This is a Breaker List Testing Schedule that details circuit breaker refurbishment and testing requirements for the Louis Stokes Cleveland VA Medical Center across a five-year contract period consisting of a base year plus four option years. The document provides specific equipment inventories organized by substation and facility location, including manufacturer names, ampacity ratings, and quantities of circuit breakers requiring service for each contract period.
The Base Year (October 1, 2026 through September 30, 2027) requires testing and refurbishment of 85 circuit breakers distributed across multiple Energy Center locations including Russell Gear, EC1, EC2, EC3A, EC3B, DPE-5, EDSB3, EDSB4, GDS3, DPE3, and MV Substation Research and Surgery areas. Manufacturers represented include Cutler Hammer, Square D, Eaton, GE, and Schneider. Option Years 1 and 4 each specify 85 total breakers with equipment located at D21 Sub A, D21 Sub B, EDSB-2, Penthouse Sub W, MICU, 7th Floor EDP, and Cares Tower. Option Year 2 (October 1, 2028 through September 30, 2029) identifies 83 circuit breakers across Ambulatory Care facilities, Emergency areas, Energy Center locations, Radiology, Pathology, Lab Warehouse, and Parking Garage. Option Year 3 (October 1, 2029 through September 30, 2030) returns to 85 breakers with the same equipment and locations as the Base Year, indicating a two-year testing cycle for certain facility infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25027Q0014_1.docx | DOCX document | |
| Description 10082026.docx | DOCX document | |
| 36C25027Q0014.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Yearly Breaker Refurbishing and Testing Listing | ||||||
| Base Year: October 1, 2026 Through September 30, 2027 | ||||||
| Substation | MV Sw | XFMRs | Circuit Breakers | |||
| 2027/2030 | Qty | KVA | Qty | MFG | Ampacity | Qty |
| Energy Center | ||||||
| Russel Gear | N/A | N/A | Cutler Hammer MDS840 | 4000 | 1 | |
| BE602 | Cutler Hammer MDS632 | 3200 | 2 | |||
| Cutler Hammer MDS620 | 2000 | 3 | ||||
| Cutler Hammer MDS616 | 1600 | 6 | ||||
| Cutler Hammer MDS608 | 800 | 2 |
| EC2 | 2 | 1000 Dry | 1 | Square D RJ1600 | 1600 | 1 |
| Square D NE361200 LSG | 1200 | 3 |
EC1 6-Jun 2500 Dry 1 5KV SW/5 KV Starters
EC3A 2 3000 Oil 1 Square D NW40H 4000 1
| Tie-GPS-TGPB | Square D NW40H | 4000 | 1 |
| Square D NW32H | 3200 | 2 |
| DPE-5 | Square D PJ800 | 800 | 1 |
| Square D LJ400 | 400 | 1 | |
| EDSB3 | Square D PJ800 | 800 | 2 |
| EDSB4 | Square D PJ800 | 800 | 1 |
| Square D LJ400 | 400 | 1 | |
| EC3B | Square D NW20H1 | 2000 | 2 |
| Square D NW16H1 | 1600 | 1 | |
| Square D NW08H1 | 800 | 3 |
| GDS3 | Eaton SBS 630 | 3000 | 4 |
| DPE3 | Eaton LT360032 | 450 | 2 |
MV Substation C/H 150VCP-W 500 1200 33
| Research K03 | 1 | 1000 Oil | 1 | GE AK50 | 1600 | 2 |
| BF458 | GE AK25 | 600 | 4 |
| Surgery | 4 | Dry | 2 | Schneider | 1600 | 3 |
| Schneider | 800 | 3 |
Total Bkr 85
Option 1
| Yearly Breaker Refurbishing and Testing Listing |
| Option Year 1: October 1, 2027 Through September 30, 2028 |
| Substation | MV Sw | XFMRs | Circuit Breakers | ||
| 2028/2031 | Qty | KVA | Qty | MFG | Ampacity |
| D21 | |||||
| Sub A | N/A | 1500 Oil | 2 | GE AK2-75 | 3000 |
| GE AK2-50 | 1600 | ||||
| Sub B | N/A | 1500 Oil | 2 | GE AK2-75 | 3000 |
| GE AK2-50 | 1600 | ||||
| EDSB-2 | N/A | N/A | Square D MH36800 | 800 | |
| Emergency | Square D MH36600 | 600 | |||
| Panel | Square D MH36400 | 400 | |||
| Square D MH34250 | 250 | ||||
| Square D MH34225 | 225 | ||||
| Square D MH34200 | 200 | ||||
| Square D SE | 2500 | ||||
| Siemens MCCB | 1200 | ||||
| Penthouse | |||||
| Sub W | 2 | 1500 Oil | 2 | GE AKRT-6D-50H | 2000 |
| GE AKRT-6D-30H | 800 |
| Elevator | N/A | N/A | GE AK2A-50 | 1600 | |
| GE AK2A-25 | 600 | ||||
| MICU | |||||
| MSB-N1 | 2 | 750 Dry | 1 | Siemens WLS2A316 | 1200 |
| Siemens MCCB | 800 | ||||
| Siemens MCCB | 600 | ||||
| Siemens MCCB | 400 | ||||
| Siemens MCCB | 300 | ||||
| DPNB1-G | Siemens MCCB | 800 | |||
| Siemens MCCB | 600 | ||||
| Siemens MCCB | 300 | ||||
| DPNB1 | Siemens MCCB | 600 | |||
| DPNB1-CR | Siemens MCCB | 600 | |||
| DPNB2-CR | Siemens MCCB | 600 | |||
| CB-T-UPS | Siemens MCCB | 600 | |||
| 7th Floor | |||||
| EDP | Eaton RD320T36W | 2000 | |||
| Eaton MCCB | 800 | ||||
| Eaton MCCB | 400 | ||||
| DPHL71EQ | Eaton MCCB | 800 | |||
| Eaton MCCB | 250 | ||||
| DPHL72EQ | Square D Power Pact | 800 | |||
| Square D Power Pact | 400 | ||||
| DPEG2 | Eaton MCCB | 1200 | |||
| Cares Tower | Eaton MCCB | 800 | |||
| Total Bkr | 85 |
Option 2
| Yearly Breaker Refurbishing and Testing Listing | ||||||
| Option Year 2 : October 1, 2028 Through September 30, 2029 | ||||||
| Substation | MV Sw | XFMRs | Circuit Breakers | |||
| 2029/2032 | Qty | KVA | Qty | MFG | Ampacity | Qty |
| Amb Care | ||||||
| Sub H1 | 2 | 1500 Dry | 1 | Cutler Hammer MDS632 | 3200 | 1 |
| Cutler Hammer MDS616 | 1600 | 1 | ||||
| Cutler Hammer MDS408 | 800 | 9 | ||||
| Sub H2 | 2 | 1500 Dry | 1 | Cutler Hammer MDS632 | 3200 | 1 |
| Cutler Hammer MDS616 | 1600 | 1 | ||||
| Cutler Hammer MDS408 | 800 | 8 | ||||
| EGSB1 | Cutler Hammer MCCB | 1200 | 1 | |||
| Cutler Hammer MCCB | 1200 | 1 | ||||
| Cutler Hammer MCCB | 800 | 2 | ||||
| Cutler Hammer MCCB | 600 | 2 |
| Emergency | N/A | 750 Dry | 1 | In Amb Care |
| Emergency | 1 | 750 Dry | 1 | In Energy Center |
| Cares Tower | ||||||
| 1st Floor F1, F2 | 4 | 1500 Dry | 2 | Eaton MDS630 | 3000 | 3 |
| BF-193 | Eaton MCCB | 800 | 5 | |||
| Eaton MCCB | 400 | 2 | ||||
| Eaton MCCB | 150 | 1 | ||||
| Upstairs F3, F4 | 4 | 1000 Dry | 2 | Eaton MDS620 | 2000 | 3 |
| PF-105 | Eaton MCCB | 800 | 6 | |||
| Eaton MCCB | 160 | 2 | ||||
| DPEG2 - Cares PH | Eaton MCCB | 1200 | 1 | |||
| Eaton MHDL3400F | 400 | 6 | ||||
| Radiology | ||||||
| Left side | 2 | 500 Dry | 1 | Eaton MDS612 | 1200 | 2 |
| 2B-502 | Eaton MCCB | 800 | 2 | |||
| Eaton MCCB | 400 | 2 | ||||
| Eaton MCCB | 225 | 7 | ||||
| Right Side | 2 | 1000 Dry | 1 | Eaton MDS620 | 2000 | 1 |
| Eaton MCCB | 400 | 1 | ||||
| Eaton MCCB | 800 | 1 | ||||
| Eaton MCCB | 160 | 3 | ||||
| Pathology | 2 | 1500 Dry | 1 | GE Wavepro | 2500 | 2 |
| USS-F2 | GE MCCB | 400 | 2 | |||
| GE MCCB | 150 | 2 | ||||
| GE MCCB | 125 | 1 | ||||
| GE MCCB | 100 | 1 |
| Lab Warehouse | 2 | 1500 Dry | 1 | Eaton MDS625 | 2500 | 2 |
| USS-F1 | Eaton MCCB | 630 | 2 | |||
| Eaton MCCB | 400 | 3 |
| Parking Garage | 1 | Oil | 1 | ||
| Total Bkr | 83 |
Option 3
| Yearly Breaker Refurbishing and Testing Listing | ||||||
| Option Year 3 : October 1, 2029 Through September 30, 2030 | ||||||
| Substation | MV Sw | XFMRs | Circuit Breakers | |||
| 2027/2030 | Qty | KVA | Qty | MFG | Ampacity | Qty |
| Energy Center | ||||||
| Russel Gear | N/A | N/A | Cutler Hammer MDS840 | 4000 | 1 | |
| BE602 | Cutler Hammer MDS632 | 3200 | 2 | |||
| Cutler Hammer MDS620 | 2000 | 3 | ||||
| Cutler Hammer MDS616 | 1600 | 6 | ||||
| Cutler Hammer MDS608 | 800 | 2 |
| EC2 | 2 | 1000 Dry | 1 | Square D RJ1600 | 1600 | 1 |
| Square D NE361200 LSG | 1200 | 3 |
EC1 6-Jun 2500 Dry 1 5KV SW/5 KV Starters
EC3A 2 3000 Oil 1 Square D NW40H 4000 1
| Tie-GPS-TGPB | Square D NW40H | 4000 | 1 |
| Square D NW32H | 3200 | 2 |
| DPE-5 | Square D PJ800 | 800 | 1 |
| Square D LJ400 | 400 | 1 | |
| EDSB3 | Square D PJ800 | 800 | 2 |
| EDSB4 | Square D PJ800 | 800 | 1 |
| Square D LJ400 | 400 | 1 | |
| EC3B | Square D NW20H1 | 2000 | 2 |
| Square D NW16H1 | 1600 | 1 | |
| Square D NW08H1 | 800 | 3 |
| GDS3 | Eaton SBS 630 | 3000 | 4 |
| DPE3 | Eaton LT360032 | 450 | 2 |
MV Substation C/H 150VCP-W 500 1200 33
| Research K03 | 1 | 1000 Oil | 1 | GE AK50 | 1600 | 2 |
| BF458 | GE AK25 | 600 | 4 |
| Surgery | 4 | Dry | 2 | Schneider | 1600 | 3 |
| Schneider | 800 | 3 |
Total Bkr 85
Option 4
| Yearly Breaker Refurbishing and Testing Listing |
| Option Year 4: October 1, 2030 Through September 30, 2031 |
| Substation | MV Sw | XFMRs | Circuit Breakers | ||
| 2028/2031 | Qty | KVA | Qty | MFG | Ampacity |
| D21 | |||||
| Sub A | N/A | 1500 Oil | 2 | GE AK2-75 | 3000 |
| GE AK2-50 | 1600 | ||||
| Sub B | N/A | 1500 Oil | 2 | GE AK2-75 | 3000 |
| GE AK2-50 | 1600 | ||||
| EDSB-2 | N/A | N/A | Square D MH36800 | 800 | |
| Emergency | Square D MH36600 | 600 | |||
| Panel | Square D MH36400 | 400 | |||
| Square D MH34250 | 250 | ||||
| Square D MH34225 | 225 | ||||
| Square D MH34200 | 200 | ||||
| Square D SE | 2500 | ||||
| Siemens MCCB | 1200 | ||||
| Penthouse | |||||
| Sub W | 2 | 1500 Oil | 2 | GE AKRT-6D-50H | 2000 |
| GE AKRT-6D-30H | 800 |
| Elevator | N/A | N/A | GE AK2A-50 | 1600 | |
| GE AK2A-25 | 600 | ||||
| MICU | |||||
| MSB-N1 | 2 | 750 Dry | 1 | Siemens WLS2A316 | 1200 |
| Siemens MCCB | 800 | ||||
| Siemens MCCB | 600 | ||||
| Siemens MCCB | 400 | ||||
| Siemens MCCB | 300 | ||||
| DPNB1-G | Siemens MCCB | 800 | |||
| Siemens MCCB | 600 | ||||
| Siemens MCCB | 300 | ||||
| DPNB1 | Siemens MCCB | 600 | |||
| DPNB1-CR | Siemens MCCB | 600 | |||
| DPNB2-CR | Siemens MCCB | 600 | |||
| CB-T-UPS | Siemens MCCB | 600 | |||
| 7th Floor | |||||
| EDP | Eaton RD320T36W | 2000 | |||
| Eaton MCCB | 800 | ||||
| Eaton MCCB | 400 | ||||
| DPHL71EQ | Eaton MCCB | 800 | |||
| Eaton MCCB | 250 | ||||
| DPHL72EQ | Square D Power Pact | 800 | |||
| Square D Power Pact | 400 | ||||
| DPEG2 | Eaton MCCB | 1200 | |||
| Cares Tower | Eaton MCCB | 800 | |||
| Total Bkr | 85 |