About this file

This file is an Amendment to a Previous Combined Solicitation providing answers to contractor questions and clarifications regarding the Statement of Work (SOW) for electrical power distribution equipment testing, inspection, and maintenance services at the Louis Stokes Cleveland VA Medical Center.

The procurement is for a firm-fixed-price contract under NAICS 238210 with a 100% small business set-aside, Service Contract Act wage determination WD# 2015-4727, and Product Service Code J061. The contracting office is the Department of Veterans Affairs Network Contracting Office in Cleveland, Ohio (44131-6969), with Contracting Officer Christopher A. Callihan as the point of contact. The response deadline is October 23, 2026, at 3:00 PM Eastern Time, with a site visit scheduled for October 10, 2026, at 9:00 AM at the medical center. This is a recompete following the expiration of previous contract 36C25022F0010. The base year runs November 1, 2026, through October 31, 2027, with four option years following. The scope includes testing, inspection, minor repair, and maintenance of 85 circuit breakers (400 amps and above), 33 medium-voltage switches at 11 kV, four oil-filled transformers (704, 292, 151, and 151-gallon capacities), 37 protective relays (primarily Schweitzer Engineering Laboratories models), one 129 VDC battery system, and infrared inspections. Prime contractors must have electrical testing as their primary business specialty with permanent licensed staff and NETA certifications; NICET Level III or higher in applicable electrical power disciplines with five years of documented experience is acceptable as an equivalent. The contractor is responsible for transformer cooling liquid replacement and refill costs when testing indicates liquid no longer meets manufacturer specifications. Work requiring power interruption will be scheduled for Sundays during daylight hours, with VA performing all switching operations and lockout/tagout procedures. The contractor must provide onsite support during a planned 4-hour outage test in 2029. Deliverables include testing reports submitted within timelines specified in the deliverables table. Invoicing occurs upon completion of testing events, not to exceed monthly billing.

View the file

Other files

File Type Posted
Breaker List Testing Schedule.xlsx XLSX spreadsheet
Description 10082026.docx DOCX document
36C25027Q0014.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
44131-6969
SOLICITATION NUMBER*
36C25027Q0014
RESPONSE DATE/TIME/ZONE
10-30-2026 15:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SBA
PRODUCT SERVICE CODE*
J061
NAICS CODE*
238210
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 10 6100 Oak Tree Boulevard Suite 490 Cleveland OH 44131-6969

POINT OF CONTACT*

Contracting Officer Christopher A. Callihan christopher.callihan@va.gov 216-707-7736 N/A N/A

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Louis Stokes Cleveland VA Medical Center

10701 East Boulevard

Cleveland OH

POSTAL CODE
44106-1702
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

The purpose of this amendment is to provide answers to the questions received prior to the cutoff date. In addition to providing answer to the questions, a site visit is also set for 0900 on Tuesday 10 October 2026 at the Louis Stokes Cleveland VA Medical Center 10701 East Boulevard, Cleveland, Ohio 44106-1702. We will meet at the information desk, first floor of the Atrium. This is directly across from the parking garage.

Is this a new requirement or a recompete? If a recompete, please identify the incumbent contractor, the previous contract number, and the prior contract value.

The final option year of the previous contract 36C25022F0010 has expired.

Can prior test reports (most recent tri-annual cycle, IR survey, oil analysis) be provided to help establish equipment condition and test history?

Prior test reports will not be shared outside of authorized staff.

What is the estimated contract value or funding range for this requirement?

This is not a construction requirement and therefore we do not have a project magnitude.

The circuit breaker testing schedules for Option Year 1 (November 1, 2027–October 31, 2028) and Option Year 4 (November 1, 2030–October 31, 2031) appear to omit the quantity column shown in the other annual schedules. Could the Government provide revised schedules identifying the quantities for each listed circuit breaker in these two option years?

Edited spreadsheet for breaker listing provided below.

The SOW identifies working hours of 7:00 a.m.–11:30 p.m. Monday through Friday and 6:00 a.m.–6:00 p.m. Saturday and Sunday when maintenance requires an electrical power interruption. However, we could not locate an equipment schedule distinguishing Normal (Monday–Friday) equipment from Critical (Saturday–Sunday) equipment. Could the Government provide this classification or confirm how contractors should determine which equipment requires weekend work for pricing purposes?

Any work that requires power to be interrupted will be completed on Sunday’s, during daylight hours. Work that does not require power interruption, i.e. IR scan or transformer oil samples can be completed M-F during normal working hours.

The section requires electrical contracting to be the primary specialty of the contractor's business and references properly trained and licensed permanent staff. Would the VA consider a qualified small-business prime contractor that provides contract management, coordination, quality assurance, and oversight while utilizing an experienced electrical testing subcontractor with the required NETA certifications, licensed personnel, equipment, and relevant past performance?

This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations.

Technician certification equivalence: the statement of work requires technicians certified to NETA standards or an equivalent certifying organization. Would NICET-certified technicians performing testing to the latest NETA MTS standards be accepted as equivalent for this requirement?

NICET-certified technicians may be accepted as meeting the "equivalent certifying organization" requirement, provided the certification is in a relevant electrical testing, maintenance, or power-distribution-related subfield and the individual possesses the knowledge, training, and experience necessary to perform the testing, inspection, maintenance, and troubleshooting activities required under this contract. Consistent with the SOW requirements, personnel performing the work shall have a minimum of five (5) years of relevant documented experience and shall perform all testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Additionally, NICET Level III or higher in an applicable electrical power testing or power distribution discipline will be considered equivalent to the NETA certification requirement.

Additionally, would the VA consider the subcontractor's technical qualifications and past performance when evaluating the prime contractor's technical capability?

This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While subcontractors may be utilized as permitted by the solicitation, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Evaluation of technical capability and past performance will be conducted in accordance with the evaluation criteria specified in the solicitation.

Finally, please confirm which limitation on subcontracting applies to this procurement under NAICS 238210.

The NAICS for this requirement is 238210 Offer due date: The SAM.gov notice header lists a response date of October 19, 2026, but the solicitation text says quotes are due October 23, 2026 at 3:00 PM ET. Please confirm which date and time govern.

SAM was corrected within 4 hours of the posting to reflect 10/23/2026 at 15:00 which matches the solicitation that was posted.

Period of performance: The SOW lists a base year of November 1, 2026 through October 31, 2027, plus four option years. Please confirm the anticipated award date that supports a November 1 start.

The current need is to start 11/1/2026. The period of performance will start as soon as possible if not on 11/1/2026.

The SOW requires NETA-certified technicians "or equivalent." Please confirm whether the certification may be held by the subcontractor's technicians doing the testing, and which other certifications are acceptable as equivalent.

The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary testing, inspection, maintenance, and troubleshooting activities required under this contract. The use of qualified subcontractors is permitted; however, the prime contractor shall maintain an active onsite role and directly perform a substantial portion of the work with its own qualified personnel. The prime contractor's role shall not be limited solely to contract administration, project management, quality assurance, or oversight functions.

For personnel qualification purposes, NETA-certified technicians are acceptable. As an equivalent certification, the Government will accept NICET Level III or higher certification in an applicable electrical power testing or power distribution discipline, provided the technician has a minimum of five (5) years of documented relevant experience and performs testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS).

Limitations on subcontracting: The solicitation includes FAR 52.219-14. Please confirm that the services limit applies (no more than 50% of the amount paid may go to subcontractors that are not similarly situated).

Yes the clause applies to this requirement.

Payment: The solicitation includes clause 52.232-90 Fast Payment Procedure, which covers supply deliveries. Please confirm how invoicing will work for this service: after each testing event is completed and accepted, or monthly in arrears.

Invoice upon completion, not more than Monthly.

The evaluation weighs technical capability and requires references. Is there a prescribed format or minimum number of references quoters should submit, and should the references be healthcare or VA facility electrical testing work?

The relevance of references, due to the complexity of performing electrical testing, maintenance, and outage activities within an operating healthcare environment, the Government recommends that offerors provide references demonstrating experience performing work of similar scope, complexity, and operational criticality whenever available. References involving healthcare facilities, VA medical facilities, or other mission-critical facilities are preferred but are not required.

Please clarify whether the equipment quantities listed on Page 20 of 65 under “Infra-Red Line Items for Inspection” are also included in the testing and maintenance scope, or whether the listed equipment requires infrared inspection only. If testing and maintenance are required, please provide the equipment type and voltage level for each item.

The equipment listed under "Infra-Red Line Items for Inspection" is included for infrared inspection purposes only under Section 5.4 and is not included in the testing and maintenance scope unless specifically identified elsewhere in the SOW. Accordingly, no additional equipment type or voltage information is required for these line items.

Please confirm whether protective relay testing is required under this solicitation. If so, please provide the quantity, manufacturer, model, and voltage level for the protective relays to be serviced.

Yes. Protective relay testing is included under this Statement of Work. Specifically, Section 5.5, "Medium Voltage Relay Testing," requires the contractor to inspect, clean, test, calibrate, and maintain adjustable protective relays.

The protective relays to be serviced are associated with the facility's 11 kV switchgear and consist of approximately 37 relays. The manufacturer is Schweitzer Engineering Laboratories (SEL). Known relay models include:

· SEL-351

· SEL-587A

· SEL-551

Voltage Level: 11 kV.

Offerors should base their proposals on the testing, calibration, inspection, and maintenance of these protective relays as required by the SOW.

Please clarify whether the cost of replacing or refilling transformer cooling liquid is the responsibility of the contractor or the VA. If it is the contractor’s responsibility, please provide a cost allowance for this work.

Yes. Replacement or refilling of transformer cooling liquid shall be the contractor's responsibility when testing indicates the liquid no longer meets the manufacturer's specifications, as required by the SOW. No separate cost allowance will be provided by the Government, and offerors shall include all costs associated with this requirement in their proposal.

The facility currently has four (4) oil-filled transformers with approximate oil capacities as follows:

· Energy Center Transformer: 704 gallons

· Research Transformer: 292 gallons

· Penthouse Transformer #1: 151 gallons

· Penthouse Transformer #2: 151 gallons The most recent transformer oil sample testing did not recommend oil replacement for any of these transformers. Copies of recent oil sample reports may be provided upon request.

Please confirm if the permitted working hours, including shutdown hours, for this contract will be after business hours or from Monday through Friday, 7:00 a.m. to 11:30 p.m. or Saturday and Sunday, 6:00 a.m. to 6:00 p.m.

Work requiring electrical power interruptions and planned shutdowns is anticipated to occur on assigned Sundays during daylight hours. Specific outage dates and work schedules will be coordinated by the Government based on facility operational requirements and the impact of the outage on medical center operations.

Work activities that do not require interruption of electrical service may be performed during the normal operating hours identified in the SOW.

Please provide the quantity of battery systems requiring inspection, testing, and maintenance under this solicitation.

The solicitation includes one (1) medium-voltage switchgear battery backup system and charger requiring inspection, testing, and maintenance.

Battery system details are as follows:

· Quantity: One (1) battery system

· Application: Medium-voltage switchgear control power system

· Manufacturer: ALCAD

· Configuration: 96-cell battery bank

· Nominal Voltage: 129 VDC

· Battery Model: XHP130 The contractor shall perform inspection, testing, and maintenance of this battery system in accordance with the requirements of the Statement of Work.

Please confirm whether Automatic Transfer Switches (ATSs) are included in the required testing and maintenance scope. If so, please provide the quantity, their rated power, and clarify whether testing is required annually or once every three years.

Automatic Transfer Switches (ATSs) are included in the infrared inspection requirements of this contract. Infrared inspections, including ATS infrared inspections, shall be performed annually in accordance with Section 5.4 of the SOW.

ATS testing, maintenance, and repair are not included in the scope of this SOW and are covered under a separate maintenance agreement. Therefore, ATS quantities, ratings, and testing frequencies for maintenance and testing purposes are not applicable to this solicitation.

Can you provide the one-line diagram of the facility and the previous electrical study report?

Facility power diagrams will not be shared outside of authorized staff.

Is there a required format, page limit, or volume structure for the technical and price quotes? The solicitation states that failure to follow the document format will render a quote non-responsive.

Submission must be complete and contain an appropriate level of detail to allow the evaluator to determine technical acceptability and Compliance with the RFQ.

Please confirm that "tri-annual" means once every three years (triennial), with the equipment rotating per the Section 5.10 lists (Base/OY3, OY1/OY4, OY2).

Correct. For the purposes of this SOW, "tri-annual" means once every three (3) years. Equipment identified in Section 5.10 is tested and maintained on a three-year rotational schedule as outlined in the Base Year/Option Year 3, Option Year 1/Option Year 4, and Option Year 2 equipment lists.

Several items lack kVA ratings (Surgery transformers, Parking Garage oil transformer). Please provide kVA and voltage ratings. Please also confirm the EC1 MV switch quantity shown as "6-Jun" in the Option Year 3 list.

EC1 MV switch quantity = 1 Surgery Sub 1,000 kVA Parking Garage 300 kVA What is the medium-voltage service level (e.g., 5 kV, 15 kV), and how many MV switches, relays, and battery systems are in scope?

The medium-voltage distribution system covered under this solicitation operates at 11 kV.

The equipment currently in scope includes:

· Medium-Voltage (MV) Switches: 33

· Protective Relays: 37 Schweitzer Engineering Laboratories (SEL) protective relays

· Battery Systems: One (1) medium-voltage switchgear battery backup system Offerors should base their proposals on the inspection, testing, maintenance, and related services associated with the above equipment.

Section 5.2 covers breakers 400A and above, but the lists include breakers below 400A (e.g., 100A–300A MCCBs). Are breakers under 400A in scope for testing?

Circuit breakers rated below 400 amps are not included in the testing requirements of Section 5.2. Breakers rated below 400 amps that are listed and located within distribution equipment containing breakers rated 400 amps and above shall be manually exercised during the maintenance activity but are not required to undergo testing.

The IR line item list skips items 157–163. Are these intentionally excluded or missing?

Appears to be a numbering error where equipment has been added or removed during unrelated construction projects.

Section 5.4 states problem connections shall be replaced or tightened. Is connector replacement included in the firm-fixed price, or handled as an out-of-scope repair? Please define "basic repair."

Connector replacement required under Section 5.4 is included in the firm-fixed-price scope. "Basic repair" refers to minor corrective actions that can be completed without additional material costs beyond incidental consumables and without extending the scheduled work effort. Any repair involving replacement of equipment other than connectors, significant additional labor, or material costs not contemplated by the SOW will be considered out-of-scope work.

For liquid-filled transformers, is fluid replacement and refill (and disposal of used oil) included in the fixed price or treated as additional work?

Fluid replacement, refill, and disposal of used oil, when required based on testing results, are included within the firm-fixed-price scope of this contract and are the contractor's responsibility. As specified in the SOW, liquid-filled transformers shall have the cooling liquid tested and replaced when testing indicates the liquid no longer meets the manufacturer's specifications, and the transformer shall be refilled to the manufacturer's specified levels.

** Section 5.9 notes that if breaker or ATS settings are not available, the contractor may conduct a study. Is a coordination study in scope for pricing? Are current coordination and arc flash studies available?

The most recent coordination study and arc flash study will not be shared outside of authorized staff. Offerors shall base their pricing on the information provided by the VA. Any additional coordination or arc flash studies performed by the contractor shall be at the contractor's expense and at no additional cost to the Government.

Section 5.8 (4-hour outage test, 2029): please identify the local utility provider and confirm the services the contractor is expected to pay for.

The planned outage is expected to occur between 7:30 a.m. and 11:30 a.m. on the assigned Sunday. The contractor shall include in its firm-fixed-price proposal onsite support from 7:00 a.m. to 3:00 p.m. to provide emergency response, troubleshooting, and technical support for power-distribution equipment covered by this SOW. A NETA-certified technician, qualified to troubleshoot and support the equipment included in this SOW, shall be onsite for the duration of the scheduled outage and restoration period.

Should the outage extend beyond the planned 4-hour duration due to a malfunction of power-distribution equipment, the contractor shall continue to provide troubleshooting and technical support necessary to assist the Government in restoring electrical service.

The Government will coordinate the outage with Cleveland Public Power and will be responsible for all utility-provider fees and outage-related costs. The contractor shall not be responsible for the cost of replacement parts, materials, or repairs that require work outside the scope of this contract. Any such work shall be handled in accordance with the contract provisions for additional work and shall require Government approval prior to execution.

The Inspection and Acceptance section references "monthly inspection" and "response to service call." Neither appears elsewhere in the SOW. Are monthly inspections or emergency service calls required? If so, what are the response times?

This requirement is not applicable to this solicitation. The references to "monthly inspection" and "response to service call" in the Inspection and Acceptance section were included in error and will be removed from the SOW. No monthly inspections or emergency service-call response requirements are included under this contract.

The deliverables table lists ">30 days" and "14 days," while Section 6 requires reports within 7 days. Please clarify the required report turnaround times.

The report turnaround times identified in the Deliverables table shall govern. The requirement in Section 6 stating that reports must be submitted within seven (7) days was included in error and will be corrected in the SOW. Contractors shall adhere to the report submission timelines specified in the Deliverables table.

How many planned outages/shutdowns will be allowed per year, and will work requiring de-energization be limited to weekends (6 AM–6 PM)? Will VA perform switching and lockout, or is the contractor responsible?

Planned outages will be scheduled as required to support the testing and maintenance activities identified in Section 5.10. Multiple pieces of equipment may be combined and tested during a single outage or testing day when determined to be beneficial to the Government. The exact outage schedule for each contract year will be determined by facility operational requirements, equipment availability, and the impact of the outage on medical center operations.

When de-energization is required, outages are anticipated to occur on assigned Sundays during daylight hours. Specific dates and outage durations will be coordinated by the Government.

The VA will perform all switching operations and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements.

Will VA staff be available to support switching and load transfers during testing?

VA staff will perform all switching operations, load transfer, and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements.

Are there any background investigation, PIV badge, or TB/vaccination requirements for contractor personnel?

Contractor will need to complete background investigation and be issued a contractor badge.

Please confirm the contract type is firm-fixed-price.

Yes this will be awarded as a firm fixed-price contract.

Please provide the applicable Service Contract Act wage determination for Cuyahoga County, OH.

Service Contract Act WD #: 2015-4727 Please confirm whether 52.219-9 (Small Business Subcontracting Plan) applies, given the 100% small business set-aside.

After further review 52.219-9 will not apply to this requirement.

Section 52.212-2 references past performance, but the listed evaluation factors are Technical Capability and Price. Will past performance be evaluated as a separate factor?

CPARS will be reviewed for negative past performance.

Qualifications and experience: Under SOW Sections 7(C)–(F) and 14(B)–(C), may the electrical-contracting specialty, permanent licensed technical staff, technician certifications, and required experience and references be demonstrated through the proposed performing subcontractor? Or must the prime contractor independently satisfy those requirements? We understand that all applicable limitations on subcontracting would still need to be met.

This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations.

Evaluation of offeror qualifications and experience will be conducted in accordance with the solicitation requirements and evaluation criteria.

Are you able to provide the equipment list for the hospital?

The equipment included in the scope of this contract is identified in Section 5.10 and other applicable sections of the SOW. No separate equipment list will be provided. Offerors should use the information contained within the SOW for proposal preparation.

Are you able to provide the most recent inspection and/or maintenance report?

Prior test reports will not be shared outside of authorized staff.

Can the Government clarify what constitutes minor repairs included in the fixed-price requirement versus repairs requiring a separate contract modification?

Minor repairs are those corrective actions that are incidental to the testing, inspection, and preventive maintenance services specifically identified in the SOW and that can be completed as part of the scheduled maintenance effort without requiring replacement of major equipment or components. Examples include tightening electrical connections, torquing hardware, cleaning, lubrication, adjustment, calibration, minor housekeeping activities, and similar corrective actions identified during testing and inspection. The SOW expressly includes "onsite testing, inspection, minor repair, and housekeeping" as part of the required services.

Repairs that exceed basic or minor repair, including major component replacement, equipment refurbishment, or other work outside the defined maintenance and testing scope, shall not be performed under the fixed-price requirement. The contractor shall submit a cost estimate and scope of work to the COR for review and routing to the Contracting Officer (CO). Such work requires CO approval and may require a separate order/contract or contract modification and funding authorization before performance.

As stated in the SOW, "In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation."

See attached document: Breaker List Testing Schedule.

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation image1.emf

Breaker Listing Testing Schedule.xlsx Base Year

Yearly Breaker Refurbishing and Testing Listing

Base Year: October 1, 2026 Through September 30, 2027

Substation MV Sw XFMRs Circuit Breakers

2027/2030 Qty KVA Qty MFG Ampacity Qty

Energy Center

Russel Gear N/A N/A Cutler Hammer MDS840 4000 1

BE602 Cutler Hammer MDS632 3200 2

Cutler Hammer MDS620 2000 3

Cutler Hammer MDS616 1600 6

Cutler Hammer MDS608 800 2

EC2 2 1000 Dry 1 Square D RJ1600 1600 1

Square D NE361200 LSG 1200 3

EC1 6-Jun 2500 Dry 1 5KV SW/5 KV Starters

EC3A 2 3000 Oil 1 Square D NW40H 4000 1

Tie-GPS-TGPB Square D NW40H 4000 1

Square D NW32H 3200 2

DPE-5 Square D PJ800 800 1

Square D LJ400 400 1

EDSB3 Square D PJ800 800 2

EDSB4 Square D PJ800 800 1

Square D LJ400 400 1

EC3B Square D NW20H1 2000 2

Square D NW16H1 1600 1

Square D NW08H1 800 3

GDS3 Eaton SBS 630 3000 4

DPE3 Eaton LT360032 450 2

MV Substation C/H 150VCP-W 500 1200 33

Research K03 1 1000 Oil 1 GE AK50 1600 2

BF458 GE AK25 600 4

Surgery 4 Dry 2 Schneider 1600 3

Schneider 800 3

Total Bkr 85

Option 1

Yearly Breaker Refurbishing and Testing Listing

Option Year 1: October 1, 2027 Through September 30, 2028

Substation MV Sw XFMRs Circuit Breakers

2028/2031 Qty KVA Qty MFG Ampacity

D21

Sub A N/A 1500 Oil 2 GE AK2-75 3000

GE AK2-50 1600

Sub B N/A 1500 Oil 2 GE AK2-75 3000

GE AK2-50 1600

EDSB-2 N/A N/A Square D MH36800 800

Emergency Square D MH36600 600

Panel Square D MH36400 400

Square D MH34250 250

Square D MH34225 225

Square D MH34200 200

Square D SE 2500

Siemens MCCB 1200

Penthouse

Sub W 2 1500 Oil 2 GE AKRT-6D-50H 2000

GE AKRT-6D-30H 800

Elevator N/A N/A GE AK2A-50 1600

GE AK2A-25 600

MICU

MSB-N1 2 750 Dry 1 Siemens WLS2A316 1200

Siemens MCCB 800

Siemens MCCB 600

Siemens MCCB 400

Siemens MCCB 300

DPNB1-G Siemens MCCB 800

Siemens MCCB 600

Siemens MCCB 300

DPNB1 Siemens MCCB 600

DPNB1-CR Siemens MCCB 600

DPNB2-CR Siemens MCCB 600

CB-T-UPS Siemens MCCB 600

7th Floor

EDP Eaton RD320T36W 2000

Eaton MCCB 800

Eaton MCCB 400

DPHL71EQ Eaton MCCB 800

Eaton MCCB 250

DPHL72EQ Square D Power Pact 800

Square D Power Pact 400

DPEG2 Eaton MCCB 1200

Cares Tower Eaton MCCB 800

Total Bkr 85

Option 2

Yearly Breaker Refurbishing and Testing Listing

Option Year 2 : October 1, 2028 Through September 30, 2029

Substation MV Sw XFMRs Circuit Breakers

2029/2032 Qty KVA Qty MFG Ampacity Qty

Amb Care

Sub H1 2 1500 Dry 1 Cutler Hammer MDS632 3200 1

Cutler Hammer MDS616 1600 1

Cutler Hammer MDS408 800 9

Sub H2 2 1500 Dry 1 Cutler Hammer MDS632 3200 1

Cutler Hammer MDS616 1600 1

Cutler Hammer MDS408 800 8

EGSB1 Cutler Hammer MCCB 1200 1

Cutler Hammer MCCB 1200 1

Cutler Hammer MCCB 800 2

Cutler Hammer MCCB 600 2

Emergency N/A 750 Dry 1 In Amb Care

Emergency 1 750 Dry 1 In Energy Center

Cares Tower

1st Floor F1, F2 4 1500 Dry 2 Eaton MDS630 3000 3

BF-193 Eaton MCCB 800 5

Eaton MCCB 400 2

Eaton MCCB 150 1

Upstairs F3, F4 4 1000 Dry 2 Eaton MDS620 2000 3

PF-105 Eaton MCCB 800 6

Eaton MCCB 160 2

DPEG2 - Cares PH Eaton MCCB 1200 1

Eaton MHDL3400F 400 6

Radiology

Left side 2 500 Dry 1 Eaton MDS612 1200 2

2B-502 Eaton MCCB 800 2

Eaton MCCB 400 2

Eaton MCCB 225 7

Right Side 2 1000 Dry 1 Eaton MDS620 2000 1

Eaton MCCB 400 1

Eaton MCCB 800 1

Eaton MCCB 160 3

Pathology 2 1500 Dry 1 GE Wavepro 2500 2

USS-F2 GE MCCB 400 2

GE MCCB 150 2

GE MCCB 125 1

GE MCCB 100 1

Lab Warehouse 2 1500 Dry 1 Eaton MDS625 2500 2

USS-F1 Eaton MCCB 630 2

Eaton MCCB 400 3

Parking Garage 1 Oil 1

Total Bkr 83

Option 3

Yearly Breaker Refurbishing and Testing Listing

Option Year 3 : October 1, 2029 Through September 30, 2030

Substation MV Sw XFMRs Circuit Breakers

2027/2030 Qty KVA Qty MFG Ampacity Qty

Energy Center

Russel Gear N/A N/A Cutler Hammer MDS840 4000 1

BE602 Cutler Hammer MDS632 3200 2

Cutler Hammer MDS620 2000 3

Cutler Hammer MDS616 1600 6

Cutler Hammer MDS608 800 2

EC2 2 1000 Dry 1 Square D RJ1600 1600 1

Square D NE361200 LSG 1200 3

EC1 6-Jun 2500 Dry 1 5KV SW/5 KV Starters

EC3A 2 3000 Oil 1 Square D NW40H 4000 1

Tie-GPS-TGPB Square D NW40H 4000 1

Square D NW32H 3200 2

DPE-5 Square D PJ800 800 1

Square D LJ400 400 1

EDSB3 Square D PJ800 800 2

EDSB4 Square D PJ800 800 1

Square D LJ400 400 1

EC3B Square D NW20H1 2000 2

Square D NW16H1 1600 1

Square D NW08H1 800 3

GDS3 Eaton SBS 630 3000 4

DPE3 Eaton LT360032 450 2

MV Substation C/H 150VCP-W 500 1200 33

Research K03 1 1000 Oil 1 GE AK50 1600 2

BF458 GE AK25 600 4

Surgery 4 Dry 2 Schneider 1600 3

Schneider 800 3

Total Bkr 85

Option 4

Yearly Breaker Refurbishing and Testing Listing

Option Year 4: October 1, 2030 Through September 30, 2031

Substation MV Sw XFMRs Circuit Breakers

2028/2031 Qty KVA Qty MFG Ampacity

D21

Sub A N/A 1500 Oil 2 GE AK2-75 3000

GE AK2-50 1600

Sub B N/A 1500 Oil 2 GE AK2-75 3000

GE AK2-50 1600

EDSB-2 N/A N/A Square D MH36800 800

Emergency Square D MH36600 600

Panel Square D MH36400 400

Square D MH34250 250

Square D MH34225 225

Square D MH34200 200

Square D SE 2500

Siemens MCCB 1200

Penthouse

Sub W 2 1500 Oil 2 GE AKRT-6D-50H 2000

GE AKRT-6D-30H 800

Elevator N/A N/A GE AK2A-50 1600

GE AK2A-25 600

MICU

MSB-N1 2 750 Dry 1 Siemens WLS2A316 1200

Siemens MCCB 800

Siemens MCCB 600

Siemens MCCB 400

Siemens MCCB 300

DPNB1-G Siemens MCCB 800

Siemens MCCB 600

Siemens MCCB 300

DPNB1 Siemens MCCB 600

DPNB1-CR Siemens MCCB 600

DPNB2-CR Siemens MCCB 600

CB-T-UPS Siemens MCCB 600

7th Floor

EDP Eaton RD320T36W 2000

Eaton MCCB 800

Eaton MCCB 400

DPHL71EQ Eaton MCCB 800

Eaton MCCB 250

DPHL72EQ Square D Power Pact 800

Square D Power Pact 400

DPEG2 Eaton MCCB 1200

Cares Tower Eaton MCCB 800

Total Bkr 85 image2.png

File details come from the government source that posted it. Updated .