EXAMPLE - LOTO - Graphical Procedure - 942058 Elevator.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25026Q0604
About this file
This is a Lockout-Tagout (LOTO) Procedure document for Elevator P1 (equipment reference 538 EE4594) located in Building 1, Attic area, developed by the U.S. Department of Veterans Affairs. The procedure was created on August 7, 2024, and complies with 29 CFR 1910.147 OSHA regulations.
The document identifies three isolation points requiring lockout and tagout: G-1 (gravity isolation on the unit itself), E-1 (208V electrical breaker in the elevator equipment room), and E-2 (120V electrical breaker in the elevator equipment room). For the gravity isolation point, the unit must be lowered to the bottom level and visually verified. For both electrical isolation points, the breaker switches must be turned off and locked out, with voltage confirmed at zero using a meter. The procedure emphasizes that a machine stop must always be performed before locking out disconnects and that an open guard is not equivalent to a lockout. The document includes detailed shutdown and lockout sequences with seven steps, followed by five restoration steps to return equipment to normal operation. Critical enforcement notes warn that failure to properly follow lockout-tagout procedures may result in disciplinary action, and any machine modifications must be documented and approved by the safety department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Developed by Reviewed by Revised by
DW
Equipment Name:
Area: Attic Revn: 0 Date: 8-7-2024
ID Device
G-1 None
E-1 Breaker device
E-2 Breaker device
LOCKOUT-TAGOUT
PROCEDURE
Elevator P1 (942058) Equip. Ref.: 538 EE4594
Building: 1
Isolation Points to be
Locked and Tagged
CAUTION
Origin Date: 8-7-2024
ALWAYS PERFORM A MACHINE STOP BEFORE LOCKING OUT DISCONNECTS
Source Location Method Check
Gravity Isolation point located on unit. Lower unit to bottom level.
Visually verify unit is at bottom level.
Electrical
208V
Isolation point located in elevator equipment room.
Switch breaker switch to off. Lock out.
Confirm 0 voltage with meter. Attempt restart at CP-1.
Electrical
120V
Isolation point located in elevator equipment room.
Switch breaker switch to off. Lock out.
Confirm 0 voltage with meter. Verify cab electronics are off.
AN OPEN GUARD IS NOT THE SAME AS A LOCKOUT
Any machine modifications must be shown in procedure. Contact safety department to update procedure.
Safety Depends on You!
! Note:
G-1
CP-1
E-1
E-2
Equipment Specific Lockout/Tagout Procedure
29 CFR 1910.147
Shutdown and Lockout Sequence
File details come from the government source that posted it. Updated .