RFI Questions and Answers.docx

DOCX document 873 KB Posted

Attached to
Z1DA--Repair Facility Parking lots and Sidewalks 583-25-515
Solicitation number
36C25025Q0537
Issued by

About this file

This document is an RFI (Request for Information) Questions and Answers file for a Department of Veterans Affairs project involving parking lot repairs. The file contains two specific technical questions and responses related to concrete ramp dimensions and pavement striping procedures. Key details include guidance on sealcoating and striping timelines, specifically that new pavement surfaces must cure for 14 days before final marking application, with the first striping coat to be applied the day after sealcoating. The solicitation number is 36C25025Q0537 and involves repair work for facility parking lots and sidewalks under Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
36C25025Q0537 0001.docx DOCX document
Attachment I - WD.pdf PDF
Attachment III - Specifications.pdf PDF
36C25025Q0537_1.docx DOCX document
Attachment V - EMR.docx DOCX document
Attachment VI - RFI Form.docx DOCX document
Attachment IV - Drawings.pdf PDF
Attachment II - VHA Directive 1192-01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions and Answers

1. In order to have parking lot ready for traffic after a weekend shutdown, we will need to do the sealcoating on Saturday, and come back the next day to do the first coat of striping. The 2nd coat of striping would be applied the following weekend.

Spec section 32 17 23-4, 3.1 A 1. States "allow new pavement surfaces to cure for period of minimum 14 days before application of marking materials."

Are we to wait 14 days, or should we apply the striping the day after sealcoating? Please confirm.

ANSWER: Wait 14 days to apply the second striping coat. The first striping coat must be applied the next day. The parking lot must be striped and ready for parking by Monday.

2. I was hoping to get a little help when it comes to the concrete ramp on the drawings labeled “#4”.

If you could please provide dimensions of the ramp and a picture it would be greatly appreciated.

ANSWER: Please see the picture below of ramp #4 with dimensions.

image1.png