This is a bid schedule for a Department of Veterans Affairs (VA) construction/maintenance contract involving fire hydrant and isolation valve replacement and installation work at two facilities: the Richard L. Roudebush VA Medical Center (VAMC) in Indianapolis and the VA Cold Spring Road Facility (CSR).

The Base Bid encompasses replacement of existing fire hydrants and isolation valves across nine VAMC locations (VAMC #1 through #9) and two CSR locations (CSR #1 and #2), with two additional installations of new isolation valves specified at VAMC #1 and VAMC #5, plus one isolation valve replacement at the VAMC Water Softener Room. The contractor must provide all tools, equipment, materials, labor, and supervision necessary for completion. Four bid alternates are structured hierarchically: Bid Alternate 1 modifies the Base Bid by adding installation of new isolation valves at VAMC #1 and VAMC #5; Bid Alternate 2 further refines Alternate 1 by specifying work scope changes at the VAMC Water Softener Room, CSR #1, and CSR #2; Bid Alternate 3 builds on Alternate 2 by adding fire hydrant and isolation valve replacement work at VAMC #2, #3, and #8; and Bid Alternate 4 concludes the sequence by modifying Alternate 3 with fire hydrant replacements at VAMC #1 and #5, and fire hydrant and isolation valve replacements at VAMC #9. Contractors are required to submit pricing for each bid line item with blank spaces provided for dollar amounts.

View the file

Other files

File Type Posted
36C25026Q0425 0003.docx DOCX document
36C25026Q0425 0002.docx DOCX document
RFIs.pdf PDF
Site Visit Sign In Sheet.pdf PDF
36C25026Q0425 0001.docx DOCX document
Attachment IV - VAAR 852.219-75.pdf PDF
36C25026Q0425_1.docx DOCX document
Attachment I - DBA WD.pdf PDF
Attachment II - Specifications.pdf PDF
Attachment III - Drawings.pdf PDF
Attachment V - RFI Form.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid:

Contractor shall provide all tools, equipment, material, labor, and supervision necessary to accomplish all work set forth within the following list, and the project Statement of Work and Specifications at the

Richard L. Roudebush VA Medical Center (VAMC) and at the VA Cold Spring Road Facility (CSR).

Bid Alternate 1, Base Bid except:

Bid Alternate 2, Bid Alternate 1 except:

Bid Alternate 3, Bid Alternate 2 except:

Bid Alternate 4, Bid Alternate 3 except:

***END OF BID SCHEDULE***

File details come from the government source that posted it. Updated .