This document contains answers to questions from potential offerors on a solicitation to replace overhead garage doors at a Veterans Affairs medical center. Six new overhead garage doors are required, which must be locally serviceable and have two windows on the third panel to match the existing door configuration. High cycle springs and pneumatic safety reversing edges are needed on all doors. The existing door openers will be evaluated to determine remaining life expectancy, with all openers to be replaced if failing parts are found. Compactors located in front of two doors are to remain in place during installation. The project is classified as a Class II infection control risk. The virtual bid opening call-in information is also provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment IV - VHA Directive 1192-01.pdf | ||
| Attachment II - RFI Template.doc | DOC document | |
| Attachment I - Wage Determination.pdf | ||
| 36C25024Q0142_1.docx | DOCX document | |
| Attachment III - EMR.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 610-24-2-6902-0008 610A4-24-503 36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240 36C250 Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite Indianapolis IN 46240 To all Offerors/Bidders
36C25024Q0142 03-11-2024
X X X
610-3640162-6902-854200-3223 23NRNR002
This amendment is being posted to provide answers to questions received and provide call-in information for the virtual bid opening. That information begins on page two.
There are no other changes to the solicitation.
Luke A Turner Contracting Officer
VA-VHA-2020-D02DEFD3
Questions and Answers:
It appears the existing doors have high cycle springs. Are high cycle springs required on the new doors?
Yes, more robust for opening and closing
Doors 1,2,5, and 6 have pneumatic safety reversing edges. Only door 6 is hooked up. Do all doors require new pneumatic safety edges with cord reels?
Just have the pneumatic safety reversing edges instead of the laser eye
Five of the openers are fairly new based on the Logic 5 control. Door #5 has an older unit with a different color case. Do all doors require new openers?
Installer shall evaluate current controllers to determine remaining life expectancy of the controllers. Install shall inspect the controllers for any failing parts.
For the six new O/H garage doors, is there a specific brand/manufacture you wish to use?
We do not have a specific brand/manufacturer in mind, but the doors must be locally serviceable
I assume that the VA will want the new doors to have two windows on the third panel of the doors as well?
Yes, we do want the windows.
Will the trash compactors in front of doors 3&4 be moved or remain in place during the installations of the new doors?
No, the compactors will not be moved. There is a cowl covering over the end of the compactor, if the compactor was to be moved the covering would remain, therefore moving would be of no benefit.
According to the statement of work for infection control, paragraph D, this project will be classified as class III or lower risk; if approved, could you please indicate which classification we should base our pricing on? The price difference could be significant.
In speaking with Infection Control, this is going to be classified as a Class II