36C25025Q0410 0001.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C25025Q0410
About this file
This document is an Amendment to Solicitation/Modification of Contract for a Department of Veterans Affairs (VA) Request for Quote (RFQ) for an Air Emissions Survey Inventory at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The solicitation (RFQ 36C25025Q0410) is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS Code 541620, with a size standard of $19 million. The scope requires completing an air emissions inventory to determine if additional permits are needed, develop emissions tracking tools, and potentially update current air emissions permits, with onsite activities and a videoconference permit strategy meeting.
Key details include a submission deadline of 8:00 AM EDT on March 28, 2025, with offers to be emailed to Alexis.Alexander1@va.gov. The contract allows for monthly invoicing in arrears and requires offerors to submit a technical quote, past performance evidence, and pricing documentation. The facility currently has two existing air emissions permits, and the project aims to evaluate and potentially adjust these permits. Offerors must be registered in the System for Award Management (SAM) and will find the full solicitation package on the Contract Opportunities website, with the initial posting expected around March 14, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Approved DNRE Air permit 2010 79-10.pdf | ||
| Permit 206-10.pdf | ||
| P01 Air Emissions List 2024.xlsx | XLSX spreadsheet | |
| 36C25025Q0410.docx | DOCX document | |
| P07 WD No. 2015-4865 Rev. 26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-25-2025 36C250 Department of Veterans Affairs Network Contracting Office 10 2215 Fuller Road Ann Arbor
MI
48105 36C250 Department of Veterans Affairs Network Contracting Office 10 2215 Fuller Road Ann Arbor
MI
48105 To all Offerors/Bidders
36C25025Q0410 03-17-2025
X X X X See attached questions and answers related to RFQ 36C25025Q0410.
All offers shall be emailed to: Alexis.Alexander1@va.gov NLT 8:00AM EDT. on Friday, March 28, 2025.
NO FURTHER QUESTIONS WILL BE ANSWERED.
Alexis S. Alexander Contracting Officer Questions and Answers from RFQ 36C25025Q0410
Question: Does the VAMC have an existing air emissions permit and if so, can a copy be provided for review?
Answer: The facility currently has 2 existing air emissions permits. (See attached)
Question: Does the VAMC have a mandated timeline by which it needs to obtain an air emissions permit – that is, is an older permit expiring? If so, please clarify the timeline, including specifying any due dates for permit application documents to be submitted to Michigan Department of Environment, Great Lakes, and Energy (MI EGLE).
Answer: This is an air emissions inventory to determine if any additional permits are required and to update the list of air emissions sources within the facility. The facility’s permits are current.
Question: Task 1 specifically indicates that only one site visit is requested. Task 2 mentions a face-to-face permit strategy meeting with VAMC staff. Please confirm that this permit strategy meeting may occur via videoconference.
Answer: Onsite activities are required for the evaluation of the air emission sources. The permit strategy meeting can be via videoconference.
Question: Given that permit application review and permit issuance by MI EGLE may take several months or more, given that the VA expects work (e.g., development of emissions tracking tools and staff training) to occur after permit issuance, and given that this solicitation is an SDVOSB set-aside, would the VA be amenable to a milestone payment schedule, rather than a single lump sum payment, so that a small business does not have to wait many months to invoice and receive payment for work completed?
Answer: Yes, invoicing may be done monthly in arrears.
Question: Does the scope require applying for a permit or only the permitting strategy? Task 2. says It is for the Permitting Strategy but does not state how to apply for the permit. Although the Project Scope introduction states, “Complete all documentation to apply for applicable permits, work on the Aleda E. Lutz VA Medical Center behalf to negotiate permit conditions…” Answer: The scope is to complete application process if permit conditions are met or adjustments to current permits are necessary.
Question: Section E—Solicitation Provisions—states that Offers shall be assembled by the following Sections; each section shall be easily identified. (Sections A-D), but the evaluation states Technical, Past Performance, and Price. The instructions reference a technical quote. Do you want a technical quote submission and price submission, or do you want a separate submission per section outlined? Which section do you want the references for our past performance?
Answer: Please refer to pg. 26 of RFQ 36C25025Q0410 for guidance. Specifically, “Section A- Offer Form (Standard Form 1449) shall be signed and dated. Any amendments to RFQ 36C25025Q0410 shall also be signed, dated, and returned. The offeror shall also complete Section B.2 – Price/Cost Schedule. All pricing shall be in accordance with the guidance on page 26 of RFQ 36C25025Q0410. The offeror should provide evidence of capability of servicing this requirement. Please refer to pages 32 and 33 of RFQ 36C25025Q0410. Lastly, offeror shall provide evidence of past performance on active and physically completed contracts. Please refer to page 33 of RFQ 36C250250410 for descriptions of past performance examples.
See attached document: Permit 206-10.
See attached document: Approved DNRE Air permit 2010 79-10.
File details come from the government source that posted it. Updated .