About this file

This document is a Request for Quotation (RFQ) from the VA Northeast Ohio Healthcare System for hospital linen laundering services. The solicitation covers linen and uniform services for the Louis Stokes VA Medical Center in Cleveland, Ohio, with a contract period beginning 4/1/2026 after the current incumbent's contract expires on 3/31/2026. The procurement is a full and open competition with a NAICS code 812331 and a small business size standard of $41.5 Million.

Key requirements include laundering hospital linens, uniforms, and specialty items for the main hospital and Community-Based Outpatient Clinics (CBOCs), with specific details on delivery frequencies, cart preparation, and inventory management. The vendor will be responsible for all vehicles, transportation, and logistics. Uniform requirements include Landau brand or equivalent (with prior approval), with replacements authorized every two years. The solicitation includes attachments detailing uniform counts, linen counts, and CBOC service site information. Invoicing will be monthly, with pricing based on cost per pound and a delivery fee for off-site locations.

View the file

Other files

File Type Posted
Linen counts.pdf PDF
36C25026Q0095 0004.pdf PDF
36C25026Q0095 0001.pdf PDF
Uniform Counts.pdf PDF
CLE CBOC Counts_Redacted.pdf PDF
36C25026Q0095 0003.pdf PDF
36C25026Q0095.docx DOCX document
Price-Cost_Schedule - 26Q0095 - V2.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 5

0002 12-03-2025

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

3140 Governor’s Place Blvd. Suite 210

Kettering OH 45409-1337

36C250

Department of Veterans Affairs

Network Contracting Office (NCO) 10

3140 Governors Place Blvd. Suite 210

Kettering OH 45409-1337

To all Offerors/Bidders

36C25026Q0095

11-19-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-16-2026 13:30 EST

X 1

The purpose of this solicitation amendment is to answer questions from industry.

Please see continuation pages below.

Josh Kovar

Joshua.Kovar@VA.gov

1. Can you provide the full list of CBOC service sites (with addresses, anticipated weekly or monthly pickup/delivery frequency, and volumes) included under this solicitation?

a. Please see PDF CLE CBOC Counts

2. What are the estimated monthly volumes (in pounds and item counts) for clean linen, soiled linen pickup, and specialty items (e.g., patient slings, mops, uniforms) for the first year of the contract?

a. All of the estimated counts are included in the Price-Cost_Schedule.

3. For each site, what are the required delivery/pick-up time windows (especially for the Cleveland VAMC’s early morning delivery), and are there any required service days beyond Monday through Saturday?

a. All the delivery/pickup windows are included in the Performance Work Statement.

4. Is there an incumbent contractor currently providing these services, and if so, will there be a transition/cut-over period or incumbent wrap-up responsibilities?

a. Yes there is an incumbent vendor that will be servicing the contract until 3/31/2026. The transition to the new contract will take place on 4/1/2026.

5. Will the contractor (and subcontractors) be responsible for all fleet vehicles, carts, transportation, and route logistics for all CBOCs, or are some site logistics already provided by the VA?

a. Yes, the contractor is responsible for all vehicles, carts, and transportation for the entire contract.

6. Are there any socio-economic participation goals (e.g., small business, minority-owned, women-owned, HUBZone) or subcontracting plan requirements beyond the standard FAR 52.212-2 evaluation factors?

a. No.

7. How are performance metrics (timeliness, cleanliness, packaging accuracy, equipment calibration, reporting) verified (inspection frequency, audit methods), and what are the associated penalty/deduction provisions for non-compliance?

a. Contract deficiency reports (CDRs) will be issued for non-compliance items, if there are enough CDRs a

CURE notice will be issued which may lead to a termination. Or the Government may not exercise an option.

8. Is the pricing schedule strictly firm-fixed price for all CLINs, or is there an adjustment mechanism for volume fluctuations (e.g., +20% surge) and how is that structured within the CLINs?

a. The schedule is based on estimates and does not consider any “surge”. If a surge happens then we will issue a contract modification to increase the counts as required up to the 20% stated in the PWS.

9. Are there dedicated line items (or pricing worksheets) for the specialized services (patient slings, mops, uniforms, surgical linen) or are they embedded in general linen categories? Will a draft of the price schedule be made available?

a. the price sheet has the base items listed in column E and the special services in column H. For example, if your scrub shirt cost is 2.5 per unit you would enter that into Cell E8. If you had special washing costs of 1.05 you would enter that into Cell H8. The E8 cell is for 0002AB and the

H8 cell is for 0002AC as referenced in the pricing sheet.

10. What are the billing and invoicing procedures (monthly, per delivery, site-based), and how are loss/damage charges defined (if any) under this contract?

a. Invoicing is monthly in arrears. Any loss charges will be invoiced against the loss charges clin. You can send 1 invoice however it must be broken by CLIN/SLIN in the contract.

11. Is there any way we can get a breakdown of how much linen each Facility. This will help us understand of how much product each Facility is using.

a. Please see PDF CLE CBOC Counts.

12. Uniform Brand & Model - Is Landau required exclusively for all applicable roles in Cleveland, or are equivalent brands acceptable with prior COR approval?

If equivalents are permitted, are there specific Landau lines, fabric weights, or material compositions that should be used as the quality benchmark?

a. Landau is the current vendor, any changes to the fabrics or lines must be approved by the Facility

POC prior to new uniforms being installed.

13. Uniform Types & Quantities

a. Please confirm the specific uniform pieces required (e.g., scrub tops, scrub pants, lab coats, jackets, etc.) by role.

b. Please see Uniform Counts PDF attachment

14. Is there a standard issue quantity per employee under Cleveland’s VA employee replacement program?

a. Please see Unform counts pdf attachment

15. Color & Style Standards

a. Are there designated colors, styles, or insignia/embroidery requirements that must be adhered to for Cleveland VAMC?

i. All uniforms, polos, provider coats are COG items and only need chipped by the vendor then laundered.

b. Should uniforms be provided on standard hangers or VA-specified hangers?

i. Standard hangers are sufficient.

16. Replacement Cycle Guidance

a. Can you confirm the expected replacement interval considered “fair wear and tear” under the

COR’s guidance?

i. Employees are authorized replacement uniforms every two years.

17. Approval Process for Equivalent Vendors

a. If proposing an equivalent to Landau, is there a formal submittal and approval process (e.g., samples, spec sheets) prior to implementation?

i. Yes, Samples are to be sent to the COR prior to changes being proposed.

18. Do the volume estimates provided represent the entire health system, including off-site locations, or are they specific to the main hospital only?

• If systemwide, can you identify which items are used at the main hospital versus off-site locations.

o All estimates are systemwide

• Can you also provide estimated poundage for the main hospital compared to the off-site locations?

o Poundage is system wide.

19. Are launderable laundry bags currently being used? If so, would you be open to fluid-resistant bags being direct billed per unit rather than billed by weight?

a. The government would be open to look at the change

20. Is the hospital purchasing all uniforms, including scrubs?

a. No

21. If uniforms and scrubs are purchased, does the cost per pound apply solely to laundering these items?

a. Cost per pound

22. For off-site locations, is pricing intended to be structured as a delivery charge per visit, or are you seeking pricing on a cost-per-pound basis?

a. The delivery fee per visit will be the cost to come to the offsite facility (Stop Fee). Items and poundage are pulled in from the main CLINS

23. For off-site locations, can you provide the specific items and estimated quantities delivered per visit? The

Price-Cost Schedule lists the number of visits per base period and year, but does not specify item types, quantities, or estimated poundage. This information is needed in order to accurately quote a cost per visit.

a. Please see attached PDF CLE CBOC Counts

24. Are you able to confirm current price per pound that you are paying.

a. No

25. We will be delivering to LSVA via Tractor trailer, Are we able to leave a trailer onsite and VA Staff load and unload or would we be docking and loading/unloading ourselves.

a. Vendor must offload at the dock.

26. With regard to the alEX distribution: Is this simply providing the carts premade for VA to exchange or are we actually loading and unloading?

a. At the main facility and all cbocs the Vendor will premake the carts by floor/function and VA Staff will load.

27. With regard to the alEX distribution Does the VA own the alEX machines or are they looking to rent from provider

a. The VA owns the alEx machines.

28. Will another visit time be assigned to tour the campus and understand what is needed, as the 12/11 visit has passed?

A. No additional site visits will be scheduled. The Government is on a short deadline to get the requirement completed.

29. Is there a safety stock level needed? I did not specifically see that in the proposal, however we know that

Pittsburgh facilities require a 72-hour buffer at all times.

a. The PWS Stated. Ensure a 48-hour par level on site to meet the 96-hour sustainability requirement. The PWS hereby changed to 72 hour due to the typo.

This is a solicitation for commercial items prepared in accordance with the format in Federal

Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and

Solicitation for Commercial Items,” as supplemented with additional information included in this notice.

This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-06.

This solicitation is a Full and Open Competition. (Not Set Aside)

The associated North American Industrial Classification System (NAICS) code for this procurement is 812331, with a small business size standard of $41.5 Million. The FSC/PSC is

S209.

The VA Northeast Ohio Healthcare System, Louis Stokes VA Medical Center, 10701 East

Boulevard Cleveland, OH

44106-1702 is seeking to purchase hospital linen laundering services.

All interested companies shall provide quotations for the following:

See attached document: Uniform Counts.

See attached document: CLE CBOC Counts_Redacted.

See attached document: Linen counts.

File details come from the government source that posted it. Updated .