1-H8_HvacPlnBdlg1ScndFlrB - Replace Degraded Hot Water Piping.pdf

PDF 331 KB Posted

Attached to
J047--Replace Degraded Piping in C-2099 583-25-518
Solicitation number
36C25025Q0238-1
Issued by

About this file

This document is a detailed mechanical plan drawing for a building, specifically showing the HVAC and mechanical systems for Block 1, Second Floor, Unit B. The architectural blueprint is highly technical, with precise measurements, room designations, and complex mechanical system layouts. Key areas include a main kitchen, food processing area, cold food and dessert area, mechanical systems, corridors, and various support spaces. The drawing contains multiple grid references, scale indicators, and specific notations for different mechanical and architectural elements, suggesting it is part of a comprehensive facility design or renovation project documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAINDDodsoE Rectangle

File details come from the government source that posted it. Updated .