36C25025Q0588_1.docx

DOCX document 131 KB Posted

Attached to
Z1DA--Repair Roof 36 - 583-25-514
Solicitation number
36C25025Q0588
Issued by

About this file

This is a Department of Veterans Affairs (VA) Request for Quote (RFQ) for roof repair services at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The solicitation (36C25025Q0588) seeks a Service-Disabled Veteran-Owned Small Business (SDVOSB) to prepare and coat the entire 2,500 square foot roof of the 10th floor penthouse, designated as Roof 36. The project involves cleaning the roof surface, relocating communication equipment, repairing flashing and penetration deficiencies, and applying a liquid-based polyurethane or silicon coating.

Key details include a 70-day performance period, an estimated contract value between $25,000 and $100,000, and a site visit scheduled for June 10th, 2025. The contractor must provide a five-year manufacturer's warranty and comply with VA specifications for roof preparation and coating. Quotes are due by 2:00 PM EDT on July 7th, 2025, and must be submitted electronically. The solicitation is 100% set aside for VA-certified Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 236220 and a size standard of $45 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5.

REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE

DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL

SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25025Q0588 X 05-21 -2025 583-25-4-650-0033 583-25-514 36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240 Email only, send to Contract Specialist:

Tiffany Rausch No physical documents will be accepted

Tiffany Rausch 317-988-1521 Repair Roof 36 - Project #583-25-514

The contractor shall prepare and coat the entire surface of the 2,500 square foor roof of the 10th floor penthouse, Roof 36, at the Richard L. Roudebush VAMC. Roof 36 is a Spray Polyurethane Foam (SPF) material in deteriorating condition. The preparation of the roof shall include cleaning the area, removing or relocating the communicaiton equipment, repairing flashing deficiencies, repairing penetration deficiencies, and all other work required for the coating to adhere propertly. The coating used shall be a liquid-applied base coat and sealant; and the coating shall be polyurethane, or silicon based.

An organized pre-bid site visit is scheduled. Please see FAR provision 52.236-7 for additional details.

Per FAR 36.204, the magnitude of construction for this project is estimated to be between $25,000 and $100,000.

The NAICS Code is 236220 with a Size Standard of $45.0 million.

Quotes will be accepted, via Email only, if received before the date/time specified in block 13a below.

Send bids to the email specified in block 8 above. Hand delivered and mailed quotes/bonds will not be accepted.

This solicitation is 100% set aside for a Service-Disabled Veteran Owned Small Business. Only bids from VA-certified SDVOSBs in the Department of Veterans Affairs, Office of Small Disadvantaged Business Veterans Certification website (https://veterans.certify.sba.gov/) or DSBS at time of bid submission and prior to award will be eligible for award.

NOTICE: The VA and/or a third party (support contractor) will require access to the VA contractor records to assess contractor compliance with the limitations on subcontracting requirement included in VAAR 852.219-75(a)(1)(ii) "Limitations on Subcontracting..."(Jan 2023)(Deviation) located in the General Conditions section of this solicitation.

X X 52.211-10 X 14:00

EDT

07-07-2025 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Bid Amount:

Tax I.D.:

UEI:

Email Address:

583-3650162-650-854200-3223 23NRNR000

36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240 36C250 Department of Veterans Affairs Financial Management System P O Box 149971 Austin TX 78714-9971 512-242-7300 N/A Luke A Turner

VA-VHA-RPOC-2024-0076

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
STATEMENT OF WORK5
IMPORTANT INFORMATION9
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS15
2.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)15
2.2 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)15
2.3 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)16
2.4 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)16
2.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)16
2.6 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)16
REPRESENTATIONS AND CERTIFICATIONS18
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025)18
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)20
3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)22
3.4 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020)23
GENERAL CONDITIONS24
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021)24
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)25
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)25
4.4 52.223-20 AEROSOLS (MAY 2024)27
4.5 52.223-21 FOAMS (MAY 2024)27
4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)28
4.7 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)31
4.8 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)31
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)31
4.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)33
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)33
4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020)34
4.13 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023)34
4.14 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)40
4.15 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)42
4.16 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)43
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)45
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)46
4.19 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)46
4.20 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023)47
4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)47
4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)48
4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)48
ATTACHMENTS50
ATTACHMENT I - WAGE DETERMINATION - DBA.50
ATTACHMENT II - RFI TEMPLATE.50
ATTACHMENT III - EMR.50
ATTACHMENT IV - VHA DIRECTIVE 1192-01.50
ATTACHMENT V - VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.50
ATTACHMENT VI - COMMUNICATION EQUIPMENT LIST.50
ATTACHMENT VII - ROOF 36 ACCESS ROUTE.50
ATTACHMENT VIII - SPECIFICATIONS.50

STATEMENT OF WORK

GENERAL PROJECT SCOPE:

The Contractor shall prepare and coat the entire surface of the 2,500 square foot roof of the 10th floor penthouse, Roof 36, at the Richard L. Roudebush VAMC. Roof 36 is a Spray Polyurethane Foam (SPF) material in deteriorating condition. The preparation of the roof shall include cleaning the area, removing or relocating the communication equipment, repairing flashing deficiencies, repairing penetration deficiencies, and all other work required for the coating to adhere properly. The coating used shall be a liquid-applied base coat and sealant; and the coating shall be polyurethane, or silicon based. Completion of this project will protect the mechanical and electrical equipment in the penthouse from water damage.

Location: All work will be performed on the C-Wing 11th floor rooftop location, referred to as Roof 36, at the Richard L. Roudebush VA Medical Center (VAMC), located at 1481 West 10th Street, Indianapolis, IN 46202.

Period of Performance: Period of Performance shall be 70 days following the Notice to Proceed (NTP). All work shall be performed to minimize outages and disruption to the VAMC. Work shall be performed during normal hours (6 AM to 5 PM) and may involve second or third shift staffing (5 PM to 6 AM) if it is deemed necessary.

TECHNICAL REQUIREMENTS:

A. The Contractor shall provide all necessary services (i.e., labor, materials, tools, equipment, and competent supervision) to perform all work as noted below to meet the scope objectives and requirements, and to provide the required outcome in terms of overall quality, timeliness, and documentation. All work performed under this project shall fully adhere to all VA Design and Master Specification criteria, as well as relevant additional standards and criteria outlined in the Project Specifications. The Contractor shall be responsible for obtaining and coordinating the services of all third-party subcontractors performing services on-site as part of the contract to accomplish the following:

1. The Contractor shall prepare the site to be coated. Preparation will include temporarily relocating the communication equipment on the roof’s surface, cleaning and repairing drains, repairing penetrations, power-washing of the roof surface, and any other good roofing practices required to meet manufacturer’s specifications.

2. Roof 36 holds communication equipment that shall be relocated. The equipment that shall be moved includes but is not limited to: one 4ft diameter satellite dish with 40in roof mount, two 800MHz lines connected to one 5ft roof mount, one communication line connected to 8ft antenna with 5ft roof mount, one 155MHz line connected to wall mounted antenna inside roof perimeter, and one communication line connected to wall mounted antenna outside roof perimeter.

3. The Contractor shall temporarily remove any lightning protection or drain covers that will interfere with the coating process. The Contractor shall reinstall all lightning protection and drain covers to full serviceable condition. The reinstalled lightning protection and drain covers shall meet all warranty standards.

4. The Contractor shall make repairs to the roof surface before coating. The repairs shall include punctures in the SPF surface, vegetation growth, and deteriorated seals around the coping stones. The Contractor shall use flashing grade coating materials and reinforcement to repair all punctures. The Contractor shall repair the coping stone seals by removing loose mortar, sealing the limestone joints, and pan flashing underneath the coping stones.

5. The Contractor shall coat the roof with polyurethane-based or silicon-based liquid-applied materials. The material selected shall be suitable for application to the SPF roof surface. All materials used shall be Ultraviolet (UV) rated. Coating material shall be applied by rollers; spray coating shall not be used.

6. The Contractor shall apply sealant to the coated roof with appropriate material. The sealant shall be capable of bonding to the coating. The sealant shall be UV rated. The Contractor may use a combination material for coating and sealing with COR approval only.

7. The Contractor shall provide a manufacturer’s warranty of the roof repair for a minimum of 5 years from date of installation and final acceptance. All work shall be completed in accordance with the manufacturer’s specifications. All corrective actions identified by warranty inspections shall be completed by the Contractor until the inspection passes and the warranty is approved.

8. The Contractor shall transport all personnel, equipment, and materials through the interior of the facility. No access shall be granted for exterior lifts by crane, hoist, or other methods. See the attached Roof Access Route for transportation details.

9. The Contractor shall provide all protections necessary during the curing process of the roof coating that are recommended by the manufacturer. Any after-hours work or supervision of applied coating shall be approved by the COR before said work begins.

10. Temporary storage of equipment or materials onsite may be permitted. Any onsite storage for this contract shall be conducted by COR approval only. The Contractor shall communicate to the COR the proposed location of the stored equipment/materials, the proposed duration of the storage required, and all safety hazards that the stored equipment/materials may cause.

B. Prior to the start of work, the Contractor is responsible for verifying existing conditions and maintaining current conditions of the VAMC during and following completion of the repairs. Responsibilities include but are not limited to:

1. The Contractor shall perform the services of this contract without interfering with the normal flow of vehicle and pedestrian traffic at the Medical Center.

2. It shall be the responsibility of the Contractor to keep the construction areas clean and the surrounding areas free from damage. If during work, surrounding areas are damaged, the Contractor will be responsible for any repairs/replacements that are required.

3. It is the responsibility of the Contractor to understand and comply with all applicable city, county, state, and federal codes, laws, ordinances, standards, rules, and regulations.

CONTRACTOR GENERAL REQUIREMENTS

C. All communication from the Contractor to the VA must be submitted and communicated through the Contracting Officer’s Representative (COR).

D. The Contractor is not authorized to park on the VAMC campus. The Contractor employees and subcontractors may park at the VA/s Cold Springs Road (CSR) campus located at 2669 Cold Springs Road, Indianapolis, IN 46222. All personnel, materials, and equipment shall be dropped off at the campus before work shifts begin.

E. The Contractor shall only use the facility’s Service Elevators for transportation. Contractor personnel shall not use the facility’s Patient Elevators at any time.

F. The Contractor shall secure all material, supplies, and equipment left on-site after working hours. All materials, tools, and equipment shall be labeled with the Contractors name and a point of contact. No materials or tools shall be left unattended outside the authorized construction site. The VA is not responsible for any theft of tools, equipment, or materials that are stored on-site or in the construction site. The following applies to materials and demolition material at the VAMC:

1. All the Contractor’s materials, tools, and equipment shall be clean when transporting them through the facility. If the materials, tools, and equipment cannot be cleaned, then the Contractor shall transport them in a cleanable container or cart. Materials over 6’ long carried or hauled through the facility require a person to be in front of and behind the material or equipment ensuring the path of travel is safe.

2. The Contractor shall cover all loads of demolition material to prevent dust/debris from disrupting medical activities in the hospital. The Contractor shall be responsible for the proper disposal of all waste generated, including all items shown to be removed on the various demolition drawings. The Contractor shall provide a roll off dumpster for all applicable phases and coordinate with the COR for dumpster staging areas. The Contractor shall be responsible for the removal and relocation of the dumpster throughout the entirety of the project.

G. Upon completion of all work items, the Contractor shall conduct a walkthrough with the COR noting all punch list items. Once all punch list items are completed the final invoice will be approved.

H. The Richard L. Roudebush VAMC is an active Medical Center environment; therefore, work may be performed directly adjacent to active offices or patient care areas. The Contractor and all subcontractors shall act with professional behavior at all times, being cognizant of excessive noise and disruptions. If certain work tasks are expected to be especially disruptive, communicate with the COR for prior approval.

I. The VA is not responsible for variability in the price of goods or consumables used during demolition and construction of this project.

DELIVERABLES:

J. The Contractor shall submit a Site-Specific Safety Plan to the COR within ten (10) business days from the contract award. The plan must be approved by the COR before any work begins.

K. The Contractor shall submit all products for approval by the COR before beginning construction. Coating material submittals shall include the Safety Data Sheet (SDS) for each product.

L. The Contractor shall comply with all aspects of contract specifications and submit a Request for Information (RFI) for clarification or additional information if the project documents are not clear.

M. The Contractor shall provide waste reports to the COR each month for the entire duration of the project. Refer to the Construction Waste Management Specification for instructions.

N. The Contractor shall submit a list of all subcontractors that will be working on the construction site.

O. The Contractor shall provide a minimum five (5) day notice to the COR before any utility shutdowns are required to allow for proper scheduling and notification.

P. The Contractor shall deliver a warranty and maintenance package prior to project close out. This package will include all applicable product(s) warranty information, manuals, and maintenance information for equipment installed during the project.

HEALTH AND SAFETY:

Q. The Contractor shall have the responsibility for the safety of their own personnel. No physical work can begin until a Site-Specific Safety Plan is approved, governed by the Accident Prevention (FAR 52.236-13) clause. It is the responsibility of the Contractor to safeguard the public, Contractor personnel, etc. during construction. The VA will not intervene except when the safety of VA personnel or property is at risk, or imminent risk to life safety exists.

R. Provide appropriate signage, barricades, etc., as appropriate, and as directed by the COR. The Contractor will dictate appropriate PPE for each work area and clearly indicate those requirements at all entrances to construction areas. The Contractor is to fill out and post the Construction Safety Poster with critical safety information at the main entrance door to the construction site.

S. The Contractor shall be thoroughly familiar will all rules and regulations governing safety. A 30-hour OSHA “Competent Person” shall be present for all work and all additional workers shall have a minimum of a 10-hour OSHA Certification. All “Skilled Trades” workers including but not limited to welders, pipefitters, carpenters, electricians, etc. performing work must present a valid certification for their respective trade.

T. The Contractor shall comply with all VA regulations concerning Safety, Interim Life Safety Measure Requirements, Parking, Personnel Access, and proper removal/safe disposal of construction waste and debris as listed in the specifications and drawings.

U. The Contractor shall properly identify all chemicals with an OSHA GHS label and store them according to OSHA regulations. The Contractor shall keep all applicable OSHA GHS approved label and SDS sheets on the job site.

V. The Contractor shall provide all necessary tools, equipment, Personal Protective Equipment (PPE), and safety related materials to perform the work in a safe, effective, and timely manner. All tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I.

W. The Contractor shall comply with OSHA Standard 29 CFR1926, Subpart AA for all confined space entry. A VA confined space permit shall be required prior to entry into confined spaces.

X. The Contractor shall be responsible for insuring all their employees.

Y. The Richard L. Roudebush VAMC campus is a smoke-free facility. It is the Contractor’s responsibility to maintain compliance to this policy within the campus.

SECURITY:

Z. The Contractor, contractor personnel, and all subcontractors shall be subject to all Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract.

AA. The Contractor and all subcontractors shall wear a VAMC badge at all times when on VAMC property. General Contractor’s or subcontractor’s employees shall not enter the project site without an appropriate badge. Ensure all construction entry doors are locked at all times. Contractor personnel may be subject to inspection of their personal effects when entering or leaving the project site. Before starting work the General Contractor shall give two weeks’ notice to the COR so that security arrangements can be provided for employee badging.

AB. The Indianapolis VAMC uses an electronic key and coring system throughout the entire Medical Center. The Prime Contractor will be issued one (1) electronic key once the contract has been awarded and the NTP has been issued. The Prime Contractor will only be given access to the rooms/spaces that work is required in to complete the contract. Any additional access shall be requested through the VA COR. The Contractor will be responsible for the electronic key during the entire duration of the project. The last invoice on the contract will not be paid until the electronic key is returned in good working condition to the COR. The Prime Contractor will be responsible for reimbursing the VA $125.00 if the electronic key is lost, stolen or damaged during the duration of the contract. The COR may at any time inspect the electronic key to ensure the key is in possession of the Prime Contractor. The electronic key will be required to be reprogrammed periodically to ensure updated access. Currently the electronic key is set to be reprogrammed every four (4) days.

AC. The C&A requirements do not apply, and a Security Accreditation Package is not required.

ATTACHMENTS:

Roof 36 Access Route Communication Equipment List Specifications

IMPORTANT INFORMATION

QUOTE MATERIALS: Offeror materials consist of Invitation for Quotes forms and any issued Amendments which will be provided via email.

QUOTE SUBMISSION: The following documents are to be included in the quote submission: one (1) original fully completed and signed SF 1442 Offer page, acknowledgment of all amendments either via entering data in block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the original SF 1442 Offer page; one (1) original completed quote schedule if one is provided, otherwise quote amounts are entered in block 17 of the SF1442 Offer page; one (1) original completed/wet ink signed SF 24 Quote Bond (if required, see block 13B) of the SF1442 Solicitation page; Completed certification at VAAR 852.219-75, Limitations on Subcontracting (JAN2023)(DEVIATION); Completed Offerors are responsible for ensuring and verifying their quote and all required quote documents are received at the address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment).

PROJECT TITLE AND NUMBER: Repair Roof 36 #583-25-514

PROJECT LOCATION: 1481 W 10th Street, Indianapolis, IN 46202

TYPE CONSTRUCTION: Commercial and Institution Building Construction

MAGNITUDE OF CONSTRUCTION: Between $25,000 and $100,000.

SMALL BUSINESS SIZE STANDARD: $45M

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM CODE: (NAICS): 236220

PERIOD OF PERFORMANCE: 70 calendar days from receipt of Notice to Proceed.

WAGE DETERMINATION: Department of Labor General Decision Number IN20240002 05/16/2025 is included as an attachment to solicitation and is applicable to any resultant contract. If necessary, subsequent revisions will be posted to the solicitation via amendment prior to quote opening. Revision may also be applicable prior to any contract award. Wage decisions are available at http://www.wdol.gov/Index.aspx.

REQUESTS FOR INFORMATION (RFI): To obtain clarifications and/or additional information concerning the contract requirements, specifications, and/or drawings, submit a query utilizing the RFI Form attached to this solicitation, send via email to tiffany.rausch@va.gov. The subject line of the email must read “RFI – 36C25025Q0588.” RFIs must be specific identifying the section, paragraph, and page number of the specifications or cite the drawing number. RFIs must be stated as a question. All RFIs submitted shall include the solicitation number and title, contractor name, city, state, telephone, email address, date submitted, and the RFI question(s). All RFI’s need to be submitted in PDF format. RFI responses will be posted to www.sam.gov as an amendment to the solicitation, as necessary. The deadline for RFI submissions is 14:00 (EDT) on June 17th, 2025. Late RFIs will not be answered unless the contracting officer determines a response is in the Governments interest. Telephone requests for information will not be accepted or returned.

TYPE OF SET-ASIDE: This solicitation is 100% set aside for a Service-Disabled Veteran-Owned Small Business (SDVOSB)

BONDING INFORMATION

ALTERNATIVE PROTECTIONS: A bid guarantee is not required. Rather, FAR Clause 52.228-13 Alternative Payment Protections (JUL 2000) applies to this solicitation. Upon award, the contractor must submit one of the payment protections listed at (a) that complies with: the amount indicated (b), within the timeline required (c), and for the duration indicated (d). See the full text of FAR 52.228-13 in the clauses section for additional information.

BID GUARANTEE: A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, shall require rejection of the bid in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) and the form must be provided in original (copy of original if facsimile bids are allowed) with ‘wet ink’ signatures and contain the proper solicitation number, bid opening date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties must be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.

PERFORMANCE AND PAYMENT BONDS: In accordance with Contract Clause 52.228-15, and FAR 28.102, Contractors are reminded that any amount awarded over $35,000.00 shall require a Payment Bond (SF 25A), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award. Bonds must be provided with original ‘wet ink’ signatures - no white outs or other corrections are allowable. Copies and facsimiles of bonds shall not be accepted.

DATABASE REGISTRATION INFORMATION

SYSTEM FOR AWARD MANAGEMENT REGISTRATION: The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system. Warning: Award cannot be made to unregistered contractors. If not registered, quoters are advised to do so immediately. If registration is not active when quotes are opened the quote may be considered non-responsive and thereafter rejected.

THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year. Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, check the following website: http://www.dol.gov/vets/programs/fcp/main.htm. See FAR provision 52.222-38, Compliance with Veterans' Employment Reporting Requirements (FEB 2016) under the Representations, Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports Veterans (FEB 2016) under the General Conditions.

SECURITY

BACKGROUND INVESTIGATIONS All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform the statement of work. This requirement is also applicable to all subcontractor personnel requiring the same level of access.

Levels and associated types of Background Investigations:

· If the project requires that workers have only limited physical access to the VA facility for a period of one year or less, a local flash badge with fingerprint check is issued.

· If the project requires that workers require un-supervised, logical, and/or physical access for 180 consecutive or aggregate days in a 365-day period, over a 3-year period, a background investigation may be required (Special Agency Check (SAC)) which must be completed prior to being allowed access.

If the project requires that workers have access to a VA Network (such as the Building Management System) or un-supervised, full-time, logical, and/or restricted physical access for more than 6 months or more than 180 aggregate days in a one-year period, a background investigation is required (Special Agency Check and National Agency Check with Written Inquiries (NACI)) and access is not allowed until a favorable SAC completion.

All costs for SAC and NACI checks are borne by the contractor. The VA may at its discretion make deductions against the contract in order to recoup the investigation costs. Current cost for a SAC is $25.00 per employee and the current cost for a NACI check is $182.00 per employee (subject to change at any time).

MEDICAL CENTER ACCESS: Anyone participating in the site visit, or for any other reason that involves visiting the medical center related to this solicitation, must have a valid ID on their person and their vehicle must be properly registered and insured. Visitors are prohibited from possessing weapons while on a federal installation (See 18 USC 930 - Possession of Firearms and Dangerous Weapons in Federal Facilities). Handheld cellphone use or texting while driving is also prohibited. All VA Medical Centers and associated properties are Federal Property.

PRIVACY TRAINING: All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer's Representative.

E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).

OTHER IMPORTANT QUOTEDER INFORMATION

ADDITIONAL PRIME CONTRACTOR INFORMATION- SAFETY OR ENVIRONMENTAL VIOLATIONS AND EXPERIENCE MODIFICATION RATING INFORMATION: All Quoteders/Offerors shall submit information pertaining to their past Safety and Environmental record. (Using the attached EMR information and certification form) pertaining to their past Safety and Environmental record. The information must contain a certification that the quoteder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Quoteder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat,, and/or willful OSHA violations, along with a detailed description of those violations.

All Quoteders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Quoteders/Offeror's insurance carrier and be furnished on the insurance carrier's letterhead. If a Quoteder/Offeror's EMR is above 1.0, Quoteder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier's letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state run worker's compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the Quoteder/Offeror lacks insurance history, Quoteder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier's letterhead, and include a letter from the NCCI indicating that it has assigned Quoteder/Offeror a Unity Rating of 1.0.

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make a Determination of Responsibility.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS: The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management System (GEMS) applicable for the contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting Officer's Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location.

REFERENCES TO VA ENGINEER, RESIDENT ENGINEER, SENIOR RESIDENT ENGINEER, OR PROJECT MANAGER: Any reference contained within contract specifications and/or drawings to the “VA Engineer”, “Resident Engineer”, “Senior Resident Engineer”, “Project Manager”, or their abbreviations are to be replaced with “Contracting Officer's Representative (COR)”.

PAYMENT FOR MATERIALS STORED OFF-SITE: Payment in advance of installation for materials stored off-site is not authorized under this contract.

SCHEDULE OF MATERIAL SUBMITTALS: The submittals contemplated by FAR 52.236-5, Material and Workmanship, are listed on the Schedule of Material Submittals in the Specifications. The provided schedule is for reference only, all submittals required by the contract documents are required.

PROGRESS SCHEDULE: The schedule required by FAR 52.236-15 shall be provided after receipt of the Notice to Proceed.

REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS)

(a) As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $750,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies. PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

(b) Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: www.cpars.csd.disa.mil. Help in registering can be obtained by contacting Customer Support Desk at DSN: 684-1690 or COMM: 207-438-1690. Registration should occur no later than thirty days after contract award, and must be kept current should there be any change to the contractor's registered representative.

(c) For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

(d) Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government's evaluation being placed on file in the database with a statement that the contractor failed to respond.”

SUPPLEMENTAL INFORMATION

The influenza season is generally considered to span the four-month period from December 1 through March 31; however, it can vary from one season or geographic location to another. Individual VHA facilities may expand (but not reduce) this time period based on local influenza activity and other epidemiological circumstances.

Health Care Personnel (HCP). HCP are individuals who, during the influenza season, work in VHA locations or who come into contact with VA patients or other HCP as part of their duties. VHA locations include, but are not limited to, VA hospitals and associated clinics, community living centers (CLCs), community-based outpatient clinics (CBOCs), domiciliary units, Vet centers and VA-leased medical facilities. HCP include all VA licensed and unlicensed, clinical and administrative, remote and onsite, paid and without compensation, full- and part-time employees, intermittent employees, fee basis employees, VA contractors, researchers, volunteers and health professions trainees (HPTs) who are expected to perform any or all of their work at these facilities. HPTs may be paid or unpaid and include residents, interns, fellows and students. HCP also includes VHA personnel providing home-based care to Veterans and drivers and other personnel whose duties put them in contact with patients outside VA medical facilities.

* Seasonal Influenza Vaccination Program (VHA Directive 1192.01)"

JOINT VENTURE ELIGIBILITY

Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:

1. have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and

1. will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.

MISC

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.2 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i…

This is the start of the file's text. The full file is on GovTribe.