) treated as an "other direct cost" excluded from the calculation under 13 CFR 125.6?

Answer: Rented equipment — even if it is not operated by the prime’s own staff — is generally not considered an “other direct cost” for the purpose of the 50% services limit. Instead, rental costs for equipment are treated as equipment costs, which are excluded from the “services” portion of the calculation.

12. Time zone of site visits and question deadline (Section E.1, Addendum to 52.212-1, "Site Visit" and "Questions"). These times are stated as "10:00AM EDT," but they fall after daylight saving time ends on Nov 1, 2026. Please confirm whether they mean 10:00 AM local Eastern time (EST).

Answer: 10:00AM Eastern

13. Are both window surfaces to be cleaned unless noted otherwise?

Answer: Exterior surfaces only.

14. Are structural anchors in place at high rise buildings to support window washing apparatus at Ft. Wayne and Marion?

Answer: No

15. What is the maximum building height(s)?

Answer: Fort Wayne: 5 stories. Marion: 4 stories.

16. Are campus maps available to identify buildings?

Answer: Yes

17. How many skylights require cleaning? What is their height above a stable work surface?

Answer: Marion: 4. Accessible from a flat roof on Building B185. Fort Wayne: 0

18. Are there atriums? Qty?

Answer: Fort Wayne: No. Marion: Yes.

19, Could you please confirm whether the window cleaning scope includes both interior and exterior windows, or exterior only?

Answer: Exterior only

20. What was the approximate previous contract value for the contract listed in the subject line?

Answer: There is no previous contract for this requirement. This is the first time both Fort Wayne and Marion have been combined on one contract.

21. Marion Building 124 (D.1 Statement of Work, page 26): Building 124 is listed under both the semiannual schedule ("1, 2, 3, 4, 5, 6, 15,16,17,65, 124,138,170,172,174, &185," Attachment 1) and the annual schedule cleaned in March ("8, 9, 41, 54 (T), 55,58,76,79, 97, 114, 124, 137(T),153, 173, T504(T), T516(T)," Attachment 2), but Attachment 2 does not list Building 124. Is Building 124 cleaned on the semiannual schedule only, or on both schedules?

Answer: All buildings should be cleaned twice a year.

22. Fort Wayne Building 8 (D.1 Statement of Work, page 26, and Attachment 3): The Fort Wayne semiannual list reads "1, 2, 3, 4, 5, 7(does not start till Option Year 1), 6, T4, T5, TT6," while Attachment 3 also lists Building 8 (35 first floor windows, "Includes glass on doors") and lists "T6" rather than "TT6." Is Building 8 in scope, and is "TT6" the same building as "T6" in Attachment 3?

Answer: See question 5.

23. Fort Wayne access (D.1 Statement of Work, pages 26 and 30): The Statement of Work states "There are no anchor points on the roofs of any buildings on the Fort Wayne Campus," and Attachment 3 shows Building 1 with windows through the 5th floor and "6 windows on roof penthouse." Are aerial lifts permitted around Building 1, are there any ground load, lawn, or access restrictions for lift equipment, and where may lift equipment be staged and parked during the work?

Answer: No restrictions that I am aware of. Rest of question answered above.

24. Can the Government confirm whether certified and inspected anchorage points are currently available for exterior window cleaning operations?

Answer: No anchor points on any buildings in Fort Wayne except for Bldg. 7 currently under construction.

25. If no compliant anchorage points are available, does the Government have plans to install or certify suitable anchorage systems before contract performance begins?

Answer: No

26. If installation of anchorage points is not anticipated, will the Government authorize alternative access methods, such as aerial lifts or other OSHA-compliant equipment, to perform the required exterior window cleaning?

Answer: All equipment that will be used will need to be presented in the bid and approved by the VA for use on the VA property. All equipment used by the contractor shall be OSHA and NFPA certified. All operators must be trained, and documents of training shall be submitted in the bid proposal along with the equipment.